Nippon Koei – July 2018
A Reliable & Sustainable Partner
More than 70 years of experience
3 3
Nippon Koei Co. Ltd (NK), founded in 1946, listed company in Japan with a turnover
of ¥81,865m in 2016 (equivalent of 740m USD) with 16 subsidiaries and more than
4,300 employees, had during the last 72 years provided engineering consulting and
EPC services to major energy players in Japan and abroad.
NK now supports energy transition and sustainable development worldwide via
investment in projects focused on new business models such as energy storage,
micro grids and VPP.
1st Japanese at ENR Ranking (ENR has produced a ranking of top 100 green design
firms based on the volume of sustainable and "Green" projects they have worked on)
“Act with integrity and contribute to society through technology and engineering.”
Nippon Koei founder Yutaka Kubota (1890-1986)
Our Main Lines of Business
Domestic Consulting International Consulting
Power Engineering Urban & Spatial Development
Nippon Koei strives to create a rich living space by developing urban and
railway-side areas in parallel with infrastructure construction, and designing
airport and railway station buildings to meet the demand for urban
development mainly in emerging Asian countries.
Nippon Koei has implemented projects (about 3,000 per year) to
underpin the foundations of people’s daily lives, such as
development and maintenance of social capital including rivers,
roads, etc., and regional reforms to realize rich and safe living.
Nippon Koei underpins development in the developing countries of Africa, the Middle East and Latin America as well as primary countries in Asia by providing support in a broad range of fields including water resources, energy, urban development, transportation, agricultural development, and the environment.
Nippon Koei has worked on the development of power sources and the
promotion of business supporting power demand in Japan and overseas.
The Company has engaged in new construction and repairs of substations,
switching stations, power stations, the formation of dam management
systems at hydroelectric power plants, etc.
4
Latin AmericaSub-Saharan
Africa
Middle East/
North AfricaAsiaJapan
Asahan 2 Hydropower, Indonesia
Landfill Project forIndustrial Solid Waste
Kanagawa Pumped-Storage Power Station
Onahama Port Restoration
Solid Waste ManagementPalau
Masjed-SoleymanHydropower, Iran
Forest Preservation Program,Timor-Leste
Sustainable Dev. of the Greater Cairo, Egypt
Greater Kampala Road Network, Uganda
Huachipa Water SystemPeru
Agricultural Sector Strengthening, Paraguay
Ho Chi Minh City MRTVietnam
Doha West Sewage Treatment Plant, Qatar
Sondu-Miriu Hydropower, Kenya
RoppongiRedevelopment
Countermeasures againstDeep-seated Landslide
Tunis South Suburban LineTunisia
Rural Water Supply, Rwanda
Solar Power SystemBelize & Uruguay
Sihanoukville Port & SEZ Dev. Project, Cambodia
Urban Development Master Plan for Lilongwe, Malawi
Callao PortPeru
Agriculture project,Jordan River Rift Valley
Urban Transport Development Project ,Sao Paulo, Brazil
Artisanal promotion - One Village One Product Program
A Wide Range of Expertise over the World
Energy
Infrastructure
Water &
Sanitation
Transportation
Infrastructure
Urban Industry
& Development
Environment,
Disaster
Management
& Agriculture
5
Power Generation Business - IPP: Distributed power technologies
8 power stations in Japan (Total 2,655kW including a planned power station of 600kW )
1 power station in Indonesia (7,200kW:put into operation in 2019)
From service provider to investor
Small-scale hydropower plants
6
Our references abroad as an investor
- Hydropower plants in Indonesia
- Biomass power plant in Philippines
- Battery energy storage 4MWh in UK
- Battery energy storage 6MWh in UK
- Participation as main investor to the first energy storage fund listed at the London Stock Exchange
- Co developer of a 25MW battery energy storage project in Belgium
In Discussion:
- Micro grids hybrid power plants in South East Asia
- Portfolios of energy storage projects in UK and Continental Europe
7
BATTERY ENERGYSTORAGE SYSTEMS
(BESS)
Energy Management System for Micro Grids
Energy Management system charges and discharges storage battery according to fluctuation of photovoltaic generation power and electric consumption
Peak shaving from 620 kW to less than 500 kW
Supply and demand plan control that predicts peak power of the next day
9
Micro grid & Energy Management at our Fukushima Works Plant in 2013
Solar PanelSolar Panel
Solar Panel
Solar Panel
BESS
PV Power
160kW
Conservation(HV/AC,Lighting etc.)
Power supply
Charges/dischargesDemand
Measurement
Control, Monitoring
BOPPower Grid
BESS
380kW/100kWh
Control, Measurement
Measurement
Solar PanelSolar Panel
Solar Panel
0
20
40
60
80
100
蓄電池充電率(%
)
-200
-100
0
100
200
300
400
500
600
700
0:00
1:00
2:00
3:00
4:00
5:00
6:00
7:00
8:00
9:00
10:0
011
:00
12:0
013
:00
14:0
015
:00
16:0
017
:00
18:0
019
:00
20:0
021
:00
22:0
023
:00
電力(
kW)
エネルギーマネジメ ント によるデマンド 電力の低減受電電力
デマンド 電力
蓄電充放電電力
太陽光発電
charge
discharge
Demand Control example
Charge in low load timeSO
C(%
)Dem
ad(k
W)
Demad
Real power
BESS Power
Smart grids in small islands
Carried out a feasibility study of "Mikurajima Smart Grid"
A small island located in southern area of Tokyo in the Pacific Ocean
• 300 residents 480kW max demand
Solar Power & BESS + Hydraulic Power + EMS +DG
Stabilize an unstable power grid system
10
Mikura Haber
PV Power Sta.
City hallSchool
Hydro Power Sta.
DG Power Sta.
Resident
LIB
EMS
Mikura Isle Micro Grid
Stabilize an unstable Power grid system
Solar Power Hydraulic Power
Hydrore-powering & prevent
long fluctuation
EMSMonitoring & Control for
stabilize Power grid
Solar PowerOutput Stabilization of the
solar power by LIB
By stabilizing the fluctuation by the control system,Photovoltaic system
increases 170%
UK Battery Project in North Yorkshire (6MWh)Applications
Enhanced Frequency Response (one of the first of its kind in UK)
Capacity Market
Triad
11
BESS Control System (NK-EMS)
Project Summary
Implemented a test connected to the actual BESS.
Measurement of operation confirmation based on FFR test specification, communication response time / response time of power storage system.
Test result
Confirm the normality of communication between the BESS site controller and NK-EMS.
Performing the test based on FFR test the National Grid. Confirm the normality of the following items.
· Speed of delivering the response
· Proportionality of the response
· Sustainability of the response
Request response time (within 10 seconds) of FFR fully satisfied. We got the possibility to respond to EFR request response time (within 1 second).
NK-EMS successfully tested with a 4MWh BESS (partly owned by NK)
BESS from one of most renown integrator
FFR (Firm Frequency Control) Testing of UK National Grid
Real connection test at the facility of the maker in Netherlands
12
■System Connection Diagram
Database server (Nippon Koei/Japan)
3G Cellular
NK-EMS (Linux Computer)
Tesla Site Master Controller
Battery System (Switch, PCS,
Battery)
Meter
(Frequency)
Test Site (Holland)
: Equipment and cable that Nippon Koei brings in test site from Japan
Modbus TCP/IP (Cat5e/6 Lan)
Laptop PC (for data checking)
Aggregator Simulator
※Refer to “BLOCK DIAGRAM”
Nippon Koei System
Site controller
Development of a BESS in Belgium (25MWh)
Ruien Energy Storage NV (RES) is a joint venture between NK and the Belgium company Yuso.
RES is currently developing a Battery-based Energy Storage System (BESS) in Ruien (East Flanders, Belgium).
The BESS aims to deliver ancillary services to European grid operators (TSOs) as well as energy services to local businesses at the site of the former 800MW coal-fired power plant currently under post-decommissioning redevelopment.
The BESS commissioning is expected for early 2020. The capacity of the energy storage installation will be 25 MW with the option to enlarge its size later.
More information: http://www.res-nv.be/
13
BESS FOR SOLAR & DISTRIBUTED
GENERATION
Market size today?
15
For which applications?
16
For which applications?
• Ancillary services for grid operators
Frequency regulation
Voltage support
Congestion management
Black start
Inertia
• Renewable energy integration
Load shifting
Load smoothing
• Optimization of existing thermal plants
• Hybrid system for decentralised generation
Micro grids
Peak shaving17
Technical Proof of Concept?
18
Teylers Museum in Haarlem (NL) 18th century batteries
Costs?
19
What are the main barriers?
• Regulation
• Regulation
• Regulation
• Regulation
• Regulation
• Regulation
• Regulation
• Regulation
20
“Act with integrity and contribute to society through technology and engineering.”
Franck BERNARD
Senior Vice-President Energy Storage & VPP
Nippon Koei
bernard-fr@n-koei.jp