LOS ALAMOS COUNTYJUDICIAL / POLICE – JAIL

COMPLEX60% SUBMITTALAugust 8, 2008

SITE PLAN

Judicial Parking

Public & Staff parking

`

ENTRANCE POINTS TO SITE

Police Parking

Public & Staff parking

SITE PLAN

C-JUDICIAL

B-POLICE-EXISTING

A-JAIL/POLICE

Overall Plan – 1st FloorA-JAIL/POLICE B-POLICE-EXISTING

C-JUDICIAL

Overall Plan – 2nd Floor

C-JUDICIAL

A-JAIL/POLICE

Mechanical / Support

B-POLICE-EXISTING

Mechanical / Support

Bu

ildin

g A

-

Jail

Firs

t floor

JAIL

POLICE

MAIN ENTRANCE

SECURE ENTRANCE

Bu

ildin

g B

-

Polic

eFi

rst

Floor

ACCESS TO COURTS

UNASSIGNED SPACE

POLICE

POLICE

JAIL

Bu

ildin

g C

-

Jud

icia

lFi

rst

Floor

MAIN LOBBY

HEARING ROOM

COURT NON-JURY

SECURE ENTRANCE

EXIT

Bu

ildin

g c

-

Jud

icia

lS

eco

nd

floor

UPPER LOBBYCOURT - JURY

Bu

ildin

g A

-

Jail

Futu

re S

eco

nd

floor

A-JAIL

VERTICAL CIRCULATION

SOUTH ELEVATION (TRINITY DRIVE)

NORTH ELEVATION (MAIN PARKING LOT)

WEST ELEVATION

EAST ELEVATION

WEST ELEVATION FROM STREET

SOUTH ELEVATION @ SW CORNER

NORTH ELEVATION @ NW CORNER

FROM NORTHEAST

FROM SOUTHEAST

FROM SOUTHWEST

• Bullets here– Bullets here

• Bullets here

FROM NORTHWEST

STREET LEVEL AT SCREEN WALL

MATERIALS

MATERIALS

MATERIALS

MATERIALS

CHANGES SINCE 2007

• EXISTING GENERATOR RELOCATED• PUMPS FOR DOMESTIC WATER ADDED• PUMPS FOR FIRE PROTECTION ADDED• MECHANICAL ROOM ADDED FOR PUMP• 4” GAS SERVICE LINE RELOCATED• TRINITY SIDE SITE IMPROVEMENTS

CHANGED TO MEET NEW DOWNTOWN REQUIREMENTS

CHANGES SINCE 2007

• FOUNDATIONS CHANGE TO DRILLED PIER AFTER ADDITIONAL SOIL INVESTIGATION

• ASBESTOS CONTAINING MATERIALS (LAC)

• ADD RECYCLE DUMPSTER – SCREENED• ADD SCREEN WALL AT WEST PARKING

CHANGES SINCE 2007

Rem

ove

Sew

er

Remove SewerN

ew S

ewer

New Sewer

Rem

ove

Gas

line

Remove Gas line

New Gas lineNew Gas line

ACM’s Removal

ACM’s Removal

Pump bldg

Pump bldg

Gen bldg

Generator bldg

Drilled Pier foundation system

BUILDING AREASCHEMATIC DESIGN ‘07

• Existing Police/Jail– 1st Floor 11,586 gsf– 2nd Floor 1,361 gsf

• 12,947 total gsf

DESIGN DEVELOPMENT ‘08

• Existing Police/Jail– 1st Floor 11,075 gsf– 2nd Floor 1,361 gsf

• 12,436 total gsf

BUILDING AREASCHEMATIC DESIGN ‘07

• New Jail– 1st Floor

• 12,529 gsf

– 2nd Floor• none

– Total = 12,529 gsf

DESIGN DEVELOPMENT ‘08

• New Jail– 1st Floor

• Added Generator 469 nsf• Added Stair 173 nsf• Added Elevator 69 nsf• Added Elev eq. elec 151 nsf• Added Pump room 220 nsf

– 2nd Floor (req’d for expansion)• Added 2nd Floor mech, plumb,

stair, elec, elevator space, equipment room 1,436 nsf

– Total = 15,905 gsf

BUILDING AREASCHEMATIC DESIGN ‘07

• Judicial– 1st Floor 8,289 gsf– 2nd Floor 7,514 gsf

• 15,803 total gsf

• Total Building New & Old– 41,279 gsf

DESIGN DEVELOPMENT ‘08

• Judicial– 1st Floor 8,315 gsf– 2nd Floor 7,282 gsf

• 15,497 total gsf

• Total Building New & Old– 43,938 gsf

SCHEDULEIMPORTANT DATES

• Los Alamos County Council approval of 60% - 8/21/08• WHPacific continue to 90% Construction Docs – 8/22/08• Submit JPJ for Foundation Only Permit – 8/25/08• CMAR Approved by Los Alamos County Council – 9/9/08• CMAR/WHPacific/Los Alamos Staff project refinement

and cost savings measures (September & October)• Begin Construction – September 08• Submit Final Construction Documents – 11/26/08• Los Alamos County Council approval of FINAL- 12/16/08• Submit for Building Permit – 12/17/08• Complete Construction – 5/15/10 or sooner