3. Transfer the top layer of the � replace to desired location. This will become the bottom layer of the � re pit.

4. Transfer the second layer. Stagger the blocks on the second layer so the seams are not aligned.

5. Transfer the 8" jumbo units for the third layer.

6. Place 8" caps around the top layer.7. Fill the inside of the � re pit with gravel or

base rock a minimum 2 inches deep.

Instructions1. Remove packaging from the � re pit on the pallet. 2. Prepare the � replace location by establishing a

level surface about 65" x 65".

Size: Outside Diameter: 58" Inside Diameter: 42"

Piece Count 8" Tapered Units: 46 8" Jumbo Units: 13 8" Caps: 23

Fire pits should only be built over a non-combustible surface like concrete patios or a compacted gravel base. Never install a � re pit over a wood deck.

MUTUAL MATERIALS INSTALLATION INSTRUCTIONS Mutual Fire Pit Kits

Mutual High Back 58" Circle Fire Pit