noida metro rail corporation (nmrc) limited€¦ · · 2017-04-01noida and greater noida are...
Post on 16-Apr-2018
217 Views
Preview:
TRANSCRIPT
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
1 | P a g e
Application
For
Connectivity to Metro Station throughFoot over Bridge / Skywalk
NOIDA METRO RAILCORPORATION (NMRC) LIMITED
March 2017
Issued by:
Noida Metro Rail Corporation (NMRC) LimitedBlock-III, 3rd Floor,
Ganga Shopping Complex, Sector-29, Noida -201301,District Gautam Budh Nagar, Uttar Pradesh, India
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
2 | P a g e
CONTENTS 1. About NMRC
2. Disclaimer
3. Application for FOB/ Skywalk
4. Annexure 1
5. Annexure 2
6. Annexure 3
03
03
04
06
07
08
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
3 | P a g e
ABOUT NMRCNoida and Greater Noida are being developed as the industrial townsto New Delhi and more and more people from Delhi and other areasare shifting to these towns in search of fresh air, greenery and betterinfrastructure. There is a need of providing an efficient, reliable andcomfortable transportation system for the population intending tosettle in these towns and also the public coming to these areas foreducation, service and business.
Noida Metro Rail Corporation (NMRC) is a Special Purpose Vehicle(SPV) formed for planning and executing urban transport projects inNoida, Greater Noida regions. NMRC desires to provide a world-class Public Transportation System with state-of-the-art technology.As such, the overarching criterion for setting up of NMRC is to helpcreate an efficient, safe, reliable, economical and affordable publictransport system.
This Application for “Connectivity to Metro Station through Foot overBridge (FOB)/ Skywalk” contains brief information about the scope ofwork.
While all efforts have been made to ensure the accuracy of informationcontained in this Application Document, this Document does not purportto contain all the information required by the Applicants. The Applicantsshould conduct their own independent assessment, investigation andanalysis and should check the reliability, accuracy and completeness ofthe information at their end and obtain independent advice from relevantsources as required before submission of their application/s. NoidaMetro Rail Corporation Ltd. (“NMRC” or “the Company”) or any of itsemployees or advisors shall incur no liability under any law, statute,rules or regulations as to the accuracy or completeness of theApplication Document.
NMRC reserves the right to change any or all conditions/information setin this Application Document by way of revision, deletion, updating orannulment through issuance of appropriate addendum as NMRC maydeem fit without assigning any reason thereof.
NMRC reserves the right to accept or reject any or all applicationswithout giving any reasons thereof. NMRC will not entertain or be liablefor any claim for costs and expenses in relation to the preparation of thedocuments to be submitted in terms of this Application Document.
DISCLAIMER
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
4 | P a g e
Application for Connectivity to Metro Station throughFoot over Bridge (FOB)/ Skywalk
1. Background1.1. An elevated metro line between Noida and Greater Noida is under advanced stages
of construction and is likely to be operational from April 2018.1.2. It is acknowledged that Foot over Bridges/ Skywalks will provide
· Better, hassle free and seamless integration for people living in that area orproperty
· Possibility of linking business within and around the pedestrian skywalks· Benefits of saving in travel time due to direct link between origin and destinations· Possibility of Increase in property value due to increase in accessibility to
pedestrian traffic from metro station· Shaded paths to pedestrians· Enhancement of environmental quality
1.3. NMRC invites Applicants (“Interested parties”) to submit their Applications. Based onthe responses of Applications received, NMRC shall finalize the terms and conditionsand initiate the procedure.
1.4. The issue of this Application does not imply that NMRC is bound to undertake theProcess and select the Applicant.
2. About ProjectI. The project is envisioned to provide seamless integration between metro station and
the commercial/ residential/ institutional and/or other developments. The mapsshowcasing the upcoming metro line have been depicted in Annexure 3.
II. The Applicant shall be responsible for construction, operation, maintenance etc. for aperiod of 30 years after taking prior written permission of NMRC.
III. The design and construction of FOB/ Skywalk shall be undertaken by Applicant at itsown cost and is subject to the approval by NMRC.
IV. The Applicant needs to obtain all approvals, permits, etc. from all competent andrequired authorities, including different tiers of government, statutory, local, civicauthorities, etc.at its own cost. NMRC shall extend the assistance of its good office ona reasonable effort basis to assist the Applicant in getting such approvals, permits, etc.in connection with the development of the FOB/ Skywalk.
V. Ownership rights of FOB/ Skywalks shall vest in NMRC.
3. Eligibility of BiddersShould be real estate property owner/ institution/ office/ commercial property owner,RWA, individual or jointly in consortium
4. Selection ProcessThe Application is issued only with a purpose of collection of information from interestedparties and NMRC reserves the right to proceed ahead with the Project. However, theapplications received shall be reviewed carefully and interactions with the applicants arelikely to take place before finalisation of terms and conditions.
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
5 | P a g e
5. Application Registration and InstructionsI. Applicants are advised to study all instructions, forms, terms, requirements and other
information in the Application carefully.II. Applicant shall be deemed to have applied after careful study and examination of the
Application Document with full understanding of its implications.
6. Submission ofI. All the notifications & detailed terms and conditions regarding this Application notice
hereafter will be published on the NMRC website.II. The application should be submitted in hardcopy in a sealed envelope within the
deadline as specified in Clause no. 8.III. Applicant shall submit all formats and suggested documentary evidence with the
Application document.
7. Documents to be submittedThe Application to be submitted by the Interested Parties shall, interalia, include:
(a) Cover Letter expressing interest to participate in the form and manner prescribedhereunder as Annexure 1;
(b) Details of Applicant and Project in the form and manner as prescribed hereunder asAnnexure 2.
8. Date of submissionI. The Interested parties shall submit their respective details in aforesaid format latest by
21/04/2017 [3:00 PM] at NMRC’s herein below mentioned address:Noida Metro Rail Corporation (NMRC) LimitedBlock-III, 3rd Floor, Ganga Shopping Complex, Sector-29,Noida -201301District Gautam Budh Nagar, Uttar Pradesh Email: nmrcnoida@gmail.com
II. Applications received by the NMRC after the specified time on the Application Due Dateshall not be eligible for consideration and shall be summarily rejected.
9. Nodal Officer for Information about the Project ApplicationApplicants may obtain further information/ clarifications pertaining to this Application fromthe office of Shri Yogesh Kumar, DGM (Operations), +91-120-4344483/84 (Extn- 531)/+91-9910375462, Noida Metro Rail Corporation (NMRC) Limited, Block-III, 3rd Floor,Ganga Shopping Complex, Sector-29, Noida -201301, District Gautam Budh Nagar, UttarPradesh
10. LanguageI. The Applications prepared by the Applicant and all correspondence and documents
relating to the applications exchanged by the Applicant and NMRC, shall be written inEnglish language, provided that any printed literature furnished by the Applicant inanother language shall be accompanied by an English translation in which case, forpurposes of interpretation of the application, the English translation shall govern.
II. If any supporting documents submitted are in any language other than English,translation of the same in English language is to be duly attested by the Applicant.
Executive DirectorNoida Metro Rail Corporation (NMRC)
Uttar Pradesh
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
6 | P a g e
Annexure 1
Format for Covering Letter
Date:
To,Executive DirectorNoida Metro Rail Corporation (NMRC) LimitedBlock-III, 3rd Floor, Ganga Shopping Complex,Noida -201301,District Gautam Budh Nagar, Uttar Pradesh
Sub: Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Dear Sir,
1. With reference to your Application document dated _______________, I/We theundersigned am/are hereby expressing our Interest to install, operate and maintain FOB/Skywalk at ______________ (Station name) for a period of 30 years.
2. We understand that NMRC wishes to grant rights for the construction, operation,maintenance of FOB/ Skywalk and based on responses, NMRC shall finalize the termsand conditions. Further, the issue of this Application does not imply that NMRC is boundto appoint any applicant, as the case may be, for the Project.
3. We have prepared our application for the captioned project as specified in ApplicationDocument.
I/We hereby declare that all the information and statements made in this Application are true.
___________________________(Name and Title of the Signatory)
___________________________(In the capacity of)
Company Seal
__________________________(Name of the Entity)
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
7 | P a g e
Annexure 2
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
1 Name of Applicant/Company :
2 Address for CorrespondenceContact PersonMobile No.Phone No.Email ID
:::::
3 Station name for which connectivityis requested
:
4 Distance from Central line or station(Map as per website)(Provide Google image indicatingConnectivity)
:
5 Expected Tentative Ridership to themetro station from property
:
6 Details of the Property : Commercial Residential (Select one)
(i) Land use of plot :
(ii) Plot area :
(iii) No. of Units (In case of residential)
:
(iv) Covered area (In case of other than
Residential)
:
7 Tentative alignment of Sky walk /FOB
(Attach Sheet)
:
Declaration :- The cost of construction of the FOB & its maintenance from the station to the property shall be borne by us.
Date : --------------------
Place : ----------------------
(Signature of Applicant)
✓
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
8 | P a g e
Annexure 3: Details of the Metro Stations
Fig: The Upcoming Metro Line
Please Note: The map shown above is indicative (not to scale)
Sector 71
Sector 50
Sector 101
Sector 81
Dadri Road
Sector 83
Sector 137
Sector 142
Sector 143
Sector 144
Sector 145
Sector 146
Sector 147
Sector 148
Knowledge Park IIPari Chowk
GNIDA Office
ALPHA I
DELTA I
Depot Station
Sector 78
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 9 | P a g e
Station – Sector 71
Sector 71 Station
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 10 | P a g e
Station – Sector 50
Sector 50 Station
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 11 | P a g e
Station – Sector 78
Sector 78 Station
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 12 | P a g e
Station – Sector 101
Sector 101 Station
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 13 | P a g e
Station – Sector 81
Sector 81 Station
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 14 | P a g e
Station – Dadri Road
Dadri Road
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 15 | P a g e
Station – Sector 83
Sector 83 Station
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 16 | P a g e
Station – Sector 137
Sector 137 Station
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 17 | P a g e
Station – Sector 142
Sector 142 Station
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 18 | P a g e
Station – Sector 143
Sector 143 Station
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 19 | P a g e
Station – Sector 144
Sector 144 Station
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 20 | P a g e
Station – Sector 145
Sector 145 Station
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 21 | P a g e
Station – Sector 146
Sector 146 Station
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 22 | P a g e
Station – Sector 147
Sector 147 Station
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 23 | P a g e
Station – Sector 148
Sector 148 Station
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 24 | P a g e
Station – Knowledge Park II
Knowledge Park II
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 25 | P a g e
Station – Pari Chownk
Pari Chowk
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 26 | P a g e
Station – Alpha I
Alpha I
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 27 | P a g e
Station – Delta I
Delta I
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 28 | P a g e
Station – GNIDA Office
GNIDA Office
Application for Connectivity to Metro Station through Foot over Bridge/ Skywalk
Potential sites shown on google maps are indicative only. Any Developer or prospective owner of the property who foresees potential connectivity can submit his Application 29 | P a g e
Station – Depot Station
Depot Station
top related