modular building systems international (mbsi) modular buildings and construction

Post on 01-Nov-2014

859 Views

Category:

Documents

4 Downloads

Preview:

Click to see full reader

DESCRIPTION

 

TRANSCRIPT

888-320-8050

www.MBSI.com

Key Contact

Patricia Berk - President & Owner of MBSI• Patricia Berk incorporated MBSI in April of 2000.

• MBSI has become the leading environmentally consciousmodular company in the State of Florida.

• Prior to MBSI, Ms. Berk held positions as Executive VicePresident and was a shareholder of ASAP Office Buildings

in Orlando, Florida, 1996-1999.• Branch Manager for the Central Florida branch of Space

Master International, 1993-1996.• Account Executive for Diamond Engineered Space, 1989-

1993.

• Phone 888-320-8050GUATEMALA HOUSING REVITALIZATION

About MBSI

• MBSI is a solely owned corporation based in theState of Florida, United States.

• MBSI is a certified general contracting firm,specializing in modular construction with Turn KeyServices.

• The Company was established April 10, 2000 withit’s primary business in the South East, USA.

• MBSI has established themselves in the alternativebuilding marketplace as a leader with energy

efficient and environmentally friendly buildings.

GUATEMALA HOUSING REVITALIZATION

MBSI’s Mission

• To exceed client expectations throughhonest communication, quality construction

and sensitivity for the environment, whilefostering a safe, creative and ethicalworkplace that provides unlimitedopportunities.

• To be major contributor to the developmentand quality of modular construction whileproviding impeccable customer service and

communication.GUATEMALA HOUSING REVITALIZATION

MBSI Business Philosophy

• To attain successful long-term relationshipsthrough truthful and honest business

procedures.

- Utilize proven manufacturers, qualitymaterials, and provide cost effective

construction.

- Committed to meeting all clientrequirements, for total customer satisfaction.

GUATEMALA HOUSING REVITALIZATION

Environmental Focus• Provider of the first platinum-levelLeadership, Energy and Environmental

Design (LEED) Certified modular school inthe State of Florida

• Introduced green building practices in allaspects of MBSI as standard practices.

• We use use certified green products in ourmodular buildings in order to minimize offgassing and conserve energy

GUATEMALA HOUSING REVITALIZATION

Market Sectors• Commercial Housing

- Group treatment homes, Dormitories, Military Housing,Worker Camps

• Schools- Charter, Public and Private, Gymnasiums, Classrooms,

Auditoriums• Medical

- CT/MRI Buildings, X-Ray Storage, AdministrativeBuildings, Doctors Offices, Hospitals, Laboratories

• Churches/Places of Worship - Daycare & Child Care, Offices, Fellowship Halls,Sanctuary's, Business Offices

• Government- Administrative Offices, dormitories, field

stations,Grelocatable medical centers

Types of Products Provided

• Factory Built Modular Structures

• Pre-engineered Steel Buildings

• Turn Key Site Services

• Building Accessories

GUATEMALA HOUSING REVITALIZATION

Recent Completed Projects

• Shands Hospital MRI/CT Scan ModularFacility

• Learning Gate Community School, PlatinumLevel LEED Certified Hillsboro CountyPublic Charter School.

www.learninggate.org• Terrace Community Charter Middle School-Hillsboro County Public Charter School

• 50,000 sq. ft. classroom space EmbryRiddle Aeronautical University

GUATEMALA HOUSING REVITALIZATION

Jacksonville Medical Center• MRI/CT can, type II non

combustible modularmedical facility.

• 5000 Square feet.• Contracted November2007• Finished March 2008

To know about MBSI’s other medical buildings and projects, visit http://mbsi.com/building-types/medical.html

Learning Gate School

• 9 Classrooms, 8000Sq. Feet

• First Platinum LEEDCertified ModularSchool in U.S.• Receiving National

Attention• www.learninggate.org

To know about MBSI’s other educational buildings and projects,visit http://mbsi.com/building-types/education.html

Terrace CommunityCharter School

• Built in 2007• Two Buildingstotaling 36,000 sq.feet.• Administrative

Offices• Gymnasium

• 30 Classrooms• Cafeteria

An Overview of thePermanent/Relocatable Modular Construction

Engineering & SubmittalsSite Development

Modular ConstructionStaging & Installation

Interior & Exterior FinishesProject Completion

2000 Modular Building Systems Intl.

Design Engineering• Unlimited Design Assistance

• FL Engineered Blueprints

• PE /Architect Coordination

• Local Permitting Administration

Design Site Development

Modular Construction

Staging and Installation Finishout Completion

2000 Modular Building Systems Intl.

Site Development

• Site preparation

• Foundations

• Logistics and receiving for staging

Design Site Development

Modular Construction

Staging and Installation Finishout Completion

2000 Modular Building Systems Intl.

Modular Construction Process• Begin Manufacturing Modules• Quality control/Documentation• State of FL building approval

• Delivery to Site

Design Site Development

Modular Construction

Staging and Installation

2000 Modular Building Systems Intl.

Finishout Completion

Staging & Installation

• Foundation Development prior toDelivery

• Staging on or near existing site• Set-up and installation• Begin on-site finishes

Design Site Development

Modular Construction

GUATEMALA

Staging and Installation

Begin Finishout

2000 Modular Building Systems Intl.

Finishout Completion

Begin On Site Finishes• As modular building is installed, on site Interior &

Exterior finishes Begin

• Full Time Construction Management

Design Site Development

Modular Construction

Staging and Installation

Begin Finishout

2000 Modular Building Systems Intl.

On Site CompletionFinishes

Interior Finishes• Interior finishes are completed

• Full Time Construction Management and Coordination of Interior Contractors

Design Site Development

Modular Construction

Staging and Installation

Begin Finishout

2000 Modular Building Systems Intl.

Interior CompletionFinishes

Finish Out•Exterior finishes completed:

•Exterior siding, sidewalks, canopies, etc

Design Site Development

Modular Construction

Staging and Installation

Begin Finishout

2000 Modular Building Systems Intl.

Exterior CompletionFinishes

Completion• Final walkthrough of building

• Test HVAC, Electrical & Plumbing

• Substantial Completion Signed Off

Design Site Development

Modular Construction

Staging and Installation

Begin Finishout

2000 Modular Building Systems Intl.

Finishout Completion

Project Completed

Design Site Development

Modular Construction

Staging and Installation

Begin Finishout

2000 Modular Building Systems Intl.

Finishout Completion

top related