INTRODUCTION• In Obra power Station electricity is generated.• The project was proposed by Uttar Pradesh Rajya
Vidyute Utapadan Nigm Ltd. (Uttar Pradesh) India in July 1967.
• At first two units were installed each producing 50 MW of power.
• The first estimated cost was Rs. 143 Crores.
STAGE I
5 X 50 MW STAGE Il
3X100 MWSTAGE Ill
3X200 MW
STAGE IV
2X200 MW
Coal Storage
Coal Handling Plant
Ash Storage
Ash Handling Plant Boiler Super
Heater
Economizer
Air Pre-heater
Turbine
Chimney
Feed Water Heater
Deaerator
Cooling Tower
Make up Water
Air
Coal
Ash
COAL
ASH
STEAM
WATER
FLUE GASES
Alternator
Condenser
Exciter
COAL HANDLING PLANT
WAGON TRIPLER Wagons From the coal yard come to the tippler and are emptied here.
The process is performed by a Slip ring motor of rating 55KW, 415V, 1480 RPM.
This motor turns the wagon by 150 degree and coal falls directly on the conveyor through vibrators
WATER TREATMENT PLANTWATER TREATMENT PLANT
BOILERBOILERTemperature of SuperHeated Steam – 540’cPressure-144 kg/cm*cm
• Boilers are used for electrical power generation, heat energy is released from the combustion of fuels.
• BHEL make direct fired natural circulation balanced draft tube boilers are used here, having capacity of 375 tones/hour and efficiency of 86.6%.
STEAM TURBINESTEAM TURBINE
Steam Flow
HP Turbine
IP Turbine
LP Turbine
It convert heat energy of steam into mechanical energy and drive generator.
It uses the principle the steam when issuing from a small opening attains a high velocity.
DETAILS OF BRIEFLY TURBINE
BASIC WORKING OF THERMAL POWER PLANT
TRANSFORMER Transformer is a static device which
is used to change the voltage level keeping the power and frequency same.
In the whole plant there are about 83 transformer installed at various places to operate the auxiliaries.
Main transformers, which are necessary: 1. To step up the generated voltage. 2. To supply power to the auxiliaries from the generator. 3. To start the plant by taking the supply from the grid
Fly ash (80%).Used for making bricks.Cement.
Bottom ash (20%)Used to improve fertility.Roads.
BOILER –FLY ASH PRODUCESDE.S.P. – BOTTOM ASH
(in small amount)
Two 220 KV bus bars have been provided in switch yard and are inter-connected through a bus coupler
Two step down transformer each feeding 6.6 KV system
12 Feeders