SeminarontheJointCreditingMechanism(JCM)ImplementationinChileAcceleratingPromotionofEnvironmentalInfrastructurethroughJCM

MGMInnovaGruop– JCMProjectsinLatinAmerica

IntercontinentalHotel,SantiagoChile,August29th,2019

MGMInnovaEnergyServicesLLCisaprojectdevelopmentfirmfocusingontheidentification,design,technicalandfinancialstructuring,implementation,operationandmonitoringofenergyefficiencyandrenewableenergyprojects,aswellasthroughtheprovisionofenergyservices.

ThefirmservesastheenergyservicesarmoftheMGMInnovaGroup.

MGMInnovaConsultingspecializesinthedesign,development,promotionandimplementationofinnovativesolutionsthatenabletheirclientstoincorporatesustainableandclimatechangepracticesintheirproducts,projects,services,operationsandcorporatestrategies.

ThefirmservesastheclimatechangeconsultancyarmoftheMGMInnovaGroup.

MGMInnovaCapitalLLCisaprivateequityandgreeninfrastructureinvestmentfirmfocusingonsociallyresponsible,triplebottomline(financial,socialandenvironmental)investmentsinenergyefficiencyandrenewableenergyinLatinAmericaandtheCaribbean.

ThefirmservesasthefinancialarmofMGMInnovaGroup

ENERGY EFFICIENCY

Municipal Efficiency

Commercial Efficiency

Industrial Efficiency

Distributed Generation/Hybrid

Hotels,hospitals,shoppingmalls,fastfoodchains,universities,yachtclubs.

*Targetlargebuildingsandapplymultiplemeasures

Airconditioning,highefficiencylighting,highefficiencysteamboilersandwaterheaters,solarwaterheating,controlandautomation.

Streetlighting.

*Streetlightingisoneofthelargestexpensesofmunicipalities.

*50%+savingswithLEDlights.

HighefficiencyLEDstreetlighting.

Foodandbeverage(biogastoenergy),agro-industry(biomasstoenergy),cement,glass,steel(wasteheattoenergy).

*Largersizeandgreatestsavingspotential,bothinelectricandthermalenergy.

Energycogenerationsystems,wasteheatrecoverytogenerateelectricity(OrganicRankineCycle),steamandhotair,biogasfromwastewatertreatmenttogenerateelectricity(biogas-poweredinternalcombustionengines),steamandhotwater(efficientboilers),highefficiencymotors.

Hotels,hospitals,supermarkets,shoppingcenters,TVstations.

*Seekopportunitiesincountrieswithaclearlydefinedregulatoryframeworkandattractiveretail/commercialelectricityprices.*Establishportfoliosofprojects.

Solarphotovoltaic(PV)generationforself-consumption.

Energy Efficiency: Investment Types, Strategy and Technologies

RENEWABLE ENERGY

Utility Scale Solar

Biogas to Energy

Small Hydro Power

Landfillgasusedasfuelforsteamboilerstogenerateelectricitywithturbinesorthroughgasifierscombinedwithinternalcombustionengines.

Selectinnovativeopportunitieswithinterestingexitstrategies.

Generationofsolarphotovoltaic(PV)energyforsaletothegrid.

Enterprojectswithhighpotentialatearlystagestoaddvaluetolocaldevelopersandachievehigherreturns

Earlystageinvestmentsinhydrogeneration(smallscale)andrehabilitationofhydroelectricplants.

Selectopportunitiesinsituationswithnocompromisingsocialand/orenvironmentalconcerns.

Renewable Energy: Investment Types, Strategy and Technologies

MGM Innova Group – JCM Experience

1

Pionner in JCM in Latin America

Implemented the first projects in Costa Rica, Mexico and Chile

5 JCM projects approved to date

3 projects fully implemented, 1 partially implemented and 1 to start implementation

List of projects:

5MWSolarPowerProjectinBelen,CostaRicaCoopeguanacaste (100%implemented)- 2016

HighEfficiencyChillerandtheExhaustHeatRecoverySysteminSanJose,CostaRicaWyndhamHotel(100%Implemented)- 2016

2.4MWPowerGenerationwithMethaneGasRecoverySysteminMexico,Energreen(partiallyimplemented)- 2016

1MWRooftopSolarPowerSysteminChile– UniversityFedericoSantaMaria(100%implemented)- 2016

2MWSolarPowerand4MWhStorageBatteryProjectinSanPedrodeAtacama,Chile(tobeimplemented)- 2018

Costa Rica Projects

SMAInverters - 2.2MW

Juanilama 5MW SPV in Belen

1

Installed PV capacity (kWp) 5,000

Inverter power (kW AC) 4,400(2x2.200)

HIT 325 Wp Modules 15,456

Annual Electricity (MWh) 9,680

Expected GHG Emission Reductions (tCO2e/yr) 2,504

JCM Subsidy 40%

Japanese Representative Partner NTTData

PanasonicHITPanels

Plant Layout: Subsidized Items

1 3 2

8

10

4 5

Panel detail(1 array consists of 42 panels)

1

3

2

4

5

8

10

PV Module with structures

Inverter (incl. sub-station)

Combiner Boxes/Electric Materials (DC)

Electric Materials (MV)

Recloser

Pyranometer (Weather Station)

UPS

Equipment Q’ty

15,456

2

32

1 set

1

1

1

New transmission line to connect with existing point of Coope Guanacaste

Grid Connecting Point

8km

187,

600

mm(2

3 ro

ws)

269,272 mm(16 arrays per row)

1array=42panels42panelsX16X23rows=15,456panels

CB#1

CB#4CB#5

CB#6CB#7

CB#8

CB#9

CB#3CB#2

CB#10

CB#17

CB#20

CB#18

CB#14

CB#21

CB#22CB#23

CB#24

CB#25

CB#26CB#27

CB#28

CB#11

CB#12CB#13

CB#19

CB#29

CB#31CB#30

CB#16CB#15

CB#32

INV#1 INV#2

Costa Rica 5MW SPV Belen – Aerial View

2

Wyndham High Efficiency Chiller and the Exhaust Heat Recovery

1

Chiller EfficiencyOldCentrifugal

Efficient Magnectic

Hot Water System EfficiencyBunker OilBoiler

TemplifierHeatRecovery

Annual Electricity (MWh/yr) 1,116

Annual Bunker Oil savings (liters/yr) 185,682

Financial Savings Upto40%

Expected GHG Emission Reductions (tCO2e/yr) 402

JCM Subsidy 40%

Japanese Representative Partner NTTData

High Efficiency Chiller and Heat Recovery

HighEfficiencyChiller

• Capacity– 400TR• ElectricitySavings– 769,184kWh/year• Financialsavings– 95,665US$/year• ExpectedEmissionReductions– 71.45tCO2/year

• Technology– DaikinMagneticChiller• Model–WMC400DC

BEFORE AFTER

Exhaust Heat Recovery

BEFORE AFTER

ExhaustHeatRecovery

• Capacity– 1,088MBH• BunkerOilSavings– 185,682liters/year• Financialsavings– 55,286US$/year• ExpectedEmissionReductions– 330.67tCO2/year

• Technology– DaikinTemplifier• Model– TGZ060B

Mexico Project

Energreen LFG to Energy Mexico

1

Landfill gas recovery and power generation systems in 2 landfills in Mexico:

2 Landfills in Mexico StateAtizapan(operational)Mextepec(in progress)

Installed capacity (MW) 2,4

Nominal capacity (MW) 2,0

Fuji Eletric / 2G Gensets - 1,2 MW (units) 2

Annual Electricity (MWh/year) 28,400

Expected GHG Emission Reductions (tCO2e/yr) 185,000 estim.

JCM Subsidy 40%

Japanese Representative Partner NTTData

Atizapan Landfill – 1,2 MW Installed Capacity

AtizapanLandfill

• Beginingofcommercialoperations– August2019• Regimen– SaleofElectricitytoCFEgrid

• Installedcapacity– 1,2MW• Nominalcapacity– 1,0MW• Annualgeneration– 12,000MWh/year• ExpectedEmissionReductions– 80,000tCO2/year(est.)

• Technology– 2GGensets (Germany)byFujiElectric• Model– AVUS1200

Mextepec Landfill – 1,2 MW in progress

2

MextepecLandfill

• Beginingofcommercialoperations– January2020(planned)• Regimen– SaleofElectricitytoCFEgrid

• Installedcapacity– 1,2MW(Potentialexpansionto2,4MW)• Nominalcapacity– 1,0MW• Annualgeneration– 16,400MWh/year• ExpectedEmissionReductions– 105,000tCO2/year(est.)

• Technology– 2GGensets (Germany)byFujiElectric• Model– AVUS1200

Chile Projects

1MW Rooftop Solar Power system to University

1

PV power (kWp) 992

Inverter power (kW AC) 974

HIT 325 Modules 3.054

Annual Electricity (MWh) 1.628

Emission Factor (tCO2/MWh) 0,314

Expected GHG Emission Reductions (tCO2/yr) 511

Japanese Representative Partner Waseda

2MW Solar Power and 4MWh Storage Battery Project

1

SPV and Storage Battery Project in Chile (Mining, Hotel and Utility)

Project under design and contract negotaiations phase

Project Location1SiteinTarapacáRegion2

SitesinAntofagasta

PV Power (kWp) 2,000

Battery capacity (kWh) 3,300

Sharp 370 Wp Modules (Japan) and Qinous Batteries (Germany)

Annual Electricity (MWh/year) 4,491

Expected GHG Emission Reductions (tCO2e/yr) 185,000 estim.

Japanese Representative Partner LiberalSolutions

Marco G. Monroy María Pía IannarielloFounderandCEO|MGMInnova Groupmarcogmonroy@mgminnova.com

FounderandCOO|MGMInnova Groupmariapiai@mgminnova.com

Gonzalo DiazCountryRepresentativeMGMInnovaCapitalChilegdiaz@sherpasgroup.cl

VPGlobalOperationsMGMInnova Consultinganicastro@mgminnova.com

Alfredo Nicastro

www.mgminnovagroup.com

Thank you