TRANSCRIPT

NoNo--Impact: Hydraulic ModelingImpact: Hydraulic Modeling

Risk MAPNo-Impact/ No-Rise

A Document Used to show that a proposed project will result in “no impact” in the 1% annual chance floodresult in “no-impact” in the 1% annual chance flood and floodway elevations or floodway widths and locations

See RIV Guidance Document

Risk MAP2

Risk MAPGeneral OverviewNo-Rise Conditions

Section 60.3 (d) (3) of the National Flood Insurance Program (NFIP) regulations states that a community g ( ) g yshall “prohibit encroachments, including fill, new construction, substantial improvements, and other developments within the adopted regulatory floodwaydevelopments within the adopted regulatory floodway unless it has been demonstrated through hydrologic and hydraulic analyses performed in accordance with t d d i i ti th t th dstandard engineering practice that the proposed

encroachment would not result in any increase in flood levels within the community during the occurrence of y gthe base (100-year) flood discharge.”

Risk MAP

Risk MAPGeneral OverviewNo-Rise Conditions (Continued)

Prior to issuing any building grading or development permits involving activities in adevelopment permits involving activities in a regulatory floodway, the community must:• obtain a certification stating the proposed g p pdevelopment will not impact the pre-project base flood elevations, floodway elevations, or floodway d t idthdata widths.

• The certification should be obtained from the permittee and signed and sealed by a professionalpermittee and signed and sealed by a professional engineer.

Risk MAP

Risk MAPGeneral ConditionsNo-Rise Conditions (Continued)

The engineering or “no-rise” certification must be supported by technical databe supported by technical data. • Based upon the standard step-backwater computer model utilized to develop the 100-year floodway p y yshown on the community’s effective Flood Insurance Rate Map (FIRM) or Flood Boundary and Floodway Map (FBFM)Map (FBFM)

• and the results tabulated in the community’s Flood Insurance Study (FIS).su a ce S udy ( S)

Risk MAP

Risk MAPNo-Impact

“No Rise” “No Impact”“No-Rise” = “No-Impact”

Risk MAP

Risk MAP

ExampleExample

Risk MAP 7

Risk MAPProposed Project

Proposed road in the floodway and floodplain Cut and fill along a river

Risk MAP8

Risk MAPEffective FIRM

Risk MAP9Two New Cross Sections Between G and H

Risk MAPCross Sections14650 and 14850

Added to the effective model to create pre-project conditions modelM difi d i th j t diti d l t fl t Modified in the pre-project conditions model to reflect the proposed project cut and fill conditions

Risk MAP10

Risk MAPCross Section 14650

Cut and Fill

Risk MAP11

Risk MAPCross Section 14850

Cut and Fill

Risk MAP12

Risk MAPEffective Conditions HEC-2 Input- found in warehousep

Risk MAP13

Risk MAP

Effective ConditionsHEC-2 Input

G

H

Risk MAP14

Risk MAP

Pre-Project GR Data

Risk MAP15

Risk MAPPost-Project GR Data

Risk MAP16

Risk MAPWhat to Look For . . .

Water-surface elevation increases Floodway elevation increases Floodway width increases Floodway width increases Surcharges that exceed 1.0 Negative surcharges Changes to Manning’s “n” values Reach lengths

Risk MAP17

Risk MAPPre-ProjectConditions Output

Risk MAP18

Risk MAPPost-ProjectConditions Output

Risk MAP19

Risk MAPPre-ProjectConditions Output

Risk MAP20

Risk MAPOutput Table 200

Risk MAP21

Risk MAPThree (3) Computer Runs

Effective

Pre-Project

Post Project

Risk MAP22

Risk MAP

Output Comparisonp p

Risk MAP23

Risk MAP

Output Comparisonp p

Risk MAP24

Risk MAPCommon Problems

Changes in Manning’s “n” values Changes to the floodway Surcharge values outside 0.0 to 1.0 Incorrect reach lengths

Risk MAP25

Risk MAPNo-Impact

Project cause increases in • flood levels • floodway velocitiesfloodway velocities • floodway widths

Not a “No-Rise” andM t t S ti 65 12 (CLOMR) Must meet Section 65.12 (CLOMR)

Risk MAP26

Risk MAP

No-ImpactHydraulic ModelingHydraulic Modeling

Questions?

Risk MAP