News from Alberto et al.• Fibers document separated from the rest of the computing

resources• https://edms.cern.ch/document/1155044/1 • https://edms.cern.ch/document/1158953/1

• Documents finalized (end of August)• Power requirements: 100 kW total

Racks• Racks on Jura side: 800 mm depth (standard CERN racks)• Racks on Saleve side: 1000 mm depth• Dimensions of racks’ base plate is needed (for the supports)

Power• Computing nodes:

• 9kW/rack• 2 to 5 racks

• Storage nodes: • 5kW/rack• 3 racks

• Support: • 1/2 rack, 4kW

• DCS,DSS• 4 kW • 2 racks

• Network: 4kW• GTK:

• 3 kW/rack• 3 racks

+ cooling doors: 1 kW/door, 10kW

Total: 68 kW (include 50% safety margin: 95 kW)

Computing nodes• How much total computing power for 2012?• Specify AMD or INTEL?• How many processors? How many cores?

Intel Westmere architecture (32 nm):• Xeon 5600, 6cores

• X series, up to 3.33 GHz• E series, up to 2.66 GHz• L series, low-consumption, up to 2.26 GHz

• CERN Openlab tested system: • 2×X5670@2.93 GHz, 16 cores• 2×6 GB RAM, 450 W power load (full load), • 238 HEPSPEC06 (24 processes)=20/core• In one 9 kW rack, 20 systems, 4760 HEPSPEC06, approximately 1250 kSi2k

• How much RAM? How much local disk space?• How many 10 Gb and 1 Gb ports/machine? (How many switches?)

Storage nodes• How much disk for 2012?• Availability of CMS hardware• 12 disk arrays with 12 disks each and redundant fiber channel interface:

• 120 disks WD raptor 300GB (bought at the beginning of the year) • 24 disks 1TB • 2x 32 port fiberchannel switch • 10 DELL servers 2950 with redundant fiber channel cards.

• Questions:• More technical details asked to our CMS colleagues• Cost?• Maintenance?

Procurement• Racks and cooling doors

• Difficult/not possible to join CERN-IT tender• Network apparata

• Handled by CERN-IT, installation, management, maintenance included• Computing & storage nodes

• How to handle the purchase/acquisition? (CERN, Mainz?...)

• Time plan for purchase and delivery?

Man power• Who and when is going to do/follow/check:• Installation• Commissioning• Operations

• More: • What about UPS system purchase/installation?• Remote monitoring of cooling doors (discussion going on with