MOVE, GROW, and  BE GREEN with

Kenilworth-Parkside Recreation Center Master Plan

Community CharretteSaturday March 1, 2014

MOVE, GROW, and  BE GREEN with

Agenda

• Project Timeline• Findings from Community

Engagement Process• Charrette

– Break Out Groups Exercise– Break Out Group Presentations

• Next Steps

2

MOVE, GROW, and  BE GREEN with

Mid - June 2013 DPR prepares RFP for Kenilworth Parkside Recreation Center Master Plan. (Done)

End September 2013 - Contractor for Kenilworth Parkside Master Planis chosen. (Done in October 2013)

October/November/December 2013 - Community Engagement Process starts. (On-going. Meetings held in November, January, and March)

Thursday March 27, 2014 – Presentation of findings + concept design.

April 2014 – DPR works with DGS to procure design/build team.

Spring 2014 – Design/build firm is selected.

October 2014 - Design portion is completed.

Construction Timeline: 12 to 18 months to build.

Opening - October 2015 and April 2016.

Kenilworth-Parkside Recreation Center Master PlanProject Timeline Update

MOVE, GROW, and  BE GREEN with

Program + Facilities Needs Assessment ProcessKenilworth-Parkside Neighborhood

4

• Population + Demographics Projections• Existing Program Providers + Programs• Community Engagement Process

– DC Parks and Recreation Master Plan Statistically Valid Survey Findings

– Recreation Center Survey Findings– Project Kick‐Off + Public Workshop Findings– Stakeholder Meetings

MOVE, GROW, and  BE GREEN with

Population + Demographic ProjectionsKenilworth-Parkside Neighborhood

5

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

0 to 9years

10 to 19years

20 to 34years

35 to 54years

55+ years Total

20102020+45% -0.5% +53% +25% +116%

+48%

MOVE, GROW, and  BE GREEN with6

DCPNI• Boxing Gym• Classrooms• Computer Room

Programs:• Digital Media Arts• Microsoft Training• Resume Workshops• Homework Help• Legal Clinics• Illustration/Oil Painting• Dance• Boxing• DJ’ing• Hip Hop Songwriting/Music

Production• Performance Poetry• Young Men’s/Women’s Group

Kenilworth-Parkside Recreation Center Master PlanExisting Program Providers

MOVE, GROW, and  BE GREEN with

Community Engagement Process Findings• DC Parks and

Recreation Master Plan (Summer 2013)– Statistically Valid Survey– Recreation Center

Survey

• Kenilworth-Parkside Neighborhood Recreation Plan Kick-Off + Public Workshop (November 2013)

• Stakeholder Meetings (January 2014)

7

MOVE, GROW, and  BE GREEN with

DC Parks and Recreation Master PlanStatistically Valid Survey Findings

• Community Special Events Programs

• Adult Fitness Programs

• Picnic Shelters• Outdoor Pool• Indoor Pool

Community Special Events Adult Fitness + Wellness

Indoor Fitness Center Picnic Shelters

MOVE, GROW, and  BE GREEN with

DC Parks and Recreation Master PlanRecreation Center + On-Line Survey Findings

• Walking Trails• Playgrounds• Running Track• Outdoor Pool• Tennis Court• Adult Softball Fields• Skateboard Parks

MOVE, GROW, and  BE GREEN with

Kenilworth-Parkside Recreation Center Master PlanPublic Engagement Findings

Facilities• Senior Activity Area• Teen Activity Area• Kitchen• Multi-Purpose

Room• Fitness Center• Indoor Gymnasium• Outdoor Basketball• Playground• Picnic Shelters +

BBQ• Outdoor Pool• Natural Areas

Programs• Teen Programs

o Digital Media Classeso Dancing Classeso Music Classes

• Programs for Adults Over 50• Health + Wellness

Workshops/Seminars• Life Skills Cooking• Field Trips• Arts + Crafts

• Adult Workforce Trainingo Computer Skillso Resume Skills

• Youth Athletics (recreation + competition)

Participants• 65+ Residents at Project

Kick Workshop• 20 Stakeholders

– Councilmember Alexander’s Office

– ANC – Representatives– Eastland Gardens

Civic Association– DPR– DCHA– DCOP– DCPNI– Local Church

Representatives

MOVE, GROW, and  BE GREEN with

Kenilworth-Parkside Recreation Center Master PlanProposed Recreation Center Square Footage + Facilities

Component Square Footage

Multi-Purpose Room 4,400

Kitchen 300

Senior Activity Area 1,200

Teen Activity Area 1,200

Fitness Center 2,200

Gymnasium 9,000

Support Spaces

Lobby/Lounge 800

Front Desk 200

Office Space 400

Locker Room 1,400

Restrooms 800

Vending 100

General Storage 400

Mechanical Space 1,500

Sub-Total 23,900

Net/Gross (20%) 4,780

Grand Total 28,680

+Outdoor BasketballPlaygroundPicnic Shelters + BBQOutdoor PoolNatural AreasWalking Trails

MOVE, GROW, and  BE GREEN with

Charrette• 5 Break-out Groups– Site Base Map @ 1” = 20’– Neighborhood Aerial– Recreation Center Space +

Facility Cut-Outs

13

How should we locate the proposed Recreation Center spaces + facilities within the site + neighborhood? Consider utilizing: • The existing Elementary

School spaces

• Other areas throughout the neighborhood

MOVE, GROW, and  BE GREEN with

Charrette

14

Charrette: 45 Minutes

Group Presentations: 30 Min.

MOVE, GROW, and  BE GREEN with

Group 1 Concept

15

MOVE, GROW, and  BE GREEN with

Group 2 Concept

16

MOVE, GROW, and  BE GREEN with

Group 3 Concept

17

MOVE, GROW, and  BE GREEN with

Mid - June 2013 DPR prepares RFP for Kenilworth Parkside Recreation Center Master Plan. (Done)

End September 2013 - Contractor for Kenilworth Parkside Master Planis chosen. (Done in October 2013)

October/November/December 2013 - Community Engagement Process starts. (On-going. Meetings held in November, January, and March)

Thursday March 27, 2014 – Presentation of findings + concept design.

April 2014 – DPR works with DGS to procure design/build team.

Spring 2014 – Design/build firm is selected.

October 2014 - Design portion is completed.

Construction Timeline: 12 to 18 months to build.

Opening - October 2015 and April 2016.

Kenilworth-Parkside Recreation Center Master PlanProject Timeline Update

MOVE, GROW, and  BE GREEN with

Kenilworth-Parkside Recreation Center Master Plan

Community CharretteSaturday March 1, 2014