SERVICE PHOTOS REPORT
Vessel Name: MV. ORITENTAL SLIVER Customer: PT. Salam Pacific Indonesia Lines
Location : JAKARTA Port, Indonesia Customer Order No.: PO#H0442/SG/IV / 15
Date : 11 & 12. APR.2015 Crane Maker: JSW-Mac GREGORE-HAGGLUNDS
Crane- Type : L4032/3033.5-2 Year Built :1996
S/N :Crane#1:7092(1) / Crane#2:7092(2) Crane Working Hours: #1:8565 ; #2:8882
Purpose of Attendance: Cranes Inspection Service Engineer: KYAW MYINT THEIN
Work Done Photo Report
MV. ORIENTAL SLIVER is berthing in JAKARTA PORT
Marine Crane Service Specialist Co.Reg.No.201307215E
5 Soon Lee Street, # 03-31 Pioneer Point Singapore 627607 Tel: +65 67107071 Fax: +65 67107011 e-mail: greatechelon@singnet.com.sg
service@greatechelon.com.sg
pg. 2
Cr.1 Control Pressure
Cr.1 Hoist wire fix point greasing O.K
Crane.1 Room temp setting was wrong Crane.1 after 10 min operation hydraulic .temp increase, due to
ventilation fan was not run
Crane.1 Slewing Gear greasing O.K Crane.1 Feed Pressure
pg. 3
Crane.1 check PCB control panel
Check Cr.1 PCB DC power supply
Cr.1 “A” panel is good in condition
Test Crane.1Luffing down
Crane.1 Brake pads are oily and greasy
Both Cranes Hoist slack rope roller worn out (almost break to two)
pg. 4
Cr.2 Feed Pressure
Cr.2 Feed Pressure dropping during hoist up or down
Cr.2 Switch panel. A
Cr.2 Switch panel. B
Dry Greasing points,Cr.2 column top
Oily Slip Ring cover(Both Cranes)
pg. 5
(I) WORKDONE AND FINDINGS
1. Carried out Vessel Deck Cranes inspection in the Jakarta Port on 11 & 12 April.2015.
2. As per visual inspection, both cranes structure and appearance are good in condition.
3. Crane.1 requires doing housekeeping and wiping out oil leakages in the cranes column’s floor.
4. Crane.1 both Hoisting and Luffing Band brakes’ pads are very oily and greasy, need to remove clean with
de-greaser, if not possible to clean need to be replaced all oily brake pads.( will cause Cargo slipping)
5. Crane.1 reported over-heated problem, found Room Thermostat not correct setting cause Ventilation blower to not
running, once power “ON”, adjusted and tested. O.K.
6. Also corrected hydraulic oil max temp setting to 85’ was 95’ set, that caused some pumps’ to damage seals and “O”
rings.
7. Crane.2 most of the external greasing points are completely dry, long time never perform the external greasing.
8. Both Cranes Hoisting and Luffing wire slack rope protection assay Rollers were badly worn out need to be replaced
ASAP.
9. Crane.2 during hoisting operation (even w/o load) noticed Feed Pressure drop significantly, due to hoisting
hydraulic motor starting internally worn out.
10. Both cranes base column protection timber plates are missing, possible impact hitting to base column with cargo or
hatch covers, it may cause effect to slewing bearing (if not fix the timber plates on the base column).
(II) RECOMMENDATIONS
Crane.1
11. Leaking Hoisting Pump. I(1111) hose’s SAE flange “O” ring to be replaced. 12. Leaking Slewing pump control solenoid end plate “O”/seals to be replaced. 13. Defective (worn out) hoisting and luffing (Slack Rope protection assay) Teflon rollers to be replaced. 14. Need to be greasing crane column top all greasing points(to the Rope sheaves’ bearings) 15. If not able to clean the brake pads (for both hoist and Luff winch), to be replaced. Crane.2
16. Defective (worn out) hoisting and luffing (Slack Rope protection assay) Teflon rollers to be replaced. 17. Hoisting Motor to be replaced. 18. Pressure accumulator need to be charged(with nitrogen gas)
Both Cranes
19. To be replaced all filter elements.
20. To be renewed slewing gear oil.
pg. 6
(III) REQUIRE SPARE PARTS
1 Hoist Hydraulic motor MB-84 1 unit
2 Filter Element 2 sets
3 Teflon Rollers 4 pieces
4 Hoisting Brake band 1 set
5 Luffing Brake band 1 set
6 “ O” ring Kit (Matric & BSP) 1 set each