  • PROYECTO:

    UBICACIN:

    METRADO:

    FECHA :

    ITEM DESCRIPCION UND TOTAL L A H PARCIAL TOTAL

    01.00.00 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD

    01.01.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPO GLB 1.00 1.00

    01.02.00 CASETA Y GUARDIANIA GLB 1.00 1.00

    01.03.00 TRAZO Y REPLANTEO M2 1.00 AREA= 120.00 120.00 120.00

    01.04.00 LIMPIEZA DE TERRENO MANUAL M2 1.00 AREA= 120.00 120.00 120.00

    01.05.00 CERCADO PROVISIONAL DE AREA DE TRABAJO M2 1.00 6.00 2.00 16.00 16.00

    02.00.00 ESTRUCTURAS

    02.01.00 MOVIMIENTO DE TIERRAS

    02.01.01 EXCAVACIONES

    02.01.01.01 EXCAVACIONES PARA ZANJAS DE CIMIENTOS CORRIDOS M3 29.36

    EJE 1-1, TRAMO A-B M3 1.00 0.60 0.45 1.10 0.30

    EJE 1-1, TRAMO B-C M3 1.00 2.10 0.45 1.10 1.04

    EJE 1-1, TRAMO C-C" M3 1.00 1.45 0.45 1.10 0.72

    EJE 1-1, TRAMO C"-D M3 1.00 1.40 0.45 1.10 0.69

    EJE 1-1, TRAMO D-E M3 1.00 1.87 0.45 1.10 0.93

    EJE 1-1, TRAMO E-F M3 1.00 1.13 0.45 1.10 0.56

    EJE 1-1, TRAMO F-G M3 1.00 0.95 0.45 1.10 0.47

    EJE 1'-1', TRAMO B-C M3 1.00 1.88 0.50 1.10 1.03

    EJE 1'-1', TRAMO C-C" M3 1.00 1.90 0.50 1.10 1.05

    EJE 1'-1', TRAMO E-F M3 1.00 1.23 0.50 0.90 0.55

    EJE 1'-1', TRAMO F-G M3 1.00 2.25 0.50 1.10 1.24

    EJE 2-2, TRAMO A-B M3 1.00 0.60 0.50 1.10 0.33

    EJE 2-2, TRAMO B-C M3 1.00 2.10 0.50 1.10 1.16

    EJE 2-2, TRAMO C-C" M3 1.00 1.28 0.50 1.10 0.70

    EJE 2-2, TRAMO C"-D M3 1.00 1.58 0.50 1.10 0.87

    EJE 2-2, TRAMO D-E M3 1.00 1.87 0.50 1.10 1.03

    EJE 3-3, TRAMO A-B M3 1.00 1.60 0.45 1.10 0.79

    EJE 3-3, TRAMO B-C M3 1.00 2.10 0.45 1.10 1.04

    EJE 3-3, TRAMO C-C" M3 1.00 1.28 0.45 1.10 0.63

    EJE 3-3, TRAMO C"-D M3 1.00 1.58 0.45 1.10 0.78

    EJE 3-3, TRAMO D-E M3 1.00 1.87 0.45 1.10 0.93

    EJE 3-3, TRAMO E-F M3 1.00 1.13 0.45 1.10 0.56

    EJE 3-3, TRAMO F-G M3 1.00 1.25 0.45 1.10 0.62

    EJE A-A, TRAMO 1-2 M3 1.00 1.55 0.45 1.10 0.77

    EJE A-A, TRAMO 2-3 M3 1.00 1.80 0.45 1.10 0.89

    EJE B-B, TRAMO 2-3 M3 1.00 1.00 0.50 1.10 0.55

    EJE B"-B", TRAMO 1-2 M3 1.00 2.58 0.50 1.10 1.42

    EJE C-C, TRAMO 1-2 M3 1.00 1.68 0.50 1.10 0.92

    EJE C-C, TRAMO 2-3 M3 1.00 2.08 0.50 1.10 1.14

    EJE C"-C", TRAMO 1-2 M3 1.00 1.68 0.50 1.10 0.92

    EJE C"-C", TRAMO 2-3 M3 1.00 1.13 0.50 1.10 0.62

    EJE D-D, TRAMO 1-2 M3 1.00 1.68 0.50 0.90 0.75

    EJE D-D, TRAMO 2-3 M3 1.00 1.13 0.50 1.10 0.62

    EJE E-E, TRAMO 2-3 M3 1.00 2.58 0.50 1.10 1.42

    EJE F-F, TRAMO 1-2 M3 1.00 0.88 0.50 1.10 0.48

    EJE G-G TRAMO 2-3 M3 1.00 1.92 0.50 0.90 0.87

    02.01.01.01 EXCAVACIONES PARA ZANJAS DE ZAPATAS M3 43.89

    ENTRE EJE 1 Y EJE A M3 1.00 1.00 1.60 1.60

    ENTRE EJE 1 Y EJE B M3 1.20 1.00 1.60 1.92

    ENTRE EJE 1 Y EJE C M3 1.20 1.00 1.60 1.92

    ENTRE EJE 1 Y EJE C" M3 1.20 1.00 1.60 1.92

    ENTRE EJE 1 Y EJE D M3 1.20 1.00 1.60 1.92

    ENTRE EJE 1 Y EJE E M3 1.20 1.00 1.60 1.92

    ENTRE EJE 1 Y EJE F M3 1.20 1.00 1.60 1.92

    ENTRE EJE 1 Y EJE G M3 AREA= 0.40 1.60 0.64

    ENTRE EJE 1' Y EJE F M3 1.20 1.20 1.60 2.30

    ENTRE EJE 1' Y EJE G M3 AREA= 0.79 1.60 1.27

    ESTRUCTURAS

    22 DE ABRIL DEL 2015

    VIVIENDA MULTIFAMILIAR

    PLANILLA DE METRADOS - ESTRUCTURAS

    BARRANCA

    6 m

    1 m

    1

  • PROYECTO:

    UBICACIN:

    METRADO:

    FECHA :

    ITEM DESCRIPCION UND TOTAL L A H PARCIAL TOTAL

    ESTRUCTURAS

    22 DE ABRIL DEL 2015

    VIVIENDA MULTIFAMILIAR

    PLANILLA DE METRADOS - ESTRUCTURAS

    BARRANCA

    ENTRE EJE 2 Y EJE A M3 1.00 1.20 1.60 1.92

    ENTRE EJE 2 Y EJE B M3 1.20 1.20 1.60 2.30

    ENTRE EJE 2 Y EJE C M3 1.20 1.20 1.60 2.30

    ENTRE EJE 2 Y EJE C" M3 1.20 1.20 1.60 2.30

    ENTRE EJE 2 Y EJE D M3 1.20 1.20 1.60 2.30

    ENTRE EJE 2 Y EJE E M3 1.20 1.20 1.60 2.30

    ENTRE EJE 3 Y EJE B M3 1.00 1.20 1.60 1.92

    ENTRE EJE 3 Y EJE C M3 1.00 1.20 1.60 1.92

    ENTRE EJE 3 Y EJE C" M3 1.00 1.20 1.60 1.92

    ENTRE EJE 3 Y EJE D M3 1.00 1.20 1.60 1.92

    ENTRE EJE 3 Y EJE E M3 1.00 1.20 1.60 1.92

    ENTRE EJE 3 Y EJE F M3 1.00 1.20 1.60 1.92

    ENTRE EJE 3 Y EJE G M3 1.00 1.00 1.60 1.60

    02.01.02 RELLENO

    02.01.02.01 RELLENO CON MATERIAL PROPIO 14.59

    02.01.02.01.01 EN CIMIENTOS CORRIDOS M3 3.03

    EJE 1-1, TRAMO A-B M3 1.00 2.05 0.30 0.10 0.06

    EJE 1-1, TRAMO B-C M3 1.00 3.35 0.30 0.10 0.10

    EJE 1-1, TRAMO C-C" M3 1.00 2.45 0.30 0.10 0.07

    EJE 1-1, TRAMO C"-D M3 1.00 2.60 0.30 0.10 0.08

    EJE 1-1, TRAMO D-E M3 1.00 3.08 0.30 0.10 0.09

    EJE 1-1, TRAMO E-F M3 1.00 2.12 0.30 0.10 0.06

    EJE 1-1, TRAMO F-G M3 1.00 1.60 0.30 0.10 0.05

    EJE 1'-1', TRAMO B-C M3 1.00 2.55 0.35 0.10 0.09

    EJE 1'-1', TRAMO C-C" M3 1.00 2.25 0.35 0.10 0.08

    EJE 1'-1', TRAMO E-F M3 1.00 1.99 0.50 0.10 0.10

    EJE 1'-1', TRAMO F-G M3 1.00 3.85 0.35 0.10 0.13

    EJE 2-2, TRAMO A-B M3 1.00 1.85 0.35 0.10 0.06

    EJE 2-2, TRAMO B-C M3 1.00 2.50 0.35 0.10 0.09

    EJE 2-2, TRAMO C-C" M3 1.00 3.10 0.35 0.10 0.11

    EJE 2-2, TRAMO C"-D M3 1.00 2.50 0.35 0.10 0.09

    EJE 2-2, TRAMO D-E M3 1.00 3.12 0.35 0.10 0.11

    EJE 3-3, TRAMO A-B M3 1.00 1.85 0.30 0.10 0.06

    EJE 3-3, TRAMO B-C M3 1.00 3.10 0.30 0.10 0.09

    EJE 3-3, TRAMO C-C" M3 1.00 2.50 0.30 0.10 0.08

    EJE 3-3, TRAMO C"-D M3 1.00 2.50 0.30 0.10 0.08

    EJE 3-3, TRAMO D-E M3 1.00 3.12 0.30 0.10 0.09

    EJE 3-3, TRAMO E-F M3 1.00 2.17 0.30 0.10 0.07

    EJE 3-3, TRAMO F-G M3 1.00 3.85 0.30 0.10 0.12

    EJE A-A, TRAMO 1-2 M3 1.00 2.58 0.30 0.10 0.08

    EJE A-A, TRAMO 2-3 M3 1.00 2.03 0.30 0.10 0.06

    EJE B-B, TRAMO 2-3 M3 1.00 2.03 0.35 0.10 0.07

    EJE B"-B", TRAMO 1-2 M3 1.00 2.08 0.35 0.10 0.07

    EJE C-C, TRAMO 1-2 M3 1.00 2.58 0.35 0.10 0.09

    EJE C-C, TRAMO 2-3 M3 1.00 2.61 0.35 0.10 0.09

    EJE C"-C", TRAMO 1-2 M3 1.00 2.58 0.35 0.10 0.09

    EJE C"-C", TRAMO 2-3 M3 1.00 2.03 0.35 0.10 0.07

    EJE D-D, TRAMO 1-2 M3 1.00 2.58 0.50 0.10 0.13

    EJE D-D, TRAMO 2-3 M3 1.00 2.03 0.35 0.10 0.07

    EJE E-E, TRAMO 2-3 M3 1.00 2.06 0.35 0.10 0.07

    EJE F-F, TRAMO 1-2 M3 1.00 1.96 0.35 0.10 0.07

    EJE G-G TRAMO 2-3 M3 1.00 2.27 0.50 0.10 0.11

    02.01.02.01.02 EN ZAPATAS M3 11.56

    ENTRE EJE 1 Y EJE A M3 AREA= 0.30 1.00 0.30

    ENTRE EJE 1 Y EJE B M3 AREA= 0.66 1.00 0.66

    ENTRE EJE 1 Y EJE C M3 AREA= 0.43 1.00 0.43

    ENTRE EJE 1 Y EJE C" M3 AREA= 0.38 1.00 0.38

    ENTRE EJE 1 Y EJE D M3 AREA= 0.39 1.00 0.39

    ENTRE EJE 1 Y EJE E M3 AREA= 0.66 1.00 0.66

    ENTRE EJE 1 Y EJE F M3 AREA= 0.38 1.00 0.38

    2

  • PROYECTO:

    UBICACIN:

    METRADO:

    FECHA :

    ITEM DESCRIPCION UND TOTAL L A H PARCIAL TOTAL

    ESTRUCTURAS

    22 DE ABRIL DEL 2015

    VIVIENDA MULTIFAMILIAR

    PLANILLA DE METRADOS - ESTRUCTURAS

    BARRANCA

    ENTRE EJE 1 Y EJE G M3 AREA= 0.09 1.00 0.09

    ENTRE EJE 1' Y EJE F M3 AREA= 0.56 1.00 0.56

    ENTRE EJE 1' Y EJE G M3 AREA= 0.24 1.00 0.24

    ENTRE EJE 2 Y EJE A M3 AREA= 0.39 1.00 0.39

    ENTRE EJE 2 Y EJE B M3 AREA= 0.67 1.00 0.67

    ENTRE EJE 2 Y EJE C M3 AREA= 1.38 1.00 1.38

    ENTRE EJE 2 Y EJE C" M3 AREA= 0.49 1.00 0.49

    ENTRE EJE 2 Y EJE D M3 AREA= 0.49 1.00 0.49

    ENTRE EJE 2 Y EJE E M3 AREA= 0.80 1.00 0.80

    ENTRE EJE 3 Y EJE B M3 AREA= 0.39 1.00 0.39

    ENTRE EJE 3 Y EJE C M3 AREA= 0.39 1.00 0.39

    ENTRE EJE 3 Y EJE C" M3 AREA= 0.39 1.00 0.39

    ENTRE EJE 3 Y EJE D M3 AREA= 0.39 1.00 0.39

    ENTRE EJE 3 Y EJE E M3 AREA= 0.66 1.00 0.66

    ENTRE EJE 3 Y EJE F M3 AREA= 0.66 1.00 0.66

    ENTRE EJE 3 Y EJE G M3 AREA= 0.39 1.00 0.39

    02.01.03 NIVELACION INTERIOR Y APISONADO MANUAL M2 96.97

    DORMITORIO 1 AREA = 10.58

    BAO AREA = 3.60

    DORMITORIO 2 AREA = 6.98

    DORMITORIO 3 AREA = 6.94

    PASADIZO AREA = 4.59

    PATIO-LAVANDERIA AREA = 6.25

    SALA-COMEDOR AREA = 24.09

    COCINA AREA = 10.03

    GARAJE AREA = 15.88

    BAO VISITA AREA = 1.60

    RECIBO AREA = 3.19

    ZONA ESCALERA AREA = 3.25

    02.01.04 ELIMINACION DE MATERIAL EXCEDENTE M3 82.27

    VOLUMEN EXCAVACIN = 73.26

    VOLUMEN RELLENO = 14.59

    V. ELIMINA COMPACTADO = 58.67 ESPONJAMIENTO = 1.30

    V. ELIMIN. COMPACTADO = VOLUMEN DESMONTE 1 = 76.27

    AREA TECHADA = 120 M2

    VOLUMEN DESMONTE 2 = 6

    VOLUMEN DE MATERIAL EXCEDENTE = 82.27

    02.02.00 OBRAS DE CONCRETO SIMPLE

    02.02.01 CIMIENTOS CORRIDOS

    02.02.01.01 CONCRETO 1:10 (CEMENTO - HORMIGON) + 30% PM MAX 06 " M3 43.37

    EJE 1-1, TRAMO A-B M3 1.00 2.20 0.45 1.00 0.99

    EJE 1-1, TRAMO B-C M3 1.00 3.31 0.45 1.00 1.49

    EJE 1-1, TRAMO C-C" M3 1.00 2.65 0.45 1.00 1.19

    EJE 1-1, TRAMO C"-D M3 1.00 2.60 0.45 1.00 1.17

    EJE 1-1, TRAMO D-E M3 1.00 3.08 0.45 1.00 1.39

    EJE 1-1, TRAMO E-F M3 1.00 2.07 0.45 1.00 0.93

    EJE 1-1, TRAMO F-G M3 1.00 4.10 0.45 1.00 1.85

    EJE 1'-1', TRAMO B-C M3 1.00 2.50 0.50 1.00 1.25

    EJE 1'-1', TRAMO C-C" M3 1.00 2.77 0.50 1.00 1.39

    EJE 1'-1', TRAMO E-F M3 1.00 1.72 0.50 0.80 0.69

    EJE 1'-1', TRAMO F-G M3 1.00 4.10 0.50 1.00 2.05

    EJE 2-2, TRAMO A-B M3 1.00 2.20 0.50 1.00 1.10

    EJE 2-2, TRAMO B-C M3 1.00 3.30 0.50 1.00 1.65

    EJE 2-2, TRAMO C-C" M3 1.00 2.35 0.50 1.00 1.18

    EJE 2-2, TRAMO C"-D M3 1.00 2.90 0.50 1.00 1.45

    EJE 2-2, TRAMO D-E M3 1.00 3.07 0.50 1.00 1.54

    EJE 3-3, TRAMO A-B M3 1.00 2.20 0.45 1.00 0.99

    EJE 3-3, TRAMO B-C M3 1.00 3.30 0.45 1.00 1.49

    EJE 3-3, TRAMO C-C" M3 1.00 2.35 0.45 1.00 1.06

    EJE 3-3, TRAMO C"-D M3 1.00 2.90 0.45 1.00 1.31

    3

  • PROYECTO:

    UBICACIN:

    METRADO:

    FECHA :

    ITEM DESCRIPCION UND TOTAL L A H PARCIAL TOTAL

    ESTRUCTURAS

    22 DE ABRIL DEL 2015

    VIVIENDA MULTIFAMILIAR

    PLANILLA DE METRADOS - ESTRUCTURAS

    BARRANCA

    EJE 3-3, TRAMO D-E M3 1.00 3.07 0.45 1.00 1.38

    EJE 3-3, TRAMO E-F M3 1.00 2.33 0.45 1.00 1.05

    EJE 3-3, TRAMO F-G M3 1.00 3.85 0.45 1.00 1.73

    EJE A-A, TRAMO 1-2 M3 1.00 2.58 0.45 1.00 1.16

    EJE A-A, TRAMO 2-3 M3 1.00 2.03 0.45 1.00 0.91

    EJE B-B, TRAMO 2-3 M3 1.00 2.03 0.50 1.00 1.01

    EJE B"-B", TRAMO 1-2 M3 1.00 2.08 0.50 1.00 1.04

    EJE C-C, TRAMO 1-2 M3 1.00 1.18 0.50 1.00 0.59

    EJE C-C, TRAMO 2-3 M3 1.00 2.63 0.50 1.00 1.31

    EJE C"-C", TRAMO 1-2 M3 1.00 1.18 0.50 1.00 0.59

    EJE C"-C", TRAMO 2-3 M3 1.00 2.03 0.50 1.00 1.01

    EJE D-D, TRAMO 1-2 M3 1.00 2.58 0.50 0.80 1.03

    EJE D-D, TRAMO 2-3 M3 1.00 2.03 0.50 1.00 1.01

    EJE E-E, TRAMO 2-3 M3 1.00 2.33 0.50 1.00 1.17

    EJE F-F, TRAMO 1-2 M3 1.00 2.24 0.50 1.00 1.12

    EJE G-G TRAMO 2-3 M3 1.00 2.82 0.50 0.80 1.13

    02.02.01.02 ENCOFRADO PARA CIMIENTOS CORRIDOS M2 45.43

    ZONA DE ZAPATAS M2

    ENTRE EJE 1 Y EJE A M2 1.00 1.10 1.00 1.10

    ENTRE EJE 1 Y EJE B M2 1.00 1.20 1.00 1.20

    ENTRE EJE 1 Y EJE C M2 1.00 1.80 1.00 1.80

    ENTRE EJE 1 Y EJE C" M2 1.00 1.80 1.00 1.80

    ENTRE EJE 1 Y EJE D M2 1.00 1.10 0.80 0.88

    1.00 0.68 1.00 0.68

    ENTRE EJE 1 Y EJE E M2 1.00 1.20 1.00 1.20

    ENTRE EJE 1 Y EJE F M2 1.00 1.75 1.00 1.75

    ENTRE EJE 1 Y EJE G M2 1.00 1.25 1.00 1.25

    ENTRE EJE 1' Y EJE F M2 1.00 2.76 1.00 2.76

    ENTRE EJE 1' Y EJE G M2 1.00 1.93 1.00 1.93

    ENTRE EJE 2 Y EJE A M2 1.00 1.80 1.00 1.80

    ENTRE EJE 2 Y EJE B M2 1.00 2.85 1.00 2.85

    ENTRE EJE 2 Y EJE C M2 1.00 2.88 1.00 2.88

    ENTRE EJE 2 Y EJE C" M2 1.00 3.00 1.00 3.00

    ENTRE EJE 2 Y EJE D M2 1.00 3.00 1.00 3.00

    ENTRE EJE 2 Y EJE E M2 1.00 2.51 1.00 2.51

    ENTRE EJE 3 Y EJE B M2 1.00 1.80 1.00 1.80

    ENTRE EJE 3 Y EJE C M2 1.00 1.80 1.00 1.80

    ENTRE EJE 3 Y EJE C" M2 1.00 1.80 1.00 1.80

    ENTRE EJE 3 Y EJE D M2 1.00 1.80 1.00 1.80

    ENTRE EJE 3 Y EJE E M2 1.00 2.30 1.00 2.30

    ENTRE EJE 3 Y EJE F M2 1.00 2.30 1.00 2.30

    ENTRE EJE 3 Y EJE G M2 1.00 1.25 1.00 1.25

    02.02.02 CONCRETO PARA SOLADO 1:10 (CEMENTO - HORMIGON) M2 28.44

    Z1 M2 6.00 1.20 1.20 8.64

    Z2 M2 14.00 1.20 1.00 16.80

    Z3 M2 3.00 1.00 1.00 3.00

    02.02.03 SOBRECIMIENTO

    02.02.03.01 CONCRETO 1:8 + 25% PM MAX 3" M3 2.91

    EJE 1-1, TRAMO A-B M3 1.00 1.60 0.15 0.30 0.07

    EJE 1-1, TRAMO B-C M3 1.00 2.75 0.15 0.30 0.12

    EJE 1-1, TRAMO C-C" M3 1.00 1.69 0.15 0.30 0.08

    EJE 1-1, TRAMO C"-D M3 1.00 2.20 0.15 0.30 0.10

    EJE 1-1, TRAMO D-E M3 1.00 2.68 0.15 0.30 0.12

    EJE 1-1, TRAMO E-F M3 1.00 1.67 0.15 0.30 0.08

    EJE 1-1, TRAMO F-G M3 1.00 3.50 0.15 0.30 0.16

    EJE 1'-1', TRAMO B-C M3 1.00 1.10 0.15 0.30 0.05

    EJE 1'-1', TRAMO C-C" M3 1.00 2.00 0.15 0.30 0.09

    EJE 1'-1', TRAMO E-F M3 1.00 0.62 0.15 0.30 0.03

    EJE 1'-1', TRAMO F-G M3 1.00 3.25 0.15 0.30 0.15

    EJE 2-2, TRAMO B-C M3 1.00 1.40 0.15 0.30 0.06

    4

  • PROYECTO:

    UBICACIN:

    METRADO:

    FECHA :

    ITEM DESCRIPCION UND TOTAL L A H PARCIAL TOTAL

    ESTRUCTURAS

    22 DE ABRIL DEL 2015

    VIVIENDA MULTIFAMILIAR

    PLANILLA DE METRADOS - ESTRUCTURAS

    BARRANCA

    EJE 2-2, TRAMO C-C" M3 1.00 1.30 0.15 0.30 0.06

    EJE 2-2, TRAMO C"-D M3 1.00 1.75 0.15 0.30 0.08

    EJE 2-2, TRAMO D-E M3 1.00 1.77 0.15 0.30 0.08

    EJE 3-3, TRAMO A-B M3 1.00 1.47 0.15 0.30 0.07

    EJE 3-3, TRAMO B-C M3 1.00 2.90 0.15 0.30 0.13

    EJE 3-3, TRAMO C-C" M3 1.00 1.95 0.15 0.30 0.09

    EJE 3-3, TRAMO C"-D M3 1.00 1.94 0.15 0.30 0.09

    EJE 3-3, TRAMO D-E M3 1.00 2.27 0.15 0.30 0.10

    EJE 3-3, TRAMO E-F M3 1.00 1.93 0.15 0.30 0.09

    EJE 3-3, TRAMO F-G M3 1.00 3.25 0.15 0.30 0.15

    EJE A-A, TRAMO 1-2 M3 1.00 2.55 0.15 0.30 0.11

    EJE A-A, TRAMO 2-3 M3 1.00 2.22 0.15 0.30 0.10

    EJE B-B, TRAMO 2-3 M3 1.00 2.00 0.15 0.30 0.09

    EJE B"-B", TRAMO 1-2 M3 1.00 1.75 0.15 0.30 0.08

    EJE C-C, TRAMO 1-2 M3 1.00 1.75 0.15 0.30 0.08

    EJE C-C, TRAMO 2-3 M3 1.00 3.05 0.15 0.30 0.14

    EJE C"-C", TRAMO 1-2 M3 1.00 0.50 0.15 0.30 0.02

    EJE C"-C", TRAMO 2-3 M3 1.00 1.40 0.15 0.30 0.06

    EJE D-D, TRAMO 2-3 M3 1.00 1.50 0.15 0.30 0.07

    EJE E-E, TRAMO 2-3 M3 1.00 2.03 0.15 0.30 0.09

    EJE F-F, TRAMO 1-2 M3 1.00 0.90 0.15 0.30 0.04

    02.02.03.01 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO M2 27.81

    EJE 1-1, TRAMO A-B M2 1.00 1.60 0.30 0.48

    EJE 1-1, TRAMO B-C M2 1.00 2.75 0.30 0.83

    EJE 1-1, TRAMO C-C" M2 1.00 1.69 0.30 0.51

    EJE 1-1, TRAMO C"-D M2 1.00 2.20 0.30 0.66

    EJE 1-1, TRAMO D-E M2 1.00 2.68 0.30 0.80

    EJE 1-1, TRAMO E-F M2 1.00 1.67 0.30 0.50

    EJE 1-1, TRAMO F-G M2 1.00 3.50 0.30 1.05

    EJE 1'-1', TRAMO B-C M2 2.00 1.10 0.30 0.66

    EJE 1'-1', TRAMO C-C" M2 2.00 2.00 0.30 1.20

    EJE 1'-1', TRAMO E-F M2 2.00 0.62 0.30 0.37

    EJE 1'-1', TRAMO F-G M2 2.00 3.25 0.30 1.95

    EJE 2-2, TRAMO B-C M2 2.00 1.40 0.30 0.84

    EJE 2-2, TRAMO C-C" M2 2.00 1.30 0.30 0.78

    EJE 2-2, TRAMO C"-D M2 2.00 1.75 0.30 1.05

    EJE 2-2, TRAMO D-E M2 2.00 1.77 0.30 1.06

    EJE 3-3, TRAMO A-B M2 1.00 1.47 0.30 0.44

    EJE 3-3, TRAMO B-C M2 1.00 2.90 0.30 0.87

    EJE 3-3, TRAMO C-C" M2 1.00 1.95 0.30 0.59

    EJE 3-3, TRAMO C"-D M2 1.00 1.94 0.30 0.58

    EJE 3-3, TRAMO D-E M2 1.00 2.27 0.30 0.68

    EJE 3-3, TRAMO E-F M2 1.00 1.93 0.30 0.58

    EJE 3-3, TRAMO F-G M2 1.00 3.25 0.30 0.98

    EJE A-A, TRAMO 1-2 M2 1.00 2.55 0.30 0.77

    EJE A-A, TRAMO 2-3 M2 1.00 2.22 0.30 0.67

    EJE B-B, TRAMO 2-3 M2 2.00 2.00 0.30 1.20

    EJE B"-B", TRAMO 1-2 M2 2.00 1.75 0.30 1.05

    EJE C-C, TRAMO 1-2 M2 2.00 1.75 0.30 1.05

    EJE C-C, TRAMO 2-3 M2 2.00 3.05 0.30 1.83

    EJE C"-C", TRAMO 1-2 M2 2.00 0.50 0.30 0.30

    EJE C"-C", TRAMO 2-3 M2 2.00 1.40 0.30 0.84

    EJE D-D, TRAMO 2-3 M2 2.00 1.50 0.30 0.90

    EJE E-E, TRAMO 2-3 M2 2.00 2.03 0.30 1.22

    EJE F-F, TRAMO 1-2 M2 2.00 0.90 0.30 0.54

    02.03.00 OBRAS DE CONCRETO ARMADO

    02.03.01 ZAPATAS

    02.03.01.01 CONCRETO EN ZAPATAS F'c = 210 Kg/cm2 M3 11.38

    Z1 M3 6.00 1.20 1.20 0.40 3.46

    Z2 M3 14.00 1.20 1.00 0.40 6.72

    5

  • PROYECTO:

    UBICACIN:

    METRADO:

    FECHA :

    ITEM DESCRIPCION UND TOTAL L A H PARCIAL TOTAL

    ESTRUCTURAS

    22 DE ABRIL DEL 2015

    VIVIENDA MULTIFAMILIAR

    PLANILLA DE METRADOS - ESTRUCTURAS

    BARRANCA

    Z3 M3 3.00 1.00 1.00 0.40 1.20

    02.03.01.02 ACERO F'y = 4200 Kg/cm2 PARA ZAPATAS Kg 246.31

    VER FORMATO DE FIERRO

    02.03.02 COLUMNAS

    02.03.02.01 CONCRETO PARA COLUMNAS F'c = 210 Kg/cm2 M3 7.97

    C1 M3 7.00 AREA= 0.10 3.65 2.49

    C2 M3 15.00 AREA= 0.06 3.65 3.29

    C3 M3 4.00 AREA= 0.06 3.65 0.88

    C4 M3 1.00 AREA= 0.10 3.65 0.36

    C5 M3 7.00 AREA= 0.04 3.65 0.96

    02.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL DE COLUMNAS M2 73.40

    ENTRE EJE 1 Y EJE A M2 1.00 0.50 3.65 1.83

    ENTRE EJE 1 Y EJE B M2 1.00 0.40 3.65 1.46

    ENTRE EJE 1 Y EJE B' M2 1.00 0.50 3.65 1.83

    ENTRE EJE 1 Y EJE C M2 1.00 1.00 3.65 3.65

    ENTRE EJE 1 Y EJE C' M2 1.00 0.65 3.65 2.37

    ENTRE EJE 1 Y EJE D M2 1.00 0.40 3.65 1.46

    ENTRE EJE 1 Y EJE E M2 1.00 0.40 3.65 1.46

    ENTRE EJE 1 Y EJE F M2 1.00 0.75 3.65 2.74

    ENTRE EJE 1 Y EJE G M2 1.00 0.25 3.65 0.91

    ENTRE EJE 1' Y EJE B' M2 1.00 0.80 3.65 2.92

    ENTRE EJE 1' Y EJE C M2 1.00 0.65 3.65 2.37

    ENTRE EJE 1' Y EJE C' M2 1.00 0.80 3.65 2.92

    ENTRE EJE 1' Y EJE F M2 1.00 1.40 3.65 5.11

    ENTRE EJE 1' Y EJE G M2 1.00 0.95 3.65 3.47

    ENTRE EJE 2 Y EJE A M2 1.00 0.65 3.65 2.37

    ENTRE EJE 2 Y EJE B M2 1.00 1.30 3.65 4.75

    ENTRE EJE 2 Y EJE C M2 1.00 0.80 3.65 2.92

    ENTRE EJE 2 Y EJE C' M2 1.00 0.95 3.65 3.47

    ENTRE EJE 2 Y EJE D M2 1.00 0.95 3.65 3.47

    ENTRE EJE 2 Y EJE E M2 1.00 1.26 3.65 4.60

    ENTRE EJE 3 Y EJE A M2 1.00 0.10 3.65 0.37

    ENTRE EJE 3 Y EJE B M2 1.00 1.00 3.65 3.65

    ENTRE EJE 3 Y EJE C M2 1.00 0.30 3.65 1.10

    ENTRE EJE 3 Y EJE C' M2 1.00 1.00 3.65 3.65

    ENTRE EJE 3 Y EJE D M2 1.00 1.00 3.65 3.65

    ENTRE EJE 3 Y EJE E M2 1.00 0.40 3.65 1.46

    ENTRE EJE 3 Y EJE F M2 1.00 0.40 3.65 1.46

    ENTRE EJE 3 Y EJE G M2 1.00 0.55 3.65 2.01

    02.03.02.03 ACERO F'y = 4200 Kg/cm2 PARA COLUMNAS Kg 1,433.66

    VER FORMATO DE FIERRO

    02.03.02 VIGAS

    02.03.02.01 CONCRETO EN VIGAS F'c = 210 Kg/cm2 M3 5.92

    EJE 1-1, VS 100 TRAMO A-C M3 1.00 5.70 0.15 0.40 0.34

    EJE 1-1, VS 100 TRAMO C'-G M3 1.00 12.05 0.15 0.40 0.72

    EJE 1'-1', VS 100 TRAMO B'-C' M3 1.00 4.50 0.15 0.40 0.27

    EJE 1'-1', VS 100 TRAMO F-G M3 1.00 3.91 0.15 0.40 0.23

    EJE 1'-1', VS 101 TRAMO E-F M3 1.00 2.45 0.30 0.20 0.15

    EJE 2-2, VS 100 TRAMO A-E M3 1.00 14.02 0.15 0.40 0.84

    EJE 3-3, VS 100 TRAMO B-C' M3 1.00 6.05 0.15 0.40 0.36

    EJE 3-3, VS 100 TRAMO D-G M3 1.00 9.45 0.15 0.40 0.57

    VA 101 , LADO DE ESCALERA M3 1.00 3.45 0.25 0.20 0.17

    EJE A-A, VA 100 M3 1.00 3.05 0.25 0.20 0.15

    EJE B-B, VA 100 M3 1.00 5.55 0.25 0.20 0.28

    EJE B'-B', VA 100 M3 1.00 2.90 0.25 0.20 0.15

    EJE C-C, VA 100 M3 1.00 5.40 0.25 0.20 0.27

    EJE C"-C", VA 100 M3 1.00 3.05 0.25 0.20 0.15

    1.00 2.50 0.25 0.20 0.13

    1.00 0.90 0.15 0.20 0.03

    EJE D-D, VA 100 M3 1.00 5.55 0.25 0.20 0.28

    6

  • PROYECTO:

    UBICACIN:

    METRADO:

    FECHA :

    ITEM DESCRIPCION UND TOTAL L A H PARCIAL TOTAL

    ESTRUCTURAS

    22 DE ABRIL DEL 2015

    VIVIENDA MULTIFAMILIAR

    PLANILLA DE METRADOS - ESTRUCTURAS

    BARRANCA

    EJE E-E, VA 100 M3 1.00 5.55 0.25 0.20 0.28

    EJE F-F, VA 100 M3 1.00 5.55 0.25 0.20 0.28

    EJE G-G, VA 100 M3 1.00 5.55 0.25 0.20 0.28

    VA 100 EN VOLADIZO M3 1.00 AREA = 0.97 0.20 0.19

    02.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 29.94

    EJE 1-1, VS 100 TRAMO A-C M2 1.00 5.70 0.20 1.14

    EJE 1-1, VS 100 TRAMO C'-G M2 1.00 12.05 0.20 2.41

    EJE 1'-1', VS 100 TRAMO B'-C' M2 1.00 4.50 0.40 1.80

    2.55 0.15

    EJE 1'-1', VS 100 TRAMO F-G M2 1.00 3.91 0.40 1.57

    EJE 1'-1', VS 101 TRAMO E-F M2 1.00 2.45 0.30 0.73

    EJE 2-2, VS 100 TRAMO A-E M2 1.00 14.02 0.40 5.61

    EJE 3-3, VS 100 TRAMO B-C' M2 1.00 6.05 0.20 1.21

    EJE 3-3, VS 100 TRAMO D-G M2 1.00 9.45 0.20 1.89

    VA 101 , LADO DE ESCALERA M2 1.00 3.45 0.30 1.04

    EJE A-A, VA 100 M2 1.00 3.05 0.15 0.46

    EJE B-B, VA 100 M2 1.00 3.05 0.30 0.92

    1.00 2.50 0.15 0.38

    EJE B'-B', VA 100 M2 1.00 2.90 0.15 0.44

    EJE C-C, VA 100 M2 1.00 5.40 0.30 1.62

    EJE C"-C", VA 100 M2 1.00 3.05 0.15 0.46

    1.00 3.40 0.15 0.51

    EJE D-D, VA 100 M2 1.00 5.55 0.30 1.67

    EJE E-E, VA 100 M2 1.00 5.55 0.30 1.67

    EJE F-F, VA 100 M2 1.00 5.55 0.30 1.67

    EJE G-G, VA 100 M2 1.00 5.55 0.30 1.67

    VA 100 EN VOLADIZO M2 1.00 3.74 0.30 1.12

    02.03.02.03 ACERO F'y = 4200 Kg/cm2 EN VIGAS Kg 33,413.95

    VER FORMATO DE FIERRO

    02.03.03 LOSAS ALIGERADAS

    02.03.03.01 CONCRETO EN LOSAS ALIGERADAS F'C = 210 Kg/cm2 M3

    DE LA PARTIDA 2.3.3.2 ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA M3 6.91

    76.78 X 0.09 6.91

    02.03.03.02 ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA M2 76.78

    ENTRE LOS EJES A-B, 1-2 M2 AREA = 5.19

    ENTRE LOS EJES B'-B, 1-2 M2 AREA = 3.97

    ENTRE LOS EJES B'-C, 1-2 M2 AREA = 4.35

    ENTRE LOS EJES B-C, 2-3 M2 AREA = 7.75

    ENTRE LOS EJES C'-C, 1-2 M2 AREA = 1.85

    ENTRE LOS EJES C'-C, 2-3 M2 AREA = 5.31

    ENTRE LOS EJES C'-D, 1-2 M2 AREA = 7.02

    ENTRE LOS EJES D-E, 1-2 M2 AREA = 8.62

    ENTRE LOS EJES D-E, 2-3 M2 AREA = 7.07

    ENTRE LOS EJES E-F, 1-2 M2 AREA = 5.25

    ENTRE LOS EJES E-F, 2-3 M2 AREA = 5.38

    ENTRE LOS EJES F-G, 1-1' M2 AREA = 2.59

    ENTRE LOS EJES F-G, 1'-2 Y VOLADIZO M2 AREA = 12.45

    02.03.03.03 LADRILLO HUECO ARCILLA 15*0.3*0.3 EN LOSA ALIGERADA UND 639.61

    76.78 8.33 639.61

    02.03.03.04 ACERO F'y = 4200 Kg/cm2 EN LOSA ALIGERADA Kg 416.87