LAFARGE - INTEGRATED POLICY
201-Nov-16
ENVIRONMENT ROADMAP
SN PROJECT TIME LINE COST (mINR)
1 Water Zero Discharge 2016-17 9.3
2 Stack Emission Reduction 2016-17 10.5
3 Fabrication & erection of covered storage 2017 23
301-Nov-16
ENVIRONMENT ORGANISATION
VICE PRESIDENT (JCP) SR. VICE PRESIDENT(Country Head-HSE)
401-Nov-16
Dy. GENERAL MANAGER (Optimization)
SENIOR MANAGER (Environment)
------- Functional reporting
ISO SYSTEM CERTIFICATIONS
01-Nov-16 5
ISO 14001:2015 ISO 9001:2015
CERTIFICATES & AWARDS
01-Nov-16 6
ISO 18001:2007
ENVIRONMENT PERFORMANCE IMPROVEMENT
1) Periodic inspection and maintenance of bag filters.2) Up-grading bag filters.3) Regular cleaning of RCC roads with the help of road seeping machine4) Regular water spray on roads.5) Construction of RCC wall in raw material yard to prevent run-off.6) Effective control measure to bring down spillages.7) Maintaining Sewage Treatment facility.8) Installed Online Ambient Air and Stack monitoring instruments to monitor and reduce
emission9) Water sprinkler in Gypsum yards10) Water spray on wagon tippler belt conveyor.11) Utilization of seepage water coming to our plant from outside by pumping it back to
circuit12) Plantation of tree saplings.13) Undertaken projects to reduce dust concentration in working areas.14) Improving Performance Factor of all production circuits.15) Reduction in CO2 emission by improving C/K ratio.16) Effective Implementation of Environmental Management System in operations as per17) International Standard ISO : 14001: 2015.18) Monitoring and Maintaining Quality, Environment and Occupational Health standards as
defined in ISO:9001:2015, ISO:14001:2015 and OHSAS : 18001: 2007.
7701-Nov-16
1) Periodic inspection and maintenance of bag filters.2) Up-grading bag filters.3) Regular cleaning of RCC roads with the help of road seeping machine4) Regular water spray on roads.5) Construction of RCC wall in raw material yard to prevent run-off.6) Effective control measure to bring down spillages.7) Maintaining Sewage Treatment facility.8) Installed Online Ambient Air and Stack monitoring instruments to monitor and reduce
emission9) Water sprinkler in Gypsum yards10) Water spray on wagon tippler belt conveyor.11) Utilization of seepage water coming to our plant from outside by pumping it back to
circuit12) Plantation of tree saplings.13) Undertaken projects to reduce dust concentration in working areas.14) Improving Performance Factor of all production circuits.15) Reduction in CO2 emission by improving C/K ratio.16) Effective Implementation of Environmental Management System in operations as per17) International Standard ISO : 14001: 2015.18) Monitoring and Maintaining Quality, Environment and Occupational Health standards as
defined in ISO:9001:2015, ISO:14001:2015 and OHSAS : 18001: 2007.
TOP ENVIRONMENT PROJECTS 2015-16
1) Reduction in ambient air quality emission : Bagfilter bag replacement with improvedperformance fabric to comply emission < 30 mg/Nm3
2) Zero discharge Project :3) Road Water sprinkler commissioning :4) Rain water harvesting pit renovation :5) Fresh water consumption reduction :6) Green belt covered increased along with species planted :
801-Nov-16
HOUSE KEEPING INFRSTRUCTURE
Vacuum cleaner for cleaning of fine dust Road sweeping machine
901-Nov-16
Vacuum cleaner for cleaning of fine dust Road sweeping machine
Water sprinkling on roads for dust suppression
DISASTER MANAGEMENT
Jojobera cement plant works on 5 pillar methodology of disaster/emergency management.Prevention : Action taken to prevent an emergency or disasterMitigation : Action taken to reduce the effect of an emergency or disaster.Preparedness : Action taken prior to an emergency or disaster to ensure an effective response.Response : Action taken to respond to an emergency or disaster.Recovery : Action taken to recover from an emergency or disaster.
1001-Nov-165 pillars of Disaster Management
EMERGENCY PREPAREDNESS
1101-Nov-16
EMERGENCY PREPAREDNESS
1201-Nov-16
FIRE FIGHTING & RESCUE EQUIPMENT
Fire fightingequipment briefing &display
1301-Nov-16
Fire hydrant Hose pipe, fire extinguisher & accessories CO2 bank for coal mill
Fire fighting trainingto employees
SPILL PREVENTION
Major source of spillage in cement industries are material transport belt conveyors.Jojobera cement plant focuses on effective preventive maintenance & time bound rectification.Spillage control is achieved by –1) Covered belt conveyors2) Effective side skirting & scrapper installation3) Covering of belt hood box by rubber skirting4) Belt conveyor belt sway installation & maintenance
1401-Nov-16
EMISSION CONTROL
Major source of emission in cement industries are stacks & raw material transport transfer towers.Jojobera cement plant focuses on effective preventive maintenance & time bound rectification.Emission control is achieved by –1) Total of 111 numbers of bag filters have been installed in all process circuits and transfer
points. They are being regularly maintained.2) Fixed type Water sprinklers have been installed in coal yard3) Online Ambient Air Quality Monitoring instrument have been installed, data of same is being
continuously transferred to CPCB and JSPCB, Ranchi servers.4) Highly powerful Vacuum Cleaning Machine is used to collect spilled dust, if any and is
recycled back to the system ….
1501-Nov-16
Major source of emission in cement industries are stacks & raw material transport transfer towers.Jojobera cement plant focuses on effective preventive maintenance & time bound rectification.Emission control is achieved by –1) Total of 111 numbers of bag filters have been installed in all process circuits and transfer
points. They are being regularly maintained.2) Fixed type Water sprinklers have been installed in coal yard3) Online Ambient Air Quality Monitoring instrument have been installed, data of same is being
continuously transferred to CPCB and JSPCB, Ranchi servers.4) Highly powerful Vacuum Cleaning Machine is used to collect spilled dust, if any and is
recycled back to the system ….
OCCUPATIONAL HEALTH CENTRE
Fully equipped ambulance & healthcheckup facility for permanent &contract employees
Fully equipped ambulance & healthcheckup facility for permanent &contract employees
1601-Nov-16
Area ownership concept has been initiated and being followed for area and sub-area to takecare of Housekeeping and day to day status of the area. In this concept, all officers as well asworkmen work together for upkeep of their area.
CAPACITY BUILDING ACTIVITY- PLANT TEAM
Sample of Housekeeping drive done by team is displayed above.
1701-Nov-16
Area ownership team
Tree plantation is carried out at all possible opportunities.Asst. Deputy Commissioner was the chief guest during one of the occasions.
CAPACITY BUILDING ACTIVITY- PLANT TEAM
GREEN COVER1801-Nov-16
RAIN WATER HARVESTING
Rain Water harvesting system implemented at site. Total 6 rain water harvesting pits havebeen constructed all across the plant. This helps in charging rain water to aquifer.
6 recharge pits constructed in plant
1901-Nov-16
WASTE WATER PURIFICATION ARRANGEMENT
Sewage Treatment Plant has been installed to take care of plant sewerage as well canteenwaste water. Treated water is being used for gardening purpose.
2001-Nov-16
SOLID WASTE MANAGEMENT
No in-process solid waste is generated by the plant. However, for day to day wasteproduct management, we have colour coded waste bin system.Red – Plastic wastesGreen – Bio-degradable wastesBlue - Electrical filingsYellow - Iron piecesLight blue – Oil soaked jute / rag
Wastes are collected by specific vehicle and stored in scrap yard in segregated mannerand are disposed as per guidelines
2101-Nov-16
SOx, NOx andCO monitoring
Online PM 10PM 2.5 Monitoring Online PM 10
Monitoring
ENVIRONMENTAL LABORATORY
1. Stack Monitoring Kit2. AAQ Monitoring Kit3. Noise Monitoring instrument4. Online Stack Monitoring devices5. Online PM 10 Monitoring at 3
locations6. Online PM 2.5 Monitoring at 3
location7. SOx, NOx and CO monitoring at 1
location
SOx, NOx andCO monitoring
Weather monitoring station Noise monitoringOnline stack monitoring
Online PM 10Monitoring
2201-Nov-16
1. Stack Monitoring Kit2. AAQ Monitoring Kit3. Noise Monitoring instrument4. Online Stack Monitoring devices5. Online PM 10 Monitoring at 3
locations6. Online PM 2.5 Monitoring at 3
location7. SOx, NOx and CO monitoring at 1
location
EMMISION MONITORING EQUIPMENTS
Online stack monitoring station
2301-Nov-16
Other instruments for stack monitoring
Surakshit Bharat – Under the ‘Surakshit Bharat’ program, we undertake following activities – RoadsafetyAwareness in school , Safety message wall painting in rural area, quiz Completion &domestic Safety for village women through ladies club.
Sakcham Bharat – 208 hrs comprehensive training (Theory & Practical)(a) Jojobera Cement Plant started Mason Training in Partnership With IL&FS.(b) Trained & placed 300 unemployed rural youth.(c) Post placement cheques – 2000 Rs provided to all trained & placed students.
Funded by Ministry of Rural Development.Sakshar Bharat - Tribal Children Education (Sunderhatu Village): We have started with 10 students in
2001, today it has 115 students on its roll from nursery to std III.Basic Computer Training Programme - The programme was started in 2005 with Bankati Middle School,
Ghatshila and was later expanded in AVN School Govindpur and Adarse Madhya Vidyalaya,Sarzamda.2500Students continuing their education and 85% students are tribal.
Swasth Bharat - Health & Hygiene : Mobile Van is well equipped with variety of medicines and othermedical aids to facilitate proper medical checkup, diagnosis of the diseases and treatment free ofcost at regular intervals. It visits Sunderhatu ,Govindpur , Krishna Nagar, Gadra , Rahargora &Pershudih Village. This helps in treating ailments, promoting child & mother care and health careof the villagers.50,000 people are benefited from this initiative. We are also organizing Camp forcontractor’s laborers and their family members.HIV / AIDS Awareness Programme, CommunitySanitary Complex & Blood Donation camp.H
Other Initiative –Drinking Water facilities , street Light facilities and supporting stakeholders fororganizing cultural programme. Providing Support to villagers during crises.
SERVICE TO COMMUNITY
Surakshit Bharat – Under the ‘Surakshit Bharat’ program, we undertake following activities – RoadsafetyAwareness in school , Safety message wall painting in rural area, quiz Completion &domestic Safety for village women through ladies club.
Sakcham Bharat – 208 hrs comprehensive training (Theory & Practical)(a) Jojobera Cement Plant started Mason Training in Partnership With IL&FS.(b) Trained & placed 300 unemployed rural youth.(c) Post placement cheques – 2000 Rs provided to all trained & placed students.
Funded by Ministry of Rural Development.Sakshar Bharat - Tribal Children Education (Sunderhatu Village): We have started with 10 students in
2001, today it has 115 students on its roll from nursery to std III.Basic Computer Training Programme - The programme was started in 2005 with Bankati Middle School,
Ghatshila and was later expanded in AVN School Govindpur and Adarse Madhya Vidyalaya,Sarzamda.2500Students continuing their education and 85% students are tribal.
Swasth Bharat - Health & Hygiene : Mobile Van is well equipped with variety of medicines and othermedical aids to facilitate proper medical checkup, diagnosis of the diseases and treatment free ofcost at regular intervals. It visits Sunderhatu ,Govindpur , Krishna Nagar, Gadra , Rahargora &Pershudih Village. This helps in treating ailments, promoting child & mother care and health careof the villagers.50,000 people are benefited from this initiative. We are also organizing Camp forcontractor’s laborers and their family members.HIV / AIDS Awareness Programme, CommunitySanitary Complex & Blood Donation camp.H
Other Initiative –Drinking Water facilities , street Light facilities and supporting stakeholders fororganizing cultural programme. Providing Support to villagers during crises.
ENVIRONMENT PERMITS
LEGAL COMPLIANCE STANDS COMPLIED
Emission and Discharge consents for 4.6 MTPA capacity of plant has been obtained fromJharkhand
State Pollution Control Board (JSPCB) vide their letter no. JSPCB/HO/RNC/CTO-600181/2016/348 dated 04.08.2016 and is valid from 01.07.16 to 30.06.2021.
Authorization for use of Hazardous waste has been obtained from Jharkhand StatePollution Control
Board vide their letter ref. no. G-5914 dated 28.12.15 for a period of five year i.e. from01.07.2015 to 30.06.2020
LEGAL COMPLIANCE STANDS COMPLIED
Emission and Discharge consents for 4.6 MTPA capacity of plant has been obtained fromJharkhand
State Pollution Control Board (JSPCB) vide their letter no. JSPCB/HO/RNC/CTO-600181/2016/348 dated 04.08.2016 and is valid from 01.07.16 to 30.06.2021.
Authorization for use of Hazardous waste has been obtained from Jharkhand StatePollution Control
Board vide their letter ref. no. G-5914 dated 28.12.15 for a period of five year i.e. from01.07.2015 to 30.06.2020
2501-Nov-16
Authorisation forHazardous Waste 01.07.2
Consent toOperate 01.07.2016 to 30.06.20