Sr No Description Amount Remarks

1Construction of First Floor of Main Building

(Academic Block)20384229

2Construction of Training and Demonstration Free

Rang / Backyard Poultry Shed3246536

3 Construction of Conference Hall 23698044

4 Construction of First Floor of Boys Hostel 17718581

5 Construction of Parking Shed 1710457

66757847

3337892

70095739

70.096

Main Summary

Estimates For the Civil Work "Strengthening of Capacity Building Facilities at

Para Veterinary Institute, Karor Lal Eason, Layyah"

UNIVERSITY OF VETERINARY & ANIMAL SCIENCES (UVAS) LAHORE

Total Amount

Add 05% PST

Grand Total

Cost in Million

Contractor University Executive Engineer

MEMORANDUM OF WORK

(To be filled by the Project Directorate of the University of

Veterinary & Animal Sciences, Lahore)

General Description _________________________________________________________

(if several sub works are included, they should be detailed in a separate sheet)

__________________________________________________________________________

__________________________________________________________________________

(a) Estimate cost Rs. ____________________________________________________________

_____________________________________________________________

(b) Amount of earnest money to accompany the tender Rs. ____________________________

(to be furnished by the tenderer in the shape of deposit at call from a scheduled Bank of

Pakistan)

(c) Percentage of security deposit to be retained from the bills.

i. On the amount of work done upto Rs. 5 million = ten (10) percent

ii. On the amount of work done beyond Rs. 5 million = five (5) percent

(d) Minimum amount of interim running bills Rs. _____________________________________

(e) Mobilization period ______________________________________________________days

(f) Time allowed to complete the work after the expiry of mobilization period ________ days.

(g) Amount of performance security of Rs ________________________________________ in

the form of Bank Guarantee (see contract conditions clause 7 and general direction 26 (A),

five (05) percent of the accepted tender price in case of tenders with cost exceeding Rs. 50

millions and as per condition 26(A) for all tenders.

(h) Period of maintenance (after the date of issuance of certificate of completion)

_______________________________________________

Sr No Description Amount Remarks

1 Civil Work MRS Items 49865629 MRS

2 Civil Work Non Schedules items 9043923 N-S

3Public Health /Plumbing, Sanitary Installation &

Gas Fittings967208 MRS

4Public Health /Plumbing, Sanitary Installation &

Gas Fittings Non Schedules 1482368 N-S

5 Electric Installation MRS 2334175 MRS

6 Electric Installation Non Schedule 2038600 N-S

7 Road & Road Structure / External Development 1528023 MRS

67259926

Add 5 % PRA 3362996

Total Amount 70622923

Cost in Million 70.623

Subject .Estimate for Construction of Boys Hostel Building at Ravi

Campus Pattoki

UNIVERSITY OF VETERINARY & ANIMAL SCIENCES (UVAS)

RAVI CAMPUS PATTOKI

MRS, 2nd BI-ANNUAL-2021 (01.07.2021 to 31.12.2021) DISTRICT KASUR

Contractor University Executive Engineer

MEMORANDUM OF WORK

(To be filled by the Project Directorate of the University of

Veterinary & Animal Sciences, Lahore)

General Description _________________________________________________________

(if several sub works are included, they should be detailed in a separate sheet)

__________________________________________________________________________

__________________________________________________________________________

(a) Estimate cost Rs. ____________________________________________________________

_____________________________________________________________

(b) Amount of earnest money to accompany the tender Rs. ____________________________

(to be furnished by the tenderer in the shape of deposit at call from a scheduled Bank of

Pakistan)

(c) Percentage of security deposit to be retained from the bills.

i. On the amount of work done upto Rs. 5 million = ten (10) percent

ii. On the amount of work done beyond Rs. 5 million = five (5) percent

(d) Minimum amount of interim running bills Rs. _____________________________________

(e) Mobilization period ______________________________________________________days

(f) Time allowed to complete the work after the expiry of mobilization period ________ days.

(g) Amount of performance security of Rs ________________________________________ in

the form of Bank Guarantee (see contract conditions clause 7 and general direction 26 (A),

five (05) percent of the accepted tender price in case of tenders with cost exceeding Rs. 50

millions and as per condition 26(A) for all tenders.

(h) Period of maintenance (after the date of issuance of certificate of completion)

_______________________________________________

Sr.

No. Description Amount Remarks

1 Civil Work MRS Items 49865629 MRS

2 Civil Work Non Schedules items 9043923 N-S

3Public Health /Plumbing, Sanitary Installation &

Gas Fittings967208 MRS

4Public Health /Plumbing, Sanitary Installation &

Gas Fittings Non Schedules 1482368 N-S

5 Electric Installation MRS 2334175 MRS

6 Electric Installation Non Schedule 2038600 N-S

7Construction Of Boundry Wall ,gates and Gate

Pillars 3121480 MRS

8 External Development Tuff paver 1202912 MRS

70056295

Add 5 % PRA 3502815

Total Amount 73559110

Cost in Million 73.559

Subject .Estimate for Construction of Girls Hostel Building at Ravi

Campus Pattoki

UNIVERSITY OF VETERINARY & ANIMAL SCIENCES (UVAS)

RAVI CAMPUS PATTOKI

MRS, 2nd BI-ANNUAL-2021 (01.07.2021 to 31.12.2021) DISTRICT KASUR

Contractor University Executive Engineer

MEMORANDUM OF WORK

(To be filled by the Project Directorate of the University of

Veterinary & Animal Sciences, Lahore)

General Description _________________________________________________________

(if several sub works are included, they should be detailed in a separate sheet)

__________________________________________________________________________

__________________________________________________________________________

(a) Estimate cost Rs. ____________________________________________________________

_____________________________________________________________

(b) Amount of earnest money to accompany the tender Rs. ____________________________

(to be furnished by the tenderer in the shape of deposit at call from a scheduled Bank of

Pakistan)

(c) Percentage of security deposit to be retained from the bills.

i. On the amount of work done upto Rs. 5 million = ten (10) percent

ii. On the amount of work done beyond Rs. 5 million = five (5) percent

(d) Minimum amount of interim running bills Rs. _____________________________________

(e) Mobilization period ______________________________________________________days

(f) Time allowed to complete the work after the expiry of mobilization period ________ days.

(g) Amount of performance security of Rs ________________________________________ in

the form of Bank Guarantee (see contract conditions clause 7 and general direction 26 (A),

five (05) percent of the accepted tender price in case of tenders with cost exceeding Rs. 50

millions and as per condition 26(A) for all tenders.

(h) Period of maintenance (after the date of issuance of certificate of completion)

_______________________________________________