lascot16 - kanban systems for change
Post on 13-Apr-2017
103 Views
Preview:
TRANSCRIPT
SYSTEMSFORCHANGE©PatrickSteyaert,2016 1
@PatrickSteyaert
Lean Agile Scotland 2016
KANBAN systems for change
SYSTEMSFORCHANGE©PatrickSteyaert,2016 2
ThementalimageofasnowmobileusedbyCol.JohnBoydtoillustratetheroleofanalysisandsynthesisininnova,on.
Picture: http://s117.photobucket.com/
SYSTEMSFORCHANGE©PatrickSteyaert,2016 3
Confusion
ChangeisadynamiccomplexsystemwithmanymovingpartsandinteracPons
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 4
The parts Different types of change
Evolutionary change
Directed change
Retrospective change Planned
change
Convex/ExponenPalConcave/Linear
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 5
The whole
Constraints* and regime changes
Enablingconstraints
Emergentconstraints
Over-constrained
Un-constrained
*InspiredbybothA.Juarrero’sDynamicsinAc9onandE.Goldrath’sTheoryofConstraints
(Individual,nosystem)
(Emergentteam,system)
(“Individual”,rigidrules)
(Team,system)
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 6
Opposite ends that meet Planned and retrospective change
Action After Action
Review Set standard
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 7
By separating the thinking from the doing the system of work becomes over-constrained
Planned change
After Action Review
whatneedstobedonehowithastobedone
bywhominwhatPming
Set standard Action
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 8
Unconstrained Retrospective change
Action Set standard
ThingstokeepThingstoimprove
WhathavewelearnedWhatsPllpuzzlesus
After Action Review
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 9
Creating flow
Inbound
Outbound
IdenPfyingopPonsforchange
(usingmodels,frameworks,
assessments,…)
Deliveringchange(insmall
increments)
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 10
Kanban system for change Planned and retrospective change
upstream inventory downstream suggestion Evaluation consolidation Ready to
impl ready Initiate
change Guide
change Validate Adoption
TechniquesPrac,cesProcedures
5 4 65>7 >5 >38
Inventory
TechniquesPrac,cesProcedures
Storymapping Visual
mngt
SYSTEMSFORCHANGE©PatrickSteyaert,2016 11
What is (implicitly) expected Convex/exponential change
success
Expectedpain
Expectedgain
Changeaccumulatesinto*big*outcomes
fail
SYSTEMSFORCHANGE©PatrickSteyaert,2016 12
What is actually happening Concave/linear change
success
Expectedpain
Expectedgain
Outcomesarecappedandchangeini,a,vestendtostall
fail
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 13
Active experimentation The pdca loop and hypothesis-driven change
do
check
adjust
plan
Webelievethat<doingthis>
Willachieve<thisoutcome>
Hypothesis
Experiment
Results
Learning
Model
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 14
Evolutionary change
Start where you are now
STEP #1
Implement a safe-to-fail change
STEP #2
Evaluate fitness against fitness-for-
purpose criteria
Ø ifposiPvereinforceØ ifnegaPverollback
STEP #3
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 15
Experimentsneedastablecontexttogivemeaningfulresults.
Context matters
Whenthelevelofcollabora,onislowandtheprocessisunstablethen
experimenta,ondoesnotmakesense.
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 16
Too unstable to experiment in What turns this …
Ideas Ready for Dev Development TesTIng Ready for UAT Done
ongoing done
Abandoned
A user story
A user story
A user story
A user story
A user story
A user story
A user
story A user story
A user story
A user story
A user story
A user story
A user story
A user story A user
story A user story
A user story
A user story
A user story
A user story
A user story A user
story A user story
A user story
A user story A user
story A user story
A user story
A user story A user
story A user story
A user story
A user story A user
story A user story
A user story
A user story A user
story A user story
A user story
A user story A user
story A user story
A user story
A user story A user
story A user story
A user story
A user story A user
story A user story
A user story
A user story A user
story A user story
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 17
Into this? Ideas Ready for Dev Development TesTIng Ready for UAT Done
ongoing done
Abandoned
A user story
A user story
A user story
A user story
A user story
A user story
A user
story A user story
A user story
A user story
A user story
A user story
A user story
A user story A user
story A user story
A user story
A user story
A user story
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 18
Kanban Ideas Ready for Dev Development TesTIng Ready for UAT Done
ongoing done 5 ∞
Abandoned
5
3
A user story
A user story
A user story
A user story
A user story
A user story
A user
story A user story
A user story
A user story
A user story
A user story
A user story
A user story A user
story A user story
A user story
A user story
A user story ItisnotaboutvisualizaPon;itisabout
theeffectofWIPlimitsasaconstraintthatenablesnovelbehavior.
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 19
Enabling constraints
Catalyze
Collabora,on
StableChao,c
Individual
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 20
Emerging constraints
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 21
Reflective observation The OODA loop
orient
decide
act
observe
Unfoldingevents
Implicitguidance
Implicit
guidance
Habits,experiencesanddisposiPons RaPonalchoice
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 22
Align on direction give autonomy to execution
Directed change
New target Ideal future state now
“How”isdiscovered
“Why”and“What”aredefined
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 23
Double loop Learning
ReflecPveobservaPon
AcPveexperimentaPon
ORIENT
DECIDE ACT OBSERVE
Implicitguidance
DO CHECK
ADJUST
PLAN
Feedback
Unfoldingevents
Model
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 24
Kanban system for change Reflective observation + Active experimentation
Decision making (OODA) Hypothesis Learning (PDCA) Observe Orient
Abandon
Decide Act Plan Do Check Adjust
Observa,ons
5 4 655 6 88
Hypothesis
AbandonExperiments
©PatrickSteyaert,2016 SYSTEMSFORCHANGE 25
Looking at the whole System of Change
Convexchange
Concavechange
Evolutionary change
Directed change
Retrospective change Planned
change
Enablingconstraints
Emergentconstraints
Over-constraining
Un-constraining
SYSTEMSFORCHANGE©PatrickSteyaert,2016 26
System of change
Changing the way of change
Planned change is often the starting point – It can mobilize for change
Keep a watch on emergent constraints to realize measurable results
Look for constraints that enable collaboration and experimentation
Retrospective change is your eyes and ears in the organization
SYSTEMSFORCHANGE©PatrickSteyaert,2016 27
Thank you Stay in touch with us!
twiher.com/@PatrickSteyaert patrick.steyaert@okaloa.com
top related