Low Impact Development Stormwater Controls and Changing State and

Federal Regulations

Steven Roy, LEED® AP

Geosyntec Consultants, Inc. Acton, MA

www.geosyntec.com

engineers | scientists | innovators

Presentation Objectives• Understanding of the new regulatory drivers for

innovative stormwater management including Infiltration and groundwater recharge

• Energy Independence and Security Act Section 438 requirements, and Executive Order 13514

• Discuss examples of Low Impact Development (LID) stormwater implementation including techniques such as porous pavers, porous asphalt, bioretention, raingardens, and dry wells

www.geosyntec.com

engineers | scientists | innovators

www.epa.gov/owow/nps/lid/section438

www.geosyntec.com

engineers | scientists | innovators

Impervious Surfaces Generate Stormwater Runoff

www.geosyntec.com

engineers | scientists | innovators

www.geosyntec.com

engineers | scientists | innovators

www.geosyntec.com

engineers | scientists | innovators

www.geosyntec.com

engineers | scientists | innovators

www.geosyntec.com

engineers | scientists | innovators

Low Impact Development (LID)

An ecosystem-based approach to land development and stormwater management

Mimic pre-development site hydrology

Low Impact Development Centerwww.lowimpactdevelopment.org

www.geosyntec.com

engineers | scientists | innovators

Conventional vs. LID Approach to Stormwater

• Conventional Collect Convey Discharge

• LID Approach Reduce volume Minimize impacts Distributed controls Treatment trains Infiltration Hybrid systems Mimic the

predevelopment hydrology

www.geosyntec.com

engineers | scientists | innovators

What are the Drivers for Innovative Stormwater and Ground Water Recharge?

• Energy Independence and Security Act of 2007 (EISA)- Federal Facilities

• LEED/Green Design• State Stormwater Regulations• New Municipal Separate Stormwater

System (MS4) Stormwater Permits

www.geosyntec.com

engineers | scientists | innovators

New Terminology for Stormwater in Permits and Regulations

• Mimic Pre-development Hydrology• Retain onsite• Maximize Infiltration• Groundwater Recharge Requirements

www.geosyntec.com

engineers | scientists | innovators

EISA Section 438

Text of Section 438:

“Storm water runoff requirements for federal development projects. The sponsor of any development or redevelopment project involving a Federal facility with a footprint that exceeds 5,000 square feet shall use site planning, design, construction, and maintenance strategies for the property to maintain or restore, to the maximum extent technically feasible, the predevelopment hydrology of the property with regard to the temperature, rate, volume, and duration of flow.”

www.geosyntec.com

engineers | scientists | innovators

Maximum Extent Technically Feasible (METF)

• Stormwater control practices that are effective in reducing the volume of stormwater discharge must be used.

• The Federal facility must use all known, available and reasonable methods of stormwater retention and/or reuse to prevent the off site discharge of stormwater runoff consistent with the performance standard.

• In cases when a facility seeks or claims an exception, it is expected that there will be a serious and documented attempt to comply.

www.geosyntec.com

engineers | scientists | innovators

Performance Options

Option 1 : Control 95th Percentile Rainfall Event •Manage rainfall onsite•Infiltrate, Evapotranspirate, Harvest and

Infiltrate, and Reuse Runoff

Note: The 95th percentile rainfall event is the event whose precipitation total is greater than or equal to 95 percent of all 24-hour storms on an annual basis.

www.geosyntec.com

engineers | scientists | innovators

95% Storm Event

City 95th Percentile Event Rainfall Total (in) City

95th Percentile Event Rainfall Total (in)

Atlanta, GA 1.8 Kansas City, MO 1.7Baltimore, MD 1.6 Knoxville, TN 1.5Boston, MA 1.5 Louisville, KY 1.5

Buffalo, NY 1.1 Minneapolis, MN 1.4Burlington, VT 1.1 New York, NY 1.7

Charleston, WV 1.2 Salt Lake City, UT 0.8

Coeur D’Alene, ID 0.7 Phoenix, AZ 1Cincinnati, OH 1.5 Portland, OR 1Columbus, OH 1.3 Seattle, WA 1.6Concord, NH 1.3 Washington, DC 1.7Denver, CO 1.1

www.geosyntec.com

engineers | scientists | innovators

www.geosyntec.com

engineers | scientists | innovators

Worst case cost

52,272 sq ft @ $15/sq ft = $784,080

Plus site demo, design, permits= ~$900k

www.geosyntec.com

engineers | scientists | innovators

Performance Options

• Option 2: Preserve predevelopment hydrology (rate, volume, duration & temperature) Conduct hydrologic and hydraulic analyses Quantify post-construction hydrographs for the following storm

sizes: • 1, 2, 10 and 100 year 24 hour storm events

Maintain pre-development hydrographs for these storm events

www.geosyntec.com

engineers | scientists | innovators

Performance Options

What if Options 1 and 2 are not technically feasible?

• Conduct site evaluation and assessment • If site conditions or other factors preclude

achievement of Options 1 or 2, i.e., neither is technically feasible

• Agency/Department follows a process to employ onsite practices to the METF

• Agency/Department documents stormwater design based on METF and other factors

www.geosyntec.com

engineers | scientists | innovators

Complying with EISA

• Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, Oct 5, 2009: Required EPA to Issue Guidance

www.geosyntec.com

engineers | scientists | innovators

www.epa.gov/owow/nps/lid/section438

www.geosyntec.com

engineers | scientists | innovators

DOD - EISA Implementation Policy

www.geosyntec.com

engineers | scientists | innovators

New Proposed Federal and State Stormwater Regulations

• EPA Proposed new SW Rulemaking – Effective Nov 2012 New stormwater controls for “newly developed and redeveloped sites” Recently completed “listening” sessions EPA sent out an ICR (Information Collection Rule) to developers, MS4

permit holders, and states Likely to require retrofits to existing sites

• New – North Coastal Watersheds MS4 Permit - Massachusetts 84 Communities and several state/federal and transportation agencies Requires compliance with new MA SW Management Standards for post

construction stormwater control Requires as-built plans for all new development to demonstrate

compliance Requires elimination of local barriers to green infrastructure Requires GW recharge and infiltration where feasible – first 1 Inch Requires an assessment of street design & parking lot guidelines and other

requirements that create impervious cover

www.geosyntec.com

engineers | scientists | innovators

LID BMP Performance Metrics (Ventura and Orange County, CA)

• Retain (infiltrate, harvest and use, or evapotranspire) or biotreat the runoff volume from the 85th percentile, 24-hour storm event (“design capture volume”) on-site to the Maximum Extent Practicable (MEP)

www.geosyntec.com

engineers | scientists | innovators

Effective Impervious Area Metric (Ventura County, CA)

• Projects must reduce Effective Impervious Areato less than 5% of the total project area

• Impervious surface are rendered “ineffective” if water quality design storm runoff volume is fully retained onsite 85th percentile, 24-hour event 80 percent capture volume 0.75 inch storm event

• Any remaining surface discharges must be treated

www.geosyntec.com

engineers | scientists | innovators

Draft District of Columbia MS4 Permit• Integrate green technology stormwater

management practices at the site and neighborhood level through policies, regulations, ordinances and incentive programs

• Mimic pre-development site hydrology through use of on-site stormwater retention measures (e.g., harvesting and using, infiltration and ET)

www.geosyntec.com

engineers | scientists | innovators

Draft DC MS4 Permit

• Performance standards: On-site retention of 1.2 in. (non-federal) or 1.7

in. (federal) from a 24- hour storm with a 72-hour antecedent dry period

Retention of the predevelopment runoff volume of stormwater from a 24- hour storm with a 72-hour antecedent dry period• Maintenance of predevelopment hydrographs

(volume, rate and duration) for the 1-, 2-, 10- and 100-year 24-hour storm events.

• Modeled predevelopment condition must be meadow.

www.geosyntec.com

engineers | scientists | innovators

MA Stormwater Standards• the annual recharge from the post-development

site shall approximate the annual recharge from pre-development conditions based on soil type.

• capture of at least the 1 inch (90th percentile) storm event.

• The term “capture” includes practices that infiltrate, evapotranspire, and/or harvest and reuse rainwater. This means that 100 percent of the volume of water from events less than or equal to the 90th percentile event shall not be discharged.

www.geosyntec.com

engineers | scientists | innovators

Pennsylvania Stormwater BMP Manual – Volume Control

• At least the first one inch (1.0”) of runoff from new impervious surfaces shall be permanently removed from the runoff flow — i.e. it shall not be released into the surface Waters of this Commonwealth.

Removal options include reuse, evaporation, transpiration, and infiltration.

• Wherever possible, infiltration facilities should be designed to accommodate infiltration of the entire permanently removed runoff; however, in all cases at least the first one-half inch (0.5”) of the permanently removed runoff should be infiltrated.

www.geosyntec.com

engineers | scientists | innovators

EPA Class V/Stormwater Memo-2008

•Infiltration Trenches

•Commercially Manufactured Stormwater Infiltration Devices

•Drywells, Seepage Pits, ImprovedSinkholes

www.geosyntec.com

engineers | scientists | innovators

Dry Wells and UIC Class V

States require registration – Is it happening?Leaching catch basins in roadways- State and Local DOT’s?

www.geosyntec.com

engineers | scientists | innovators

Sustainable Stormwater Management• Low Impact Development Stormwater Designs Green roofs Trees and tree boxes Raingardens/bioretention/infiltration planters Vegetated swales Pocket wetlands Permeable pavements Reforestation/revegetation Site planning- protection of riparian

buffers/floodplains Rainwater harvesting/reuse (where allowed)

www.geosyntec.com

engineers | scientists | innovators

Tree Box Filters/Roof Top Planters

www.geosyntec.com

engineers | scientists | innovators

www.geosyntec.com

engineers | scientists | innovators

www.geosyntec.com

engineers | scientists | innovators

www.geosyntec.com

engineers | scientists | innovators

LID Design Feature

Planter Box Bioretention Cell• Treat roof top drainage • Reduce storm water volume• Decrease peak discharge• Provide high levels of pollutant

removal

www.geosyntec.com

engineers | scientists | innovators

www.geosyntec.com

engineers | scientists | innovators

Porous Surfaces

www.geosyntec.com

engineers | scientists | innovators

LID Design Feature

Porous Pavers• Surface with "holes" which can be

filled with vegetation or aggregate depending upon the need.

• Porous pavers provide the same advantages as traditional concrete pavers, including resistance to heavy loads, flexibility of repair, low maintenance, exceptional durability, and high quality.

• Use infiltration to reduce stormwater runoff that leaves parking lots

• Increase stormwater storage • Reduce thermal loading on surface

waters • Reduce pollutants reaching surface

waters

www.geosyntec.com

engineers | scientists | innovators

US Navy Monterey Post Graduate Naval AcademyInstalled 30,000 Square Feet of Permeable Pavers Photo Credit: Belgard Pavers

LID Opportunities

www.geosyntec.com

engineers | scientists | innovators

www.geosyntec.com

engineers | scientists | innovators

www.geosyntec.com

engineers | scientists | innovators

www.geosyntec.com

engineers | scientists | innovators

Drivable Grass®

www.geosyntec.com

engineers | scientists | innovators

www.geosyntec.com

engineers | scientists | innovators

FlexiPave™ – recycled rubber tires and aggregate

www.geosyntec.com

engineers | scientists | innovators

Porous Asphalt

www.geosyntec.com

engineers | scientists | innovators

Porous Concrete

www.geosyntec.com

engineers | scientists | innovators

Bioretention Cells

www.geosyntec.com

engineers | scientists | innovators

LID Design FeaturesBioretention Cell• Provide water quality treatment; remove suspended solids,

metals, nutrients • Increase groundwater recharge through infiltration • Reduce peak discharge rates • Reduce total runoff volume • Improve site landscaping

www.geosyntec.com

engineers | scientists | innovators

100 ft Bioretention Cell in Parking Lot

www.geosyntec.com

engineers | scientists | innovators

www.geosyntec.com

engineers | scientists | innovators

Leadership in Energy and Environmental Design -LEED® and

Stormwater Management

Green Building- GSA Has a “Zero Environmental Footprint” Goal

Green Infrastructure- Promoting LID and Pre-Development Hydrology

www.geosyntec.com

engineers | scientists | innovators

Summary – the New Stormwater • Federal Requirements for Green Design and EISA Section

438 are mandating stormwater infiltration- Guidance• Most requirements require capture and onsite infiltration of

between 1.0 -1.5+ inches of runoff from impervious surfaces• New stormwater regulatory terminology

Mimic the pre-development hydrology Retain onsite Infiltrate stormwater to the maximum extent practicable

(MEP) Federal Facilities -Maximum Extent Technically Feasible

(METF)• UIC Class V Well registration may be required-

Compliance?

www.geosyntec.com

engineers | scientists | innovators

Questions?