new airport in dnepropetrovsk city

Post on 24-Feb-2016

54 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

new airport in dnepropetrovsk city. We intend to clarify main problems to maintain and expand the existing airport…. …and benefits of building the NEW one…. T he expansion of Ukrainian main airports. GATE CAPACITY OF UKRAINIAN AIRPORT’S after 2012 . Kyiv. Lvov. Kharkov. - PowerPoint PPT Presentation

TRANSCRIPT

new airportin dnepropetrovsk city

We intend to clarify main problems to maintain and expand the existing airport…

…and benefits of building the

NEW one…

BORYSPIL

Lviv

Donetsk

PLAYERS

SUPPORTERS

TOURISTS

The expansion of Ukrainian main airports

BORYSPIL ODESSA LVIV DONETSK KHARKIV

1840

400 300 300 200

4150

2000 2000 21001300

Before expansion After expansion

GATE CAPACITY OF UKRAINIAN AIRPORT’S after 2012

Lvov KyivKharkov

Odessa

Donetsk

Modernization of Ukrainian airports

DNEPROPETROVSK?

1980 1990 1991 1993 1995 1998 2002 2009

530,000660,000

474,000

53,000 78,000 101,000183,000

330,000

Annual Capacity Of The Dnepropetrovsk Airport

Annual capas...

Resent Terminal can operate only 800 000 passengers annually

800 000

passengers per year

5-8 million passengers

per year

Dnipropetrovsk

European city

ONLY FEW CONSTANT AND SEASONAL DESTINATIONS…

3. Taxiways for aircraft are longand not convenient

4. Runway is too short

2. Airport is situated too close to theresidential area

PROBLEMS OF EXISTING AIRPORT

1. Limited space for potentialdevelopment of the Terminal building

Runway orientation does correspond with prevailing wind orientation

Centralized to

De-centralized organization of the Terminal

The expansion of existing airport will transform previously

INTERNATIONAL EXPERIENCE.CENTRALIZED CONFIGURATION OF THE TERMINAL BUILDING

Oslo

Beijing

Queen Alia

hj 2 runways will accept all aircraft types

new terminal building will meet European standards

the site will not be constrained from futureexpansion

Dnepropetrovsk

Zaporozhe

Solene

The site for New airport

New airport will be situated in 30 km from both Dnepropetrovsk and Zaporozhe cities

It will have 2 runways for all types of aircrafts

New Terminal will have 2 levels of transport approach for departures and arrivals

New airport will meet all international licensing standards

30 km

30 km

We will reduce the time needed to operate passengers

We will avoid transportation problems on the road to the Terminal

We will create a sufficient circulation and concourse area…

will provide high level of service to travelerswill have an attractive architectural lookwill become a symbol of our region

New Terminal Building

Thank you for your attention!

top related