This is the presentation given by RPA on Metro North to Fingal County Council, Fingal Area Committee on Friday 15th April 2011

TRANSCRIPT

Place title here

Metro NorthSwords/Balbriggan Area Committee14 April 2011

Metro North - Ready to Go

Metro North

• Overview

• Is now the time for Metro North

• Stops in Fingal area– Airport– Fosterstown– Swords

• Managing the Project

Metro North - Ready to Go

Metro North

St Stephen’s Green to Estuary

• 16.5km total length – 11 km in tunnel (City centre to Ballymun

and Airport)– 5.5 km in retained cut, at-grade or

elevated

• 14 stops – 9 underground stops from St. Stephen’s

Green to Ballymun and at Airport– 5 surface stops

• Planning Permission Granted – 20 Conditions– Depot relocation application early 2011– Enabling Works – Govt. Decision

● Estuary● Swords● Fosterstown● Airport● Dardistown● Northwood● Ballymun● DCU● Griffith Avenue● Drumcondra● Mater● Parnell Square● O’Connell Bridge● St Stephen’s Green

Metro North - Ready to Go

Is now the time for Metro North?

Tackling traffic congestion

Tackling urban sprawl

Environmental costs high if we do not proceed

Strong economic case even

with modest growth

Metro North - Ready to Go

Is now the time for Metro North?

Metro serves key

destinationsOver 6,000

jobs

PPP is the appropriate

funding model

Capital costs are at the

bottom of the curve

Metro North - Ready to Go

Metro North Stops in Fingal Area

• Estuary

• Swords

• Fosterstown

• Airport

• Dardistown

• Northwood

Metro North - Ready to Go

Airport Portal & Depot

Metro North - Ready to Go

Airport Stop

Metro North - Ready to Go

Airport Stop

Metro North - Ready to Go

Airport Stop

Metro North - Ready to Go

Airport Stop

Metro North - Ready to Go

Fosterstown Stop

Metro North - Ready to Go

Fosterstown Stop

Metro North - Ready to Go

Swords Stop

Metro North - Ready to Go

Swords Stop

Metro North - Ready to Go

Estuary Terminus

Managing our Environment

• Noise and dust limits strictly controlled and monitored

• High quality, well maintained attractive hoarding

• Good lighting and signage will be provided

• Good housekeeping, plant and equipment cleaned and fully serviced, worksites kept tidy and dust free

• RPA and its contractor will work closely with local representatives throughout the construction period

Metro North - Ready to Go

RPA Commitments

RPA will:

• Have an ongoing role throughout the works• Ensure you are consulted and kept informed about the works• Arrange open forums with local representatives, local

businesses & residents• Run a 24/7 hotline for queries and complaints• Appoint Community Liaison Officers dedicated to specific

areas• Provide up to date information through meetings and other

communications channels

Metro North - Ready to Go

Summary

• The case for Metro North remains strong• Awaiting funding approval• Award Enabling Works contracts• Engage with local representatives in planning the works• Programme of information meetings closer to the works

commencing

Ready to go