isu storage 2

Post on 06-Jul-2015

383 Views

Category:

Technology

2 Downloads

Preview:

Click to see full reader

DESCRIPTION

isu stroage

TRANSCRIPT

Outline DAC Storage Delivery Practical Implementation1

Storage

Outline DAC Storage Delivery Practical Implementation2

Content Menu

Outline DAC Storage Delivery Practical Implementation3

Liquid Oxygen

Outline DAC Storage Delivery Practical Implementation4

Liquid Hydrogen

Outline DAC Storage Delivery Practical Implementation5

Water

• Liquid or Solid (Ice)• Least pressure on containment

vessel

• Higher Density for Hydrogen• Life Support Systems

Outline DAC Storage Delivery Practical Implementation6

Storage System

Outline DAC Storage Delivery Practical Implementation7

Tank Materials

Outline DAC Storage Delivery Practical Implementation8

Thermal Management

Outline DAC Storage Delivery Practical Implementation9

Location

• Environmental Considerations• OPTIONS:

– Surface• Day temp (107 to 123 deg C)

• Night temp (-153 to –233 deg C)– Permanently shadowed craters allow for less energy

expenditure for cooling

– Sub Surface• Avg. Temp at 1m depth (-35 deg C)

Outline DAC Storage Delivery Practical Implementation

Fixed Vs. Mobile

10

Outline DAC Storage Delivery Practical Implementation11

Interfaces (not yet researched)

• Assumed to be based on terrestrial designs.

• Must be adaptable to different transportation systems.

• Ideally standardized.• Must be resilient to leaks and contain a

health monitoring system (leak detection)

Outline DAC Storage Delivery Practical Implementation12

Major Problems

• Hydrogen Leaks + Flammability

• Long-term Storage (Oxidized parts)

• Lunar Dust• Rapid Expansion (Asphyxiation)• High Pressure Gases (ruptures/explosions)

– Boil-off (Rocket Fuel Venting)

Outline DAC Storage Delivery Practical Implementation13

Health Monitoring and Communication

• Sensors (which ones are vital?)• We need to address the communication

infrastructure! (on some level)• Back-up power supplies

Outline DAC Storage Delivery Practical Implementation14

Input & Output

InputPerson

in Charge

Req’d Date

Status

Production Rate!

Wale and Hubert

Now Pending

# of facilities

DAC/Transport

Yesterday Pending

Location of Facilities

DAC/Transport

Yesterday Pending

CapacityDemand

DAC/Transport

Now Pending

Current and Future Tank Volumes

AndreeaWednesday 6PM

Pending

OutputPerson

in Charge

Req’d Date

Status

1st Tank Solution

Scott Monday Pending

Interface Andreea Tuesday Pending

Challenges

William Thursday Pending

Volume Supplied

Scottdreea Weekend Pending

Instantaneous Capacity

Scottdreea Monday Pending

top related