Project No. 160113
PID 100244
BUT-Wet Crash Locations
Federal
Type: SPOT SAFETY
Completion Date: 9/16/2016
Award Amount: $759,253.20
Contract Awarded To: A & A SAFETY INC
Letting Date: 4/7/2016
Engineer's Estimate: $661,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
A & A SAFETY INC
1126 FERRIS RD
AMELIA, OH 45102
Clermont
Bidder 1
Bid $759,253.20
160113 - Page 1
Ref #1 611E97001 SLOTTED DRAIN, TYPE 1, AS PER PLAN 12 INCH, (370 FT)
Awd $101,750.00$275.00
Ref #2 611E98370 CATCH BASIN, NO. 6, (2 EACH)
Awd $5,800.00$2,900.00
Section 1 - DRAINAGE - Totals
Awd $107,550.00
Ref #3 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (250 SY)
Awd $28,875.00$115.50
Ref #4 253E01001 PAVEMENT REPAIR, AS PER PLAN, (250 SY)
Awd $50,000.00$200.00
Ref #5 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (40005 SY)
Awd $100,812.60$2.52
Ref #6 254E01600 PATCHING PLANED SURFACE, (250 SY)
Awd $1,312.50$5.25
Ref #7 618E40100 RUMBLE STRIPS, (ASPHALT CONCRETE), (398 FT)
Awd $5,970.00$15.00
Ref #8 690E98300 SPECIAL - MISC.:HIGH FRICTION SURFACE TREATMENT, (9276 SY)
Awd $231,900.00$25.00
Section 2 - PAVEMENT - Totals
Awd $418,870.10
Ref #9 621E00100 RPM, (269 EACH)
Awd $10,612.05$39.45
Ref #10 621E54000 RAISED PAVEMENT MARKER REMOVED, (269 EACH)
Awd $10,571.70$39.30
Ref #11 644E00100 EDGE LINE, 4", (6.43 MILE)
Awd $16,203.60$2,520.00
Ref #12 644E00200 LANE LINE, 4", (1.05 MILE)
Awd $1,464.75$1,395.00
Ref #13 644E00300 CENTER LINE, (1.95 MILE)
Awd $8,336.25$4,275.00
Ref #14 644E00400 CHANNELIZING LINE, 8", (1240 FT)
Awd $1,426.00$1.15
Section 3 - TRAFFIC CONTROL - Totals
Awd $48,614.35
Ref #15 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (128 HOUR)
Awd $9,600.00$75.00
Ref #16 614E12440 WORK ZONE SIGN SUPPORT, (404 EACH)
Awd $4,040.00$10.00
Ref #17 614E12460 WORK ZONE MARKING SIGN, (262 EACH)
Awd $3,930.00$15.00
160113 - Page 2
Ref #18 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (1 SNMT)
Awd $900.00$900.00
Ref #19 614E20400 WORK ZONE LANE LINE, CLASS II, (1.8 MILE)
Awd $450.00$250.00
Ref #20 614E22310 WORK ZONE EDGE LINE, CLASS II, (6.4 MILE)
Awd $2,560.00$400.00
Ref #21 614E23650 WORK ZONE CHANNELIZING LINE, CLASS II, (225 FT)
Awd $123.75$0.55
Ref #22 614E24000 WORK ZONE DOTTED LINE, CLASS I, (1260 FT)
Awd $630.00$0.50
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $22,233.75
Ref #23 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $5,100.00$5,100.00
Ref #24 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $136,885.00$136,885.00
Ref #25 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
Section 5 - INCIDENTALS - Totals
Awd $161,985.00
160113 - Page 3
Project No. 160131
PID 77886
TRU-US 62-4.58 (PART 1 AND PART 2)
Federal
Type: MISCELLANEOUS
Completion Date: 9/30/2017
Award Amount: $9,787,454.44
Contract Awarded To: MARUCCI & GAFFNEY EXCAVATING CO
Letting Date: 4/7/2016
Engineer's Estimate: $11,309,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
MARUCCI & GAFFNEY EXCAVATING CO
18 HOGUE ST
YOUNGSTOWN, OH 44502
Mahoning
Bidder 1
Bid $9,787,454.44
A P O'HORO COMPANY
P O BOX 2228
YOUNGSTOWN, OH 44504
Mahoning
Bidder 2
Bid $10,416,000.00
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 3
Bid $11,382,802.38
KARVO COMPANIES INC
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 4
Bid $12,057,200.81
160131 - Page 4
Ref #1 202E30000 WALK REMOVED, (164 SF)
Awd $328.00$2.00
2 $574.00$3.50
3 $656.00$4.00
4 $1,476.00$9.00
Ref #2 202E32000 CURB REMOVED, (34 FT)
Awd $170.00$5.00
2 $272.00$8.00
3 $340.00$10.00
4 $595.00$17.50
Ref #3 202E98100 REMOVAL MISC.: BARRIER REFLECTOR, (175 EACH)
Awd $875.00$5.00
2 $525.00$3.00
3 $306.25$1.75
4 $1,575.00$9.00
Ref #4 203E10000 EXCAVATION (FOR PAVEMENT REPAIR), (133 CY)
Awd $1,330.00$10.00
2 $2,660.00$20.00
3 $3,325.00$25.00
4 $4,123.00$31.00
Ref #5 203E10000 EXCAVATION (FOR WALK OR CURB RAMP INSTALLATION), (3 CY)
Awd $150.00$50.00
2 $108.00$36.00
3 $300.00$100.00
4 $300.00$100.00
Ref #6 203E20000 EMBANKMENT, (1 CY)
Awd $200.00$200.00
2 $20.00$20.00
3 $300.00$300.00
4 $110.00$110.00
Ref #7 209E60200 LINEAR GRADING, (338 STA)
Awd $16,900.00$50.00
2 $20,280.00$60.00
3 $20,280.00$60.00
4 $4,732.00$14.00
Ref #8 608E10000 4" CONCRETE WALK, (40 SF)
Awd $600.00$15.00
2 $600.00$15.00
3 $1,200.00$30.00
4 $360.00$9.00
Ref #9 608E52000 CURB RAMP, (156 SF)
Awd $3,120.00$20.00
2 $2,839.20$18.20
3 $4,680.00$30.00
4 $3,744.00$24.00
Ref #10 608E53020 DETECTABLE WARNING, (16 SF)
Awd $800.00$50.00
2 $672.00$42.00
3 $400.00$25.00
4 $800.00$50.00
160131 - Page 5
Section 1 - ROADWAY (PART 1) - Totals
Awd $24,473.00
2 $28,550.20
3 $31,787.25
4 $17,815.00
Ref #11 659E10000 SEEDING AND MULCHING, (18789 SY)
Awd $11,273.40$0.60
2 $21,607.35$1.15
3 $13,152.30$0.70
4 $12,776.52$0.68
Ref #12 659E20000 COMMERCIAL FERTILIZER, (2.53 TON)
Awd $506.00$200.00
2 $670.45$265.00
3 $657.80$260.00
4 $632.50$250.00
Ref #13 659E31000 LIME, (3.88 ACRE)
Awd $77.60$20.00
2 $388.00$100.00
3 $194.00$50.00
4 $194.00$50.00
Ref #14 659E35000 WATER, (102 MGAL)
Awd $51.00$0.50
2 $102.00$1.00
3 $102.00$1.00
4 $102.00$1.00
Ref #15 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
Section 2 - EROSION CONTROL (PART 1) - Totals
Awd $12,908.00
2 $23,767.80
3 $15,106.10
4 $14,705.02
Ref #16 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (300 SY)
Awd $16,500.00$55.00
2 $15,000.00$50.00
3 $15,000.00$50.00
4 $28,800.00$96.00
Ref #17 253E01000 PAVEMENT REPAIR, (300 SY)
Awd $18,000.00$60.00
2 $33,000.00$110.00
3 $33,000.00$110.00
4 $30,000.00$100.00
160131 - Page 6
Ref #18 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (241716 SY)
Awd $205,458.60$0.85
2 $265,887.60$1.10
3 $265,887.60$1.10
4 $314,230.80$1.30
Ref #19 255E10500 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (500 SY)
Awd $95,000.00$190.00
2 $92,500.00$185.00
3 $92,500.00$185.00
4 $132,500.00$265.00
Ref #20 255E20000 FULL DEPTH PAVEMENT SAWING, (3413 FT)
Awd $6,826.00$2.00
2 $5,460.80$1.60
3 $5,460.80$1.60
4 $10,068.35$2.95
Ref #21 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR), (133 CY)
Awd $4,655.00$35.00
2 $5,985.00$45.00
3 $5,985.00$45.00
4 $10,640.00$80.00
Ref #22 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (24172 GAL)
Awd $66,473.00$2.75
2 $66,473.00$2.75
3 $66,473.00$2.75
4 $66,473.00$2.75
Ref #23 407E20510 SPECIAL - TACK COAT, TRACKLESS TACK FOR INTERMEDIA, (898 GAL)
Awd $2,469.50$2.75
2 $2,469.50$2.75
3 $2,469.50$2.75
4 $2,469.50$2.75
Ref #24 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (34 CY)
Awd $9,690.00$285.00
2 $9,350.00$275.00
3 $9,350.00$275.00
4 $11,900.00$350.00
Ref #25 442E10051 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE B (, (10072 CY)
Awd $1,359,720.00$135.00
2 $1,309,360.00$130.00
3 $1,309,360.00$130.00
4 $1,510,800.00$150.00
Ref #26 442E20250 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE , (1091 CY)
Awd $153,285.50$140.50
2 $136,375.00$125.00
3 $136,375.00$125.00
4 $157,104.00$144.00
Ref #27 609E26000 CURB, TYPE 6, (6 FT)
Awd $180.00$30.00
2 $149.40$24.90
3 $600.00$100.00
4 $456.00$76.00
160131 - Page 7
Ref #28 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (1353 CY)
Awd $54,120.00$40.00
2 $60,885.00$45.00
3 $60,885.00$45.00
4 $81,180.00$60.00
Ref #29 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE), (15 MILE)
Awd $12,150.00$810.00
2 $11,952.75$796.85
3 $12,000.00$800.00
4 $12,000.00$800.00
Ref #30 621E00100 RPM, (212 EACH)
Awd $5,045.60$23.80
2 $4,240.00$20.00
3 $4,452.00$21.00
4 $4,409.60$20.80
Ref #31 621E54000 RAISED PAVEMENT MARKER REMOVED, (191 EACH)
Awd $2,292.00$12.00
2 $955.00$5.00
3 $955.00$5.00
4 $477.50$2.50
Ref #32 626E00100 BARRIER REFLECTOR, (35 EACH)
Awd $227.50$6.50
2 $227.50$6.50
3 $236.25$6.75
4 $227.50$6.50
Ref #33 644E00104 EDGE LINE, 6", (3.9 MILE)
Awd $13,564.20$3,478.00
2 $13,884.00$3,560.00
3 $12,870.00$3,300.00
4 $13,884.00$3,560.00
Ref #34 644E00204 LANE LINE, 6", (0.76 MILE)
Awd $1,599.80$2,105.00
2 $1,850.60$2,435.00
3 $1,406.00$1,850.00
4 $1,850.60$2,435.00
Ref #35 644E00300 CENTER LINE, (0.14 MILE)
Awd $1,330.00$9,500.00
2 $742.70$5,305.00
3 $588.00$4,200.00
4 $742.70$5,305.00
Ref #36 644E00400 CHANNELIZING LINE, 8", (3588 FT)
Awd $4,485.00$1.25
2 $5,740.80$1.60
3 $4,664.40$1.30
4 $5,740.80$1.60
Ref #37 644E00500 STOP LINE, (146 FT)
Awd $1,489.20$10.20
2 $744.60$5.10
3 $839.50$5.75
4 $744.60$5.10
160131 - Page 8
Ref #38 644E00700 TRANSVERSE/DIAGONAL LINE, (100 FT)
Awd $800.00$8.00
2 $495.00$4.95
3 $550.00$5.50
4 $495.00$4.95
Ref #39 644E01300 LANE ARROW, (20 EACH)
Awd $2,660.00$133.00
2 $1,500.00$75.00
3 $1,640.00$82.00
4 $1,500.00$75.00
Section 3 - PAVEMENT (PART 1) - Totals
Awd $2,038,020.90
2 $2,045,228.25
3 $2,043,547.05
4 $2,398,693.95
Ref #40 621E00100 RPM, (1171 EACH)
Awd $27,869.80$23.80
2 $23,420.00$20.00
3 $24,591.00$21.00
4 $24,356.80$20.80
Ref #41 621E54000 RAISED PAVEMENT MARKER REMOVED, (1054 EACH)
Awd $3,604.68$3.42
2 $5,270.00$5.00
3 $5,270.00$5.00
4 $2,635.00$2.50
Ref #42 626E00100 BARRIER REFLECTOR, (159 EACH)
Awd $1,033.50$6.50
2 $1,033.50$6.50
3 $1,073.25$6.75
4 $1,033.50$6.50
Ref #43 644E00104 EDGE LINE, 6", (18.14 MILE)
Awd $51,082.24$2,816.00
2 $64,578.40$3,560.00
3 $59,862.00$3,300.00
4 $64,578.40$3,560.00
Ref #44 644E00204 LANE LINE, 6", (8.74 MILE)
Awd $12,498.20$1,430.00
2 $21,281.90$2,435.00
3 $11,362.00$1,300.00
4 $21,281.90$2,435.00
Ref #45 644E00400 CHANNELIZING LINE, 8", (5853 FT)
Awd $7,023.60$1.20
2 $9,364.80$1.60
3 $7,608.90$1.30
4 $9,364.80$1.60
Ref #46 644E00500 STOP LINE, (362 FT)
Awd $2,334.90$6.45
2 $1,846.20$5.10
3 $2,081.50$5.75
4 $1,846.20$5.10
160131 - Page 9
Ref #47 644E00700 TRANSVERSE/DIAGONAL LINE, (715 FT)
Awd $3,575.00$5.00
2 $3,539.25$4.95
3 $3,932.50$5.50
4 $3,539.25$4.95
Ref #48 644E00900 ISLAND MARKING, (280 SF)
Awd $1,120.00$4.00
2 $826.00$2.95
3 $1,120.00$4.00
4 $826.00$2.95
Ref #49 644E01300 LANE ARROW, (43 EACH)
Awd $3,440.00$80.00
2 $3,225.00$75.00
3 $3,526.00$82.00
4 $3,225.00$75.00
Ref #50 644E01500 DOTTED LINE, 4", (700 FT)
Awd $1,393.00$1.99
2 $1,085.00$1.55
3 $1,190.00$1.70
4 $1,085.00$1.55
Section 4 - TRAFFIC CONTROL (PART 1) - Totals
Awd $114,974.92
2 $135,470.05
3 $121,617.15
4 $133,771.85
Ref #51 632E26501 DETECTOR LOOP, AS PER PLAN, (16 EACH)
Awd $19,200.00$1,200.00
2 $19,200.00$1,200.00
3 $14,800.00$925.00
4 $14,400.00$900.00
Section 5 - TRAFFIC SIGNALS (PART 1) - Totals
Awd $19,200.00
2 $19,200.00
3 $14,800.00
4 $14,400.00
Ref #52 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (40 HOUR)
Awd $2,400.00$60.00
2 $2,600.00$65.00
3 $3,000.00$75.00
4 $2,600.00$65.00
Ref #53 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $25,000.00$25,000.00
3 $22,000.00$22,000.00
4 $22,000.00$22,000.00
160131 - Page 10
Ref #54 614E12460 WORK ZONE MARKING SIGN, (60 EACH)
Awd $5,100.00$85.00
2 $6,900.00$115.00
3 $7,200.00$120.00
4 $6,900.00$115.00
Ref #55 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (40 CY)
Awd $3,200.00$80.00
2 $5,800.00$145.00
3 $7,000.00$175.00
4 $7,200.00$180.00
Ref #56 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (17 SNMT)
Awd $12,750.00$750.00
2 $6,800.00$400.00
3 $17,000.00$1,000.00
4 $17,850.00$1,050.00
Ref #57 614E20000 WORK ZONE LANE LINE, CLASS I, (19 MILE)
Awd $6,650.00$350.00
2 $15,200.00$800.00
3 $15,675.00$825.00
4 $15,200.00$800.00
Ref #58 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (9.5 MILE)
Awd $3,325.00$350.00
2 $15,390.00$1,620.00
3 $16,150.00$1,700.00
4 $15,390.00$1,620.00
Ref #59 614E21000 WORK ZONE CENTER LINE, CLASS I, (0.28 MILE)
Awd $700.00$2,500.00
2 $296.80$1,060.00
3 $308.00$1,100.00
4 $296.80$1,060.00
Ref #60 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (0.14 MILE)
Awd $350.00$2,500.00
2 $263.20$1,880.00
3 $266.00$1,900.00
4 $263.20$1,880.00
Ref #61 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (22.04 MILE)
Awd $8,265.00$375.00
2 $3,306.00$150.00
3 $3,416.20$155.00
4 $3,306.00$150.00
Ref #62 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, (18882 FT)
Awd $4,720.50$0.25
2 $12,273.30$0.65
3 $12,273.30$0.65
4 $12,273.30$0.65
Ref #63 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (9441 FT)
Awd $2,360.25$0.25
2 $7,080.75$0.75
3 $7,080.75$0.75
4 $7,080.75$0.75
160131 - Page 11
Ref #64 614E26000 WORK ZONE STOP LINE, CLASS I, (1016 FT)
Awd $2,032.00$2.00
2 $2,540.00$2.50
3 $2,641.60$2.60
4 $2,540.00$2.50
Ref #65 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (508 FT)
Awd $1,016.00$2.00
2 $1,219.20$2.40
3 $1,270.00$2.50
4 $1,219.20$2.40
Section 6 - MAINTENANCE OF TRAFFIC (PART 1) - Totals
Awd $72,868.75
2 $104,669.25
3 $115,280.85
4 $114,119.25
Ref #66 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1,000.00$1,000.00
3 $3,000.00$3,000.00
4 $3,000.00$3,000.00
Ref #67 203E40000 BORROW, (2 CY)
Awd $400.00$200.00
2 $200.00$100.00
3 $1,050.00$525.00
4 $1,000.00$500.00
Ref #68 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (271 SY)
Awd $8,130.00$30.00
2 $5,555.50$20.50
3 $8,401.00$31.00
4 $8,130.00$30.00
Ref #69 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (644 SY)
Awd $9,660.00$15.00
2 $6,375.60$9.90
3 $9,660.00$15.00
4 $9,660.00$15.00
Ref #70 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (271 SY)
Awd $5,420.00$20.00
2 $5,420.00$20.00
3 $5,691.00$21.00
4 $5,420.00$20.00
Ref #71 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (200 SF)
Awd $18,000.00$90.00
2 $15,000.00$75.00
3 $18,400.00$92.00
4 $20,000.00$100.00
Ref #72 601E25000 DUMPED ROCK FILL, TYPE A, (2 CY)
Awd $360.00$180.00
2 $400.00$200.00
3 $1,550.00$775.00
4 $1,500.00$750.00
160131 - Page 12
Ref #73 609E26000 CURB, TYPE 6, (100 FT)
Awd $3,500.00$35.00
2 $3,200.00$32.00
3 $5,000.00$50.00
4 $5,000.00$50.00
Ref #74 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $112.50$15.00
2 $112.50$15.00
3 $116.25$15.50
4 $112.50$15.00
Ref #75 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $35.00$35.00
2 $35.00$35.00
3 $36.00$36.00
4 $35.00$35.00
Ref #76 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $10.00$10.00
2 $10.00$10.00
3 $10.50$10.50
4 $10.00$10.00
Ref #77 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $10.00$10.00
2 $10.00$10.00
3 $10.50$10.50
4 $10.00$10.00
Ref #78 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $10,000.00$100.00
2 $7,500.00$75.00
3 $9,200.00$92.00
4 $10,000.00$100.00
Section 7 - STRUCTURE REPAIR (TRU-62-0482L) (PART 1) - Totals
Awd $56,637.50
2 $44,818.60
3 $62,125.25
4 $63,877.50
Ref #79 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1,000.00$1,000.00
3 $3,000.00$3,000.00
4 $3,000.00$3,000.00
Ref #80 203E40000 BORROW, (2 CY)
Awd $200.00$100.00
2 $200.00$100.00
3 $1,050.00$525.00
4 $1,000.00$500.00
Ref #81 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (297 SY)
Awd $8,910.00$30.00
2 $6,088.50$20.50
3 $9,207.00$31.00
4 $8,910.00$30.00
160131 - Page 13
Ref #82 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (828 SY)
Awd $8,280.00$10.00
2 $8,197.20$9.90
3 $8,694.00$10.50
4 $8,280.00$10.00
Ref #83 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (297 SY)
Awd $5,940.00$20.00
2 $5,940.00$20.00
3 $6,237.00$21.00
4 $5,940.00$20.00
Ref #84 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (200 SF)
Awd $20,000.00$100.00
2 $15,000.00$75.00
3 $18,400.00$92.00
4 $20,000.00$100.00
Ref #85 601E25000 DUMPED ROCK FILL, TYPE A, (2 CY)
Awd $400.00$200.00
2 $400.00$200.00
3 $1,550.00$775.00
4 $1,500.00$750.00
Ref #86 609E26000 CURB, TYPE 6, (100 FT)
Awd $3,500.00$35.00
2 $3,200.00$32.00
3 $5,000.00$50.00
4 $5,000.00$50.00
Ref #87 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $112.50$15.00
2 $112.50$15.00
3 $116.25$15.50
4 $112.50$15.00
Ref #88 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $35.00$35.00
2 $35.00$35.00
3 $36.00$36.00
4 $35.00$35.00
Ref #89 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $10.00$10.00
2 $10.00$10.00
3 $10.50$10.50
4 $10.00$10.00
Ref #90 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $10.00$10.00
2 $10.00$10.00
3 $10.50$10.50
4 $10.00$10.00
Ref #91 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $9,000.00$90.00
2 $7,500.00$75.00
3 $9,200.00$92.00
4 $10,000.00$100.00
160131 - Page 14
Section 8 - STRUCTURE REPAIR (TRU-62-0482R) (PART 1) - Totals
Awd $57,397.50
2 $47,693.20
3 $62,511.25
4 $63,797.50
Ref #92 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1,000.00$1,000.00
3 $3,000.00$3,000.00
4 $3,000.00$3,000.00
Ref #93 203E40000 BORROW, (2 CY)
Awd $400.00$200.00
2 $200.00$100.00
3 $1,050.00$525.00
4 $1,000.00$500.00
Ref #94 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (442 SY)
Awd $8,840.00$20.00
2 $9,061.00$20.50
3 $9,282.00$21.00
4 $8,840.00$20.00
Ref #95 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1047 SY)
Awd $16,752.00$16.00
2 $12,040.50$11.50
3 $16,752.00$16.00
4 $16,752.00$16.00
Ref #96 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (442 SY)
Awd $4,420.00$10.00
2 $8,840.00$20.00
3 $9,282.00$21.00
4 $4,420.00$10.00
Ref #97 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (200 SF)
Awd $20,000.00$100.00
2 $15,000.00$75.00
3 $18,400.00$92.00
4 $20,000.00$100.00
Ref #98 519E12304 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE C, (60 SY)
Awd $24,000.00$400.00
2 $18,000.00$300.00
3 $27,600.00$460.00
4 $27,000.00$450.00
Ref #99 601E25000 DUMPED ROCK FILL, TYPE A, (2 CY)
Awd $400.00$200.00
2 $400.00$200.00
3 $1,550.00$775.00
4 $1,500.00$750.00
Ref #100 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $112.50$15.00
2 $112.50$15.00
3 $116.25$15.50
4 $112.50$15.00
160131 - Page 15
Ref #101 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $35.00$35.00
2 $35.00$35.00
3 $36.00$36.00
4 $35.00$35.00
Ref #102 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $10.00$10.00
2 $10.00$10.00
3 $10.50$10.50
4 $10.00$10.00
Ref #103 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $10.00$10.00
2 $10.00$10.00
3 $10.50$10.50
4 $10.00$10.00
Ref #104 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $10,000.00$100.00
2 $7,500.00$75.00
3 $9,200.00$92.00
4 $10,000.00$100.00
Section 9 - STRUCTURE REPAIR (TRU-62-0873L) (PART 1) - Totals
Awd $85,979.50
2 $72,209.00
3 $96,289.25
4 $92,679.50
Ref #105 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1,000.00$1,000.00
3 $3,000.00$3,000.00
4 $3,000.00$3,000.00
Ref #106 203E40000 BORROW, (2 CY)
Awd $400.00$200.00
2 $200.00$100.00
3 $1,050.00$525.00
4 $1,000.00$500.00
Ref #107 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (442 SY)
Awd $8,840.00$20.00
2 $9,061.00$20.50
3 $9,282.00$21.00
4 $8,840.00$20.00
Ref #108 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1047 SY)
Awd $16,752.00$16.00
2 $12,040.50$11.50
3 $16,752.00$16.00
4 $16,752.00$16.00
Ref #109 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (442 SY)
Awd $4,420.00$10.00
2 $8,840.00$20.00
3 $9,282.00$21.00
4 $4,420.00$10.00
160131 - Page 16
Ref #110 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (200 SF)
Awd $20,000.00$100.00
2 $15,000.00$75.00
3 $18,400.00$92.00
4 $20,000.00$100.00
Ref #111 519E12304 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE C, (60 SY)
Awd $27,000.00$450.00
2 $18,000.00$300.00
3 $27,600.00$460.00
4 $27,000.00$450.00
Ref #112 601E25000 DUMPED ROCK FILL, TYPE A, (2 CY)
Awd $500.00$250.00
2 $400.00$200.00
3 $1,550.00$775.00
4 $1,500.00$750.00
Ref #113 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (7.5 FT)
Awd $112.50$15.00
2 $112.50$15.00
3 $116.25$15.50
4 $112.50$15.00
Ref #114 630E80100 SIGN, FLAT SHEET, 730.20, (1 SF)
Awd $35.00$35.00
2 $35.00$35.00
3 $36.00$36.00
4 $35.00$35.00
Ref #115 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $10.00$10.00
2 $10.00$10.00
3 $10.50$10.50
4 $10.00$10.00
Ref #116 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $10.00$10.00
2 $10.00$10.00
3 $10.50$10.50
4 $10.00$10.00
Ref #117 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (100 SF)
Awd $10,000.00$100.00
2 $7,500.00$75.00
3 $9,200.00$92.00
4 $10,000.00$100.00
Section 10 - STRUCTURE REPAIR (TRU-62-0873R) (PART 1) - Totals
Awd $89,079.50
2 $72,209.00
3 $96,289.25
4 $92,679.50
Ref #118 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $25,000.00$25,000.00
3 $3,000.00$3,000.00
4 $45,000.00$45,000.00
160131 - Page 17
Ref #119 202E23000 PAVEMENT REMOVED, (13010 SY)
Awd $78,060.00$6.00
2 $74,807.50$5.75
3 $91,070.00$7.00
4 $173,033.00$13.30
Ref #120 202E30700 CONCRETE BARRIER REMOVED, (160 FT)
Awd $1,600.00$10.00
2 $2,640.00$16.50
3 $4,000.00$25.00
4 $2,720.00$17.00
Ref #121 202E32600 GUTTER REMOVED, (50 FT)
Awd $500.00$10.00
2 $375.00$7.50
3 $400.00$8.00
4 $650.00$13.00
Ref #122 202E35100 PIPE REMOVED, 24" AND UNDER, (503 FT)
Awd $4,527.00$9.00
2 $4,778.50$9.50
3 $7,545.00$15.00
4 $14,084.00$28.00
Ref #123 202E38000 GUARDRAIL REMOVED, (4864 FT)
Awd $5,836.80$1.20
2 $5,836.80$1.20
3 $6,080.00$1.25
4 $5,836.80$1.20
Ref #124 202E38300 GUARDRAIL REMOVED, BARRIER DESIGN, (518 FT)
Awd $725.20$1.40
2 $725.20$1.40
3 $751.10$1.45
4 $725.20$1.40
Ref #125 202E58100 CATCH BASIN REMOVED, (4 EACH)
Awd $40.00$10.00
2 $1,000.00$250.00
3 $1,000.00$250.00
4 $2,800.00$700.00
Ref #126 203E10000 EXCAVATION, (15066 CY)
Awd $105,462.00$7.00
2 $143,127.00$9.50
3 $143,127.00$9.50
4 $119,021.40$7.90
Ref #127 203E20000 EMBANKMENT, (13710 CY)
Awd $95,970.00$7.00
2 $68,550.00$5.00
3 $164,520.00$12.00
4 $97,341.00$7.10
Ref #128 204E10000 SUBGRADE COMPACTION, (21541 SY)
Awd $12,924.60$0.60
2 $32,311.50$1.50
3 $26,926.25$1.25
4 $37,696.75$1.75
160131 - Page 18
Ref #129 204E45000 PROOF ROLLING, (7 HOUR)
Awd $350.00$50.00
2 $1,400.00$200.00
3 $2,100.00$300.00
4 $1,400.00$200.00
Ref #130 209E60201 LINEAR GRADING, AS PER PLAN, (49 STA)
Awd $7,350.00$150.00
2 $13,965.00$285.00
3 $4,900.00$100.00
4 $19,600.00$400.00
Ref #131 606E15050 GUARDRAIL, TYPE MGS, (4025 FT)
Awd $56,350.00$14.00
2 $56,350.00$14.00
3 $58,362.50$14.50
4 $56,350.00$14.00
Ref #132 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS, (950 FT)
Awd $15,580.00$16.40
2 $15,580.00$16.40
3 $16,150.00$17.00
4 $15,580.00$16.40
Ref #133 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS, (100 FT)
Awd $1,820.00$18.20
2 $1,820.00$18.20
3 $1,900.00$19.00
4 $1,820.00$18.20
Ref #134 606E26050 ANCHOR ASSEMBLY, MGS TYPE B, (2 EACH)
Awd $3,170.00$1,585.00
2 $3,170.00$1,585.00
3 $3,200.00$1,600.00
4 $3,170.00$1,585.00
Ref #135 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (2 EACH)
Awd $3,650.00$1,825.00
2 $3,650.00$1,825.00
3 $3,800.00$1,900.00
4 $3,650.00$1,825.00
Ref #136 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (6 EACH)
Awd $4,410.00$735.00
2 $4,410.00$735.00
3 $4,500.00$750.00
4 $4,410.00$735.00
Ref #137 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (4 EACH)
Awd $7,780.00$1,945.00
2 $7,780.00$1,945.00
3 $8,000.00$2,000.00
4 $7,780.00$1,945.00
Ref #138 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, (4 EACH)
Awd $1,400.00$350.00
2 $1,400.00$350.00
3 $1,440.00$360.00
4 $1,400.00$350.00
160131 - Page 19
Ref #139 606E35120 BRIDGE TERMINAL ASSEMBLY, TYPE 3, (3 EACH)
Awd $6,705.00$2,235.00
2 $6,705.00$2,235.00
3 $6,900.00$2,300.00
4 $6,705.00$2,235.00
Ref #140 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL), (2 EACH)
Awd $6,950.00$3,475.00
2 $6,950.00$3,475.00
3 $7,000.00$3,500.00
4 $6,950.00$3,475.00
Ref #141 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, (160 FT)
Awd $20,000.00$125.00
2 $22,400.00$140.00
3 $28,000.00$175.00
4 $17,280.00$108.00
Ref #142 690E98000 SPECIAL - MISC.:VERTICAL CLEARANCE, (2 EACH)
Awd $1,000.00$500.00
2 $900.00$450.00
3 $1,300.00$650.00
4 $5,000.00$2,500.00
Section 11 - ROADWAY (PART 2) - Totals
Awd $462,160.60
2 $505,631.50
3 $595,971.85
4 $650,003.15
Ref #143 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION, (637 SY)
Awd $12,740.00$20.00
2 $12,103.00$19.00
3 $22,295.00$35.00
4 $15,925.00$25.00
Ref #144 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (22 SY)
Awd $2,200.00$100.00
2 $1,540.00$70.00
3 $2,750.00$125.00
4 $3,190.00$145.00
Ref #145 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (123 SY)
Awd $3,690.00$30.00
2 $5,904.00$48.00
3 $7,995.00$65.00
4 $12,300.00$100.00
Ref #146 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (2 CY)
Awd $180.00$90.00
2 $240.00$120.00
3 $600.00$300.00
4 $620.00$310.00
Ref #147 601E37501 PAVED GUTTER, TYPE 1-2, AS PER PLAN, (50 FT)
Awd $5,000.00$100.00
2 $3,750.00$75.00
3 $6,250.00$125.00
4 $4,000.00$80.00
160131 - Page 20
Ref #148 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $40.00$20.00
2 $100.00$50.00
3 $50.00$25.00
4 $50.00$25.00
Ref #149 659E00300 TOPSOIL, (1318 CY)
Awd $13,180.00$10.00
2 $13,180.00$10.00
3 $26,360.00$20.00
4 $28,996.00$22.00
Ref #150 659E00550 SEEDING AND MULCHING, CLASS 4A, (6580 SY)
Awd $4,606.00$0.70
2 $8,554.00$1.30
3 $6,580.00$1.00
4 $6,580.00$1.00
Ref #151 659E10000 SEEDING AND MULCHING, (5292 SY)
Awd $3,704.40$0.70
2 $6,085.80$1.15
3 $4,498.20$0.85
4 $4,498.20$0.85
Ref #152 659E14000 REPAIR SEEDING AND MULCHING, (594 SY)
Awd $118.80$0.20
2 $237.60$0.40
3 $504.90$0.85
4 $504.90$0.85
Ref #153 659E15000 INTER-SEEDING, (594 SY)
Awd $118.80$0.20
2 $59.40$0.10
3 $5.94$0.01
4 $5.94$0.01
Ref #154 659E20000 COMMERCIAL FERTILIZER, (1.66 TON)
Awd $415.00$250.00
2 $439.90$265.00
3 $431.60$260.00
4 $415.00$250.00
Ref #155 659E31000 LIME, (2.45 ACRE)
Awd $49.00$20.00
2 $245.00$100.00
3 $122.50$50.00
4 $122.50$50.00
Ref #156 659E35000 WATER, (66 MGAL)
Awd $33.00$0.50
2 $66.00$1.00
3 $66.00$1.00
4 $66.00$1.00
Ref #157 659E40000 MOWING, (26 MSF)
Awd $26.00$1.00
2 $26.00$1.00
3 $26.00$1.00
4 $26.00$1.00
160131 - Page 21
Ref #158 670E00500 SLOPE EROSION PROTECTION, (2606 SY)
Awd $5,212.00$2.00
2 $5,472.60$2.10
3 $3,909.00$1.50
4 $3,778.70$1.45
Ref #159 670E00700 DITCH EROSION PROTECTION, (1329 SY)
Awd $2,658.00$2.00
2 $2,790.90$2.10
3 $2,126.40$1.60
4 $2,059.95$1.55
Ref #160 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $6,000.00$6,000.00
3 $40,000.00$40,000.00
4 $38,000.00$38,000.00
Ref #161 832E30000 EROSION CONTROL, (45000 EACH)
Awd $45,000.00$1.00
2 $45,000.00$1.00
3 $45,000.00$1.00
4 $45,000.00$1.00
Section 12 - EROSION CONTROL (PART 2) - Totals
Awd $102,971.00
2 $111,794.20
3 $169,570.54
4 $166,138.19
Ref #162 602E20000 CONCRETE MASONRY, (0.5 CY)
Awd $750.00$1,500.00
2 $600.00$1,200.00
3 $1,250.00$2,500.00
4 $612.50$1,225.00
Ref #163 605E11100 6" SHALLOW PIPE UNDERDRAINS, (9207 FT)
Awd $82,863.00$9.00
2 $73,656.00$8.00
3 $82,863.00$9.00
4 $119,691.00$13.00
Ref #164 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, (772 FT)
Awd $10,036.00$13.00
2 $7,720.00$10.00
3 $6,948.00$9.00
4 $10,808.00$14.00
Ref #165 605E14000 6" BASE PIPE UNDERDRAINS, (10592 FT)
Awd $95,328.00$9.00
2 $60,904.00$5.75
3 $74,144.00$7.00
4 $127,104.00$12.00
Ref #166 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (898 FT)
Awd $10,776.00$12.00
2 $7,408.50$8.25
3 $13,470.00$15.00
4 $23,348.00$26.00
160131 - Page 22
Ref #167 611E05900 15" CONDUIT, TYPE B, (42 FT)
Awd $2,730.00$65.00
2 $2,016.00$48.00
3 $2,310.00$55.00
4 $3,528.00$84.00
Ref #168 611E06100 15" CONDUIT, TYPE C, (907 FT)
Awd $34,466.00$38.00
2 $29,024.00$32.00
3 $49,885.00$55.00
4 $47,164.00$52.00
Ref #169 611E06700 15" CONDUIT, TYPE F, 707.05 TYPE C OR 707.21, (89 FT)
Awd $7,120.00$80.00
2 $4,450.00$50.00
3 $6,675.00$75.00
4 $10,502.00$118.00
Ref #170 611E98180 CATCH BASIN, NO. 3A, (3 EACH)
Awd $6,600.00$2,200.00
2 $4,650.00$1,550.00
3 $7,500.00$2,500.00
4 $8,100.00$2,700.00
Ref #171 611E98410 CATCH BASIN, NO. 8, (5 EACH)
Awd $16,000.00$3,200.00
2 $15,750.00$3,150.00
3 $20,000.00$4,000.00
4 $16,000.00$3,200.00
Ref #172 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (11 EACH)
Awd $1,650.00$150.00
2 $1,540.00$140.00
3 $2,750.00$250.00
4 $2,310.00$210.00
Section 13 - DRAINAGE (PART 2) - Totals
Awd $268,319.00
2 $207,718.50
3 $267,795.00
4 $369,167.50
Ref #173 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (2155 SY)
Awd $10,775.00$5.00
2 $11,852.50$5.50
3 $11,852.50$5.50
4 $12,175.75$5.65
Ref #174 301E46000 ASPHALT CONCRETE BASE, PG64-22, (6522 CY)
Awd $629,373.00$96.50
2 $652,200.00$100.00
3 $652,200.00$100.00
4 $717,420.00$110.00
Ref #175 304E20001 AGGREGATE BASE, AS PER PLAN, (4282 CY)
Awd $205,536.00$48.00
2 $226,946.00$53.00
3 $235,510.00$55.00
4 $256,920.00$60.00
160131 - Page 23
Ref #176 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (2092 GAL)
Awd $5,753.00$2.75
2 $5,753.00$2.75
3 $5,753.00$2.75
4 $5,753.00$2.75
Ref #177 407E20510 SPECIAL - TACK COAT, TRACKLESS TACK FOR INTERMEDIA, (837 GAL)
Awd $2,301.75$2.75
2 $2,301.75$2.75
3 $2,301.75$2.75
4 $2,301.75$2.75
Ref #178 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (107 CY)
Awd $22,470.00$210.00
2 $26,750.00$250.00
3 $26,750.00$250.00
4 $26,750.00$250.00
Ref #179 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (872 CY)
Awd $141,307.60$162.05
2 $135,160.00$155.00
3 $135,160.00$155.00
4 $167,424.00$192.00
Ref #180 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE A, (1017 CY)
Awd $143,549.55$141.15
2 $116,955.00$115.00
3 $116,955.00$115.00
4 $150,516.00$148.00
Ref #181 609E24510 CURB, TYPE 4-C, (140 FT)
Awd $4,200.00$30.00
2 $4,480.00$32.00
3 $7,000.00$50.00
4 $6,160.00$44.00
Ref #182 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (52 CY)
Awd $5,200.00$100.00
2 $5,200.00$100.00
3 $5,200.00$100.00
4 $2,964.00$57.00
Section 14 - PAVEMENT (PART 2) - Totals
Awd $1,170,465.90
2 $1,187,598.25
3 $1,198,682.25
4 $1,348,384.50
Ref #183 625E00480 CONNECTION, UNFUSED PERMANENT, (2 EACH)
Awd $200.00$100.00
2 $200.00$100.00
3 $210.00$105.00
4 $220.00$110.00
Ref #184 625E01100 CONNECTOR KIT, TYPE VII C, (2 EACH)
Awd $200.00$100.00
2 $200.00$100.00
3 $210.00$105.00
4 $220.00$110.00
160131 - Page 24
Ref #185 625E15001 LIGHT TOWER FOUNDATION, 36" X 15' DEEP, AS PER PLA, (1 EACH)
Awd $8,000.00$8,000.00
2 $8,000.00$8,000.00
3 $8,200.00$8,200.00
4 $7,350.00$7,350.00
Ref #186 625E24100 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 5000 VOLT CAB, (43 FT)
Awd $430.00$10.00
2 $430.00$10.00
3 $451.50$10.50
4 $387.00$9.00
Ref #187 625E29002 TRENCH, 24" DEEP, (628 FT)
Awd $3,140.00$5.00
2 $3,140.00$5.00
3 $3,297.00$5.25
4 $10,676.00$17.00
Ref #188 625E31510 PULL BOX REMOVED, (2 EACH)
Awd $1,000.00$500.00
2 $1,000.00$500.00
3 $1,050.00$525.00
4 $350.00$175.00
Ref #189 625E32000 GROUND ROD, (2 EACH)
Awd $500.00$250.00
2 $500.00$250.00
3 $500.00$250.00
4 $470.00$235.00
Ref #190 625E35021 RE-ERECT EXISTING LIGHT TOWER, AS PER PLAN, (1 EACH)
Awd $3,500.00$3,500.00
2 $3,500.00$3,500.00
3 $3,600.00$3,600.00
4 $5,500.00$5,500.00
Ref #191 625E36000 PLASTIC CAUTION TAPE, (628 FT)
Awd $628.00$1.00
2 $628.00$1.00
3 $628.00$1.00
4 $471.00$0.75
Ref #192 625E39520 PULL BOX CLEANED, (1 EACH)
Awd $200.00$200.00
2 $200.00$200.00
3 $210.00$210.00
4 $59.00$59.00
Ref #193 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $5,000.00$5,000.00
3 $5,200.00$5,200.00
4 $2,952.00$2,952.00
Ref #194 625E75361 LIGHT TOWER REMOVED FOR STORAGE, AS PER PLAN, (1 EACH)
Awd $3,500.00$3,500.00
2 $3,500.00$3,500.00
3 $3,600.00$3,600.00
4 $1,670.00$1,670.00
160131 - Page 25
Ref #195 625E75540 LIGHT TOWER FOUNDATION REMOVED, (1 EACH)
Awd $500.00$500.00
2 $500.00$500.00
3 $525.00$525.00
4 $250.00$250.00
Ref #196 625E75800 DISCONNECT CIRCUIT, (4 EACH)
Awd $600.00$150.00
2 $600.00$150.00
3 $620.00$155.00
4 $1,180.00$295.00
Ref #400 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $5,000.00$5,000.00
3 $5,200.00$5,200.00
4 $5,000.00$5,000.00
Section 15 - LIGHTING (PART 2) - Totals
Awd $32,398.00
2 $32,398.00
3 $33,501.50
4 $36,755.00
Ref #197 621E00100 RPM, (132 EACH)
Awd $3,141.60$23.80
2 $2,640.00$20.00
3 $2,772.00$21.00
4 $2,745.60$20.80
Ref #198 626E00100 BARRIER REFLECTOR, (78 EACH)
Awd $507.00$6.50
2 $507.00$6.50
3 $507.00$6.50
4 $507.00$6.50
Ref #199 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (64 FT)
Awd $544.00$8.50
2 $544.00$8.50
3 $560.00$8.75
4 $544.00$8.50
Ref #200 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (97.5 FT)
Awd $916.50$9.40
2 $916.50$9.40
3 $926.25$9.50
4 $916.50$9.40
Ref #201 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9, (71.75 FT)
Awd $1,291.50$18.00
2 $1,291.50$18.00
3 $1,323.79$18.45
4 $1,291.50$18.00
Ref #202 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION, (4 EACH)
Awd $1,140.00$285.00
2 $1,140.00$285.00
3 $1,200.00$300.00
4 $1,140.00$285.00
160131 - Page 26
Ref #203 630E21000 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 10, 3, (2 EACH)
Awd $30,300.00$15,150.00
2 $30,300.00$15,150.00
3 $31,000.00$15,500.00
4 $30,300.00$15,150.00
Ref #204 630E83000 COVERING OF SIGN, (13 SF)
Awd $208.00$16.00
2 $208.00$16.00
3 $214.50$16.50
4 $208.00$16.00
Ref #205 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, (4 EACH)
Awd $2,900.00$725.00
2 $2,900.00$725.00
3 $3,000.00$750.00
4 $2,900.00$725.00
Ref #206 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION, (2 EACH)
Awd $7,100.00$3,550.00
2 $7,100.00$3,550.00
3 $7,200.00$3,600.00
4 $7,100.00$3,550.00
Ref #207 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (15 EACH)
Awd $450.00$30.00
2 $450.00$30.00
3 $465.00$31.00
4 $450.00$30.00
Ref #208 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO, (2 EACH)
Awd $370.00$185.00
2 $370.00$185.00
3 $380.00$190.00
4 $370.00$185.00
Ref #209 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (13 EACH)
Awd $130.00$10.00
2 $130.00$10.00
3 $136.50$10.50
4 $130.00$10.00
Ref #210 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT , (4 EACH)
Awd $520.00$130.00
2 $520.00$130.00
3 $540.00$135.00
4 $520.00$130.00
Ref #211 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION, (4 EACH)
Awd $780.00$195.00
2 $780.00$195.00
3 $800.00$200.00
4 $780.00$195.00
Ref #212 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION, (2 EACH)
Awd $170.00$85.00
2 $170.00$85.00
3 $174.00$87.00
4 $170.00$85.00
160131 - Page 27
Ref #213 630E88100 REMOVAL OF OVERHEAD SIGN SUPPORT AND STORAGE, TYPE, (2 EACH)
Awd $1,750.00$875.00
2 $1,750.00$875.00
3 $1,800.00$900.00
4 $1,750.00$875.00
Ref #214 644E00400 CHANNELIZING LINE, 8", (315 FT)
Awd $945.00$3.00
2 $504.00$1.60
3 $409.50$1.30
4 $504.00$1.60
Ref #215 646E10010 EDGE LINE, 6", (2.91 MILE)
Awd $11,861.16$4,076.00
2 $11,290.80$3,880.00
3 $9,603.00$3,300.00
4 $11,290.80$3,880.00
Ref #216 646E10110 LANE LINE, 6", (1.58 MILE)
Awd $5,035.46$3,187.00
2 $5,056.00$3,200.00
3 $2,923.00$1,850.00
4 $5,056.00$3,200.00
Ref #217 646E10310 CHANNELIZING LINE, 12", (3653 FT)
Awd $8,401.90$2.30
2 $7,671.30$2.10
3 $5,662.15$1.55
4 $7,671.30$2.10
Ref #218 646E20504 DOTTED LINE, 6", (1920 FT)
Awd $3,648.00$1.90
2 $2,112.00$1.10
3 $3,456.00$1.80
4 $2,112.00$1.10
Section 16 - TRAFFIC CONTROL (PART 2) - Totals
Awd $82,110.12
2 $78,351.10
3 $75,052.69
4 $78,456.70
Ref #219 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (300 HOUR)
Awd $18,000.00$60.00
2 $19,500.00$65.00
3 $22,500.00$75.00
4 $19,500.00$65.00
Ref #220 614E11500 WORKSITE TRAFFIC SUPERVISOR, (16 MNTH)
Awd $32,000.00$2,000.00
2 $9,600.00$600.00
3 $104,000.00$6,500.00
4 $80,000.00$5,000.00
Ref #221 614E11630 INCREASED BARRIER DELINEATION, (220 FT)
Awd $2,200.00$10.00
2 $550.00$2.50
3 $572.00$2.60
4 $550.00$2.50
160131 - Page 28
Ref #222 614E12200 SPECIAL - WORK ZONE GUARDRAIL, (500 FT)
Awd $10,000.00$20.00
2 $10,000.00$20.00
3 $10,000.00$20.00
4 $9,900.00$19.80
Ref #223 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (16 EACH)
Awd $25,600.00$1,600.00
2 $28,320.00$1,770.00
3 $28,800.00$1,800.00
4 $28,800.00$1,800.00
Ref #224 614E12460 WORK ZONE MARKING SIGN, (36 EACH)
Awd $3,060.00$85.00
2 $4,140.00$115.00
3 $4,320.00$120.00
4 $4,140.00$115.00
Ref #225 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (50 CY)
Awd $4,500.00$90.00
2 $6,750.00$135.00
3 $10,000.00$200.00
4 $10,000.00$200.00
Ref #226 614E13200 BARRIER REFLECTOR, TYPE A, (96 EACH)
Awd $672.00$7.00
2 $624.00$6.50
3 $480.00$5.00
4 $624.00$6.50
Ref #227 614E13300 BARRIER REFLECTOR, TYPE B, (345 EACH)
Awd $4,140.00$12.00
2 $2,242.50$6.50
3 $1,725.00$5.00
4 $2,242.50$6.50
Ref #228 614E13350 OBJECT MARKER, ONE WAY, (417 EACH)
Awd $5,004.00$12.00
2 $4,795.50$11.50
3 $4,378.50$10.50
4 $4,795.50$11.50
Ref #229 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (64 SNMT)
Awd $41,600.00$650.00
2 $22,400.00$350.00
3 $57,600.00$900.00
4 $67,200.00$1,050.00
Ref #230 614E20201 WORK ZONE LANE LINE, CLASS I, 740.06, TYPE I, AS P, (1.4 MILE)
Awd $3,710.00$2,650.00
2 $5,913.60$4,224.00
3 $6,020.00$4,300.00
4 $5,913.60$4,224.00
Ref #231 614E22101 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, AS PER PL, (1.28 MILE)
Awd $640.00$500.00
2 $2,476.80$1,935.00
3 $2,560.00$2,000.00
4 $2,476.80$1,935.00
160131 - Page 29
Ref #232 614E22201 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, AS P, (6.38 MILE)
Awd $47,850.00$7,500.00
2 $37,055.04$5,808.00
3 $38,280.00$6,000.00
4 $37,055.04$5,808.00
Ref #233 614E23201 WORK ZONE CHANNELIZING LINE, CLASS I, 642 PAINT, A, (3035 FT)
Awd $1,517.50$0.50
2 $2,579.75$0.85
3 $2,731.50$0.90
4 $2,579.75$0.85
Ref #234 614E23401 WORK ZONE CHANNELIZING LINE, CLASS I, 740.06, TYPE, (18539 FT)
Awd $46,347.50$2.50
2 $27,808.50$1.50
3 $28,735.45$1.55
4 $27,808.50$1.50
Ref #235 614E24201 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, AS PER , (908 FT)
Awd $681.00$0.75
2 $726.40$0.80
3 $726.40$0.80
4 $726.40$0.80
Ref #236 614E24401 WORK ZONE DOTTED LINE, CLASS I, 740.06, TYPE I, AS, (1890 FT)
Awd $1,890.00$1.00
2 $2,079.00$1.10
3 $2,173.50$1.15
4 $2,079.00$1.10
Ref #237 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)
Awd $80,000.00$80,000.00
2 $150,000.00$150,000.00
3 $200,000.00$200,000.00
4 $39,476.41$39,476.41
Ref #238 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, (1502 SY)
Awd $67,590.00$45.00
2 $60,080.00$40.00
3 $75,100.00$50.00
4 $60,080.00$40.00
Ref #239 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER , (1427 SY)
Awd $64,215.00$45.00
2 $57,080.00$40.00
3 $71,350.00$50.00
4 $134,138.00$94.00
Ref #240 616E10000 WATER, (115 MGAL)
Awd $115.00$1.00
2 $2,300.00$20.00
3 $4,025.00$35.00
4 $2,875.00$25.00
Ref #241 616E20000 CALCIUM CHLORIDE, (1 TON)
Awd $50.00$50.00
2 $500.00$500.00
3 $1,500.00$1,500.00
4 $50.00$50.00
160131 - Page 30
Ref #242 622E41000 PORTABLE BARRIER, 32", (16530 FT)
Awd $132,240.00$8.00
2 $99,180.00$6.00
3 $148,770.00$9.00
4 $297,540.00$18.00
Ref #243 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, (520 FT)
Awd $6,240.00$12.00
2 $7,020.00$13.50
3 $15,600.00$30.00
4 $13,000.00$25.00
Section 17 - MAINTENANCE OF TRAFFIC (PART 2) - Totals
Awd $599,862.00
2 $563,721.09
3 $841,947.35
4 $853,550.50
Ref #244 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $120,000.00$120,000.00
2 $325,000.00$325,000.00
3 $115,000.00$115,000.00
4 $260,000.00$260,000.00
Ref #245 202E22900 APPROACH SLAB REMOVED, (243 SY)
Awd $4,860.00$20.00
2 $4,374.00$18.00
3 $7,290.00$30.00
4 $6,075.00$25.00
Ref #246 202E23500 WEARING COURSE REMOVED, (1722 SY)
Awd $3,444.00$2.00
2 $6,027.00$3.50
3 $5,596.50$3.25
4 $7,749.00$4.50
Ref #247 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $12,000.00$12,000.00
2 $20,000.00$20,000.00
3 $12,500.00$12,500.00
4 $15,000.00$15,000.00
Ref #248 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $18,000.00$18,000.00
2 $25,000.00$25,000.00
3 $24,000.00$24,000.00
4 $25,000.00$25,000.00
Ref #249 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)
Awd $28,000.00$28,000.00
2 $5,000.00$5,000.00
3 $19,000.00$19,000.00
4 $20,000.00$20,000.00
Ref #250 507E00100 STEEL PILES HP10X42, FURNISHED, (1710 FT)
Awd $54,720.00$32.00
2 $42,750.00$25.00
3 $28,215.00$16.50
4 $29,070.00$17.00
160131 - Page 31
Ref #251 507E00150 STEEL PILES HP10X42, DRIVEN, (1490 FT)
Awd $10,430.00$7.00
2 $17,880.00$12.00
3 $19,370.00$13.00
4 $29,800.00$20.00
Ref #252 509E10000 EPOXY COATED REINFORCING STEEL, (209665 LB)
Awd $201,278.40$0.96
2 $201,278.40$0.96
3 $188,698.50$0.90
4 $209,665.00$1.00
Ref #253 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)
Awd $200.00$2.00
2 $200.00$2.00
3 $200.00$2.00
4 $200.00$2.00
Ref #254 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (498 EACH)
Awd $5,976.00$12.00
2 $5,727.00$11.50
3 $11,454.00$23.00
4 $8,964.00$18.00
Ref #255 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, (600 CY)
Awd $246,000.00$410.00
2 $258,000.00$430.00
3 $420,000.00$700.00
4 $330,000.00$550.00
Ref #256 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE, (75 CY)
Awd $28,500.00$380.00
2 $40,500.00$540.00
3 $35,625.00$475.00
4 $50,250.00$670.00
Ref #257 511E41012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS, (91 CY)
Awd $43,225.00$475.00
2 $70,980.00$780.00
3 $81,900.00$900.00
4 $75,530.00$830.00
Ref #258 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING , (176 CY)
Awd $68,640.00$390.00
2 $68,640.00$390.00
3 $114,400.00$650.00
4 $80,960.00$460.00
Ref #259 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING, (27 CY)
Awd $9,180.00$340.00
2 $8,775.00$325.00
3 $20,250.00$750.00
4 $9,720.00$360.00
Ref #260 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1103 SY)
Awd $18,751.00$17.00
2 $22,611.50$20.50
3 $23,163.00$21.00
4 $33,090.00$30.00
160131 - Page 32
Ref #261 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (120 SY)
Awd $3,360.00$28.00
2 $2,400.00$20.00
3 $3,720.00$31.00
4 $1,800.00$15.00
Ref #262 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (173 SY)
Awd $3,287.00$19.00
2 $3,460.00$20.00
3 $3,633.00$21.00
4 $3,460.00$20.00
Ref #263 513E10261 STRUCTURAL STEEL MEMBERS, LEVEL 3, AS PER PLAN, (570500 LB)
Awd $792,995.00$1.39
2 $741,650.00$1.30
3 $884,275.00$1.55
4 $844,340.00$1.48
Ref #264 513E20000 WELDED STUD SHEAR CONNECTORS, (12399 EACH)
Awd $37,816.95$3.05
2 $40,296.75$3.25
3 $42,156.60$3.40
4 $42,156.60$3.40
Ref #265 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (157 FT)
Awd $58,090.00$370.00
2 $58,875.00$375.00
3 $66,725.00$425.00
4 $61,230.00$390.00
Ref #266 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (78 SF)
Awd $468.00$6.00
2 $234.00$3.00
3 $390.00$5.00
4 $390.00$5.00
Ref #267 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (17 EACH)
Awd $16,150.00$950.00
2 $22,100.00$1,300.00
3 $24,650.00$1,450.00
4 $17,340.00$1,020.00
Ref #268 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (9 EACH)
Awd $8,550.00$950.00
2 $11,700.00$1,300.00
3 $13,050.00$1,450.00
4 $12,150.00$1,350.00
Ref #269 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (18 EACH)
Awd $17,100.00$950.00
2 $23,400.00$1,300.00
3 $26,100.00$1,450.00
4 $26,820.00$1,490.00
Ref #270 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (65 CY)
Awd $4,550.00$70.00
2 $4,225.00$65.00
3 $4,875.00$75.00
4 $5,525.00$85.00
160131 - Page 33
Ref #271 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (185 FT)
Awd $1,110.00$6.00
2 $1,295.00$7.00
3 $666.00$3.60
4 $2,590.00$14.00
Ref #272 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (20 FT)
Awd $200.00$10.00
2 $180.00$9.00
3 $120.00$6.00
4 $280.00$14.00
Ref #273 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1, (443 SY)
Awd $86,385.00$195.00
2 $75,310.00$170.00
3 $99,675.00$225.00
4 $108,535.00$245.00
Ref #274 526E90010 TYPE A INSTALLATION, (159 FT)
Awd $15,105.00$95.00
2 $12,720.00$80.00
3 $21,465.00$135.00
4 $11,130.00$70.00
Section 18 - STRUCTURE 20 FOOT SPAN AND OVER (TRU-80- - Totals
Awd $1,918,371.35
2 $2,120,588.65
3 $2,318,162.60
4 $2,328,819.60
Ref #275 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $120,000.00$120,000.00
2 $325,000.00$325,000.00
3 $115,000.00$115,000.00
4 $260,000.00$260,000.00
Ref #276 202E22900 APPROACH SLAB REMOVED, (245 SY)
Awd $4,900.00$20.00
2 $4,410.00$18.00
3 $6,125.00$25.00
4 $6,125.00$25.00
Ref #277 202E23500 WEARING COURSE REMOVED, (1706 SY)
Awd $3,412.00$2.00
2 $5,971.00$3.50
3 $5,544.50$3.25
4 $7,677.00$4.50
Ref #278 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $12,000.00$12,000.00
2 $20,000.00$20,000.00
3 $25,000.00$25,000.00
4 $15,000.00$15,000.00
Ref #279 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $18,000.00$18,000.00
2 $25,000.00$25,000.00
3 $25,000.00$25,000.00
4 $25,000.00$25,000.00
160131 - Page 34
Ref #280 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)
Awd $28,000.00$28,000.00
2 $5,000.00$5,000.00
3 $19,000.00$19,000.00
4 $20,000.00$20,000.00
Ref #281 507E00100 STEEL PILES HP10X42, FURNISHED, (1610 FT)
Awd $53,130.00$33.00
2 $40,250.00$25.00
3 $26,565.00$16.50
4 $27,370.00$17.00
Ref #282 507E00150 STEEL PILES HP10X42, DRIVEN, (1390 FT)
Awd $11,120.00$8.00
2 $16,680.00$12.00
3 $18,070.00$13.00
4 $27,800.00$20.00
Ref #283 509E10000 EPOXY COATED REINFORCING STEEL, (207745 LB)
Awd $199,435.20$0.96
2 $191,125.40$0.92
3 $186,970.50$0.90
4 $207,745.00$1.00
Ref #284 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)
Awd $200.00$2.00
2 $200.00$2.00
3 $200.00$2.00
4 $200.00$2.00
Ref #285 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (516 EACH)
Awd $6,192.00$12.00
2 $5,934.00$11.50
3 $11,868.00$23.00
4 $9,288.00$18.00
Ref #286 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, (590 CY)
Awd $241,900.00$410.00
2 $253,700.00$430.00
3 $427,750.00$725.00
4 $324,500.00$550.00
Ref #287 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE, (75 CY)
Awd $28,500.00$380.00
2 $40,500.00$540.00
3 $35,625.00$475.00
4 $50,250.00$670.00
Ref #288 511E41012 CLASS QC1 CONCRETE WITH QC/QA, PIER ABOVE FOOTINGS, (75 CY)
Awd $35,625.00$475.00
2 $58,500.00$780.00
3 $78,750.00$1,050.00
4 $70,875.00$945.00
Ref #289 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING , (163 CY)
Awd $63,570.00$390.00
2 $63,570.00$390.00
3 $105,950.00$650.00
4 $74,980.00$460.00
160131 - Page 35
Ref #290 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING, (27 CY)
Awd $8,775.00$325.00
2 $8,775.00$325.00
3 $20,250.00$750.00
4 $9,720.00$360.00
Ref #291 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1080 SY)
Awd $18,306.00$16.95
2 $22,140.00$20.50
3 $22,680.00$21.00
4 $32,400.00$30.00
Ref #292 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (120 SY)
Awd $3,000.00$25.00
2 $2,400.00$20.00
3 $1,860.00$15.50
4 $1,800.00$15.00
Ref #293 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (198 SY)
Awd $3,762.00$19.00
2 $3,960.00$20.00
3 $4,158.00$21.00
4 $3,960.00$20.00
Ref #294 513E10261 STRUCTURAL STEEL MEMBERS, LEVEL 3, AS PER PLAN, (551000 LB)
Awd $765,890.00$1.39
2 $727,320.00$1.32
3 $854,050.00$1.55
4 $815,480.00$1.48
Ref #295 513E20000 WELDED STUD SHEAR CONNECTORS, (12174 EACH)
Awd $37,130.70$3.05
2 $39,565.50$3.25
3 $40,174.20$3.30
4 $41,391.60$3.40
Ref #296 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (157 FT)
Awd $58,090.00$370.00
2 $58,875.00$375.00
3 $66,725.00$425.00
4 $61,230.00$390.00
Ref #297 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (79 SF)
Awd $474.00$6.00
2 $237.00$3.00
3 $395.00$5.00
4 $395.00$5.00
Ref #298 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (17 EACH)
Awd $16,150.00$950.00
2 $22,100.00$1,300.00
3 $24,650.00$1,450.00
4 $19,125.00$1,125.00
Ref #299 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (9 EACH)
Awd $8,550.00$950.00
2 $11,700.00$1,300.00
3 $13,050.00$1,450.00
4 $12,330.00$1,370.00
160131 - Page 36
Ref #300 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (17 EACH)
Awd $16,150.00$950.00
2 $22,100.00$1,300.00
3 $24,650.00$1,450.00
4 $25,925.00$1,525.00
Ref #301 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (63 CY)
Awd $4,725.00$75.00
2 $4,095.00$65.00
3 $4,725.00$75.00
4 $5,355.00$85.00
Ref #302 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (180 FT)
Awd $1,080.00$6.00
2 $1,260.00$7.00
3 $720.00$4.00
4 $2,520.00$14.00
Ref #303 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (20 FT)
Awd $200.00$10.00
2 $180.00$9.00
3 $120.00$6.00
4 $280.00$14.00
Ref #304 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1, (443 SY)
Awd $86,385.00$195.00
2 $75,310.00$170.00
3 $99,675.00$225.00
4 $108,535.00$245.00
Ref #305 526E90010 TYPE A INSTALLATION, (159 FT)
Awd $15,105.00$95.00
2 $12,720.00$80.00
3 $21,465.00$135.00
4 $11,130.00$70.00
Section 19 - STRUCTURE 20 FOOT SPAN AND OVER (TRU-80- - Totals
Awd $1,869,756.90
2 $2,068,577.90
3 $2,286,765.20
4 $2,278,386.60
Ref #306 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $47,000.00$47,000.00
2 $90,180.46$90,180.46
3 $55,000.00$55,000.00
4 $75,000.00$75,000.00
Ref #307 108E10000 SPECIAL - CPM PROGRESS SCHEDULE(PART 1 AND PART 2), (LUMP SUM)
Awd $10,000.00$10,000.00
2 $2,500.00$2,500.00
3 $35,000.00$35,000.00
4 $21,000.00$21,000.00
Ref #308 614E11000 MAINTAINING TRAFFIC(PART 1 AND PART 2), (LUMP SUM)
Awd $400,000.00$400,000.00
2 $400,000.00$400,000.00
3 $266,000.00$266,000.00
4 $465,000.00$465,000.00
160131 - Page 37
Ref #309 619E16010 FIELD OFFICE, TYPE B(PART 1 AND PART 2), (22.5 MNTH)
Awd $22,500.00$1,000.00
2 $28,125.00$1,250.00
3 $45,000.00$2,000.00
4 $45,000.00$2,000.00
Ref #310 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING(PART 1 AN, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $25,000.00$25,000.00
3 $135,000.00$135,000.00
4 $80,000.00$80,000.00
Ref #311 624E10000 MOBILIZATION(PART 1 AND PART 2), (LUMP SUM)
Awd $200,000.00$200,000.00
2 $400,000.00$400,000.00
3 $400,000.00$400,000.00
4 $255,000.00$255,000.00
Section 20 - INCIDENTALS - Totals
Awd $709,500.00
2 $945,805.46
3 $936,000.00
4 $941,000.00
160131 - Page 38
Project No. 160136
PID 94262
BUT-SR 4/SR 4D-20.64/0.00
Federal
Type: FOUR LANE RESURFACING
Completion Date: 11/1/2016
Award Amount: $665,662.00
Contract Awarded To: BARRETT PAVING MATERIALS INC
Letting Date: 4/7/2016
Engineer's Estimate: $620,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BARRETT PAVING MATERIALS INC
3751 COMMERCE DR
MIDDLETOWN, OH 45005
Warren
Bidder 1
Bid $665,662.00
JOHN R JURGENSEN COMPANY
11641 MOSTELLER RD
CINCINNATI, OH 45241
Hamilton
Bidder 2
Bid $776,051.81
160136 - Page 39
Ref #100 611E99654 MANHOLE ADJUSTED TO GRADE, (30 EACH)
Awd $13,500.00$450.00
2 $17,711.70$590.39
Ref #101 638E10800 VALVE BOX ADJUSTED TO GRADE, (18 EACH)
Awd $2,700.00$150.00
2 $6,730.56$373.92
Section 1 - ROADWAY - Totals
Awd $16,200.00
2 $24,442.26
Ref #11 253E02001 PAVEMENT REPAIR, AS PER PLAN, (163 CY)
Awd $54,605.00$335.00
2 $27,871.37$170.99
Ref #12 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, (40395 SY)
Awd $54,533.25$1.35
2 $87,657.15$2.17
Ref #13 254E01600 PATCHING PLANED SURFACE, (461 SY)
Awd $461.00$1.00
2 $1,111.01$2.41
Ref #16 407E10000 TACK COAT, (3029 GAL)
Awd $7,269.60$2.40
2 $7,572.50$2.50
Ref #17 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (1615 GAL)
Awd $3,876.00$2.40
2 $4,037.50$2.50
Ref #18 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (1403 CY)
Awd $176,778.00$126.00
2 $182,390.00$130.00
Ref #19 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (1964 CY)
Awd $259,248.00$132.00
2 $218,730.68$111.37
Section 2 - PAVEMENT - Totals
Awd $556,770.85
2 $529,370.21
Ref #21 632E26501 DETECTOR LOOP, AS PER PLAN, (2 EACH)
Awd $2,900.00$1,450.00
2 $2,900.00$1,450.00
Ref #22 644E00100 EDGE LINE, 4", (0.24 MILE)
Awd $528.00$2,200.00
2 $528.00$2,200.00
Ref #23 644E00200 LANE LINE, 4", (2.55 MILE)
Awd $2,297.55$901.00
2 $2,297.55$901.00
Ref #24 644E00300 CENTER LINE, (0.42 MILE)
Awd $1,260.00$3,000.00
2 $1,260.00$3,000.00
160136 - Page 40
Ref #25 644E00400 CHANNELIZING LINE, 8", (3533 FT)
Awd $3,533.00$1.00
2 $3,533.00$1.00
Ref #26 644E00500 STOP LINE, (793 FT)
Awd $3,568.50$4.50
2 $3,568.50$4.50
Ref #27 644E00600 CROSSWALK LINE, (4166 FT)
Awd $8,956.90$2.15
2 $8,956.90$2.15
Ref #28 644E00700 TRANSVERSE/DIAGONAL LINE, (754 FT)
Awd $3,016.00$4.00
2 $3,016.00$4.00
Ref #29 644E01000 RAILROAD SYMBOL MARKING, (4 EACH)
Awd $1,980.00$495.00
2 $1,980.00$495.00
Ref #30 644E01300 LANE ARROW, (21 EACH)
Awd $1,491.00$71.00
2 $1,491.00$71.00
Ref #31 644E01400 WORD ON PAVEMENT, 72", (7 EACH)
Awd $525.00$75.00
2 $525.00$75.00
Section 3 - TRAFFIC CONTROL - Totals
Awd $30,055.95
2 $30,055.95
Ref #32 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (40 HOUR)
Awd $2,600.00$65.00
2 $3,236.80$80.92
Ref #33 614E20000 WORK ZONE LANE LINE, CLASS I, (2.55 MILE)
Awd $1,020.00$400.00
2 $2,652.51$1,040.20
Ref #34 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (2.55 MILE)
Awd $1,020.00$400.00
2 $2,543.85$997.59
Ref #35 614E21000 WORK ZONE CENTER LINE, CLASS I, (0.42 MILE)
Awd $794.64$1,892.00
2 $1,339.08$3,188.29
Ref #36 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (0.42 MILE)
Awd $794.64$1,892.00
2 $1,339.08$3,188.29
Ref #37 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, (3533 FT)
Awd $1,766.50$0.50
2 $5,723.46$1.62
Ref #38 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (3533 FT)
Awd $1,766.50$0.50
2 $16,923.07$4.79
160136 - Page 41
Ref #39 614E26000 WORK ZONE STOP LINE, CLASS I, (793 FT)
Awd $1,784.25$2.25
2 $8,493.03$10.71
Ref #40 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (793 FT)
Awd $1,784.25$2.25
2 $7,113.21$8.97
Ref #41 614E27000 WORK ZONE CROSSWALK LINE, CLASS I, (4166 FT)
Awd $3,124.50$0.75
2 $14,997.60$3.60
Ref #42 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT, (4166 FT)
Awd $3,124.50$0.75
2 $26,579.08$6.38
Ref #43 614E30000 WORK ZONE ARROW, CLASS I, (21 EACH)
Awd $525.00$25.00
2 $3,995.25$190.25
Ref #44 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT, (21 EACH)
Awd $525.00$25.00
2 $4,146.66$197.46
Ref #45 614E32000 WORK ZONE RAILROAD SYMBOL MARKING, CLASS I, (4 EACH)
Awd $480.00$120.00
2 $1,141.00$285.25
Ref #46 614E32210 WORK ZONE RAILROAD SYMBOL MARKING, CLASS III, 642 , (4 EACH)
Awd $480.00$120.00
2 $1,169.84$292.46
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $21,589.78
2 $101,393.52
Ref #47 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,300.00$4,300.00
2 $2,577.43$2,577.43
Ref #48 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $16,245.42$16,245.42
2 $66,009.79$66,009.79
Ref #49 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $5,500.00$5,500.00
2 $2,202.65$2,202.65
Ref #50 624E10000 MOBILIZATION, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $20,000.00$20,000.00
Section 5 - INCIDENTALS - Totals
Awd $41,045.42
2 $90,789.87
160136 - Page 42
Project No. 160154
PID 93121
RIC-SR 96-12.72
Federal
Type: TWO LANE RESURFACING
Completion Date: 10/31/2016
Award Amount: $3,001,499.35
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 4/7/2016
Engineer's Estimate: $3,728,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $3,001,499.35
KOKOSING CONSTRUCTION COMPANY INC
886 MC KINLEY AVE
COLUMBUS, OH 43222
Franklin
Bidder 2
Bid $3,162,887.34
ERIE BLACKTOP INC
4507 TIFFIN AVE
SANDUSKY, OH 44870
Erie
Bidder 3
Bid $3,180,191.90
KARVO COMPANIES INC
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 4
Bid $3,689,647.00
160154 - Page 43
Ref #1 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (1 EACH)
Awd $125.00$125.00
2 $120.00$120.00
3 $126.00$126.00
4 $120.00$120.00
Ref #2 203E20001 EMBANKMENT, AS PER PLAN, (57 CY)
Awd $3,135.00$55.00
2 $3,049.50$53.50
3 $3,220.50$56.50
4 $3,049.50$53.50
Ref #3 209E15000 RESHAPING UNDER GUARDRAIL, (1.19 STA)
Awd $119.00$100.00
2 $119.00$100.00
3 $124.95$105.00
4 $119.00$100.00
Ref #4 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING, (33 MILE)
Awd $36,300.00$1,100.00
2 $58,415.94$1,770.18
3 $36,300.00$1,100.00
4 $67,155.00$2,035.00
Ref #5 209E80000 GRADING MAILBOX APPROACHES, (64 EACH)
Awd $640.00$10.00
2 $640.00$10.00
3 $6,400.00$100.00
4 $10,240.00$160.00
Ref #6 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4, (1 EACH)
Awd $1,075.00$1,075.00
2 $1,075.00$1,075.00
3 $1,130.00$1,130.00
4 $1,075.00$1,075.00
Ref #7 606E35150 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 4, (1 EACH)
Awd $885.00$885.00
2 $885.00$885.00
3 $930.00$930.00
4 $885.00$885.00
Ref #8 617E10100 COMPACTED AGGREGATE, (2398 CY)
Awd $77,935.00$32.50
2 $107,910.00$45.00
3 $115,104.00$48.00
4 $57,552.00$24.00
Ref #9 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (12 EACH)
Awd $1,500.00$125.00
2 $1,500.00$125.00
3 $1,575.00$131.25
4 $1,500.00$125.00
Section 1 - ROADWAY - Totals
Awd $121,714.00
2 $173,714.44
3 $164,910.45
4 $141,695.50
160154 - Page 44
Ref #10 251E01010 PARTIAL DEPTH PAVEMENT REPAIR, (2600 CY)
Awd $384,800.00$148.00
2 $325,000.00$125.00
3 $395,200.00$152.00
4 $494,000.00$190.00
Ref #11 253E02000 PAVEMENT REPAIR, (130 CY)
Awd $16,900.00$130.00
2 $16,900.00$130.00
3 $25,350.00$195.00
4 $27,950.00$215.00
Ref #12 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (263129 SY)
Awd $236,816.10$0.90
2 $197,346.75$0.75
3 $223,659.65$0.85
4 $315,754.80$1.20
Ref #13 254E01600 PATCHING PLANED SURFACE, (14311 SY)
Awd $27,906.45$1.95
2 $14,311.00$1.00
3 $51,519.60$3.60
4 $10,017.70$0.70
Ref #14 407E10000 TACK COAT, (21050 GAL)
Awd $35,785.00$1.70
2 $34,732.50$1.65
3 $38,942.50$1.85
4 $31,575.00$1.50
Ref #15 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (10526 GAL)
Awd $17,894.20$1.70
2 $17,367.90$1.65
3 $19,473.10$1.85
4 $15,789.00$1.50
Ref #16 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (9136 CY)
Awd $986,688.00$108.00
2 $1,142,000.00$125.00
3 $1,078,048.00$118.00
4 $1,142,000.00$125.00
Ref #17 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (479 CY)
Awd $51,732.00$108.00
2 $59,875.00$125.00
3 $56,522.00$118.00
4 $56,522.00$118.00
Ref #18 442E20101 ASPHALT CONCRETE INTERMEDIATE COURSE, 9.5 MM, TYPE, (5482 CY)
Awd $592,056.00$108.00
2 $657,840.00$120.00
3 $630,430.00$115.00
4 $712,660.00$130.00
Ref #19 690E98800 SPECIAL - MISC.:ASPHALT GRINDINGS, (4000 TON)
Awd $26,000.00$6.50
2 $51,000.00$12.75
3 $20,000.00$5.00
4 $22,400.00$5.60
160154 - Page 45
Section 2 - PAVEMENT - Totals
Awd $2,376,577.75
2 $2,516,373.15
3 $2,539,144.85
4 $2,828,668.50
Ref #20 621E00100 RPM, (1114 EACH)
Awd $19,717.80$17.70
2 $19,717.80$17.70
3 $21,388.80$19.20
4 $20,330.50$18.25
Ref #21 621E54000 RAISED PAVEMENT MARKER REMOVED, (1114 EACH)
Awd $3,342.00$3.00
2 $4,456.00$4.00
3 $7,241.00$6.50
4 $1,114.00$1.00
Ref #22 642E00104 EDGE LINE, 6", TYPE 1, (30.5 MILE)
Awd $17,690.00$580.00
2 $18,605.00$610.00
3 $19,672.50$645.00
4 $18,605.00$610.00
Ref #23 642E00300 CENTER LINE, TYPE 1, (15.25 MILE)
Awd $9,455.00$620.00
2 $12,962.50$850.00
3 $13,648.75$895.00
4 $12,962.50$850.00
Ref #24 644E00400 CHANNELIZING LINE, 8", (80 FT)
Awd $92.00$1.15
2 $80.00$1.00
3 $84.00$1.05
4 $80.00$1.00
Ref #25 644E00500 STOP LINE, (529 FT)
Awd $2,459.85$4.65
2 $3,121.10$5.90
3 $3,279.80$6.20
4 $3,121.10$5.90
Ref #26 644E00600 CROSSWALK LINE, (1150 FT)
Awd $3,047.50$2.65
2 $2,242.50$1.95
3 $2,357.50$2.05
4 $2,242.50$1.95
Ref #27 644E01000 RAILROAD SYMBOL MARKING, (4 EACH)
Awd $1,300.00$325.00
2 $2,000.00$500.00
3 $2,100.00$525.00
4 $2,000.00$500.00
Ref #28 644E01110 SCHOOL SYMBOL MARKING, 96", (4 EACH)
Awd $1,400.00$350.00
2 $1,400.00$350.00
3 $1,480.00$370.00
4 $1,400.00$350.00
160154 - Page 46
Ref #29 644E01200 PARKING LOT STALL MARKING, (1425 FT)
Awd $1,425.00$1.00
2 $1,781.25$1.25
3 $1,923.75$1.35
4 $1,781.25$1.25
Ref #30 644E01300 LANE ARROW, (2 EACH)
Awd $150.00$75.00
2 $170.00$85.00
3 $178.50$89.25
4 $170.00$85.00
Section 3 - TRAFFIC CONTROL - Totals
Awd $60,079.15
2 $66,536.15
3 $73,354.60
4 $63,806.85
Ref #31 614E12460 WORK ZONE MARKING SIGN, (117 EACH)
Awd $16,380.00$140.00
2 $6,435.00$55.00
3 $8,599.50$73.50
4 $8,190.00$70.00
Ref #32 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (25 CY)
Awd $3,000.00$120.00
2 $2,500.00$100.00
3 $5,750.00$230.00
4 $1,875.00$75.00
Ref #33 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (45.75 MILE)
Awd $40,031.25$875.00
2 $54,900.00$1,200.00
3 $57,645.00$1,260.00
4 $54,900.00$1,200.00
Ref #34 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (80 FT)
Awd $320.00$4.00
2 $112.00$1.40
3 $44.00$0.55
4 $40.00$0.50
Ref #35 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (249 FT)
Awd $996.00$4.00
2 $1,369.50$5.50
3 $747.00$3.00
4 $709.65$2.85
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $60,727.25
2 $65,316.50
3 $72,785.50
4 $65,714.65
160154 - Page 47
Ref #36 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (744 SY)
Awd $669.60$0.90
2 $558.00$0.75
3 $632.40$0.85
4 $1,116.00$1.50
Ref #37 407E10000 TACK COAT, (60 GAL)
Awd $102.00$1.70
2 $99.00$1.65
3 $111.00$1.85
4 $90.00$1.50
Ref #38 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (30 GAL)
Awd $51.00$1.70
2 $49.50$1.65
3 $55.50$1.85
4 $45.00$1.50
Ref #39 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (26 CY)
Awd $2,808.00$108.00
2 $3,250.00$125.00
3 $3,068.00$118.00
4 $3,380.00$130.00
Ref #40 442E20101 ASPHALT CONCRETE INTERMEDIATE COURSE, 9.5 MM, TYPE, (16 CY)
Awd $1,728.00$108.00
2 $1,920.00$120.00
3 $1,840.00$115.00
4 $2,000.00$125.00
Ref #41 517E72710 RAILING (DEEP BEAM BRIDGE RETROFIT RAILING), (317 FT)
Awd $31,066.00$98.00
2 $29,956.50$94.50
3 $33,285.00$105.00
4 $29,956.50$94.50
Ref #42 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (55 CF)
Awd $16,940.00$308.00
2 $16,940.00$308.00
3 $17,875.00$325.00
4 $11,825.00$215.00
Section 5 - STRUCTURE REPAIR (RIC-96-1657) - Totals
Awd $53,364.60
2 $52,773.00
3 $56,866.90
4 $48,412.50
Ref #43 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (238 SY)
Awd $214.20$0.90
2 $178.50$0.75
3 $202.30$0.85
4 $357.00$1.50
Ref #44 407E10000 TACK COAT, (19 GAL)
Awd $32.30$1.70
2 $31.35$1.65
3 $35.15$1.85
4 $28.50$1.50
160154 - Page 48
Ref #45 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (5 GAL)
Awd $8.50$1.70
2 $8.25$1.65
3 $9.25$1.85
4 $7.50$1.50
Ref #46 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (9 CY)
Awd $972.00$108.00
2 $1,125.00$125.00
3 $1,062.00$118.00
4 $1,170.00$130.00
Ref #47 442E20101 ASPHALT CONCRETE INTERMEDIATE COURSE, 9.5 MM, TYPE, (5 CY)
Awd $540.00$108.00
2 $600.00$120.00
3 $575.00$115.00
4 $625.00$125.00
Ref #48 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (44 CF)
Awd $13,552.00$308.00
2 $13,552.00$308.00
3 $14,300.00$325.00
4 $9,460.00$215.00
Section 6 - STRUCTURE REPAIR (RIC-603-1356) - Totals
Awd $15,319.00
2 $15,495.10
3 $16,183.70
4 $11,648.00
Ref #49 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (179 SY)
Awd $161.10$0.90
2 $134.25$0.75
3 $152.15$0.85
4 $268.50$1.50
Ref #50 407E10000 TACK COAT, (15 GAL)
Awd $25.50$1.70
2 $24.75$1.65
3 $27.75$1.85
4 $22.50$1.50
Ref #51 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (7 CY)
Awd $756.00$108.00
2 $875.00$125.00
3 $826.00$118.00
4 $910.00$130.00
Section 7 - STRUCTURE REPAIR (RIC-603-2174) - Totals
Awd $942.60
2 $1,034.00
3 $1,005.90
4 $1,201.00
160154 - Page 49
Ref #52 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)
Awd $1,900.00$1,900.00
2 $8,500.00$8,500.00
3 $8,500.00$8,500.00
4 $7,500.00$7,500.00
Ref #53 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $13,000.00$13,000.00
3 $10,000.00$10,000.00
4 $35,000.00$35,000.00
Ref #54 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $180,875.00$180,875.00
2 $136,345.00$136,345.00
3 $125,000.00$125,000.00
4 $225,000.00$225,000.00
Ref #55 619E16010 FIELD OFFICE, TYPE B, (4 MNTH)
Awd $7,200.00$1,800.00
2 $9,600.00$2,400.00
3 $5,940.00$1,485.00
4 $6,000.00$1,500.00
Ref #56 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $7,800.00$7,800.00
2 $4,200.00$4,200.00
3 $6,500.00$6,500.00
4 $5,000.00$5,000.00
Ref #57 624E10000 MOBILIZATION, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $100,000.00$100,000.00
3 $100,000.00$100,000.00
4 $250,000.00$250,000.00
Section 8 - INCIDENTALS - Totals
Awd $312,775.00
2 $271,645.00
3 $255,940.00
4 $528,500.00
160154 - Page 50
Project No. 160157
PID 97319
SCI-US 52-(15.81)(19.07)
Federal
Type: TWO LANE RESURFACING
Completion Date: 9/30/2016
Award Amount: $1,277,413.39
Contract Awarded To: ALLARD EXCAVATION LLC
Letting Date: 4/7/2016
Engineer's Estimate: $1,200,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
ALLARD EXCAVATION LLC
8336 BENNETT SCHOOL HOUSE RD
SOUTH WEBSTER, OH 45682
Scioto
Bidder 1
Bid $1,277,413.39
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 2
Bid $1,355,985.00
160157 - Page 51
Ref #1 202E30000 WALK REMOVED, (5632 SF)
Awd $11,151.36$1.98
2 $19,712.00$3.50
Ref #2 202E32000 CURB REMOVED, (1736 FT)
Awd $12,568.64$7.24
2 $26,040.00$15.00
Ref #3 608E10000 4" CONCRETE WALK, (664 SF)
Awd $10,624.00$16.00
2 $6,640.00$10.00
Ref #4 608E52001 CURB RAMP, AS PER PLAN, (4968 SF)
Awd $101,844.00$20.50
2 $70,794.00$14.25
Section 1 - ROADWAY - Totals
Awd $136,188.00
2 $123,186.00
Ref #5 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
Ref #6 611E98630 CATCH BASIN ADJUSTED TO GRADE, (5 EACH)
Awd $3,293.40$658.68
2 $3,000.00$600.00
Ref #7 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE, (2 EACH)
Awd $2,206.00$1,103.00
2 $2,200.00$1,100.00
Ref #8 611E99150 INLET ADJUSTED TO GRADE, (4 EACH)
Awd $2,650.00$662.50
2 $2,400.00$600.00
Ref #9 611E99654 MANHOLE ADJUSTED TO GRADE, (3 EACH)
Awd $1,981.05$660.35
2 $1,800.00$600.00
Section 3 - DRAINAGE - Totals
Awd $10,130.45
2 $9,400.00
Ref #10 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, (2005 SY)
Awd $42,886.95$21.39
2 $69,172.50$34.50
Ref #11 253E01000 PAVEMENT REPAIR, (1013 SY)
Awd $92,183.00$91.00
2 $125,612.00$124.00
160157 - Page 52
Ref #12 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, (107352 SY)
Awd $72,999.36$0.68
2 $123,454.80$1.15
Ref #13 254E01601 PATCHING PLANED SURFACE, AS PER PLAN, (996 SY)
Awd $1,414.32$1.42
2 $2,988.00$3.00
Ref #14 407E10000 TACK COAT, (2755 GAL)
Awd $5,510.00$2.00
2 $5,510.00$2.00
Ref #15 407E20101 SPECIAL - TACK COAT, TRACKLESS TACK, AS PER PLAN, (5298 GAL)
Awd $21,192.00$4.00
2 $18,278.10$3.45
Ref #16 422E10000 SINGLE CHIP SEAL, (7083 SY)
Awd $30,102.75$4.25
2 $15,936.75$2.25
Ref #17 441E10100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG, (4475 CY)
Awd $604,125.00$135.00
2 $595,175.00$133.00
Ref #18 609E24510 CURB, TYPE 4-C, (333 FT)
Awd $8,158.50$24.50
2 $8,158.50$24.50
Ref #19 609E24511 CURB, TYPE 4-C, AS PER PLAN, (1000 FT)
Awd $24,500.00$24.50
2 $24,500.00$24.50
Ref #20 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE), (2 MILE)
Awd $5,420.00$2,710.00
2 $6,000.00$3,000.00
Section 4 - PAVEMENT - Totals
Awd $908,491.88
2 $994,785.65
Ref #21 621E00100 RPM, (286 EACH)
Awd $6,864.00$24.00
2 $6,864.00$24.00
Ref #22 621E54000 RAISED PAVEMENT MARKER REMOVED, (268 EACH)
Awd $2,026.08$7.56
2 $536.00$2.00
Ref #23 630E08004 ONE WAY SUPPORT, NO. 3 POST, (315 FT)
Awd $3,150.00$10.00
2 $3,150.00$10.00
Ref #24 630E80100 SIGN, FLAT SHEET, (290.5 SF)
Awd $4,648.00$16.00
2 $4,648.00$16.00
Ref #25 630E84901 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, AS PE, (24 EACH)
Awd $360.00$15.00
2 $360.00$15.00
160157 - Page 53
Ref #26 630E86003 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (6 EACH)
Awd $120.00$20.00
2 $120.00$20.00
Ref #27 644E00104 EDGE LINE, 6", (2.25 MILE)
Awd $5,332.50$2,370.00
2 $5,332.50$2,370.00
Ref #28 644E00200 LANE LINE, 4", (4.72 MILE)
Awd $1,550.38$328.47
2 $3,540.00$750.00
Ref #29 644E00204 LANE LINE, 6", (1.52 MILE)
Awd $1,550.40$1,020.00
2 $1,550.40$1,020.00
Ref #30 644E00300 CENTER LINE, (3.15 MILE)
Awd $11,418.75$3,625.00
2 $11,418.75$3,625.00
Ref #31 644E00400 CHANNELIZING LINE, 8", (2046 FT)
Awd $2,352.90$1.15
2 $2,352.90$1.15
Ref #32 644E00404 CHANNELIZING LINE, 12", (807 FT)
Awd $1,210.50$1.50
2 $1,210.50$1.50
Ref #33 644E00500 STOP LINE, (1111 FT)
Awd $4,721.75$4.25
2 $4,721.75$4.25
Ref #34 644E00600 CROSSWALK LINE, (4978 FT)
Awd $9,956.00$2.00
2 $9,956.00$2.00
Ref #35 644E00601 CROSSWALK LINE, AS PER PLAN, (192 FT)
Awd $864.00$4.50
2 $864.00$4.50
Ref #36 644E00700 TRANSVERSE/DIAGONAL LINE, (1541 FT)
Awd $5,547.60$3.60
2 $5,547.60$3.60
Ref #37 644E00900 ISLAND MARKING, (100 SF)
Awd $200.00$2.00
2 $200.00$2.00
Ref #38 644E01110 SCHOOL SYMBOL MARKING, 96", (1 EACH)
Awd $350.00$350.00
2 $350.00$350.00
Ref #39 644E01300 LANE ARROW, (46 EACH)
Awd $2,760.00$60.00
2 $2,760.00$60.00
Ref #40 644E01400 WORD ON PAVEMENT, 72", (7 EACH)
Awd $560.00$80.00
2 $560.00$80.00
Ref #41 644E20800 YIELD LINE, (266 FT)
Awd $1,330.00$5.00
2 $1,330.00$5.00
160157 - Page 54
Section 5 - TRAFFIC CONTROL - Totals
Awd $66,872.86
2 $67,372.40
Ref #42 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (24 HOUR)
Awd $1,560.00$65.00
2 $1,680.00$70.00
Ref #43 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (3 SNMT)
Awd $4,500.00$1,500.00
2 $4,500.00$1,500.00
Ref #44 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (6.24 MILE)
Awd $3,432.00$550.00
2 $3,432.00$550.00
Ref #45 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (6.3 MILE)
Awd $5,733.00$910.00
2 $5,733.00$910.00
Ref #46 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (2853 FT)
Awd $1,997.10$0.70
2 $1,997.10$0.70
Ref #47 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642, (1541 FT)
Awd $2,850.85$1.85
2 $2,850.85$1.85
Ref #48 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (1111 FT)
Awd $5,277.25$4.75
2 $5,277.25$4.75
Ref #49 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT, (5170 FT)
Awd $5,170.00$1.00
2 $5,170.00$1.00
Ref #50 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT, (46 EACH)
Awd $6,440.00$140.00
2 $6,440.00$140.00
Ref #100 614E12460 WORK ZONE MARKING SIGN, (7 EACH)
Awd $770.00$110.00
2 $770.00$110.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $37,730.20
2 $37,850.20
Ref #51 519E12300 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE B, (4 SY)
Awd $6,000.00$1,500.00
2 $6,000.00$1,500.00
Section 7 - STRUCTURE REPAIR (52 16.10 SFN 7300905) - Totals
Awd $6,000.00
2 $6,000.00
160157 - Page 55
Ref #52 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)
Awd $5,000.00$5,000.00
2 $4,890.75$4,890.75
Ref #53 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $38,000.00$38,000.00
2 $8,000.00$8,000.00
Ref #54 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $27,800.00$27,800.00
2 $50,000.00$50,000.00
Ref #55 619E16010 FIELD OFFICE, TYPE B, (3 MNTH)
Awd $4,200.00$1,400.00
2 $3,750.00$1,250.00
Ref #56 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $9,750.00$9,750.00
Ref #57 624E10000 MOBILIZATION, (LUMP SUM)
Awd $35,000.00$35,000.00
2 $40,000.00$40,000.00
Section 8 - INCIDENTALS - Totals
Awd $111,000.00
2 $116,390.75
160157 - Page 56
Project No. 160160
PID 101015
CLA-SR 4-6.11
Non-Federal
Type: BRIDGE REPAIR
Completion Date: 7/31/2016
Award Amount: $100,187.00
Contract Awarded To: EVERS STEEL CONSTRUCTION LLC
Letting Date: 4/7/2016
Engineer's Estimate: $96,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
EVERS STEEL CONSTRUCTION LLC
P O BOX 53426
CINCINNATI, OH 45253
Hamilton
Bidder 1
Bid $100,187.00
ARMSTRONG STEEL ERECTORS INC
50 SOUTH FOURTH ST P O BOX 577
NEWARK, OH 43058
Licking
Bidder 2
Bid $149,695.00
ADVANTAGE STEEL & CONSTRUCTION LLC
2300 SOUTH NOAH DR
SAXONBURG, PA 16056
Bidder 3
Bid $234,801.75
160160 - Page 57
Ref #1 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (100 HOUR)
Awd $6,500.00$65.00
2 $9,000.00$90.00
3 $10,000.00$100.00
Ref #2 614E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY, (2 SNMT)
Awd $1,710.00$855.00
2 $1,800.00$900.00
3 $1,700.00$850.00
Ref #3 614E12600 REPLACEMENT DRUM, (5 EACH)
Awd $275.00$55.00
2 $250.00$50.00
3 $250.00$50.00
Ref #4 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (1 SNMT)
Awd $910.00$910.00
2 $900.00$900.00
3 $900.00$900.00
Section 1 - MAINTENANCE OF TRAFFIC - Totals
Awd $9,395.00
2 $11,950.00
3 $12,850.00
Ref #5 202E11401 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (SECON, (283 LB)
Awd $3,679.00$13.00
2 $4,245.00$15.00
3 $9,905.00$35.00
Ref #6 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN, (283 LB)
Awd $5,943.00$21.00
2 $8,490.00$30.00
3 $636.75$2.25
Ref #7 514E20001 FIELD PAINTING OF DAMAGED STRUCTURAL STEEL, AS PER, (222 SF)
Awd $29,970.00$135.00
2 $28,860.00$130.00
3 $27,750.00$125.00
Ref #8 849E10000 DAMAGE ASSESSMENT, (LUMP SUM)
Awd $1,800.00$1,800.00
2 $2,000.00$2,000.00
3 $20,000.00$20,000.00
Ref #9 849E10500 SURFACE PREPARATION, (LUMP SUM)
Awd $1,200.00$1,200.00
2 $2,400.00$2,400.00
3 $25,000.00$25,000.00
Ref #10 849E10700 STRAIGHTENING DAMAGED MEMBERS, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $33,000.00$33,000.00
3 $71,500.00$71,500.00
160160 - Page 58
Section 2 - STRUCTURE REPAIR (SFN 1200011) - Totals
Awd $62,592.00
2 $78,995.00
3 $154,791.75
Ref #11 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $1,500.00$1,500.00
3 $2,160.00$2,160.00
Ref #12 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $21,700.00$21,700.00
2 $53,250.00$53,250.00
3 $55,000.00$55,000.00
Ref #13 624E10000 MOBILIZATION, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $4,000.00$4,000.00
3 $10,000.00$10,000.00
Section 3 - INCIDENTALS - Totals
Awd $28,200.00
2 $58,750.00
3 $67,160.00
160160 - Page 59
Project No. 160165
PID 88840
ALL-65/81/117/309-7.17
Federal
Type: FOUR LANE RESURFACING
Completion Date: 8/31/2016
Award Amount: $1,394,538.60
Contract Awarded To: SHELLY COMPANY
Letting Date: 4/7/2016
Engineer's Estimate: $1,311,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 1
Bid $1,394,538.60
BLUFFTON PAVING INC
P O BOX 26
BLUFFTON, OH 45817
Allen
Bidder 2
Bid $1,407,274.60
160165 - Page 60
Ref #1 202E23500 WEARING COURSE REMOVED, (9030 SY)
Awd $53,277.00$5.90
2 $47,859.00$5.30
Ref #2 202E30000 WALK REMOVED, (1470 SF)
Awd $5,145.00$3.50
2 $5,880.00$4.00
Ref #3 202E32500 CURB AND GUTTER REMOVED, (262 FT)
Awd $2,620.00$10.00
2 $4,192.00$16.00
Ref #4 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (3.94 MILE)
Awd $3,546.00$900.00
2 $7,880.00$2,000.00
Ref #5 253E02000 PAVEMENT REPAIR, (585 CY)
Awd $175,500.00$300.00
2 $119,925.00$205.00
Ref #6 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (105123 SY)
Awd $141,916.05$1.35
2 $183,965.25$1.75
Ref #7 254E01600 PATCHING PLANED SURFACE, (2088 SY)
Awd $16,704.00$8.00
2 $10,440.00$5.00
Ref #8 304E20000 AGGREGATE BASE, (10 CY)
Awd $800.00$80.00
2 $500.00$50.00
Ref #9 407E10000 TACK COAT, (8561 GAL)
Awd $15,837.85$1.85
2 $12,841.50$1.50
Ref #10 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (410 CY)
Awd $83,640.00$204.00
2 $132,840.00$324.00
Ref #11 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A (4, (4646 CY)
Awd $655,086.00$141.00
2 $664,378.00$143.00
Ref #12 608E10000 4" CONCRETE WALK, (120 SF)
Awd $1,440.00$12.00
2 $1,440.00$12.00
Ref #13 608E52020 CURB RAMP, TYPE A2, (239 SF)
Awd $2,868.00$12.00
2 $2,868.00$12.00
Ref #14 608E52040 CURB RAMP, TYPE B2, (700 SF)
Awd $8,400.00$12.00
2 $8,400.00$12.00
Ref #15 608E52050 CURB RAMP, TYPE C1, (112 SF)
Awd $1,344.00$12.00
2 $1,344.00$12.00
Ref #16 608E52070 CURB RAMP, TYPE D, (300 SF)
Awd $3,600.00$12.00
2 $3,600.00$12.00
160165 - Page 61
Ref #17 609E12000 COMBINATION CURB AND GUTTER, TYPE 2, (60 FT)
Awd $2,100.00$35.00
2 $1,800.00$30.00
Ref #18 611E99654 MANHOLE ADJUSTED TO GRADE, (4 EACH)
Awd $3,100.00$775.00
2 $7,200.00$1,800.00
Ref #19 614E12460 WORK ZONE MARKING SIGN, (38 EACH)
Awd $3,800.00$100.00
2 $3,800.00$100.00
Ref #20 614E21400 WORK ZONE CENTER LINE, CLASS II, (10.14 MILE)
Awd $5,577.00$550.00
2 $4,056.00$400.00
Ref #21 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (227 CY)
Awd $12,485.00$55.00
2 $8,081.20$35.60
Ref #22 621E00100 RPM, (111 EACH)
Awd $3,159.06$28.46
2 $3,330.00$30.00
Ref #23 621E54000 RAISED PAVEMENT MARKER REMOVED, (111 EACH)
Awd $999.00$9.00
2 $1,221.00$11.00
Ref #24 643E00100 EDGE LINE, 4", (3.16 MILE)
Awd $4,916.96$1,556.00
2 $3,476.00$1,100.00
Ref #25 643E00200 LANE LINE, 4", (2.09 MILE)
Awd $2,549.80$1,220.00
2 $1,881.00$900.00
Ref #26 643E00300 CENTER LINE, (5.07 MILE)
Awd $10,281.96$2,028.00
2 $8,619.00$1,700.00
Ref #27 643E00400 CHANNELIZING LINE, 8", (3183 FT)
Awd $3,978.75$1.25
2 $5,411.10$1.70
Ref #28 643E00700 TRANSVERSE/DIAGONAL LINE, (1399 FT)
Awd $4,658.67$3.33
2 $11,192.00$8.00
Ref #29 644E00500 STOP LINE, (1186 FT)
Awd $5,930.00$5.00
2 $8,005.50$6.75
Ref #30 644E00600 CROSSWALK LINE, (5739 FT)
Awd $14,347.50$2.50
2 $22,669.05$3.95
Ref #31 644E01100 SCHOOL SYMBOL MARKING, 72", (4 EACH)
Awd $2,056.00$514.00
2 $2,680.00$670.00
Ref #32 644E01300 LANE ARROW, (65 EACH)
Awd $4,875.00$75.00
2 $6,500.00$100.00
160165 - Page 62
Section 1 - ROADWAY - Totals
Awd $1,256,538.60
2 $1,308,274.60
Ref #33 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)
Awd $10,000.00$10,000.00
2 $10,000.00$10,000.00
Ref #34 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $9,500.00$9,500.00
Ref #35 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $80,000.00$80,000.00
2 $56,000.00$56,000.00
Ref #36 624E10000 MOBILIZATION, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $23,500.00$23,500.00
Section 2 - INCIDENTALS - Totals
Awd $138,000.00
2 $99,000.00
160165 - Page 63
Project No. 160166
PID 91678
ATH-124-0.00
Federal
Type: TWO LANE RESURFACING
Completion Date: 7/31/2016
Award Amount: $2,138,657.00
Contract Awarded To: NUKO PAVING INC
Letting Date: 4/7/2016
Engineer's Estimate: $2,236,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
NUKO PAVING INC
1 ACY AVE SUITE C
JACKSON, OH 45640
Jackson
Bidder 1
Bid $2,138,657.00
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 2
Bid $2,249,694.05
160166 - Page 64
Ref #1 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (27.58 MILE)
Awd $22,064.00$800.00
2 $26,201.00$950.00
Section 1 - ROADWAY - Totals
Awd $22,064.00
2 $26,201.00
Ref #2 253E02000 PAVEMENT REPAIR, (700 CY)
Awd $140,000.00$200.00
2 $154,000.00$220.00
Ref #3 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1346 SY)
Awd $20,190.00$15.00
2 $21,536.00$16.00
Ref #4 407E10000 TACK COAT, (12975 GAL)
Awd $25,950.00$2.00
2 $25,950.00$2.00
Ref #5 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (9268 GAL)
Awd $18,536.00$2.00
2 $18,536.00$2.00
Ref #6 408E10000 PRIME COAT, (12944 GAL)
Awd $45,304.00$3.50
2 $36,890.40$2.85
Ref #7 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (6642 CY)
Awd $810,324.00$122.00
2 $876,744.00$132.00
Ref #8 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (5148 CY)
Awd $628,056.00$122.00
2 $679,536.00$132.00
Ref #9 617E10100 COMPACTED AGGREGATE, (2023 CY)
Awd $137,564.00$68.00
2 $137,564.00$68.00
Section 2 - PAVEMENT - Totals
Awd $1,825,924.00
2 $1,950,756.40
Ref #10 621E00100 RPM, (1308 EACH)
Awd $34,008.00$26.00
2 $24,198.00$18.50
Ref #11 621E54000 RAISED PAVEMENT MARKER REMOVED, (1308 EACH)
Awd $13,080.00$10.00
2 $11,118.00$8.50
Ref #12 642E00090 EDGE LINE, 4", (27.58 MILE)
Awd $16,548.00$600.00
2 $12,548.90$455.00
Ref #13 642E00290 CENTER LINE, (13.79 MILE)
Awd $13,790.00$1,000.00
2 $11,928.35$865.00
160166 - Page 65
Ref #14 644E00500 STOP LINE, (384 FT)
Awd $9,600.00$25.00
2 $2,630.40$6.85
Section 3 - TRAFFIC CONTROL - Totals
Awd $87,026.00
2 $62,423.65
Ref #15 614E12460 WORK ZONE MARKING SIGN, (96 EACH)
Awd $9,120.00$95.00
2 $7,680.00$80.00
Ref #16 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (27.58 MILE)
Awd $33,096.00$1,200.00
2 $27,580.00$1,000.00
Ref #17 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT, (27.58 MILE)
Awd $17,927.00$650.00
2 $9,653.00$350.00
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $60,143.00
2 $44,913.00
Ref #18 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $52,000.00$52,000.00
2 $11,400.00$11,400.00
Ref #19 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $50,000.00$50,000.00
2 $115,000.00$115,000.00
Ref #20 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $3,500.00$3,500.00
2 $4,000.00$4,000.00
Ref #21 624E10000 MOBILIZATION, (LUMP SUM)
Awd $38,000.00$38,000.00
2 $35,000.00$35,000.00
Section 5 - INCIDENTALS - Totals
Awd $143,500.00
2 $165,400.00
160166 - Page 66
Project No. 160167
PID 96366
AUG-/CHP/LOG VAR
Federal
Type: BRIDGE REPAIR
Completion Date: 9/30/2016
Award Amount: $654,708.96
Contract Awarded To: BCC OHIO INC
Letting Date: 4/7/2016
Engineer's Estimate: $622,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BCC OHIO INC
P O BOX 229
NEW LONDON, OH 44851
Huron
Bidder 1
Bid $654,708.96
160167 - Page 67
Ref #1 202E23500 WEARING COURSE REMOVED, (654 SY)
Awd $18,024.24$27.56
Ref #2 202E38000 GUARDRAIL REMOVED, (321.25 FT)
Awd $539.70$1.68
Ref #3 202E38001 GUARDRAIL REMOVED, AS PER PLAN, (262.5 FT)
Awd $551.25$2.10
Ref #4 202E38500 BRIDGE RAILING REMOVED, (287.5 FT)
Awd $724.50$2.52
Ref #5 202E38602 BRIDGE RAILING REMOVED FOR REUSE, (112.5 FT)
Awd $897.75$7.98
Ref #6 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E, (4 EACH)
Awd $819.00$204.75
Ref #7 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (4 EACH)
Awd $231.00$57.75
Ref #8 606E15050 GUARDRAIL, TYPE MGS, (575 FT)
Awd $9,418.50$16.38
Ref #9 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (8 EACH)
Awd $15,078.00$1,884.75
Ref #10 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (8 EACH)
Awd $16,338.00$2,042.25
Section 1 - ROADWAY - Totals
Awd $62,621.94
Ref #11 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION, (5 CY)
Awd $477.00$95.40
Section 2 - EROSION CONTROL - Totals
Awd $477.00
Ref #12 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (820 SY)
Awd $15,932.60$19.43
Ref #13 407E10000 TACK COAT, (222 GAL)
Awd $932.40$4.20
Ref #14 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (33 CY)
Awd $15,956.49$483.53
Ref #15 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A (4, (77 CY)
Awd $21,708.61$281.93
Section 3 - PAVEMENT - Totals
Awd $54,530.10
Ref #16 621E54000 RAISED PAVEMENT MARKER REMOVED, (4 EACH)
Awd $85.52$21.38
Ref #17 626E00100 BARRIER REFLECTOR, (22 EACH)
Awd $150.26$6.83
160167 - Page 68
Ref #18 642E00090 EDGE LINE, 4", (0.16 MILE)
Awd $1,344.00$8,400.00
Ref #19 642E00290 CENTER LINE, (0.08 MILE)
Awd $1,344.00$16,800.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $2,923.78
Ref #20 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (4 EACH)
Awd $6,288.00$1,572.00
Ref #21 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $5,775.00$5,775.00
Ref #22 614E13300 BARRIER REFLECTOR, TYPE B, (14 EACH)
Awd $153.72$10.98
Ref #23 614E13360 OBJECT MARKER, TWO WAY, (14 EACH)
Awd $172.48$12.32
Ref #24 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (0.2 MILE)
Awd $1,794.00$8,970.00
Ref #25 622E41000 PORTABLE BARRIER, 32", (640 FT)
Awd $15,078.40$23.56
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $29,261.60
Ref #26 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $12,186.00$12,186.00
Ref #27 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $20,472.00$20,472.00
Ref #28 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $741.00$741.00
Ref #29 507E71200 SPECIAL - PILE ENCASEMENT, (112 FT)
Awd $20,312.32$181.36
Ref #30 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (3781 LB)
Awd $4,764.06$1.26
Ref #31 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)
Awd $126.00$1.26
Ref #32 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (24 EACH)
Awd $462.00$19.25
Ref #33 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK, (17 CY)
Awd $17,700.06$1,041.18
Ref #34 511E46010 CLASS QC1 CONCRETE, (1 CY)
Awd $1,845.87$1,845.87
Ref #35 511E81300 CONCRETE, MISC.:EMBEDDED GALVANIC ANODE, (54 EACH)
Awd $2,404.62$44.53
Ref #36 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (124 SY)
Awd $3,047.92$24.58
160167 - Page 69
Ref #37 512E33010 TYPE 3 WATERPROOFING, (41 SY)
Awd $1,553.90$37.90
Ref #38 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING, (225 FT)
Awd $22,396.50$99.54
Ref #39 517E76302 RAILING, MISC.:TYPE B ANCHORS, (68 EACH)
Awd $3,302.08$48.56
Ref #40 518E22300 SPECIAL - STEEL DRIP STRIP, (131 FT)
Awd $1,290.35$9.85
Ref #41 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (3 CF)
Awd $2,088.00$696.00
Ref #100 202E38603 BRIDGE RAILING REMOVED FOR REUSE, AS PER PLAN, (113 FT)
Awd $1,779.75$15.75
Section 6 - STRUCTURE REPAIR (AUG-66-1819) - Totals
Awd $116,472.43
Ref #42 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $855.00$855.00
Ref #43 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $592.50$592.50
Ref #44 507E71200 SPECIAL - PILE ENCASEMENT, (153 FT)
Awd $24,051.60$157.20
Ref #45 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (390 LB)
Awd $491.40$1.26
Ref #46 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (128 EACH)
Awd $2,460.16$19.22
Ref #47 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (53 SY)
Awd $1,304.86$24.62
Ref #48 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (47 SF)
Awd $106.69$2.27
Ref #49 516E31000 JOINT SEALER, (100 FT)
Awd $2,208.00$22.08
Ref #50 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (58 SF)
Awd $9,879.14$170.33
Ref #51 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, , (263 SF)
Awd $27,412.49$104.23
Section 7 - STRUCTURE REPAIR (AUG-66-1981) - Totals
Awd $69,361.84
Ref #52 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $8,181.00$8,181.00
Ref #53 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $592.50$592.50
Ref #54 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (1297 LB)
Awd $1,634.22$1.26
160167 - Page 70
Ref #55 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)
Awd $126.00$1.26
Ref #56 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK, (9 CY)
Awd $10,372.50$1,152.50
Ref #57 511E46010 CLASS QC1 CONCRETE, (1 CY)
Awd $1,846.50$1,846.50
Ref #58 511E81300 CONCRETE, MISC.:EMBEDDED GALVANIC ANODE (EGA), (36 EACH)
Awd $1,603.44$44.54
Ref #59 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (82 SY)
Awd $2,059.84$25.12
Ref #60 512E33010 TYPE 3 WATERPROOFING, (120 SY)
Awd $4,521.60$37.68
Ref #61 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (10 SF)
Awd $36.00$3.60
Ref #62 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (59 FT)
Awd $1,335.17$22.63
Ref #63 517E70000 RAILING (TWIN STEEL TUBE), (79 FT)
Awd $11,447.10$144.90
Ref #64 518E22300 SPECIAL - STEEL DRIP STRIP, (80 FT)
Awd $790.40$9.88
Ref #65 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK, (11 SY)
Awd $4,462.48$405.68
Section 8 - STRUCTURE REPAIR (AUG-197-1208) - Totals
Awd $49,008.75
Ref #66 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $3,450.00$3,450.00
Ref #67 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (4 SY)
Awd $384.00$96.00
Ref #68 512E33010 TYPE 3 WATERPROOFING, (2 SY)
Awd $225.00$112.50
Ref #69 518E22301 SPECIAL - STEEL DRIP STRIP, AS PER PLAN, (25 FT)
Awd $249.00$9.96
Ref #70 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, , (14 SF)
Awd $2,479.12$177.08
Section 9 - STRUCTURE REPAIR (CHP-29-1241) - Totals
Awd $6,787.12
Ref #71 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $18,773.25$18,773.25
Ref #72 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $855.00$855.00
Ref #73 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $592.50$592.50
160167 - Page 71
Ref #74 507E71200 SPECIAL - PILE ENCASEMENT, (112 FT)
Awd $20,501.60$183.05
Ref #75 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (6449 LB)
Awd $8,125.74$1.26
Ref #76 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (200 LB)
Awd $252.00$1.26
Ref #77 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK, (27 CY)
Awd $27,513.81$1,019.03
Ref #78 511E46010 CLASS QC1 CONCRETE, (2 CY)
Awd $2,872.50$1,436.25
Ref #79 511E81300 CONCRETE, MISC.:EMBEDDED GALVANIC ANODE (EGA), (134 EACH)
Awd $5,965.68$44.52
Ref #80 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (92 SY)
Awd $2,260.44$24.57
Ref #81 512E33010 TYPE 3 WATERPROOFING, (485 SY)
Awd $18,371.80$37.88
Ref #82 517E70000 RAILING (TWIN STEEL TUBE), (212 FT)
Awd $30,718.80$144.90
Ref #83 518E22300 SPECIAL - STEEL DRIP STRIP, (247 FT)
Awd $2,430.48$9.84
Ref #84 519E12300 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE B, (43 SY)
Awd $22,148.87$515.09
Ref #85 844E10000 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, (47 SF)
Awd $6,572.95$139.85
Ref #86 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (36 CF)
Awd $11,396.88$316.58
Section 10 - STRUCTURE REPAIR (LOG-33-0888) - Totals
Awd $179,352.30
Ref #87 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $8,082.00$8,082.00
Ref #88 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $47,391.90$47,391.90
Ref #89 624E10000 MOBILIZATION, (LUMP SUM)
Awd $28,438.20$28,438.20
Section 11 - INCIDENTALS - Totals
Awd $83,912.10
160167 - Page 72
Project No. 160168
PID 100560
BUT-/PRE-122-0.00/19.06
Federal
Type: TWO LANE RESURFACING
Completion Date: 9/15/2016
Award Amount: $1,236,903.78
Contract Awarded To: BARRETT PAVING MATERIALS INC
Letting Date: 4/7/2016
Engineer's Estimate: $1,414,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BARRETT PAVING MATERIALS INC
3751 COMMERCE DR
MIDDLETOWN, OH 45005
Warren
Bidder 1
Bid $1,236,903.78
JOHN R JURGENSEN COMPANY
11641 MOSTELLER RD
CINCINNATI, OH 45241
Hamilton
Bidder 2
Bid $1,411,654.51
160168 - Page 73
Ref #1 202E38000 GUARDRAIL REMOVED, (2168 FT)
Awd $2,710.00$1.25
2 $2,710.00$1.25
Ref #2 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A, (24 EACH)
Awd $4,800.00$200.00
2 $4,800.00$200.00
Ref #3 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E, (3 EACH)
Awd $435.00$145.00
2 $435.00$145.00
Ref #4 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T, (9 EACH)
Awd $675.00$75.00
2 $675.00$75.00
Ref #5 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (12 EACH)
Awd $780.00$65.00
2 $780.00$65.00
Ref #6 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (18.78 MILE)
Awd $15,024.00$800.00
2 $17,758.37$945.60
Ref #7 606E15050 GUARDRAIL, TYPE MGS, (1175 FT)
Awd $15,980.00$13.60
2 $15,627.50$13.30
Ref #8 606E25550 ANCHOR ASSEMBLY, MGS TYPE A, (1 EACH)
Awd $935.00$935.00
2 $935.00$935.00
Ref #9 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (31 EACH)
Awd $55,335.00$1,785.00
2 $55,335.00$1,785.00
Ref #10 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (4 EACH)
Awd $2,960.00$740.00
2 $2,960.00$740.00
Ref #11 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4, (12 EACH)
Awd $8,160.00$680.00
2 $8,160.00$680.00
Ref #12 659E10001 SEEDING AND MULCHING, AS PER PLAN, (2800 SY)
Awd $4,900.00$1.75
2 $4,760.00$1.70
Section 1 - ROADWAY - Totals
Awd $112,694.00
2 $114,935.87
Ref #13 253E02000 PAVEMENT REPAIR, (400 CY)
Awd $90,000.00$225.00
2 $91,144.00$227.86
Ref #14 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (142488 SY)
Awd $99,741.60$0.70
2 $149,612.40$1.05
160168 - Page 74
Ref #15 254E01600 PATCHING PLANED SURFACE, (1431 SY)
Awd $1,431.00$1.00
2 $4,894.02$3.42
Ref #16 407E10000 TACK COAT, (10695 GAL)
Awd $25,668.00$2.40
2 $26,737.50$2.50
Ref #17 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (6047 CY)
Awd $640,982.00$106.00
2 $742,269.25$122.75
Ref #18 617E10100 COMPACTED AGGREGATE, (464 CY)
Awd $26,912.00$58.00
2 $21,005.28$45.27
Ref #19 617E25000 WATER, (9 MGAL)
Awd $225.00$25.00
2 $295.65$32.85
Section 2 - PAVEMENT - Totals
Awd $884,959.60
2 $1,035,958.10
Ref #20 621E00100 RPM, (801 EACH)
Awd $14,954.67$18.67
2 $13,576.95$16.95
Ref #21 621E54000 RAISED PAVEMENT MARKER REMOVED, (801 EACH)
Awd $3,804.75$4.75
2 $6,840.54$8.54
Ref #22 626E00100 BARRIER REFLECTOR, (67 EACH)
Awd $402.00$6.00
2 $402.00$6.00
Ref #23 644E00104 EDGE LINE, 6", (18.78 MILE)
Awd $32,001.12$1,704.00
2 $32,001.12$1,704.00
Ref #24 644E00300 CENTER LINE, (9.39 MILE)
Awd $30,958.83$3,297.00
2 $30,958.83$3,297.00
Ref #25 644E00500 STOP LINE, (250 FT)
Awd $2,115.00$8.46
2 $2,115.00$8.46
Section 3 - TRAFFIC CONTROL - Totals
Awd $84,236.37
2 $85,894.44
Ref #26 614E12460 WORK ZONE MARKING SIGN, (36 EACH)
Awd $4,320.00$120.00
2 $3,077.64$85.49
Ref #27 614E21000 WORK ZONE CENTER LINE, CLASS I, (9.39 MILE)
Awd $15,681.30$1,670.00
2 $15,681.30$1,670.00
160168 - Page 75
Ref #28 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (9.39 MILE)
Awd $11,756.28$1,252.00
2 $11,756.28$1,252.00
Ref #29 614E26000 WORK ZONE STOP LINE, CLASS I, (250 FT)
Awd $1,050.00$4.20
2 $3,217.50$12.87
Ref #30 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (250 FT)
Awd $875.00$3.50
2 $875.00$3.50
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $33,682.58
2 $34,607.72
Ref #31 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $3,400.00$3,400.00
2 $2,055.27$2,055.27
Ref #32 202E23500 WEARING COURSE REMOVED, (302 SY)
Awd $906.00$3.00
2 $3,231.40$10.70
Ref #33 407E10000 TACK COAT, (23 GAL)
Awd $55.20$2.40
2 $57.50$2.50
Ref #34 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (13 CY)
Awd $2,080.00$160.00
2 $6,254.04$481.08
Ref #35 517E72710 RAILING (DEEP BEAM BRIDGE RETROFIT RAILING), (68 FT)
Awd $5,848.00$86.00
2 $5,848.00$86.00
Ref #36 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (0.99 CF)
Awd $11,558.25$11,675.00
2 $10,096.51$10,198.49
Section 5 - STRUCTURE 20 FOOT SPAN AND OVER (BUT-122 - Totals
Awd $23,847.45
2 $27,542.72
Ref #37 519E12300 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE B, (4 SY)
Awd $8,000.00$2,000.00
2 $1,278.36$319.59
Ref #38 517E72710 RAILING (DEEP BEAM BRIDGE RETROFIT RAILING), (336 FT)
Awd $29,400.00$87.50
2 $29,400.00$87.50
Ref #39 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.:HOT APPLIE, (72 FT)
Awd $3,600.00$50.00
2 $9,743.76$135.33
160168 - Page 76
Section 6 - STRUCTURE 20 FOOT SPAN AND OVER (BUT-122 - Totals
Awd $41,000.00
2 $40,422.12
Ref #40 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $7,383.78$7,383.78
2 $5,813.98$5,813.98
Ref #41 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $22,000.00$22,000.00
2 $23,873.21$23,873.21
Ref #42 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $2,606.35$2,606.35
Ref #43 624E10000 MOBILIZATION, (LUMP SUM)
Awd $24,600.00$24,600.00
2 $40,000.00$40,000.00
Section 7 - INCIDENTALS - Totals
Awd $56,483.78
2 $72,293.54
160168 - Page 77
Project No. 160169
PID 99707
CLE-IR 275-11.63
Federal
Type: BRIDGE REPAIR
Completion Date: 6/30/2016
Award Amount: $92,710.00
Contract Awarded To: EVERS STEEL CONSTRUCTION LLC
Letting Date: 4/7/2016
Engineer's Estimate: $79,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
EVERS STEEL CONSTRUCTION LLC
P O BOX 53426
CINCINNATI, OH 45253
Hamilton
Bidder 1
Bid $92,710.00
ARMSTRONG STEEL ERECTORS INC
50 SOUTH FOURTH ST P O BOX 577
NEWARK, OH 43058
Licking
Bidder 2
Bid $181,800.00
ADVANTAGE STEEL & CONSTRUCTION LLC
2300 SOUTH NOAH DR
SAXONBURG, PA 16056
Bidder 3
Bid $294,400.40
160169 - Page 78
Ref #1 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
Section 1 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
Ref #2 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (8 HOUR)
Awd $520.00$65.00
2 $720.00$90.00
3 $800.00$100.00
Ref #3 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (30 DAY)
Awd $930.00$31.00
2 $900.00$30.00
3 $900.00$30.00
Section 2 - MAINTENANCE OF TRAFFIC - Totals
Awd $1,450.00
2 $1,620.00
3 $1,700.00
Ref #4 202E11501 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN(MAIN ME, (1 EACH)
Awd $300.00$300.00
2 $5,000.00$5,000.00
3 $6,950.00$6,950.00
Ref #5 202E11501 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN(SECONDA, (9 EACH)
Awd $1,800.00$200.00
2 $3,600.00$400.00
3 $7,200.00$800.00
Ref #6 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN, (470 LB)
Awd $5,640.00$12.00
2 $16,450.00$35.00
3 $940.00$2.00
Ref #7 514E20001 FIELD PAINTING OF DAMAGED STRUCTURAL STEEL, AS PER, (256 SF)
Awd $34,560.00$135.00
2 $33,280.00$130.00
3 $40,960.00$160.00
Ref #8 849E10000 DAMAGE ASSESSMENT, (LUMP SUM)
Awd $1,800.00$1,800.00
2 $1,000.00$1,000.00
3 $14,000.00$14,000.00
Ref #9 849E10500 SURFACE PREPARATION, (LUMP SUM)
Awd $1,200.00$1,200.00
2 $2,500.00$2,500.00
3 $28,000.00$28,000.00
160169 - Page 79
Ref #10 849E10600 REPAIRING DAMAGED MEMBERS BY GRINDING, (8 HOUR)
Awd $760.00$95.00
2 $8,000.00$1,000.00
3 $8,000.00$1,000.00
Ref #11 849E10700 STRAIGHTENING DAMAGED MEMBERS, (LUMP SUM)
Awd $26,000.00$26,000.00
2 $43,350.00$43,350.00
3 $85,000.00$85,000.00
Section 3 - STRUCTURE REPAIR (CLE-275-1163) - Totals
Awd $72,060.00
2 $113,180.00
3 $191,050.00
Ref #12 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,200.00$2,200.00
2 $2,000.00$2,000.00
3 $2,650.40$2,650.40
Ref #13 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $14,000.00$14,000.00
2 $60,000.00$60,000.00
3 $88,000.00$88,000.00
Ref #14 624E10000 MOBILIZATION, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $4,000.00$4,000.00
3 $10,000.00$10,000.00
Section 4 - INCIDENTALS - Totals
Awd $18,200.00
2 $66,000.00
3 $100,650.40
160169 - Page 80
Project No. 160170
PID 97209
CLE-SR 131-6.53
Federal
Type: CULVERT REPLACEMENT
Completion Date: 9/30/2016
Award Amount: $429,169.31
Contract Awarded To: JOHN R JURGENSEN COMPANY
Letting Date: 4/7/2016
Engineer's Estimate: $422,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
JOHN R JURGENSEN COMPANY
11641 MOSTELLER RD
CINCINNATI, OH 45241
Hamilton
Bidder 1
Bid $429,169.31
SUNESIS CONSTRUCTION CO
2610 CRESCENTVILLE RD
WEST CHESTER, OH 45069
Butler
Bidder 2
Bid $447,795.79
FORD DEVELOPMENT CORP
11148 WOODWARD LANE
SHARONVILLE, OH 45241
Hamilton
Bidder 3
Bid $455,704.29
160170 - Page 81
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $2,695.23$2,695.23
2 $6,854.64$6,854.64
3 $5,000.00$5,000.00
Ref #2 202E23010 PAVEMENT REMOVED, ASPHALT, (1154 SY)
Awd $12,290.10$10.65
2 $9,462.80$8.20
3 $11,540.00$10.00
Ref #3 202E35100 PIPE REMOVED, 24" AND UNDER, (232 FT)
Awd $1,603.12$6.91
2 $1,387.36$5.98
3 $1,160.00$5.00
Ref #4 202E38000 GUARDRAIL REMOVED, (516 FT)
Awd $2,038.20$3.95
2 $2,048.52$3.97
3 $2,322.00$4.50
Ref #5 202E58100 CATCH BASIN REMOVED, (1 EACH)
Awd $391.62$391.62
2 $216.78$216.78
3 $500.00$500.00
Ref #6 202E98200 REMOVAL MISC.:WOOD RETAINING WALL, (25 FT)
Awd $520.00$20.80
2 $312.25$12.49
3 $250.00$10.00
Ref #7 203E10000 EXCAVATION, (472 CY)
Awd $8,392.16$17.78
2 $5,975.52$12.66
3 $4,720.00$10.00
Ref #8 203E20000 EMBANKMENT, (1389 CY)
Awd $22,154.55$15.95
2 $25,779.84$18.56
3 $22,224.00$16.00
Ref #9 203E35141 GRANULAR MATERIAL, TYPE E, AS PER PLAN, (93 CY)
Awd $6,575.10$70.70
2 $5,274.03$56.71
3 $4,092.00$44.00
Ref #10 204E10000 SUBGRADE COMPACTION, (1391 SY)
Awd $1,710.93$1.23
2 $3,630.51$2.61
3 $2,782.00$2.00
Ref #11 204E50000 GEOTEXTILE FABRIC, TYPE D, (317 SY)
Awd $1,179.24$3.72
2 $491.35$1.55
3 $396.25$1.25
Ref #12 606E15050 GUARDRAIL, TYPE MGS, (331.25 FT)
Awd $5,051.56$15.25
2 $4,637.50$14.00
3 $5,631.25$17.00
160170 - Page 82
Ref #13 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN, (93.75 FT)
Awd $1,664.06$17.75
2 $1,828.13$19.50
3 $1,875.00$20.00
Ref #14 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (4 EACH)
Awd $7,960.00$1,990.00
2 $7,400.00$1,850.00
3 $8,800.00$2,200.00
Ref #15 623E38500 MONUMENT ASSEMBLY, (3 EACH)
Awd $1,020.36$340.12
2 $1,657.41$552.47
3 $2,460.00$820.00
Ref #16 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $4,077.50$4,077.50
3 $5,000.00$5,000.00
Section 1 - ROADWAY - Totals
Awd $80,246.23
2 $81,034.14
3 $78,752.50
Ref #17 601E11000 RIPRAP USING 6" REINFORCED CONCRETE SLAB, (81 SY)
Awd $10,894.50$134.50
2 $8,761.77$108.17
3 $15,390.00$190.00
Ref #18 601E21000 CONCRETE SLOPE PROTECTION, (3 SY)
Awd $414.54$138.18
2 $329.13$109.71
3 $225.00$75.00
Ref #19 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (13 CY)
Awd $1,573.52$121.04
2 $1,017.90$78.30
3 $1,300.00$100.00
Ref #20 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (17 CY)
Awd $1,729.07$101.71
2 $1,217.37$71.61
3 $1,700.00$100.00
Ref #21 659E00300 TOPSOIL, (279 CY)
Awd $6,966.63$24.97
2 $9,926.82$35.58
3 $12,276.00$44.00
Ref #22 659E10000 SEEDING AND MULCHING, (2516 SY)
Awd $1,887.00$0.75
2 $2,717.28$1.08
3 $5,786.80$2.30
Ref #23 659E20000 COMMERCIAL FERTILIZER, (0.35 TON)
Awd $280.00$800.00
2 $280.00$800.00
3 $269.50$770.00
160170 - Page 83
Ref #24 659E31000 LIME, (0.52 ACRE)
Awd $78.00$150.00
2 $78.00$150.00
3 $40.04$77.00
Ref #25 659E35000 WATER, (14 MGAL)
Awd $980.00$70.00
2 $980.00$70.00
3 $14.00$1.00
Ref #26 660E20000 SODDING REINFORCED, (103 SY)
Awd $633.45$6.15
2 $633.45$6.15
3 $1,390.50$13.50
Ref #27 832E30000 EROSION CONTROL, (10000 EACH)
Awd $10,000.00$1.00
2 $10,000.00$1.00
3 $10,000.00$1.00
Ref #28 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING , (134 SY)
Awd $802.66$5.99
2 $802.66$5.99
3 $670.00$5.00
Section 2 - EROSION CONTROL - Totals
Awd $36,239.37
2 $36,744.38
3 $49,061.84
Ref #29 602E20000 CONCRETE MASONRY, (28.2 CY)
Awd $19,955.45$707.64
2 $27,202.85$964.64
3 $33,840.00$1,200.00
Ref #30 605E31100 AGGREGATE DRAINS, (593 FT)
Awd $6,155.34$10.38
2 $3,522.42$5.94
3 $7,116.00$12.00
Ref #31 611E04600 12" CONDUIT, TYPE C, (155 FT)
Awd $8,259.95$53.29
2 $5,122.75$33.05
3 $9,300.00$60.00
Ref #32 611E34000 120" CONDUIT, TYPE A 706.02 OR 138" 707.03 (0.168), (88 FT)
Awd $126,573.92$1,438.34
2 $124,076.48$1,409.96
3 $139,040.00$1,580.00
Ref #33 611E98450 CATCH BASIN, NO. 2-2A, (1 EACH)
Awd $1,532.89$1,532.89
2 $1,391.58$1,391.58
3 $1,800.00$1,800.00
Ref #34 611E98470 CATCH BASIN, NO. 2-2B, (1 EACH)
Awd $1,509.95$1,509.95
2 $1,215.62$1,215.62
3 $1,500.00$1,500.00
160170 - Page 84
Ref #35 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE, (1 EACH)
Awd $761.41$761.41
2 $242.88$242.88
3 $1,300.00$1,300.00
Section 3 - DRAINAGE - Totals
Awd $164,748.91
2 $162,774.58
3 $193,896.00
Ref #36 301E46000 ASPHALT CONCRETE BASE, PG64-22, (213 CY)
Awd $31,969.17$150.09
2 $31,950.00$150.00
3 $35,145.00$165.00
Ref #37 304E20000 AGGREGATE BASE, (221 CY)
Awd $11,211.33$50.73
2 $11,600.29$52.49
3 $11,050.00$50.00
Ref #38 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (50 GAL)
Awd $125.00$2.50
2 $200.00$4.00
3 $200.00$4.00
Ref #39 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (43 CY)
Awd $11,227.73$261.11
2 $10,965.00$255.00
3 $12,040.00$280.00
Ref #40 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (61 CY)
Awd $11,613.79$190.39
2 $10,370.00$170.00
3 $11,407.00$187.00
Section 4 - PAVEMENT - Totals
Awd $66,147.02
2 $65,085.29
3 $69,842.00
Ref #41 621E00100 RPM, (6 EACH)
Awd $1,494.00$249.00
2 $900.00$150.00
3 $1,650.00$275.00
Ref #42 621E54000 RAISED PAVEMENT MARKER REMOVED, (6 EACH)
Awd $187.92$31.32
2 $60.00$10.00
3 $60.00$10.00
Ref #43 626E00100 BARRIER REFLECTOR, (6 EACH)
Awd $48.00$8.00
2 $45.00$7.50
3 $54.00$9.00
160170 - Page 85
Ref #44 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (13 FT)
Awd $123.50$9.50
2 $156.00$12.00
3 $143.00$11.00
Ref #45 630E80100 SIGN, FLAT SHEET, (6.3 SF)
Awd $122.85$19.50
2 $116.55$18.50
3 $138.60$22.00
Ref #46 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE, (1 EACH)
Awd $25.00$25.00
2 $20.00$20.00
3 $25.00$25.00
Ref #47 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $30.00$30.00
2 $25.00$25.00
3 $25.00$25.00
Ref #48 644E00100 EDGE LINE, 4", (0.16 MILE)
Awd $1,147.52$7,172.00
2 $1,147.52$7,172.00
3 $1,261.60$7,885.00
Ref #49 644E00300 CENTER LINE, (0.08 MILE)
Awd $1,147.52$14,344.00
2 $1,147.52$14,344.00
3 $1,262.00$15,775.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $4,326.31
2 $3,617.59
3 $4,619.20
Ref #50 301E46000 ASPHALT CONCRETE BASE, PG64-22, (10 CY)
Awd $4,802.80$480.28
2 $4,818.40$481.84
3 $2,500.00$250.00
Ref #51 407E10000 TACK COAT, (15 GAL)
Awd $37.50$2.50
2 $222.00$14.80
3 $60.00$4.00
Ref #52 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (7 CY)
Awd $5,145.91$735.13
2 $2,981.44$425.92
3 $2,870.00$410.00
Ref #53 616E10000 WATER, (4 MGAL)
Awd $96.76$24.19
2 $140.48$35.12
3 $4.00$1.00
Ref #54 642E00290 CENTER LINE, (0.05 MILE)
Awd $999.00$19,980.00
2 $999.00$19,980.00
3 $1,098.75$21,975.00
160170 - Page 86
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $11,081.97
2 $9,161.32
3 $6,532.75
Ref #55 202E11000 STRUCTURE REMOVED, (LUMP SUM)
Awd $18,620.20$18,620.20
2 $13,070.05$13,070.05
3 $13,000.00$13,000.00
Ref #56 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $11,867.15$11,867.15
2 $47,814.82$47,814.82
3 $5,000.00$5,000.00
Section 7 - STRUCTURE UNDER 20 FOOT SPAN (1302567) - Totals
Awd $30,487.35
2 $60,884.87
3 $18,000.00
Ref #57 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $3,612.48$3,612.48
2 $3,627.12$3,627.12
3 $4,000.00$4,000.00
Ref #58 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $4,186.43$4,186.43
2 $3,465.28$3,465.28
3 $9,000.00$9,000.00
Ref #59 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $8,093.24$8,093.24
2 $3,250.00$3,250.00
3 $2,000.00$2,000.00
Ref #60 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $18,151.22$18,151.22
3 $20,000.00$20,000.00
Section 8 - INCIDENTALS - Totals
Awd $35,892.15
2 $28,493.62
3 $35,000.00
160170 - Page 87
Project No. 160171
PID 100525
CLE-SR 131-8.51
Federal
Type: PREVENTIVE MAINTENANCE
Completion Date: 10/31/2016
Award Amount: $269,569.74
Contract Awarded To: STRAWSER CONSTRUCTION INC
Letting Date: 4/7/2016
Engineer's Estimate: $272,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
STRAWSER CONSTRUCTION INC
1392 DUBLIN RD
COLUMBUS, OH 43215
Franklin
Bidder 1
Bid $269,569.74
AMERICAN PAVEMENTS LLC
7475 MONTGOMERY DR
PLAIN CITY, OH 43064
Madison
Bidder 2
Bid $306,099.54
160171 - Page 88
Ref #1 421E10010 MICROSURFACING, SURFACE COURSE, (90076 SY)
Awd $170,243.64$1.89
2 $192,762.64$2.14
Section 1 - PAVEMENT - Totals
Awd $170,243.64
2 $192,762.64
Ref #2 621E00100 RPM, (467 EACH)
Awd $7,939.00$17.00
2 $7,939.00$17.00
Ref #3 621E54000 RAISED PAVEMENT MARKER REMOVED, (467 EACH)
Awd $5,790.80$12.40
2 $6,538.00$14.00
Ref #4 646E10010 EDGE LINE, 6", (13.26 MILE)
Awd $27,846.00$2,100.00
2 $26,520.00$2,000.00
Ref #5 646E10200 CENTER LINE, (6.63 MILE)
Awd $20,553.00$3,100.00
2 $19,890.00$3,000.00
Ref #6 646E10400 STOP LINE, (26 FT)
Awd $247.00$9.50
2 $237.90$9.15
Ref #7 646E10500 CROSSWALK LINE, (340 FT)
Awd $1,836.00$5.40
2 $1,870.00$5.50
Section 2 - TRAFFIC CONTROL - Totals
Awd $64,211.80
2 $62,994.90
Ref #9 614E12460 WORK ZONE MARKING SIGN, (25 EACH)
Awd $2,750.00$110.00
2 $2,625.00$105.00
Ref #10 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (6.63 MILE)
Awd $2,652.00$400.00
2 $2,652.00$400.00
Ref #11 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (26 FT)
Awd $66.30$2.55
2 $65.00$2.50
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $5,468.30
2 $5,342.00
Ref #12 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $2,000.00$2,000.00
160171 - Page 89
Ref #13 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $17,073.00$17,073.00
2 $30,000.00$30,000.00
Ref #14 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $500.00$500.00
2 $1,000.00$1,000.00
Ref #15 624E10000 MOBILIZATION, (LUMP SUM)
Awd $11,073.00$11,073.00
2 $12,000.00$12,000.00
Section 4 - INCIDENTALS - Totals
Awd $29,646.00
2 $45,000.00
160171 - Page 90
Project No. 160172
PID 97202
COL-SR 164-20.08
Federal
Type: INTERSECTION
Completion Date: 8/15/2016
Award Amount: $463,463.10
Contract Awarded To: R T VERNAL PAVING & EXCAVATING INC
Letting Date: 4/7/2016
Engineer's Estimate: $469,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
R T VERNAL PAVING & EXCAVATING INC
11299 SOUTH AVE EXTENSION PO BOX 519
NORTH LIMA, OH 44452-0519
Bidder 1
Bid $463,463.10
MARUCCI & GAFFNEY EXCAVATING CO
18 HOGUE ST
YOUNGSTOWN, OH 44502
Mahoning
Bidder 2
Bid $464,940.50
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 3
Bid $516,559.05
MOUNTAINEER CONTRACTORS INC
ROUTE 26 SOUTH
KINGWOOD, WV 26537
Bidder 4
Bid $593,821.82
160172 - Page 91
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $17,000.00$17,000.00
3 $10,000.00$10,000.00
4 $13,500.00$13,500.00
Ref #2 202E20010 HEADWALL REMOVED, (3 EACH)
Awd $300.00$100.00
2 $30.00$10.00
3 $1,200.00$400.00
4 $450.00$150.00
Ref #3 202E23000 PAVEMENT REMOVED, (38 SY)
Awd $1,140.00$30.00
2 $380.00$10.00
3 $760.00$20.00
4 $1,178.00$31.00
Ref #4 202E23010 PAVEMENT REMOVED, ASPHALT, (3751 SY)
Awd $23,443.75$6.25
2 $48,763.00$13.00
3 $37,510.00$10.00
4 $26,257.00$7.00
Ref #5 202E35100 PIPE REMOVED, 24" AND UNDER, (300 FT)
Awd $3,600.00$12.00
2 $3,000.00$10.00
3 $7,500.00$25.00
4 $9,300.00$31.00
Ref #6 202E58100 CATCH BASIN REMOVED, (1 EACH)
Awd $200.00$200.00
2 $10.00$10.00
3 $430.00$430.00
4 $660.00$660.00
Ref #7 203E10000 EXCAVATION, (1721 CY)
Awd $27,536.00$16.00
2 $12,047.00$7.00
3 $36,141.00$21.00
4 $45,434.40$26.40
Ref #8 203E20000 EMBANKMENT, (803 CY)
Awd $9,636.00$12.00
2 $8,030.00$10.00
3 $8,030.00$10.00
4 $10,679.90$13.30
Ref #9 204E10000 SUBGRADE COMPACTION, (4233 SY)
Awd $2,116.50$0.50
2 $4,233.00$1.00
3 $13,757.25$3.25
4 $2,539.80$0.60
Ref #10 204E45000 PROOF ROLLING, (2 HOUR)
Awd $200.00$100.00
2 $100.00$50.00
3 $640.00$320.00
4 $180.00$90.00
160172 - Page 92
Ref #11 623E38500 MONUMENT ASSEMBLY, (8 EACH)
Awd $4,800.00$600.00
2 $6,400.00$800.00
3 $11,200.00$1,400.00
4 $4,800.00$600.00
Ref #12 623E40520 RIGHT-OF-WAY MONUMENT, (4 EACH)
Awd $2,400.00$600.00
2 $380.00$95.00
3 $920.00$230.00
4 $1,600.00$400.00
Ref #13 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (1 EACH)
Awd $200.00$200.00
2 $250.00$250.00
3 $300.00$300.00
4 $175.00$175.00
Section 1 - ROADWAY - Totals
Awd $90,572.25
2 $100,623.00
3 $128,388.25
4 $116,754.10
Ref #14 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (5 CY)
Awd $400.00$80.00
2 $400.00$80.00
3 $1,275.00$255.00
4 $590.00$118.00
Ref #15 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER, (6 CY)
Awd $480.00$80.00
2 $480.00$80.00
3 $1,530.00$255.00
4 $732.00$122.00
Ref #16 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $200.00$100.00
2 $40.00$20.00
3 $56.00$28.00
4 $100.00$50.00
Ref #17 659E10000 SEEDING AND MULCHING, (5769 SY)
Awd $7,788.15$1.35
2 $5,769.00$1.00
3 $5,769.00$1.00
4 $4,211.37$0.73
Ref #18 659E14000 REPAIR SEEDING AND MULCHING, (289 SY)
Awd $173.40$0.60
2 $57.80$0.20
3 $289.00$1.00
4 $289.00$1.00
Ref #19 659E15000 INTER-SEEDING, (289 SY)
Awd $289.00$1.00
2 $57.80$0.20
3 $289.00$1.00
4 $14.45$0.05
160172 - Page 93
Ref #20 659E20000 COMMERCIAL FERTILIZER, (1 TON)
Awd $300.00$300.00
2 $250.00$250.00
3 $320.00$320.00
4 $550.00$550.00
Ref #21 659E31000 LIME, (2 ACRE)
Awd $200.00$100.00
2 $80.00$40.00
3 $106.00$53.00
4 $280.00$140.00
Ref #22 659E35000 WATER, (32 MGAL)
Awd $32.00$1.00
2 $16.00$0.50
3 $32.00$1.00
4 $1,024.00$32.00
Ref #23 670E00500 SLOPE EROSION PROTECTION, (2132 SY)
Awd $5,330.00$2.50
2 $4,264.00$2.00
3 $5,330.00$2.50
4 $5,330.00$2.50
Ref #24 670E00700 DITCH EROSION PROTECTION, (142 SY)
Awd $355.00$2.50
2 $284.00$2.00
3 $355.00$2.50
4 $568.00$4.00
Ref #25 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $5,000.00$5,000.00
3 $5,000.00$5,000.00
4 $3,820.00$3,820.00
Ref #26 832E30000 EROSION CONTROL, (26000 EACH)
Awd $26,000.00$1.00
2 $26,000.00$1.00
3 $26,000.00$1.00
4 $26,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $44,047.55
2 $42,698.60
3 $46,351.00
4 $43,508.82
Ref #27 602E20000 CONCRETE MASONRY, (1.8 CY)
Awd $3,600.00$2,000.00
2 $2,250.00$1,250.00
3 $2,916.00$1,620.00
4 $2,430.00$1,350.00
Ref #28 605E06020 4" BASE PIPE UNDERDRAINS WITH FABRIC WRAP, (742 FT)
Awd $8,904.00$12.00
2 $7,791.00$10.50
3 $8,904.00$12.00
4 $10,202.50$13.75
160172 - Page 94
Ref #29 605E31100 AGGREGATE DRAINS, (100 FT)
Awd $1,200.00$12.00
2 $950.00$9.50
3 $1,800.00$18.00
4 $1,420.00$14.20
Ref #30 611E00400 4" CONDUIT, TYPE E, (50 FT)
Awd $1,000.00$20.00
2 $200.00$4.00
3 $850.00$17.00
4 $650.00$13.00
Ref #31 611E00406 4" CONDUIT, TYPE F, (50 FT)
Awd $1,000.00$20.00
2 $200.00$4.00
3 $850.00$17.00
4 $650.00$13.00
Ref #32 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (31 FT)
Awd $620.00$20.00
2 $465.00$15.00
3 $744.00$24.00
4 $534.75$17.25
Ref #33 611E00900 6" CONDUIT, TYPE B, (100 FT)
Awd $2,000.00$20.00
2 $500.00$5.00
3 $2,000.00$20.00
4 $1,600.00$16.00
Ref #34 611E01400 6" CONDUIT, TYPE E, (100 FT)
Awd $2,000.00$20.00
2 $500.00$5.00
3 $2,000.00$20.00
4 $1,600.00$16.00
Ref #35 611E01500 6" CONDUIT, TYPE F, (100 FT)
Awd $2,000.00$20.00
2 $500.00$5.00
3 $2,000.00$20.00
4 $1,600.00$16.00
Ref #36 611E04400 12" CONDUIT, TYPE B, (69 FT)
Awd $2,760.00$40.00
2 $4,830.00$70.00
3 $6,417.00$93.00
4 $4,781.70$69.30
Ref #37 611E07400 18" CONDUIT, TYPE B, (65 FT)
Awd $3,250.00$50.00
2 $4,875.00$75.00
3 $6,500.00$100.00
4 $4,689.75$72.15
Ref #38 611E13200 30" CONDUIT, TYPE A, (80 FT)
Awd $5,600.00$70.00
2 $7,200.00$90.00
3 $10,560.00$132.00
4 $6,560.00$82.00
160172 - Page 95
Ref #39 611E98470 CATCH BASIN, NO. 2-2B, (2 EACH)
Awd $3,200.00$1,600.00
2 $3,400.00$1,700.00
3 $4,300.00$2,150.00
4 $3,770.00$1,885.00
Ref #40 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (2 EACH)
Awd $600.00$300.00
2 $360.00$180.00
3 $800.00$400.00
4 $422.00$211.00
Section 3 - DRAINAGE - Totals
Awd $37,734.00
2 $34,021.00
3 $50,641.00
4 $40,910.70
Ref #41 251E01010 PARTIAL DEPTH PAVEMENT REPAIR, (10 CY)
Awd $2,000.00$200.00
2 $800.00$80.00
3 $5,400.00$540.00
4 $2,250.00$225.00
Ref #42 301E46000 ASPHALT CONCRETE BASE, PG64-22, (749 CY)
Awd $92,876.00$124.00
2 $89,880.00$120.00
3 $86,135.00$115.00
4 $93,625.00$125.00
Ref #43 304E20000 AGGREGATE BASE, (890 CY)
Awd $42,720.00$48.00
2 $43,610.00$49.00
3 $50,730.00$57.00
4 $54,290.00$61.00
Ref #44 407E10000 TACK COAT, (20 GAL)
Awd $40.00$2.00
2 $42.00$2.10
3 $44.00$2.20
4 $42.00$2.10
Ref #45 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (147 GAL)
Awd $294.00$2.00
2 $308.70$2.10
3 $323.40$2.20
4 $308.70$2.10
Ref #46 408E10000 PRIME COAT, (47 GAL)
Awd $235.00$5.00
2 $164.50$3.50
3 $150.40$3.20
4 $164.50$3.50
Ref #47 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (20 CY)
Awd $4,000.00$200.00
2 $3,600.00$180.00
3 $7,600.00$380.00
4 $5,600.00$280.00
160172 - Page 96
Ref #48 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (132 CY)
Awd $23,760.00$180.00
2 $35,112.00$266.00
3 $19,800.00$150.00
4 $35,112.00$266.00
Ref #49 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (178 CY)
Awd $28,480.00$160.00
2 $30,260.00$170.00
3 $19,580.00$110.00
4 $30,260.00$170.00
Ref #50 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (7 CY)
Awd $1,400.00$200.00
2 $1,680.00$240.00
3 $1,925.00$275.00
4 $1,680.00$240.00
Ref #51 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (42 SY)
Awd $2,940.00$70.00
2 $4,830.00$115.00
3 $6,300.00$150.00
4 $4,830.00$115.00
Ref #52 617E10100 COMPACTED AGGREGATE, (10 CY)
Awd $800.00$80.00
2 $700.00$70.00
3 $3,000.00$300.00
4 $650.00$65.00
Section 4 - PAVEMENT - Totals
Awd $199,545.00
2 $210,987.20
3 $200,987.80
4 $228,812.20
Ref #53 621E00100 RPM, (31 EACH)
Awd $3,100.00$100.00
2 $2,108.00$68.00
3 $2,325.00$75.00
4 $2,104.90$67.90
Ref #54 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (255.5 FT)
Awd $2,555.00$10.00
2 $2,555.00$10.00
3 $1,916.25$7.50
4 $1,788.50$7.00
Ref #55 630E08600 SIGN POST REFLECTOR, (12 EACH)
Awd $504.00$42.00
2 $480.00$40.00
3 $324.00$27.00
4 $300.00$25.00
Ref #56 630E80100 SIGN, FLAT SHEET, (97.9 SF)
Awd $2,153.80$22.00
2 $1,958.00$20.00
3 $1,468.50$15.00
4 $1,370.60$14.00
160172 - Page 97
Ref #57 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (23 EACH)
Awd $253.00$11.00
2 $230.00$10.00
3 $316.25$13.75
4 $299.00$13.00
Ref #58 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (12 EACH)
Awd $396.00$33.00
2 $360.00$30.00
3 $696.00$58.00
4 $660.00$55.00
Ref #59 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (20 EACH)
Awd $240.00$12.00
2 $200.00$10.00
3 $355.00$17.75
4 $335.00$16.75
Ref #60 646E10000 EDGE LINE, 4", (0.42 MILE)
Awd $5,670.00$13,500.00
2 $3,525.90$8,395.00
3 $5,460.00$13,000.00
4 $3,150.00$7,500.00
Ref #61 646E10200 CENTER LINE, (0.23 MILE)
Awd $3,622.50$15,750.00
2 $2,888.80$12,560.00
3 $3,450.00$15,000.00
4 $2,760.00$12,000.00
Ref #62 646E10400 STOP LINE, (40 FT)
Awd $780.00$19.50
2 $760.00$19.00
3 $760.00$19.00
4 $600.00$15.00
Ref #63 646E20500 DOTTED LINE, (256 FT)
Awd $1,280.00$5.00
2 $640.00$2.50
3 $1,280.00$5.00
4 $2,048.00$8.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $20,554.30
2 $15,705.70
3 $18,351.00
4 $15,416.00
Ref #64 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (20 CY)
Awd $1,000.00$50.00
2 $800.00$40.00
3 $2,000.00$100.00
4 $1,500.00$75.00
Ref #65 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $11,000.00$11,000.00
2 $15,000.00$15,000.00
3 $9,300.00$9,300.00
4 $7,100.00$7,100.00
160172 - Page 98
Ref #66 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (10 CY)
Awd $2,000.00$200.00
2 $900.00$90.00
3 $3,200.00$320.00
4 $2,650.00$265.00
Ref #67 616E10000 WATER, (10 MGAL)
Awd $10.00$1.00
2 $5.00$0.50
3 $840.00$84.00
4 $900.00$90.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $14,010.00
2 $16,705.00
3 $15,340.00
4 $12,150.00
Ref #68 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $5,000.00$5,000.00
3 $3,000.00$3,000.00
4 $4,000.00$4,000.00
Ref #69 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $10,000.00$10,000.00
3 $14,000.00$14,000.00
4 $23,000.00$23,000.00
Ref #70 619E16010 FIELD OFFICE, TYPE B, (3 MNTH)
Awd $4,500.00$1,500.00
2 $1,200.00$400.00
3 $7,500.00$2,500.00
4 $8,970.00$2,990.00
Ref #71 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $13,500.00$13,500.00
2 $18,000.00$18,000.00
3 $12,000.00$12,000.00
4 $14,000.00$14,000.00
Ref #72 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $10,000.00$10,000.00
3 $20,000.00$20,000.00
4 $86,300.00$86,300.00
Section 7 - INCIDENTALS - Totals
Awd $57,000.00
2 $44,200.00
3 $56,500.00
4 $136,270.00
160172 - Page 99
Project No. 160173
PID 92386
COS-SR 541-29.18
Federal
Type: BRIDGE REPAIR
Completion Date: 8/31/2016
Award Amount: $532,519.63
Contract Awarded To: STANLEY MILLER CONSTRUCTION COMPANY
Letting Date: 4/7/2016
Engineer's Estimate: $582,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
STANLEY MILLER CONSTRUCTION COMPANY
2250 HOWENSTINE DR SE
EAST SPARTA, OH 44626
Stark
Bidder 1
Bid $532,519.63
OHIO-WEST VIRGINIA EXCAVATING CO
56461 FERRY LANDING ROAD
SHADYSIDE, OH 43947
Belmont
Bidder 2
Bid $584,188.67
INFRASTRUCTURE UNLIMITED INC
144 FOGGINTOWN RD
BREWSTER, NY 10509
Bidder 3
Bid $598,609.95
V O MENUEZ & SON INC
1016 S WASHINGTON ST
MILLERSBURG, OH 44654
Holmes
Bidder 4
Bid $607,999.38
RIETSCHLIN CONSTRUCTION INC
4240 BAKER RD
CRESTLINE, OH 44827
Crawford
Bidder 5
Bid $643,610.00
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 6
Bid $699,813.06
160173 - Page 100
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $4,756.00$4,756.00
2 $800.00$800.00
3 $1,500.00$1,500.00
4 $2,875.00$2,875.00
5 $5,770.00$5,770.00
6 $5,000.00$5,000.00
Ref #2 202E23010 PAVEMENT REMOVED, ASPHALT, (1043 SY)
Awd $7,561.75$7.25
2 $6,779.50$6.50
3 $11,629.45$11.15
4 $3,129.00$3.00
5 $7,040.25$6.75
6 $11,473.00$11.00
Ref #3 202E38000 GUARDRAIL REMOVED, (599 FT)
Awd $599.00$1.00
2 $1,198.00$2.00
3 $946.42$1.58
4 $1,018.30$1.70
5 $2,096.50$3.50
6 $868.55$1.45
Ref #4 202E75000 FENCE REMOVED, (677 FT)
Awd $1,354.00$2.00
2 $541.60$0.80
3 $2,295.03$3.39
4 $778.55$1.15
5 $2,369.50$3.50
6 $2,031.00$3.00
Ref #5 203E10000 EXCAVATION, (967 CY)
Awd $15,723.42$16.26
2 $7,736.00$8.00
3 $11,043.14$11.42
4 $8,703.00$9.00
5 $14,746.75$15.25
6 $15,472.00$16.00
Ref #6 203E20000 EMBANKMENT, (863 CY)
Awd $7,076.60$8.20
2 $5,609.50$6.50
3 $15,991.39$18.53
4 $7,767.00$9.00
5 $12,945.00$15.00
6 $10,356.00$12.00
Ref #7 204E10000 SUBGRADE COMPACTION, (1629 SY)
Awd $1,629.00$1.00
2 $3,909.60$2.40
3 $2,997.36$1.84
4 $3,665.25$2.25
5 $2,443.50$1.50
6 $4,887.00$3.00
160173 - Page 101
Ref #8 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING, (8.16 STA)
Awd $7,058.40$865.00
2 $636.48$78.00
3 $2,000.34$245.14
4 $1,615.68$198.00
5 $3,264.00$400.00
6 $2,448.00$300.00
Ref #9 606E15050 GUARDRAIL, TYPE MGS, (518.75 FT)
Awd $7,781.25$15.00
2 $7,003.13$13.50
3 $8,912.13$17.18
4 $8,300.00$16.00
5 $7,781.25$15.00
6 $7,962.81$15.35
Ref #10 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (4 EACH)
Awd $8,000.00$2,000.00
2 $7,200.00$1,800.00
3 $8,520.20$2,130.05
4 $8,000.00$2,000.00
5 $7,900.00$1,975.00
6 $7,560.00$1,890.00
Ref #11 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (4 EACH)
Awd $7,336.00$1,834.00
2 $6,600.00$1,650.00
3 $8,723.60$2,180.90
4 $8,080.00$2,020.00
5 $7,240.00$1,810.00
6 $7,740.00$1,935.00
Ref #12 617E10100 COMPACTED AGGREGATE, (108 CY)
Awd $11,124.00$103.00
2 $7,776.00$72.00
3 $5,746.68$53.21
4 $12,960.00$120.00
5 $9,072.00$84.00
6 $9,936.00$92.00
Ref #13 623E40520 RIGHT-OF-WAY MONUMENT, (4 EACH)
Awd $4,644.00$1,161.00
2 $632.00$158.00
3 $1,226.20$306.55
4 $1,672.00$418.00
5 $440.00$110.00
6 $2,320.00$580.00
Section 1 - ROADWAY - Totals
Awd $84,643.42
2 $56,421.81
3 $81,531.94
4 $68,563.78
5 $83,108.75
6 $88,054.36
160173 - Page 102
Ref #14 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (78 CY)
Awd $5,382.00$69.00
2 $6,552.00$84.00
3 $7,526.22$96.49
4 $6,676.80$85.60
5 $5,928.00$76.00
6 $5,967.00$76.50
Ref #15 659E00500 SEEDING AND MULCHING, CLASS 1, (3653 SY)
Awd $7,306.00$2.00
2 $3,726.06$1.02
3 $5,369.91$1.47
4 $4,566.25$1.25
5 $6,392.75$1.75
6 $2,739.75$0.75
Ref #16 659E20000 COMMERCIAL FERTILIZER, (0.49 TON)
Awd $294.00$600.00
2 $269.50$550.00
3 $185.49$378.55
4 $137.20$280.00
5 $343.00$700.00
6 $330.75$675.00
Ref #17 659E31000 LIME, (0.75 ACRE)
Awd $300.00$400.00
2 $112.50$150.00
3 $77.97$103.96
4 $86.25$115.00
5 $75.00$100.00
6 $120.00$160.00
Ref #18 659E35000 WATER, (20 MGAL)
Awd $20.00$1.00
2 $20.00$1.00
3 $22.60$1.13
4 $0.20$0.01
5 $300.00$15.00
6 $20.00$1.00
Ref #19 832E30000 EROSION CONTROL, (2000 EACH)
Awd $2,000.00$1.00
2 $2,000.00$1.00
3 $2,000.00$1.00
4 $2,000.00$1.00
5 $2,000.00$1.00
6 $2,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $15,302.00
2 $12,680.06
3 $15,182.19
4 $13,466.70
5 $15,038.75
6 $11,177.50
160173 - Page 103
Ref #20 301E46000 ASPHALT CONCRETE BASE, PG64-22, (190 CY)
Awd $29,640.00$156.00
2 $26,600.00$140.00
3 $30,058.00$158.20
4 $26,980.00$142.00
5 $29,260.00$154.00
6 $26,600.00$140.00
Ref #21 304E20000 AGGREGATE BASE, (201 CY)
Awd $15,718.20$78.20
2 $12,864.00$64.00
3 $12,628.83$62.83
4 $15,678.00$78.00
5 $17,688.00$88.00
6 $16,281.00$81.00
Ref #22 407E10000 TACK COAT, (83 GAL)
Awd $184.26$2.22
2 $166.00$2.00
3 $187.58$2.26
4 $186.75$2.25
5 $186.75$2.25
6 $166.00$2.00
Ref #23 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (44 GAL)
Awd $98.12$2.23
2 $88.00$2.00
3 $99.44$2.26
4 $99.00$2.25
5 $99.00$2.25
6 $88.00$2.00
Ref #24 408E10001 PRIME COAT, AS PER PLAN, (229 GAL)
Awd $1,527.43$6.67
2 $1,374.00$6.00
3 $1,552.62$6.78
4 $1,396.90$6.10
5 $1,488.50$6.50
6 $1,488.50$6.50
Ref #25 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (40 CY)
Awd $8,920.00$223.00
2 $8,000.00$200.00
3 $9,040.00$226.00
4 $8,200.00$205.00
5 $8,780.00$219.50
6 $8,000.00$200.00
Ref #26 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (54 CY)
Awd $10,800.00$200.00
2 $9,720.00$180.00
3 $10,983.60$203.40
4 $9,882.00$183.00
5 $10,665.00$197.50
6 $9,720.00$180.00
160173 - Page 104
Ref #27 690E12050 SPECIAL - REINFORCED MESH FOR TRANSVERSE AND/OR LO, (34 SY)
Awd $1,666.00$49.00
2 $1,496.00$44.00
3 $1,874.08$55.12
4 $44,200.00$1,300.00
5 $1,870.00$55.00
6 $1,190.00$35.00
Section 3 - PAVEMENT - Totals
Awd $68,554.01
2 $60,308.00
3 $66,424.15
4 $106,622.65
5 $70,037.25
6 $63,533.50
Ref #28 621E54000 RAISED PAVEMENT MARKER REMOVED, (7 EACH)
Awd $105.00$15.00
2 $378.00$54.00
3 $500.08$71.44
4 $672.00$96.00
5 $280.00$40.00
6 $329.00$47.00
Ref #29 626E00100 BARRIER REFLECTOR, (17 EACH)
Awd $132.60$7.80
2 $127.50$7.50
3 $119.17$7.01
4 $170.00$10.00
5 $136.00$8.00
6 $110.50$6.50
Ref #30 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (46 FT)
Awd $736.00$16.00
2 $460.00$10.00
3 $623.76$13.56
4 $460.00$10.00
5 $506.00$11.00
6 $552.00$12.00
Ref #31 630E80100 SIGN, FLAT SHEET, (12 SF)
Awd $480.00$40.00
2 $252.00$21.00
3 $325.44$27.12
4 $240.00$20.00
5 $264.00$22.00
6 $288.00$24.00
Ref #32 642E00090 EDGE LINE, 4", (0.19 MILE)
Awd $643.91$3,389.00
2 $779.00$4,100.00
3 $814.78$4,288.32
4 $798.00$4,200.00
5 $646.00$3,400.00
6 $579.50$3,050.00
160173 - Page 105
Ref #33 642E00290 CENTER LINE, (0.09 MILE)
Awd $610.02$6,778.00
2 $783.00$8,700.00
3 $809.53$8,994.78
4 $378.00$4,200.00
5 $603.00$6,700.00
6 $549.00$6,100.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $2,707.53
2 $2,779.50
3 $3,192.76
4 $2,718.00
5 $2,435.00
6 $2,408.00
Ref #34 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C, (15 CY)
Awd $750.00$50.00
2 $2,025.00$135.00
3 $1,052.25$70.15
4 $375.00$25.00
5 $1,080.00$72.00
6 $1,365.00$91.00
Ref #35 614E12421 DETOUR SIGNING, AS PER PLAN, (LUMP SUM)
Awd $3,934.00$3,934.00
2 $10,500.00$10,500.00
3 $8,893.10$8,893.10
4 $4,000.00$4,000.00
5 $3,900.00$3,900.00
6 $3,600.00$3,600.00
Ref #36 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (15 CY)
Awd $990.00$66.00
2 $5,025.00$335.00
3 $2,952.15$196.81
4 $900.00$60.00
5 $4,200.00$280.00
6 $3,630.00$242.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $5,674.00
2 $17,550.00
3 $12,897.50
4 $5,275.00
5 $9,180.00
6 $8,595.00
Ref #37 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, SUBSTR, (90 CY)
Awd $12,780.00$142.00
2 $7,650.00$85.00
3 $26,059.50$289.55
4 $46,350.00$515.00
5 $34,585.20$384.28
6 $18,900.00$210.00
160173 - Page 106
Ref #38 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, SUPERS, (35 CY)
Awd $6,755.00$193.00
2 $29,750.00$850.00
3 $7,000.00$200.00
4 $4,200.00$120.00
5 $6,877.50$196.50
6 $9,555.00$273.00
Ref #39 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $10,089.00$10,089.00
2 $18,000.00$18,000.00
3 $4,000.77$4,000.77
4 $4,000.00$4,000.00
5 $40,700.00$40,700.00
6 $35,000.00$35,000.00
Ref #40 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $2,822.00$2,822.00
2 $25,500.00$25,500.00
3 $20,318.53$20,318.53
4 $13,860.00$13,860.00
5 $40,250.00$40,250.00
6 $55,000.00$55,000.00
Ref #41 509E10000 EPOXY COATED REINFORCING STEEL, (23853 LB)
Awd $25,045.65$1.05
2 $26,238.30$1.10
3 $23,853.00$1.00
4 $47,706.00$2.00
5 $23,853.00$1.00
6 $21,467.70$0.90
Ref #42 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (212 EACH)
Awd $5,088.00$24.00
2 $3,180.00$15.00
3 $3,816.00$18.00
4 $4,240.00$20.00
5 $4,558.00$21.50
6 $6,148.00$29.00
Ref #43 511E32210 CLASS QC2 CONCRETE, SUPERSTRUCTURE, (78 CY)
Awd $61,152.00$784.00
2 $81,900.00$1,050.00
3 $79,917.24$1,024.58
4 $54,522.00$699.00
5 $81,900.00$1,050.00
6 $111,150.00$1,425.00
Ref #44 511E45710 CLASS QC1 CONCRETE, ABUTMENT, (105 CY)
Awd $43,260.00$412.00
2 $66,150.00$630.00
3 $64,569.75$614.95
4 $63,000.00$600.00
5 $43,785.00$417.00
6 $63,000.00$600.00
160173 - Page 107
Ref #45 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY), (115 SY)
Awd $2,070.00$18.00
2 $1,380.00$12.00
3 $1,840.00$16.00
4 $1,012.00$8.80
5 $1,523.75$13.25
6 $1,380.00$12.00
Ref #46 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (23 SF)
Awd $101.20$4.40
2 $230.00$10.00
3 $305.90$13.30
4 $115.00$5.00
5 $345.00$15.00
6 $529.00$23.00
Ref #47 516E13601 1" PREFORMED EXPANSION JOINT FILLER, AS PER PLAN, (106 SF)
Awd $2,289.60$21.60
2 $1,590.00$15.00
3 $1,072.72$10.12
4 $1,060.00$10.00
5 $2,284.30$21.55
6 $1,696.00$16.00
Ref #48 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (108 FT)
Awd $2,484.00$23.00
2 $3,024.00$28.00
3 $2,487.24$23.03
4 $3,061.80$28.35
5 $2,808.00$26.00
6 $3,240.00$30.00
Ref #49 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (72 FT)
Awd $558.00$7.75
2 $1,080.00$15.00
3 $1,057.68$14.69
4 $882.00$12.25
5 $2,376.00$33.00
6 $2,232.00$31.00
Ref #50 516E42600 ELASTOMERIC BEARING PAD, MISC.: (1 1/2" X 8"), (30 FT)
Awd $3,000.00$100.00
2 $3,450.00$115.00
3 $11,208.90$373.63
4 $3,810.00$127.00
5 $3,525.00$117.50
6 $3,600.00$120.00
Ref #51 517E70000 RAILING (TWIN STEEL TUBE), (71 FT)
Awd $10,863.00$153.00
2 $10,650.00$150.00
3 $10,911.28$153.68
4 $16,468.45$231.95
5 $10,721.00$151.00
6 $12,070.00$170.00
160173 - Page 108
Ref #52 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (74 CY)
Awd $12,728.00$172.00
2 $5,328.00$72.00
3 $7,503.60$101.40
4 $4,366.00$59.00
5 $4,810.00$65.00
6 $4,958.00$67.00
Ref #53 518E22300 SPECIAL - STEEL DRIP STRIP, (71 FT)
Awd $880.40$12.40
2 $497.00$7.00
3 $1,161.56$16.36
4 $710.00$10.00
5 $816.50$11.50
6 $1,491.00$21.00
Ref #54 518E40001 6" PERFORATED CORRUGATED PLASTIC PIPE, AS PER PLAN, (119 FT)
Awd $1,044.82$8.78
2 $952.00$8.00
3 $1,037.68$8.72
4 $1,190.00$10.00
5 $1,785.00$15.00
6 $1,428.00$12.00
Ref #55 526E30000 REINFORCED CONCRETE APPROACH SLABS (T=17"), (200 SY)
Awd $39,400.00$197.00
2 $54,000.00$270.00
3 $44,176.00$220.88
4 $46,200.00$231.00
5 $41,400.00$207.00
6 $49,200.00$246.00
Section 6 - STRUCTURE 20 FOOT SPAN AND OVER (COS-541 - Totals
Awd $242,410.67
2 $340,549.30
3 $312,297.35
4 $316,753.25
5 $348,903.25
6 $402,044.70
Ref #56 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $6,650.00$6,650.00
2 $10,000.00$10,000.00
3 $18,080.00$18,080.00
4 $6,200.00$6,200.00
5 $6,500.00$6,500.00
6 $6,000.00$6,000.00
Ref #57 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $5,150.00$5,150.00
2 $6,000.00$6,000.00
3 $9,089.90$9,089.90
4 $4,000.00$4,000.00
5 $2,617.00$2,617.00
6 $7,500.00$7,500.00
160173 - Page 109
Ref #58 619E16000 FIELD OFFICE, TYPE A, (3 MNTH)
Awd $9,300.00$3,100.00
2 $2,400.00$800.00
3 $4,746.00$1,582.00
4 $2,400.00$800.00
5 $5,100.00$1,700.00
6 $10,500.00$3,500.00
Ref #59 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $17,128.00$17,128.00
2 $1,500.00$1,500.00
3 $3,955.00$3,955.00
4 $4,000.00$4,000.00
5 $3,290.00$3,290.00
6 $20,000.00$20,000.00
Ref #60 624E10000 MOBILIZATION, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $14,000.00$14,000.00
3 $26,213.16$26,213.16
4 $20,000.00$20,000.00
5 $37,400.00$37,400.00
6 $20,000.00$20,000.00
Section 7 - INCIDENTALS - Totals
Awd $53,228.00
2 $33,900.00
3 $62,084.06
4 $36,600.00
5 $54,907.00
6 $64,000.00
Ref #61 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI, (1000 DLR)
Awd $60,000.00$60.00
2 $60,000.00$60.00
3 $45,000.00$45.00
4 $58,000.00$58.00
5 $60,000.00$60.00
6 $60,000.00$60.00
Section 8 - PART B - Totals
Awd $60,000.00
2 $60,000.00
3 $45,000.00
4 $58,000.00
5 $60,000.00
6 $60,000.00
160173 - Page 110
Project No. 160174
PID 93004
COS-SR 79-00.00
Federal
Type: TWO LANE RESURFACING
Completion Date: 10/31/2016
Award Amount: $1,568,830.80
Contract Awarded To: SHELLY COMPANY
Letting Date: 4/7/2016
Engineer's Estimate: $1,497,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 1
Bid $1,568,830.80
160174 - Page 111
Ref #1 202E23500 WEARING COURSE REMOVED, (13225 SY)
Awd $39,675.00$3.00
Ref #2 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (22.49 MILE)
Awd $22,490.00$1,000.00
Section 1 - ROADWAY - Totals
Awd $62,165.00
Ref #3 253E02000 PAVEMENT REPAIR, (2000 CY)
Awd $380,000.00$190.00
Ref #4 304E20000 AGGREGATE BASE, (4 CY)
Awd $800.00$200.00
Ref #5 407E10000 TACK COAT, (10916 GAL)
Awd $21,832.00$2.00
Ref #6 408E10001 PRIME COAT, AS PER PLAN, (10555 GAL)
Awd $30,081.75$2.85
Ref #7 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (214 CY)
Awd $43,870.00$205.00
Ref #8 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (4930 CY)
Awd $712,385.00$144.50
Ref #9 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (148 FT)
Awd $4,440.00$30.00
Ref #10 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (550 CY)
Awd $46,200.00$84.00
Ref #11 617E20000 SHOULDER PREPARATION, (26474 SY)
Awd $3,971.10$0.15
Section 2 - PAVEMENT - Totals
Awd $1,243,579.85
Ref #12 621E00100 RPM, (1080 EACH)
Awd $19,980.00$18.50
Ref #13 621E54000 RAISED PAVEMENT MARKER REMOVED, (1080 EACH)
Awd $9,720.00$9.00
Ref #14 644E00500 STOP LINE, (701 FT)
Awd $4,381.25$6.25
Ref #15 644E00600 CROSSWALK LINE, (98 FT)
Awd $308.70$3.15
Ref #16 644E01110 SCHOOL SYMBOL MARKING, 96", (2 EACH)
Awd $1,130.00$565.00
Ref #17 648E00100 EDGE LINE, 4", (24.74 MILE)
Awd $21,400.10$865.00
Ref #18 648E00300 CENTER LINE, (12.37 MILE)
Awd $16,204.70$1,310.00
160174 - Page 112
Section 3 - TRAFFIC CONTROL - Totals
Awd $73,124.75
Ref #19 614E12460 WORK ZONE MARKING SIGN, (124 EACH)
Awd $11,780.00$95.00
Ref #20 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (7 CY)
Awd $1,295.00$185.00
Ref #21 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (12.06 MILE)
Awd $9,286.20$770.00
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $22,361.20
Ref #22 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $8,000.00$8,000.00
Ref #23 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $115,000.00$115,000.00
Ref #24 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $4,600.00$4,600.00
Ref #25 624E10000 MOBILIZATION, (LUMP SUM)
Awd $40,000.00$40,000.00
Section 5 - INCIDENTALS - Totals
Awd $167,600.00
160174 - Page 113
Project No. 160175
PID 84286
CUY-SR 17-18.47
Federal
Type: TWO LANE RESURFACING
Completion Date: 9/30/2016
Award Amount: $1,132,709.70
Contract Awarded To: CHAGRIN VALLEY PAVING INC
Letting Date: 4/7/2016
Engineer's Estimate: $1,200,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
CHAGRIN VALLEY PAVING INC
17290 MUNN RD
CHAGRIN FALLS, OH 44023
Geauga
Bidder 1
Bid $1,132,709.70
KOKOSING CONSTRUCTION COMPANY INC
886 MC KINLEY AVE
COLUMBUS, OH 43222
Franklin
Bidder 2
Bid $1,180,946.70
RONYAK PAVING INC
14376 N CHESHIRE ST
BURTON, OH 44021
Geauga
Bidder 3
Bid $1,198,359.50
BURTON SCOT CONTRACTORS LLC
11330 KINSMAN RD
NEWBURY, OH 44065
Geauga
Bidder 4
Bid $1,219,997.00
KARVO COMPANIES INC
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 5
Bid $1,316,355.30
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 6
Bid $1,336,330.50
BARBICAS CONSTRUCTION COMPANY INC
124 DARROW RD
AKRON, OH 44305
Summit
Bidder 7
Bid $1,342,807.40
160175 - Page 114
Ref #1 202E32001 CURB REMOVED, AS PER PLAN, (1000 FT)
Awd $5,000.00$5.00
2 $8,000.00$8.00
3 $8,000.00$8.00
4 $12,000.00$12.00
5 $10,000.00$10.00
6 $8,000.00$8.00
7 $5,000.00$5.00
Ref #2 204E10000 SUBGRADE COMPACTION, (250 SY)
Awd $250.00$1.00
2 $312.50$1.25
3 $312.50$1.25
4 $750.00$3.00
5 $250.00$1.00
6 $312.50$1.25
7 $250.00$1.00
Ref #3 204E13000 EXCAVATION OF SUBGRADE, (40 CY)
Awd $400.00$10.00
2 $1,000.00$25.00
3 $1,000.00$25.00
4 $1,200.00$30.00
5 $1,400.00$35.00
6 $1,000.00$25.00
7 $800.00$20.00
Ref #4 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN, (40 CY)
Awd $1,600.00$40.00
2 $1,440.00$36.00
3 $1,440.00$36.00
4 $1,440.00$36.00
5 $1,400.00$35.00
6 $1,440.00$36.00
7 $2,400.00$60.00
Ref #5 204E50000 GEOTEXTILE FABRIC, (250 SY)
Awd $250.00$1.00
2 $562.50$2.25
3 $562.50$2.25
4 $750.00$3.00
5 $250.00$1.00
6 $562.50$2.25
7 $1,000.00$4.00
Ref #6 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN, (16 EACH)
Awd $6,400.00$400.00
2 $6,800.00$425.00
3 $6,800.00$425.00
4 $6,800.00$425.00
5 $8,000.00$500.00
6 $8,400.00$525.00
7 $7,200.00$450.00
160175 - Page 115
Section 1 - ROADWAY - Totals
Awd $13,900.00
2 $18,115.00
3 $18,115.00
4 $22,940.00
5 $21,300.00
6 $19,715.00
7 $16,650.00
Ref #7 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN, (45 EACH)
Awd $40,500.00$900.00
2 $24,750.00$550.00
3 $24,750.00$550.00
4 $24,750.00$550.00
5 $40,500.00$900.00
6 $27,000.00$600.00
7 $38,250.00$850.00
Ref #8 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE, (20 EACH)
Awd $30,000.00$1,500.00
2 $22,000.00$1,100.00
3 $22,000.00$1,100.00
4 $23,100.00$1,155.00
5 $19,500.00$975.00
6 $20,000.00$1,000.00
7 $22,000.00$1,100.00
Ref #9 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (67 EACH)
Awd $43,550.00$650.00
2 $35,175.00$525.00
3 $35,175.00$525.00
4 $35,175.00$525.00
5 $58,625.00$875.00
6 $36,850.00$550.00
7 $40,200.00$600.00
Ref #10 611E99820 SPECIAL - MISCELLANEOUS METAL, (35000 LB)
Awd $52,500.00$1.50
2 $28,000.00$0.80
3 $42,000.00$1.20
4 $42,000.00$1.20
5 $52,500.00$1.50
6 $43,750.00$1.25
7 $43,750.00$1.25
Section 2 - DRAINAGE - Totals
Awd $166,550.00
2 $109,925.00
3 $123,925.00
4 $125,025.00
5 $171,125.00
6 $127,600.00
7 $144,200.00
160175 - Page 116
Ref #11 251E01011 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, (45 CY)
Awd $6,750.00$150.00
2 $20,250.00$450.00
3 $29,250.00$650.00
4 $24,750.00$550.00
5 $25,200.00$560.00
6 $22,500.00$500.00
7 $10,800.00$240.00
Ref #12 253E02001 PAVEMENT REPAIR, AS PER PLAN, (100 CY)
Awd $15,000.00$150.00
2 $45,000.00$450.00
3 $33,500.00$335.00
4 $25,000.00$250.00
5 $37,500.00$375.00
6 $30,000.00$300.00
7 $18,000.00$180.00
Ref #13 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (47954 SY)
Awd $86,317.20$1.80
2 $67,135.60$1.40
3 $131,873.50$2.75
4 $107,896.50$2.25
5 $141,464.30$2.95
6 $119,885.00$2.50
7 $105,498.80$2.20
Ref #14 254E01600 PATCHING PLANED SURFACE, (480 SY)
Awd $480.00$1.00
2 $960.00$2.00
3 $1,920.00$4.00
4 $960.00$2.00
5 $480.00$1.00
6 $480.00$1.00
7 $648.00$1.35
Ref #15 255E10160 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (400 SY)
Awd $40,000.00$100.00
2 $34,000.00$85.00
3 $34,000.00$85.00
4 $45,600.00$114.00
5 $52,000.00$130.00
6 $34,000.00$85.00
7 $60,000.00$150.00
Ref #16 255E20000 FULL DEPTH PAVEMENT SAWING, (3600 FT)
Awd $7,200.00$2.00
2 $7,200.00$2.00
3 $7,200.00$2.00
4 $8,640.00$2.40
5 $7,020.00$1.95
6 $7,200.00$2.00
7 $10,800.00$3.00
160175 - Page 117
Ref #17 407E14010 TACK COAT FOR INTERMEDIATE COURSE, 702.13, (3836 GAL)
Awd $7,672.00$2.00
2 $6,137.60$1.60
3 $7,672.00$2.00
4 $12,467.00$3.25
5 $6,713.00$1.75
6 $7,672.00$2.00
7 $8,055.60$2.10
Ref #18 407E20100 SPECIAL - TACK COAT, TRACKLESS TACK, SURFACE COURS, (3836 GAL)
Awd $7,672.00$2.00
2 $7,672.00$2.00
3 $7,672.00$2.00
4 $12,467.00$3.25
5 $10,549.00$2.75
6 $7,672.00$2.00
7 $15,344.00$4.00
Ref #19 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (105 CY)
Awd $18,375.00$175.00
2 $27,300.00$260.00
3 $33,600.00$320.00
4 $36,750.00$350.00
5 $23,520.00$224.00
6 $34,125.00$325.00
7 $26,250.00$250.00
Ref #20 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (1560 CY)
Awd $198,120.00$127.00
2 $265,200.00$170.00
3 $224,640.00$144.00
4 $265,200.00$170.00
5 $213,720.00$137.00
6 $241,800.00$155.00
7 $257,400.00$165.00
Ref #21 441E50301 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (2331 CY)
Awd $226,107.00$97.00
2 $307,692.00$132.00
3 $258,741.00$111.00
4 $314,685.00$135.00
5 $263,403.00$113.00
6 $268,065.00$115.00
7 $349,650.00$150.00
Ref #22 609E26001 CURB, TYPE 6, AS PER PLAN, (1000 FT)
Awd $40,000.00$40.00
2 $30,000.00$30.00
3 $30,000.00$30.00
4 $35,000.00$35.00
5 $15,000.00$15.00
6 $30,000.00$30.00
7 $35,000.00$35.00
160175 - Page 118
Section 3 - PAVEMENT - Totals
Awd $653,693.20
2 $818,547.20
3 $800,068.50
4 $889,415.50
5 $796,569.30
6 $803,399.00
7 $897,446.40
Ref #23 638E10800 VALVE BOX ADJUSTED TO GRADE, (59 EACH)
Awd $23,600.00$400.00
2 $23,600.00$400.00
3 $23,600.00$400.00
4 $23,600.00$400.00
5 $26,550.00$450.00
6 $26,550.00$450.00
7 $11,800.00$200.00
Section 4 - WATER WORK - Totals
Awd $23,600.00
2 $23,600.00
3 $23,600.00
4 $23,600.00
5 $26,550.00
6 $26,550.00
7 $11,800.00
Ref #24 642E00200 LANE LINE, 4", TYPE 1, (0.83 MILE)
Awd $373.50$450.00
2 $394.25$475.00
3 $415.00$500.00
4 $373.50$450.00
5 $415.00$500.00
6 $373.50$450.00
7 $415.00$500.00
Ref #25 642E00300 CENTER LINE, TYPE 1, (0.97 MILE)
Awd $921.50$950.00
2 $897.25$925.00
3 $873.00$900.00
4 $921.50$950.00
5 $873.00$900.00
6 $921.50$950.00
7 $873.00$900.00
Ref #26 642E00301 CENTER LINE, TYPE 1, AS PER PLAN, (1.49 MILE)
Awd $1,117.50$750.00
2 $1,192.00$800.00
3 $1,341.00$900.00
4 $1,117.50$750.00
5 $1,341.00$900.00
6 $1,117.50$750.00
7 $1,341.00$900.00
160175 - Page 119
Ref #27 642E00400 CHANNELIZING LINE, 8", TYPE 1, (1460 FT)
Awd $803.00$0.55
2 $1,095.00$0.75
3 $1,241.00$0.85
4 $803.00$0.55
5 $1,241.00$0.85
6 $803.00$0.55
7 $1,241.00$0.85
Ref #28 642E00500 STOP LINE, TYPE 1, (854 FT)
Awd $2,006.90$2.35
2 $2,562.00$3.00
3 $2,775.50$3.25
4 $2,006.90$2.35
5 $2,775.50$3.25
6 $2,006.90$2.35
7 $2,775.50$3.25
Ref #29 642E00600 CROSSWALK LINE, TYPE 1, (3766 FT)
Awd $5,084.10$1.35
2 $5,649.00$1.50
3 $6,590.50$1.75
4 $5,084.10$1.35
5 $6,590.50$1.75
6 $5,084.10$1.35
7 $6,590.50$1.75
Ref #30 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1, (40 FT)
Awd $160.00$4.00
2 $130.00$3.25
3 $90.00$2.25
4 $160.00$4.00
5 $90.00$2.25
6 $160.00$4.00
7 $90.00$2.25
Ref #31 642E01300 LANE ARROW, TYPE 1, (65 EACH)
Awd $2,730.00$42.00
2 $3,250.00$50.00
3 $3,575.00$55.00
4 $2,730.00$42.00
5 $3,575.00$55.00
6 $2,730.00$42.00
7 $3,575.00$55.00
Ref #32 642E01400 WORD ON PAVEMENT, 72", TYPE 1, (14 EACH)
Awd $770.00$55.00
2 $840.00$60.00
3 $910.00$65.00
4 $770.00$55.00
5 $910.00$65.00
6 $770.00$55.00
7 $910.00$65.00
160175 - Page 120
Section 5 - TRAFFIC CONTROL - Totals
Awd $13,966.50
2 $16,009.50
3 $17,811.00
4 $13,966.50
5 $17,811.00
6 $13,966.50
7 $17,811.00
Ref #33 632E26501 DETECTOR LOOP, AS PER PLAN, (16 EACH)
Awd $15,600.00$975.00
2 $16,800.00$1,050.00
3 $16,800.00$1,050.00
4 $15,600.00$975.00
5 $16,800.00$1,050.00
6 $16,800.00$1,050.00
7 $16,800.00$1,050.00
Section 6 - TRAFFIC SURVEILLANCE - Totals
Awd $15,600.00
2 $16,800.00
3 $16,800.00
4 $15,600.00
5 $16,800.00
6 $16,800.00
7 $16,800.00
Ref #34 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (160 HOUR)
Awd $9,600.00$60.00
2 $9,600.00$60.00
3 $9,440.00$59.00
4 $10,400.00$65.00
5 $9,600.00$60.00
6 $10,400.00$65.00
7 $10,400.00$65.00
Ref #35 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (50 CY)
Awd $4,500.00$90.00
2 $6,250.00$125.00
3 $7,500.00$150.00
4 $8,750.00$175.00
5 $10,000.00$200.00
6 $7,500.00$150.00
7 $6,500.00$130.00
Ref #36 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (12 SNMT)
Awd $11,400.00$950.00
2 $4,200.00$350.00
3 $12,600.00$1,050.00
4 $13,200.00$1,100.00
5 $12,600.00$1,050.00
6 $11,400.00$950.00
7 $12,600.00$1,050.00
160175 - Page 121
Section 7 - MAINTENANCE OF TRAFFIC - Totals
Awd $25,500.00
2 $20,050.00
3 $29,540.00
4 $32,350.00
5 $32,200.00
6 $29,300.00
7 $29,500.00
Ref #37 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $9,000.00$9,000.00
2 $8,000.00$8,000.00
3 $11,500.00$11,500.00
4 $9,300.00$9,300.00
5 $10,000.00$10,000.00
6 $4,000.00$4,000.00
7 $14,000.00$14,000.00
Ref #38 614E11001 MAINTAINING TRAFFIC, AS PER PLAN, (LUMP SUM)
Awd $150,000.00$150,000.00
2 $100,000.00$100,000.00
3 $110,000.00$110,000.00
4 $40,300.00$40,300.00
5 $145,000.00$145,000.00
6 $240,000.00$240,000.00
7 $125,000.00$125,000.00
Ref #39 619E16010 FIELD OFFICE, TYPE B, (6 MNTH)
Awd $4,500.00$750.00
2 $9,900.00$1,650.00
3 $9,000.00$1,500.00
4 $7,500.00$1,250.00
5 $10,500.00$1,750.00
6 $15,000.00$2,500.00
7 $3,600.00$600.00
Ref #40 624E10000 MOBILIZATION, (LUMP SUM)
Awd $56,400.00$56,400.00
2 $40,000.00$40,000.00
3 $38,000.00$38,000.00
4 $40,000.00$40,000.00
5 $68,500.00$68,500.00
6 $40,000.00$40,000.00
7 $66,000.00$66,000.00
Section 8 - INCIDENTALS - Totals
Awd $219,900.00
2 $157,900.00
3 $168,500.00
4 $97,100.00
5 $234,000.00
6 $299,000.00
7 $208,600.00
160175 - Page 122
Project No. 160176
PID 92611
CUY-SR 8-00.00
Federal
Type: FOUR LANE RESURFACING
Completion Date: 9/30/2016
Award Amount: $476,505.88
Contract Awarded To: AMERICAN PAVEMENTS INC
Letting Date: 4/7/2016
Engineer's Estimate: $416,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
AMERICAN PAVEMENTS LLC
7475 MONTGOMERY DR
PLAIN CITY, OH 43064
Madison
Bidder 1
Bid $476,505.88
STRAWSER CONSTRUCTION INC
1392 DUBLIN RD
COLUMBUS, OH 43215
Franklin
Bidder 2
Bid $609,638.07
NY-MAC ENTERPRISES INC
3415 S CREYTS RD
LANSING, MI 48917
Bidder 3
Bid $716,976.06
160176 - Page 123
Ref #1 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN, (2 EACH)
Awd $1,800.00$900.00
2 $1,802.00$901.00
3 $1,000.00$500.00
Section 1 - ROADWAY - Totals
Awd $1,800.00
2 $1,802.00
3 $1,000.00
Ref #2 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
Ref #3 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN, (21 EACH)
Awd $18,900.00$900.00
2 $18,921.00$901.00
3 $5,250.00$250.00
Ref #4 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (18 EACH)
Awd $16,200.00$900.00
2 $16,218.00$901.00
3 $4,500.00$250.00
Ref #5 611E99820 SPECIAL - MISCELLANEOUS METAL, (5000 LB)
Awd $8,250.00$1.65
2 $8,750.00$1.75
3 $25,000.00$5.00
Section 3 - DRAINAGE - Totals
Awd $43,350.00
2 $43,889.00
3 $34,750.00
Ref #6 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, (50 SY)
Awd $17,500.00$350.00
2 $18,750.00$375.00
3 $12,500.00$250.00
Ref #7 253E01001 PAVEMENT REPAIR, AS PER PLAN, (2525 SY)
Awd $138,875.00$55.00
2 $151,500.00$60.00
3 $189,375.00$75.00
Ref #8 421E10011 MICROSURFACING, SURFACE COURSE, AS PER PLAN, (30869 SY)
Awd $70,381.32$2.28
2 $95,385.21$3.09
3 $54,638.13$1.77
160176 - Page 124
Ref #9 421E10021 MICROSURFACING, LEVELING COURSE, AS PER PLAN, (30869 SY)
Awd $66,368.35$2.15
2 $106,806.74$3.46
3 $54,638.13$1.77
Ref #10 423E00220 CRACK SEALING, TYPE II OR TYPE III, (30869 SY)
Awd $12,038.91$0.39
2 $23,460.44$0.76
3 $15,434.50$0.50
Ref #11 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, (134 SY)
Awd $6,700.00$50.00
2 $8,040.00$60.00
3 $10,050.00$75.00
Section 4 - PAVEMENT - Totals
Awd $311,863.58
2 $403,942.39
3 $336,635.76
Ref #12 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN, (3 EACH)
Awd $1,950.00$650.00
2 $1,965.00$655.00
3 $750.00$250.00
Section 5 - WATER WORK - Totals
Awd $1,950.00
2 $1,965.00
3 $750.00
Ref #13 646E10100 LANE LINE, 4", (2.34 MILE)
Awd $6,084.00$2,600.00
2 $6,318.00$2,700.00
3 $6,072.30$2,595.00
Ref #14 646E10200 CENTER LINE, (1.15 MILE)
Awd $5,635.00$4,900.00
2 $4,600.00$4,000.00
3 $5,612.00$4,880.00
Ref #15 646E10300 CHANNELIZING LINE, 8", (364 FT)
Awd $1,001.00$2.75
2 $728.00$2.00
3 $1,001.00$2.75
Ref #16 646E10400 STOP LINE, (162 FT)
Awd $1,863.00$11.50
2 $2,025.00$12.50
3 $1,863.00$11.50
Ref #17 646E10500 CROSSWALK LINE, (254 FT)
Awd $1,905.00$7.50
2 $1,651.00$6.50
3 $63,500.00$250.00
160176 - Page 125
Ref #18 646E20300 LANE ARROW, (4 EACH)
Awd $1,000.00$250.00
2 $680.00$170.00
3 $10.80$2.70
Ref #19 646E20502 DOTTED LINE, 4", (160 FT)
Awd $432.00$2.70
2 $496.00$3.10
3 $146,400.00$915.00
Ref #20 690E98400 SPECIAL - MISC.: INVENTORY EXISTING PAVEMENT MARKI, (LUMP SUM)
Awd $915.00$915.00
2 $1,500.00$1,500.00
3 $1,500.00$1,500.00
Section 6 - TRAFFIC CONTROL - Totals
Awd $18,835.00
2 $17,998.00
3 $225,959.10
Ref #21 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (80 HOUR)
Awd $4,800.00$60.00
2 $5,600.00$70.00
3 $6,000.00$75.00
Ref #22 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (10 CY)
Awd $3,500.00$350.00
2 $3,550.00$355.00
3 $2,500.00$250.00
Ref #23 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (60 DAY)
Awd $2,100.00$35.00
2 $1,980.00$33.00
3 $1,800.00$30.00
Ref #24 614E20100 WORK ZONE LANE LINE, CLASS I, 642 PAINT, (2.34 MILE)
Awd $631.80$270.00
2 $1,287.00$550.00
3 $1,170.00$500.00
Ref #25 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (2.34 MILE)
Awd $432.90$185.00
2 $1,287.00$550.00
3 $1,170.00$500.00
Ref #26 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (1.15 MILE)
Awd $609.50$530.00
2 $1,265.00$1,100.00
3 $1,150.00$1,000.00
Ref #27 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (1.15 MILE)
Awd $517.50$450.00
2 $1,265.00$1,100.00
3 $1,150.00$1,000.00
Ref #28 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 642 PAINT, (364 FT)
Awd $200.20$0.55
2 $240.24$0.66
3 $236.60$0.65
160176 - Page 126
Ref #29 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (364 FT)
Awd $182.00$0.50
2 $240.24$0.66
3 $236.60$0.65
Ref #30 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, (160 FT)
Awd $80.00$0.50
2 $161.60$1.01
3 $160.00$1.00
Ref #31 614E24610 WORK ZONE DOTTED LINE, CLASS III, 642 PAINT, (160 FT)
Awd $72.00$0.45
2 $161.60$1.01
3 $160.00$1.00
Ref #32 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (162 FT)
Awd $405.00$2.50
2 $534.60$3.30
3 $486.00$3.00
Ref #33 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (162 FT)
Awd $388.80$2.40
2 $534.60$3.30
3 $486.00$3.00
Ref #34 614E27200 WORK ZONE CROSSWALK LINE, CLASS I, 642 PAINT, (254 FT)
Awd $571.50$2.25
2 $533.40$2.10
3 $508.00$2.00
Ref #35 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT, (254 FT)
Awd $546.10$2.15
2 $533.40$2.10
3 $508.00$2.00
Ref #36 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT, (4 EACH)
Awd $220.00$55.00
2 $184.00$46.00
3 $180.00$45.00
Ref #37 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT, (4 EACH)
Awd $200.00$50.00
2 $184.00$46.00
3 $180.00$45.00
Ref #38 630E97800 SIGNING, MISC.:ADDITIONAL SIGNS, GROUND MOUNTED, A, (300 SF)
Awd $3,750.00$12.50
2 $5,100.00$17.00
3 $4,800.00$16.00
Section 7 - MAINTENANCE OF TRAFFIC - Totals
Awd $19,207.30
2 $24,641.68
3 $22,881.20
Ref #39 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $2,500.00$2,500.00
3 $3,000.00$3,000.00
160176 - Page 127
Ref #40 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $53,000.00$53,000.00
2 $69,000.00$69,000.00
3 $45,000.00$45,000.00
Ref #41 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN, (4 MNTH)
Awd $4,000.00$1,000.00
2 $4,400.00$1,100.00
3 $8,000.00$2,000.00
Ref #42 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $500.00$500.00
3 $1,000.00$1,000.00
Ref #43 624E10000 MOBILIZATION, (LUMP SUM)
Awd $18,500.00$18,500.00
2 $38,000.00$38,000.00
3 $37,000.00$37,000.00
Section 8 - INCIDENTALS - Totals
Awd $78,500.00
2 $114,400.00
3 $94,000.00
160176 - Page 128
Project No. 160177
PID 100158
CUY-St. Clair Avenue
Federal
Type: FOUR LANE RESURFACING
Completion Date: 10/14/2016
Award Amount: $4,397,707.30
Contract Awarded To: PERK COMPANY INC
Letting Date: 4/7/2016
Engineer's Estimate: $4,069,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
PERK COMPANY INC
8100 GRAND AVE SUITE 300
CLEVELAND, OH 44104-3110
Bidder 1
Bid $4,397,707.30
VANDRA BROTHERS CONSTRUCTION INC
24629 BROADWAY AVE
OAKWOOD VILLAGE, OH 44146
Cuyahoga
Bidder 2
Bid $4,769,735.35
FABRIZI TRUCKING & PAVING CO INC
389 COLUMBIA RD
VALLEY CITY, OH 44280
Medina
Bidder 3
Bid $4,798,894.00
KARVO COMPANIES INC
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 4
Bid $4,882,215.65
160177 - Page 129
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $37,500.00$37,500.00
2 $10,000.00$10,000.00
3 $5,000.00$5,000.00
4 $2,350.00$2,350.00
Ref #2 204E10000 SUBGRADE COMPACTION, (311 SY)
Awd $933.00$3.00
2 $622.00$2.00
3 $1,555.00$5.00
4 $622.00$2.00
Ref #3 608E13001 6" CONCRETE WALK, AS PER PLAN, (75290 SF)
Awd $527,030.00$7.00
2 $602,320.00$8.00
3 $496,914.00$6.60
4 $542,088.00$7.20
Ref #4 608E52001 CURB RAMP, AS PER PLAN, (8970 SF)
Awd $271,791.00$30.30
2 $215,280.00$24.00
3 $125,580.00$14.00
4 $115,264.50$12.85
Ref #5 608E53011 TRUNCATED DOMES, AS PER PLAN, (120 SF)
Awd $1,200.00$10.00
2 $12,000.00$100.00
3 $2,160.00$18.00
4 $12,240.00$102.00
Ref #6 623E38501 MONUMENT ASSEMBLY, AS PER PLAN, (3 EACH)
Awd $2,250.00$750.00
2 $3,300.00$1,100.00
3 $2,850.00$950.00
4 $2,400.00$800.00
Ref #7 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN, (24 EACH)
Awd $18,000.00$750.00
2 $21,600.00$900.00
3 $18,000.00$750.00
4 $11,640.00$485.00
Ref #8 623E40900 MONUMENT, MISC.: MONUMENT REFERENCING, (24 EACH)
Awd $2,400.00$100.00
2 $4,800.00$200.00
3 $15,600.00$650.00
4 $600.00$25.00
Ref #9 625E75501 LIGHT POLE FOUNDATION REMOVED, AS PER PLAN, (14 EACH)
Awd $6,300.00$450.00
2 $7,000.00$500.00
3 $30,800.00$2,200.00
4 $4,200.00$300.00
Ref #10 690E98000 SPECIAL - MISC.: TREE PIT AND GRATE REMOVED, (15 EACH)
Awd $9,000.00$600.00
2 $11,250.00$750.00
3 $14,250.00$950.00
4 $4,500.00$300.00
160177 - Page 130
Section 1 - ROADWAY - Totals
Awd $876,404.00
2 $888,172.00
3 $712,709.00
4 $695,904.50
Ref #11 659E00500 SEEDING AND MULCHING, CLASS 1, HIGH QUALITY, (2180 SY)
Awd $26,160.00$12.00
2 $15,260.00$7.00
3 $8,720.00$4.00
4 $5,450.00$2.50
Ref #12 832E30001 EROSION CONTROL, AS PER PLAN, (20000 EACH)
Awd $20,000.00$1.00
2 $20,000.00$1.00
3 $20,000.00$1.00
4 $20,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $46,160.00
2 $35,260.00
3 $28,720.00
4 $25,450.00
Ref #13 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS, (1200 FT)
Awd $8,400.00$7.00
2 $15,600.00$13.00
3 $12,000.00$10.00
4 $13,200.00$11.00
Ref #14 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, (1200 FT)
Awd $8,700.00$7.25
2 $18,000.00$15.00
3 $13,200.00$11.00
4 $13,200.00$11.00
Ref #15 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN, (103 EACH)
Awd $51,500.00$500.00
2 $97,850.00$950.00
3 $118,450.00$1,150.00
4 $96,820.00$940.00
Ref #16 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN, (50 EACH)
Awd $55,000.00$1,100.00
2 $65,000.00$1,300.00
3 $85,000.00$1,700.00
4 $60,000.00$1,200.00
Ref #17 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (87 EACH)
Awd $69,600.00$800.00
2 $69,600.00$800.00
3 $95,700.00$1,100.00
4 $81,780.00$940.00
160177 - Page 131
Ref #18 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN, (25 EACH)
Awd $27,500.00$1,100.00
2 $22,500.00$900.00
3 $38,750.00$1,550.00
4 $38,750.00$1,550.00
Ref #19 611E99820 SPECIAL - MISCELLANEOUS METAL, (80000 LB)
Awd $120,000.00$1.50
2 $120,000.00$1.50
3 $100,000.00$1.25
4 $200,000.00$2.50
Ref #20 613E41250 LOW STRENGTH MORTAR BACKFILL (TYPE 1), (100 CY)
Awd $4,000.00$40.00
2 $7,500.00$75.00
3 $7,500.00$75.00
4 $8,000.00$80.00
Section 3 - DRAINAGE - Totals
Awd $344,700.00
2 $416,050.00
3 $470,600.00
4 $511,750.00
Ref #21 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, (3950 SY)
Awd $79,000.00$20.00
2 $79,000.00$20.00
3 $138,250.00$35.00
4 $165,900.00$42.00
Ref #22 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (T, (78902 SY)
Awd $252,486.40$3.20
2 $236,706.00$3.00
3 $236,706.00$3.00
4 $295,882.50$3.75
Ref #23 255E10161 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (1975 SY)
Awd $98,750.00$50.00
2 $246,875.00$125.00
3 $189,600.00$96.00
4 $237,000.00$120.00
Ref #24 304E20001 AGGREGATE BASE, AS PER PLAN, (53 CY)
Awd $3,975.00$75.00
2 $3,975.00$75.00
3 $3,975.00$75.00
4 $7,155.00$135.00
Ref #25 407E10000 TACK COAT (0.10 GAL/SY), (7924 GAL)
Awd $14,659.40$1.85
2 $15,848.00$2.00
3 $19,810.00$2.50
4 $13,074.60$1.65
Ref #26 407E14000 TACK COAT FOR INTERMEDIATE COURSE (0.075 GAL/SY), (5942 GAL)
Awd $10,992.70$1.85
2 $11,884.00$2.00
3 $14,855.00$2.50
4 $9,804.30$1.65
160177 - Page 132
Ref #27 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (2601 CY)
Awd $416,160.00$160.00
2 $429,165.00$165.00
3 $462,978.00$178.00
4 $410,958.00$158.00
Ref #28 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (176 CY)
Awd $58,080.00$330.00
2 $58,080.00$330.00
3 $66,000.00$375.00
4 $56,320.00$320.00
Ref #29 441E50201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (779 CY)
Awd $75,134.55$96.45
2 $75,563.00$97.00
3 $85,690.00$110.00
4 $98,154.00$126.00
Ref #30 441E50301 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (3663 CY)
Awd $476,190.00$130.00
2 $494,505.00$135.00
3 $531,135.00$145.00
4 $472,527.00$129.00
Ref #31 451E20000 REINFORCED CONCRETE PAVEMENT, MISC.:12" REINFORCED, (311 SY)
Awd $40,430.00$130.00
2 $40,430.00$130.00
3 $29,856.00$96.00
4 $49,138.00$158.00
Ref #32 452E12051 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, , (3530 SY)
Awd $300,050.00$85.00
2 $310,640.00$88.00
3 $282,400.00$80.00
4 $423,600.00$120.00
Ref #33 609E14001 CURB, TYPE 2-A, AS PER PLAN, (73 FT)
Awd $912.50$12.50
2 $1,095.00$15.00
3 $3,285.00$45.00
4 $1,460.00$20.00
Ref #34 609E26001 CURB, TYPE 6, AS PER PLAN, (12390 FT)
Awd $334,530.00$27.00
2 $379,629.60$30.64
3 $384,090.00$31.00
4 $297,360.00$24.00
Ref #35 609E98000 CURB, MISC.: GRANITE CURB, AS PER PLAN, (430 FT)
Awd $120,400.00$280.00
2 $51,600.00$120.00
3 $36,550.00$85.00
4 $86,000.00$200.00
Ref #36 690E98700 SPECIAL - MISC.: CONCRETE MIX DESIGN FOR CLASS QC , (100 CY)
Awd $5,000.00$50.00
2 $2,000.00$20.00
3 $3,000.00$30.00
4 $11,200.00$112.00
160177 - Page 133
Section 4 - PAVEMENT - Totals
Awd $2,286,750.55
2 $2,436,995.60
3 $2,488,180.00
4 $2,635,533.40
Ref #37 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN, (279 EACH)
Awd $167,400.00$600.00
2 $195,300.00$700.00
3 $184,140.00$660.00
4 $135,315.00$485.00
Ref #38 638E10901 SERVICE BOX ADJUSTED TO GRADE, AS PER PLAN, (50 EACH)
Awd $500.00$10.00
2 $7,500.00$150.00
3 $17,500.00$350.00
4 $20,000.00$400.00
Ref #39 638E98000 WATER WORK, MISC.: WATER MANHOLE ADJUSTED TO GRADE, (34 EACH)
Awd $17,000.00$500.00
2 $27,200.00$800.00
3 $32,300.00$950.00
4 $78,200.00$2,300.00
Ref #40 638E98000 WATER WORK, MISC.: WATER MANHOLE RECONSTRUCTED TO , (12 EACH)
Awd $14,400.00$1,200.00
2 $10,800.00$900.00
3 $30,000.00$2,500.00
4 $34,800.00$2,900.00
Ref #41 638E98000 WATER WORK, MISC.: WATER METER ADJUSTED TO GRADE, , (74 EACH)
Awd $37,000.00$500.00
2 $40,700.00$550.00
3 $99,900.00$1,350.00
4 $74,000.00$1,000.00
Section 5 - WATER WORK - Totals
Awd $236,300.00
2 $281,500.00
3 $363,840.00
4 $342,315.00
Ref #42 632E26501 DETECTOR LOOP, AS PER PLAN, (17 EACH)
Awd $16,745.00$985.00
2 $15,300.00$900.00
3 $18,700.00$1,100.00
4 $16,745.00$985.00
Ref #43 644E00200 LANE LINE, 4", (4.06 MILE)
Awd $6,090.00$1,500.00
2 $6,090.00$1,500.00
3 $6,699.00$1,650.00
4 $6,090.00$1,500.00
160177 - Page 134
Ref #44 644E00300 CENTER LINE, (2.17 MILE)
Awd $11,284.00$5,200.00
2 $11,284.00$5,200.00
3 $12,586.00$5,800.00
4 $11,284.00$5,200.00
Ref #45 644E00400 CHANNELIZING LINE, 8", (280 FT)
Awd $350.00$1.25
2 $350.00$1.25
3 $420.00$1.50
4 $350.00$1.25
Ref #46 644E00500 STOP LINE, (1253 FT)
Awd $7,518.00$6.00
2 $7,518.00$6.00
3 $8,771.00$7.00
4 $7,518.00$6.00
Ref #47 644E00600 CROSSWALK LINE, (6245 FT)
Awd $17,173.75$2.75
2 $17,173.75$2.75
3 $18,735.00$3.00
4 $17,173.75$2.75
Ref #48 644E00700 TRANSVERSE/DIAGONAL LINE, (180 FT)
Awd $990.00$5.50
2 $990.00$5.50
3 $1,170.00$6.50
4 $990.00$5.50
Ref #49 644E00900 ISLAND MARKING, (25 SF)
Awd $75.00$3.00
2 $75.00$3.00
3 $87.50$3.50
4 $75.00$3.00
Ref #50 644E01300 LANE ARROW, (5 EACH)
Awd $625.00$125.00
2 $625.00$125.00
3 $750.00$150.00
4 $625.00$125.00
Ref #51 644E01500 DOTTED LINE, 4", (154 FT)
Awd $462.00$3.00
2 $462.00$3.00
3 $539.00$3.50
4 $462.00$3.00
Section 6 - TRAFFIC CONTROL - Totals
Awd $61,312.75
2 $59,867.75
3 $68,457.50
4 $61,312.75
Ref #52 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (150 CY)
Awd $15,000.00$100.00
2 $7,500.00$50.00
3 $9,750.00$65.00
4 $2,850.00$19.00
160177 - Page 135
Ref #53 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (120 HOUR)
Awd $9,000.00$75.00
2 $7,200.00$60.00
3 $7,800.00$65.00
4 $9,000.00$75.00
Ref #54 614E11130 LAW ENFORCEMENT OFFICER FOR ASSISTANCE, (120 HOUR)
Awd $7,800.00$65.00
2 $6,000.00$50.00
3 $6,600.00$55.00
4 $9,000.00$75.00
Ref #55 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (200 CY)
Awd $20,000.00$100.00
2 $20,000.00$100.00
3 $50,000.00$250.00
4 $38,000.00$190.00
Ref #56 616E10000 WATER, (150 MGAL)
Awd $1,500.00$10.00
2 $150.00$1.00
3 $1,500.00$10.00
4 $1,500.00$10.00
Ref #57 616E20000 CALCIUM CHLORIDE, (60 TON)
Awd $7,500.00$125.00
2 $6,000.00$100.00
3 $27,000.00$450.00
4 $600.00$10.00
Section 7 - MAINTENANCE OF TRAFFIC - Totals
Awd $60,800.00
2 $46,850.00
3 $102,650.00
4 $60,950.00
Ref #58 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $30,000.00$30,000.00
3 $75,000.00$75,000.00
4 $40,000.00$40,000.00
Ref #59 614E11001 MAINTAINING TRAFFIC, AS PER PLAN, (LUMP SUM)
Awd $274,405.00$274,405.00
2 $337,040.00$337,040.00
3 $285,000.00$285,000.00
4 $325,000.00$325,000.00
Ref #60 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN, (9 MNTH)
Awd $27,000.00$3,000.00
2 $18,000.00$2,000.00
3 $31,500.00$3,500.00
4 $18,000.00$2,000.00
Ref #61 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $30,000.00$30,000.00
3 $35,000.00$35,000.00
4 $16,000.00$16,000.00
160177 - Page 136
Ref #62 624E10000 MOBILIZATION, (LUMP SUM)
Awd $148,875.00$148,875.00
2 $190,000.00$190,000.00
3 $137,237.50$137,237.50
4 $150,000.00$150,000.00
Section 8 - INCIDENTALS - Totals
Awd $485,280.00
2 $605,040.00
3 $563,737.50
4 $549,000.00
160177 - Page 137
Project No. 160178
PID 93198
COS-BP FY 2016
Federal
Type: BRIDGE PAINTING
Completion Date: 9/30/2016
Award Amount: $936,987.60
Contract Awarded To: PANTHER INDUSTRIAL PAINTING LLC
Letting Date: 4/7/2016
Engineer's Estimate: $957,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
PANTHER INDUSTRIAL PAINTING LLC
15790 SPRINGMILL DR
MISHAWAKA, IN 46545-1600
Bidder 1
Bid $936,987.60
CORROSION RESISTANCE LTD
4524 HUDSON DR
STOW, OH 44224
Summit
Bidder 2
Bid $965,407.88
UCL INC
2025 STAPLETON CT
CINCINNATI, OH 45240-2779
Bidder 3
Bid $986,850.00
360 CONSTRUCTION COMPANY INC
1252 INDUSTRIAL PARKWAY NORTH SUITE 1
BRUNSWICK, OH 44212
Medina
Bidder 4
Bid $1,050,103.00
ELITE CONTRACTORS INC
114 PIN OAK PLACE
CAMPBELL, OH 44405
Mahoning
Bidder 5
Bid $1,447,443.32
160178 - Page 138
Ref #1 832E30000 EROSION CONTROL, (4000 EACH)
Awd $4,000.00$1.00
2 $4,000.00$1.00
3 $4,000.00$1.00
4 $4,000.00$1.00
5 $4,000.00$1.00
Section 1 - EROSION CONTROL - Totals
Awd $4,000.00
2 $4,000.00
3 $4,000.00
4 $4,000.00
5 $4,000.00
Ref #2 202E98000 REMOVAL MISC.:, BEAM SEAT DEBRIS, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $2,000.00$2,000.00
3 $2,000.00$2,000.00
4 $750.00$750.00
5 $1,000.00$1,000.00
Ref #3 202E98100 REMOVAL MISC.:, WELDED STEEL BRACKETS, (53 EACH)
Awd $12,799.50$241.50
2 $12,190.00$230.00
3 $12,190.00$230.00
4 $15,900.00$300.00
5 $12,190.00$230.00
Ref #4 513E95000 STRUCTURAL STEEL, MISC.:, REPAIR OF DAMAGED MAIN O, (3 FT)
Awd $2,110.50$703.50
2 $2,010.00$670.00
3 $2,010.00$670.00
4 $1,350.00$450.00
5 $2,010.00$670.00
Ref #5 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (791 SF)
Awd $26,103.00$33.00
2 $37,968.00$48.00
3 $19,775.00$25.00
4 $31,640.00$40.00
5 $39,550.00$50.00
Ref #6 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (791 SF)
Awd $3,955.00$5.00
2 $5,932.50$7.50
3 $3,955.00$5.00
4 $7,910.00$10.00
5 $11,865.00$15.00
Ref #7 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (791 SF)
Awd $3,955.00$5.00
2 $6,328.00$8.00
3 $3,955.00$5.00
4 $3,955.00$5.00
5 $11,865.00$15.00
160178 - Page 139
Ref #8 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (791 SF)
Awd $3,955.00$5.00
2 $6,335.91$8.01
3 $3,955.00$5.00
4 $3,955.00$5.00
5 $11,865.00$15.00
Ref #9 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (3 MNHR)
Awd $600.00$200.00
2 $135.00$45.00
3 $255.00$85.00
4 $375.00$125.00
5 $240.00$80.00
Ref #10 514E10000 FINAL INSPECTION REPAIR, (2 EACH)
Awd $300.00$150.00
2 $500.00$250.00
3 $300.00$150.00
4 $300.00$150.00
5 $400.00$200.00
Ref #11 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (A), (56 FT)
Awd $5,600.00$100.00
2 $6,860.00$122.50
3 $1,680.00$30.00
4 $5,600.00$100.00
5 $1,680.00$30.00
Section 2 - STRUCTURE 20 FOOT SPAN AND OVER (COS-751 - Totals
Awd $61,378.00
2 $80,259.41
3 $50,075.00
4 $71,735.00
5 $92,665.00
Ref #12 202E98000 REMOVAL MISC.:, BEAM SEAT DEBRIS, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $2,000.00$2,000.00
3 $2,000.00$2,000.00
4 $750.00$750.00
5 $1,000.00$1,000.00
Ref #13 202E98100 REMOVAL MISC.:, BEARING PLATES, (16 EACH)
Awd $6,300.00$393.75
2 $6,000.00$375.00
3 $6,000.00$375.00
4 $5,600.00$350.00
5 $6,000.00$375.00
Ref #14 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (163 SY)
Awd $5,705.00$35.00
2 $10,595.00$65.00
3 $3,260.00$20.00
4 $4,890.00$30.00
5 $6,520.00$40.00
160178 - Page 140
Ref #15 513E21500 REPLACEMENT OF DETERIORATED END CROSSFRAMES, (400 LB)
Awd $6,300.00$15.75
2 $13,904.00$34.76
3 $10,000.00$25.00
4 $9,200.00$23.00
5 $6,000.00$15.00
Ref #16 513E95000 STRUCTURAL STEEL, MISC.:, REPAIR OF DAMAGED MAIN O, (3 FT)
Awd $2,110.50$703.50
2 $2,051.91$683.97
3 $2,010.00$670.00
4 $1,275.00$425.00
5 $2,010.00$670.00
Ref #17 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (12608 SF)
Awd $105,024.64$8.33
2 $94,560.00$7.50
3 $100,864.00$8.00
4 $100,864.00$8.00
5 $126,080.00$10.00
Ref #18 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (12608 SF)
Awd $18,912.00$1.50
2 $25,216.00$2.00
3 $25,216.00$2.00
4 $25,216.00$2.00
5 $34,672.00$2.75
Ref #19 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (12608 SF)
Awd $18,912.00$1.50
2 $25,216.00$2.00
3 $25,216.00$2.00
4 $25,216.00$2.00
5 $34,672.00$2.75
Ref #20 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (12608 SF)
Awd $18,912.00$1.50
2 $25,216.00$2.00
3 $12,608.00$1.00
4 $25,216.00$2.00
5 $34,672.00$2.75
Ref #21 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (20 MNHR)
Awd $4,000.00$200.00
2 $900.00$45.00
3 $1,700.00$85.00
4 $2,500.00$125.00
5 $1,600.00$80.00
Ref #22 514E10000 FINAL INSPECTION REPAIR, (13 EACH)
Awd $1,950.00$150.00
2 $3,250.00$250.00
3 $1,950.00$150.00
4 $1,950.00$150.00
5 $2,600.00$200.00
160178 - Page 141
Ref #23 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.:HOT APPLIE, (156 FT)
Awd $27,300.00$175.00
2 $6,708.00$43.00
3 $4,680.00$30.00
4 $4,680.00$30.00
5 $4,680.00$30.00
Ref #24 516E31011 2" DEEP JOINT SEALER, AS PER PLAN (A), (156 FT)
Awd $12,285.00$78.75
2 $6,708.00$43.00
3 $4,680.00$30.00
4 $15,600.00$100.00
5 $4,680.00$30.00
Ref #25 516E46801 REFURBISH AND RESET BEARING, AS PER PLAN, (16 EACH)
Awd $12,000.00$750.00
2 $12,000.00$750.00
3 $12,000.00$750.00
4 $5,200.00$325.00
5 $12,000.00$750.00
Ref #26 516E46900 BEARING DEVICE, MISC.:, ROCKER MASONRY PLATE, AS P, (16 EACH)
Awd $3,360.00$210.00
2 $10,578.56$661.16
3 $8,800.00$550.00
4 $15,200.00$950.00
5 $3,200.00$200.00
Ref #27 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)
Awd $12,600.00$12,600.00
2 $12,000.00$12,000.00
3 $12,000.00$12,000.00
4 $5,000.00$5,000.00
5 $12,000.00$12,000.00
Ref #28 519E11600 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.:, SID, (65 SF)
Awd $5,187.00$79.80
2 $16,250.00$250.00
3 $6,500.00$100.00
4 $13,000.00$200.00
5 $39,000.00$600.00
Ref #29 519E12300 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE B, (4 SY)
Awd $7,560.00$1,890.00
2 $9,200.00$2,300.00
3 $3,600.00$900.00
4 $6,000.00$1,500.00
5 $7,200.00$1,800.00
Section 3 - STRUCTURE 20 FOOT SPAN AND OVER (KNO-13- - Totals
Awd $270,418.14
2 $282,353.47
3 $243,084.00
4 $267,357.00
5 $338,586.00
160178 - Page 142
Ref #30 202E98000 REMOVAL MISC.:, BEAM SEAT DEBRIS, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $2,000.00$2,000.00
3 $2,000.00$2,000.00
4 $750.00$750.00
5 $1,000.00$1,000.00
Ref #31 513E95000 STRUCTURAL STEEL, MISC.:, REPAIR OF DAMAGED MAIN O, (5 FT)
Awd $4,200.00$840.00
2 $4,000.00$800.00
3 $4,000.00$800.00
4 $3,750.00$750.00
5 $4,000.00$800.00
Ref #32 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (29596 SF)
Awd $246,534.68$8.33
2 $133,182.00$4.50
3 $236,768.00$8.00
4 $236,768.00$8.00
5 $235,288.20$7.95
Ref #33 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (29596 SF)
Awd $44,394.00$1.50
2 $59,192.00$2.00
3 $59,192.00$2.00
4 $59,192.00$2.00
5 $81,389.00$2.75
Ref #34 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (29596 SF)
Awd $44,394.00$1.50
2 $59,192.00$2.00
3 $59,192.00$2.00
4 $29,596.00$1.00
5 $81,389.00$2.75
Ref #35 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (29596 SF)
Awd $44,394.00$1.50
2 $59,192.00$2.00
3 $29,596.00$1.00
4 $59,192.00$2.00
5 $81,389.00$2.75
Ref #36 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (44 MNHR)
Awd $8,800.00$200.00
2 $1,980.00$45.00
3 $3,740.00$85.00
4 $5,500.00$125.00
5 $3,080.00$70.00
Ref #37 514E10000 FINAL INSPECTION REPAIR, (29 EACH)
Awd $4,350.00$150.00
2 $8,700.00$300.00
3 $4,350.00$150.00
4 $4,350.00$150.00
5 $5,800.00$200.00
160178 - Page 143
Section 4 - STRUCTURE 20 FOOT SPAN AND OVER (LIC-70- - Totals
Awd $399,066.68
2 $327,438.00
3 $398,838.00
4 $399,098.00
5 $493,335.20
Ref #38 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (2 CY)
Awd $2,940.00$1,470.00
2 $3,200.00$1,600.00
3 $4,000.00$2,000.00
4 $40,000.00$20,000.00
5 $3,000.00$1,500.00
Ref #39 202E98000 REMOVAL MISC.:, BEAM SEAT DEBRIS, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $2,000.00$2,000.00
3 $2,000.00$2,000.00
4 $750.00$750.00
5 $1,000.00$1,000.00
Ref #40 511E53012 CLASS QC2 CONCRETE, MISC.: ACCELERATING ADMIXTURE, (2 CY)
Awd $9,240.00$4,620.00
2 $9,200.00$4,600.00
3 $15,000.00$7,500.00
4 $3,000.00$1,500.00
5 $9,000.00$4,500.00
Ref #41 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (7066 SF)
Awd $58,859.78$8.33
2 $84,792.00$12.00
3 $56,528.00$8.00
4 $56,528.00$8.00
5 $127,188.00$18.00
Ref #42 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (7066 SF)
Awd $10,599.00$1.50
2 $14,132.00$2.00
3 $14,132.00$2.00
4 $28,264.00$4.00
5 $31,373.04$4.44
Ref #43 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (7066 SF)
Awd $10,599.00$1.50
2 $14,132.00$2.00
3 $14,132.00$2.00
4 $28,264.00$4.00
5 $31,373.04$4.44
Ref #44 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (7066 SF)
Awd $10,599.00$1.50
2 $14,132.00$2.00
3 $7,066.00$1.00
4 $14,132.00$2.00
5 $31,373.04$4.44
160178 - Page 144
Ref #45 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (17 MNHR)
Awd $3,400.00$200.00
2 $765.00$45.00
3 $1,445.00$85.00
4 $2,125.00$125.00
5 $1,190.00$70.00
Ref #46 514E10000 FINAL INSPECTION REPAIR, (11 EACH)
Awd $1,650.00$150.00
2 $2,750.00$250.00
3 $1,650.00$150.00
4 $1,650.00$150.00
5 $2,200.00$200.00
Ref #47 516E31011 2" DEEP JOINT SEALER, AS PER PLAN(B), (80 FT)
Awd $8,000.00$100.00
2 $6,320.00$79.00
3 $2,400.00$30.00
4 $9,600.00$120.00
5 $2,400.00$30.00
Ref #48 519E11600 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.:, PIE, (18 SF)
Awd $6,048.00$336.00
2 $8,172.00$454.00
3 $4,500.00$250.00
4 $3,600.00$200.00
5 $5,760.00$320.00
Ref #49 519E12300 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE B, (2 SY)
Awd $6,090.00$3,045.00
2 $8,762.00$4,381.00
3 $4,000.00$2,000.00
4 $3,000.00$1,500.00
5 $6,000.00$3,000.00
Section 5 - STRUCTURE 20 FOOT SPAN AND OVER (LIC-657 - Totals
Awd $130,024.78
2 $168,357.00
3 $126,853.00
4 $190,913.00
5 $251,857.12
Ref #50 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $21,000.00$21,000.00
3 $8,000.00$8,000.00
4 $10,000.00$10,000.00
5 $12,000.00$12,000.00
Ref #51 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $25,000.00$25,000.00
3 $32,000.00$32,000.00
4 $80,000.00$80,000.00
5 $60,000.00$60,000.00
160178 - Page 145
Ref #52 619E16000 FIELD OFFICE, TYPE A, (4 MNTH)
Awd $2,000.00$500.00
2 $6,000.00$1,500.00
3 $48,000.00$12,000.00
4 $6,000.00$1,500.00
5 $4,000.00$1,000.00
Ref #53 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $100.00$100.00
2 $1,000.00$1,000.00
3 $7,500.00$7,500.00
4 $1,000.00$1,000.00
5 $1,000.00$1,000.00
Ref #54 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $50,000.00$50,000.00
3 $68,500.00$68,500.00
4 $20,000.00$20,000.00
5 $190,000.00$190,000.00
Section 6 - INCIDENTALS - Totals
Awd $72,100.00
2 $103,000.00
3 $164,000.00
4 $117,000.00
5 $267,000.00
160178 - Page 146
Project No. 160179
PID 101959
DEL-SP FY 16 Gen
Federal
Type: SPOT PATCHING
Completion Date: 10/15/2016
Award Amount: $866,867.65
Contract Awarded To: STRAWSER PAVING CO INC
Letting Date: 4/7/2016
Engineer's Estimate: $836,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
STRAWSER PAVING CO INC
1595 FRANK RD
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $866,867.65
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 2
Bid $1,059,000.00
KARVO COMPANIES INC
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 3
Bid $1,139,496.86
160179 - Page 147
Ref #1 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
Section 1 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
Ref #2 605E31100 AGGREGATE DRAINS, (2304 FT)
Awd $34,560.00$15.00
2 $28,800.00$12.50
3 $34,560.00$15.00
Section 2 - DRAINAGE - Totals
Awd $34,560.00
2 $28,800.00
3 $34,560.00
Ref #3 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, TYPE A, (1471 SY)
Awd $91,937.50$62.50
2 $94,144.00$64.00
3 $67,666.00$46.00
Ref #4 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, TYPE B, (5306 SY)
Awd $113,548.40$21.40
2 $122,038.00$23.00
3 $100,814.00$19.00
Ref #5 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, TYPE C, (96 SY)
Awd $5,222.40$54.40
2 $6,432.00$67.00
3 $4,800.00$50.00
Ref #6 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, TYPE D, (549 SY)
Awd $14,438.70$26.30
2 $20,862.00$38.00
3 $19,215.00$35.00
Ref #7 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, TYPE E, (17 SY)
Awd $9,265.00$545.00
2 $27,200.00$1,600.00
3 $374.00$22.00
Ref #8 252E01500 FULL DEPTH PAVEMENT SAWING, (23058 FT)
Awd $20,752.20$0.90
2 $3,458.70$0.15
3 $11,529.00$0.50
Ref #9 253E02001 PAVEMENT REPAIR, AS PER PLAN, TYPE A, (2000 CY)
Awd $334,400.00$167.20
2 $414,000.00$207.00
3 $512,000.00$256.00
160179 - Page 148
Ref #10 253E02001 PAVEMENT REPAIR, AS PER PLAN, TYPE B, (500 CY)
Awd $100,000.00$200.00
2 $118,500.00$237.00
3 $131,000.00$262.00
Section 3 - PAVEMENT - Totals
Awd $689,564.20
2 $806,634.70
3 $847,398.00
Ref #11 621E00100 RPM, (164 EACH)
Awd $4,264.00$26.00
2 $6,558.36$39.99
3 $4,147.56$25.29
Ref #12 621E54000 RAISED PAVEMENT MARKER REMOVED, (10 EACH)
Awd $150.00$15.00
2 $80.00$8.00
3 $100.00$10.00
Ref #13 642E00094 EDGE LINE, 6", (5.09 MILE)
Awd $3,563.00$700.00
2 $3,496.83$687.00
3 $3,919.30$770.00
Ref #14 642E00290 CENTER LINE, (0.08 MILE)
Awd $110.40$1,380.00
2 $100.64$1,258.00
3 $120.00$1,500.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $8,087.40
2 $10,235.83
3 $8,286.86
Ref #15 632E26500 DETECTOR LOOP, (8 EACH)
Awd $18,000.00$2,250.00
2 $17,200.00$2,150.00
3 $9,600.00$1,200.00
Ref #16 632E27200 LOOP DETECTOR TIE IN, (8 EACH)
Awd $880.00$110.00
2 $800.00$100.00
3 $1,200.00$150.00
Section 5 - TRAFFIC SIGNALS - Totals
Awd $18,880.00
2 $18,000.00
3 $10,800.00
Ref #17 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (120 HOUR)
Awd $7,440.00$62.00
2 $8,400.00$70.00
3 $7,800.00$65.00
160179 - Page 149
Ref #18 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (0.02 MILE)
Awd $8.00$400.00
2 $7.50$375.00
3 $100.00$5,000.00
Ref #19 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (27.41 MILE)
Awd $17,953.55$655.00
2 $17,898.73$653.00
3 $5,482.00$200.00
Ref #20 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (214 FT)
Awd $374.50$1.75
2 $374.50$1.75
3 $1,070.00$5.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $25,776.05
2 $26,680.73
3 $14,452.00
Ref #21 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,800.00$4,800.00
2 $5,148.74$5,148.74
3 $25,000.00$25,000.00
Ref #22 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $50,400.00$50,400.00
2 $115,000.00$115,000.00
3 $88,000.00$88,000.00
Ref #23 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $13,800.00$13,800.00
2 $7,500.00$7,500.00
3 $10,000.00$10,000.00
Ref #24 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $40,000.00$40,000.00
3 $100,000.00$100,000.00
Section 7 - INCIDENTALS - Totals
Awd $89,000.00
2 $167,648.74
3 $223,000.00
160179 - Page 150
Project No. 160180
PID 91941
JAC-GR 2016 (JAC LAW PIK SCI)
Federal
Type: GUARDRAIL REBUILDING
Completion Date: 9/30/2016
Award Amount: $1,581,370.00
Contract Awarded To: LAKE ERIE CONSTRUCTION COMPANY
Letting Date: 4/7/2016
Engineer's Estimate: $1,594,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
LAKE ERIE CONSTRUCTION COMPANY
25 NORWALD ROAD
NORWALK, OH 44857
Huron
Bidder 1
Bid $1,581,370.00
PDK CONSTRUCTION INC
34070 CREW RD P O BOX 683
POMEROY, OH 45769
Meigs
Bidder 2
Bid $1,647,386.94
M P DORY CO
2001 INTEGRITY DR SOUTH
COLUMBUS, OH 43209
Franklin
Bidder 3
Bid $2,122,568.75
160180 - Page 151
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $100.00$100.00
3 $1,000.00$1,000.00
Ref #2 202E38000 GUARDRAIL REMOVED, (18322 FT)
Awd $21,986.40$1.20
2 $18,322.00$1.00
3 $27,483.00$1.50
Ref #3 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN, (37689 FT)
Awd $75,378.00$2.00
2 $52,764.60$1.40
3 $94,222.50$2.50
Ref #4 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A, (128 EACH)
Awd $24,960.00$195.00
2 $22,400.00$175.00
3 $25,600.00$200.00
Ref #5 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T, (16 EACH)
Awd $1,280.00$80.00
2 $1,440.00$90.00
3 $1,440.00$90.00
Ref #6 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (20 EACH)
Awd $1,300.00$65.00
2 $1,800.00$90.00
3 $1,800.00$90.00
Ref #7 209E60201 LINEAR GRADING, AS PER PLAN, (630 STA)
Awd $18,900.00$30.00
2 $14,490.00$23.00
3 $53,550.00$85.00
Ref #8 209E70000 BORROW, (8806 CY)
Awd $264,180.00$30.00
2 $220,150.00$25.00
3 $220,150.00$25.00
Ref #9 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING, (82 FT)
Awd $9,389.00$114.50
2 $8,692.00$106.00
3 $7,257.00$88.50
Ref #10 606E13000 GUARDRAIL, TYPE 5, (42745 FT)
Awd $530,038.00$12.40
2 $512,085.10$11.98
3 $547,136.00$12.80
Ref #11 606E13030 GUARDRAIL, TYPE 5, USING 9 FOOT POSTS, (15429 FT)
Awd $231,435.00$15.00
2 $216,931.74$14.06
3 $228,349.20$14.80
Ref #12 606E15050 GUARDRAIL, TYPE MGS, (995 FT)
Awd $13,532.00$13.60
2 $13,372.80$13.44
3 $13,930.00$14.00
160180 - Page 152
Ref #13 606E17290 GUARDRAIL, TYPE 5, LONG-SPAN, (11 FT)
Awd $385.00$35.00
2 $275.00$25.00
3 $275.00$25.00
Ref #14 606E26000 ANCHOR ASSEMBLY, TYPE B, (9 EACH)
Awd $13,455.00$1,495.00
2 $13,050.00$1,450.00
3 $13,500.00$1,500.00
Ref #15 606E26100 ANCHOR ASSEMBLY, TYPE E, (115 EACH)
Awd $203,550.00$1,770.00
2 $189,750.00$1,650.00
3 $204,125.00$1,775.00
Ref #16 606E26500 ANCHOR ASSEMBLY, TYPE T, (40 EACH)
Awd $23,000.00$575.00
2 $22,000.00$550.00
3 $26,000.00$650.00
Ref #17 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (2 EACH)
Awd $2,500.00$1,250.00
2 $2,000.00$1,000.00
3 $2,500.00$1,250.00
Ref #18 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4, (34 EACH)
Awd $19,210.00$565.00
2 $18,360.00$540.00
3 $22,100.00$650.00
Ref #19 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (11 EACH)
Awd $880.00$80.00
2 $880.00$80.00
3 $1,100.00$100.00
Ref #20 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE, (1 EACH)
Awd $130.00$130.00
2 $100.00$100.00
3 $150.00$150.00
Section 1 - ROADWAY - Totals
Awd $1,456,988.40
2 $1,328,963.24
3 $1,491,667.70
Ref #21 659E10000 SEEDING AND MULCHING, (52500 SY)
Awd $28,875.00$0.55
2 $27,300.00$0.52
3 $44,625.00$0.85
Ref #22 659E14000 REPAIR SEEDING AND MULCHING, (2625 SY)
Awd $525.00$0.20
2 $1,050.00$0.40
3 $1,706.25$0.65
Ref #23 659E20000 COMMERCIAL FERTILIZER, (7.09 TON)
Awd $1,843.40$260.00
2 $5,317.50$750.00
3 $4,608.50$650.00
160180 - Page 153
Ref #24 659E31000 LIME, (10.84 ACRE)
Awd $1,138.20$105.00
2 $2,168.00$200.00
3 $1,842.80$170.00
Ref #25 659E35000 WATER, (157.5 MGAL)
Awd $126.00$0.80
2 $157.50$1.00
3 $157.50$1.00
Section 2 - EROSION CONTROL - Totals
Awd $32,507.60
2 $35,993.00
3 $52,940.05
Ref #26 626E00100 BARRIER REFLECTOR, (673 EACH)
Awd $4,038.00$6.00
2 $3,970.70$5.90
3 $4,711.00$7.00
Ref #27 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (100 FT)
Awd $800.00$8.00
2 $900.00$9.00
3 $1,000.00$10.00
Ref #28 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (50 EACH)
Awd $1,000.00$20.00
2 $750.00$15.00
3 $2,250.00$45.00
Ref #29 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT, (50 EACH)
Awd $500.00$10.00
2 $1,000.00$20.00
3 $5,000.00$100.00
Section 3 - TRAFFIC CONTROL - Totals
Awd $6,338.00
2 $6,620.70
3 $12,961.00
Ref #30 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $7,811.00$7,811.00
2 $10,490.00$10,490.00
3 $15,000.00$15,000.00
Ref #31 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $26,750.00$26,750.00
2 $155,220.00$155,220.00
3 $400,000.00$400,000.00
Ref #32 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,825.00$3,825.00
2 $100.00$100.00
3 $50,000.00$50,000.00
160180 - Page 154
Ref #33 624E10000 MOBILIZATION, (LUMP SUM)
Awd $47,150.00$47,150.00
2 $110,000.00$110,000.00
3 $100,000.00$100,000.00
Section 4 - INCIDENTALS - Totals
Awd $85,536.00
2 $275,810.00
3 $565,000.00
160180 - Page 155
Project No. 160181
PID 96381
DAR-SRTS-Ansonia IFS 1
Federal
Type: MISCELLANEOUS
Completion Date: 7/26/2016
Award Amount: $224,165.65
Contract Awarded To: DOUBLE JAY CONSTRUCTION INC
Letting Date: 4/7/2016
Engineer's Estimate: $212,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
DOUBLE JAY CONSTRUCTION INC
25 HARRISBURG DR
ENGLEWOOD, OH 45322
Montgomery
Bidder 1
Bid $224,165.65
BRUMBAUGH CONSTRUCTION INC
P O BOX 309
ARCANUM, OH 45304
Darke
Bidder 2
Bid $224,526.00
160181 - Page 156
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $17,080.00$17,080.00
2 $19,000.00$19,000.00
Ref #2 202E23000 PAVEMENT REMOVED, (146.6 SY)
Awd $9,419.05$64.25
2 $806.30$5.50
Ref #3 202E30000 WALK REMOVED, (7546 SF)
Awd $15,469.30$2.05
2 $16,978.50$2.25
Ref #4 202E32000 CURB REMOVED, (120 FT)
Awd $1,620.00$13.50
2 $480.00$4.00
Ref #5 202E32500 CURB AND GUTTER REMOVED, (129 FT)
Awd $1,741.50$13.50
2 $516.00$4.00
Ref #6 203E10000 EXCAVATION, (50 CY)
Awd $1,000.00$20.00
2 $1,000.00$20.00
Ref #7 608E10000 4" CONCRETE WALK, (8420 SF)
Awd $58,940.00$7.00
2 $39,995.00$4.75
Ref #8 608E13000 6" CONCRETE WALK, (1469 SF)
Awd $12,266.15$8.35
2 $13,221.00$9.00
Ref #9 608E52010 CURB RAMP, TYPE A1, (160 SF)
Awd $1,120.00$7.00
2 $2,320.00$14.50
Ref #10 608E52020 CURB RAMP, TYPE A2, (361 SF)
Awd $2,527.00$7.00
2 $5,234.50$14.50
Ref #11 608E53010 TRUNCATED DOME, (46.5 SF)
Awd $1,464.75$31.50
2 $1,488.00$32.00
Section 1 - ROADWAY - Totals
Awd $122,647.75
2 $101,039.30
Ref #12 659E00300 TOPSOIL, (143 CY)
Awd $9,295.00$65.00
2 $5,434.00$38.00
Ref #13 659E10000 SEEDING AND MULCHING, (1282 SY)
Awd $2,179.40$1.70
2 $6,410.00$5.00
Ref #14 659E20000 COMMERCIAL FERTILIZER, (0.17 TON)
Awd $153.00$900.00
2 $170.00$1,000.00
160181 - Page 157
Ref #15 659E31000 LIME, (0.27 ACRE)
Awd $54.00$200.00
2 $27.00$100.00
Ref #16 659E35000 WATER, (7 MGAL)
Awd $420.00$60.00
2 $70.00$10.00
Ref #17 832E30000 EROSION CONTROL, (4000 EACH)
Awd $4,000.00$1.00
2 $4,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $16,101.40
2 $16,111.00
Ref #18 602E20000 CONCRETE MASONRY, (1.32 CY)
Awd $2,508.00$1,900.00
2 $1,795.20$1,360.00
Section 3 - DRAINAGE - Totals
Awd $2,508.00
2 $1,795.20
Ref #19 253E01000 PAVEMENT REPAIR, (60 SY)
Awd $2,040.00$34.00
2 $2,040.00$34.00
Ref #20 253E01001 PAVEMENT REPAIR, AS PER PLAN, (60 SY)
Awd $6,000.00$100.00
2 $5,880.00$98.00
Ref #21 301E46000 ASPHALT CONCRETE BASE, PG64-22, (3.9 CY)
Awd $1,638.00$420.00
2 $1,602.90$411.00
Ref #22 304E20000 AGGREGATE BASE, (66.1 CY)
Awd $4,957.50$75.00
2 $2,776.20$42.00
Ref #23 407E10000 TACK COAT, (24 GAL)
Awd $96.00$4.00
2 $72.00$3.00
Ref #24 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (3.9 CY)
Awd $1,638.00$420.00
2 $1,602.90$411.00
Ref #25 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (130 SY)
Awd $9,262.50$71.25
2 $10,920.00$84.00
Ref #26 609E12000 COMBINATION CURB AND GUTTER, TYPE 2, (309 FT)
Awd $10,042.50$32.50
2 $8,466.60$27.40
Ref #27 609E16000 CURB, TYPE 2-B, (380 FT)
Awd $11,020.00$29.00
2 $5,259.20$13.84
160181 - Page 158
Section 4 - PAVEMENT - Totals
Awd $46,694.50
2 $38,619.80
Ref #28 638E10800 VALVE BOX ADJUSTED TO GRADE, (10 EACH)
Awd $1,700.00$170.00
2 $2,000.00$200.00
Section 5 - WATER WORK - Totals
Awd $1,700.00
2 $2,000.00
Ref #29 611E99700 GAS VALVE BOX ADJUSTED TO GRADE, (1 EACH)
Awd $170.00$170.00
2 $200.00$200.00
Section 6 - OTHER UTILITIES - Totals
Awd $170.00
2 $200.00
Ref #30 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (2 EACH)
Awd $340.00$170.00
2 $50.00$25.00
Ref #31 642E00590 CROSSWALK LINE, (60 FT)
Awd $1,590.00$26.50
2 $180.00$3.00
Section 7 - TRAFFIC CONTROL - Totals
Awd $1,930.00
2 $230.00
Ref #32 616E10000 WATER, (2 MGAL)
Awd $200.00$100.00
2 $20.00$10.00
Section 8 - MAINTENANCE OF TRAFFIC - Totals
Awd $200.00
2 $20.00
Ref #33 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,800.00$2,800.00
2 $5,510.70$5,510.70
Ref #34 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $6,780.00$6,780.00
2 $31,000.00$31,000.00
160181 - Page 159
Ref #35 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $2,373.00$2,373.00
2 $10,000.00$10,000.00
Ref #36 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,261.00$20,261.00
2 $18,000.00$18,000.00
Section 9 - INCIDENTALS - Totals
Awd $32,214.00
2 $64,510.70
160181 - Page 160
Project No. 160182
PID 85598
GEA-US 322-04.89
Federal
Type: PREVENTIVE MAINTENANCE
Completion Date: 10/31/2016
Award Amount: $673,768.74
Contract Awarded To: RONYAK PAVING INC
Letting Date: 4/7/2016
Engineer's Estimate: $951,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
RONYAK PAVING INC
14376 N CHESHIRE ST
BURTON, OH 44021
Geauga
Bidder 1
Bid $673,768.74
KOKOSING CONSTRUCTION COMPANY INC
886 MC KINLEY AVE
COLUMBUS, OH 43222
Franklin
Bidder 2
Bid $783,384.34
KARVO COMPANIES INC
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 3
Bid $795,419.58
CHAGRIN VALLEY PAVING INC
17290 MUNN RD
CHAGRIN FALLS, OH 44023
Geauga
Bidder 4
Bid $825,733.40
BURTON SCOT CONTRACTORS LLC
11330 KINSMAN RD
NEWBURY, OH 44065
Geauga
Bidder 5
Bid $961,953.75
BARBICAS CONSTRUCTION COMPANY INC
124 DARROW RD
AKRON, OH 44305
Summit
Bidder 6
Bid $1,041,577.14
160182 - Page 161
Ref #1 209E60501 LINEAR GRADING, AS PER PLAN, (9.21 MILE)
Awd $3,684.00$400.00
2 $1,289.40$140.00
3 $5,065.50$550.00
4 $4,605.00$500.00
5 $25,788.00$2,800.00
6 $6,447.00$700.00
Ref #2 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (9.21 MILE)
Awd $2,763.00$300.00
2 $14,736.00$1,600.00
3 $8,749.50$950.00
4 $4,605.00$500.00
5 $13,354.50$1,450.00
6 $9,210.00$1,000.00
Section 1 - ROADWAY - Totals
Awd $6,447.00
2 $16,025.40
3 $13,815.00
4 $9,210.00
5 $39,142.50
6 $15,657.00
Ref #3 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
5 $1,000.00$1.00
6 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
4 $1,000.00
5 $1,000.00
6 $1,000.00
Ref #4 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN, (5 EACH)
Awd $3,250.00$650.00
2 $2,125.00$425.00
3 $5,500.00$1,100.00
4 $5,000.00$1,000.00
5 $4,000.00$800.00
6 $4,000.00$800.00
Ref #5 611E99820 SPECIAL - MISCELLANEOUS METAL, (1000 LB)
Awd $1,100.00$1.10
2 $800.00$0.80
3 $1,000.00$1.00
4 $2,000.00$2.00
5 $2,000.00$2.00
6 $1,200.00$1.20
160182 - Page 162
Section 3 - DRAINAGE - Totals
Awd $4,350.00
2 $2,925.00
3 $6,500.00
4 $7,000.00
5 $6,000.00
6 $5,200.00
Ref #6 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (2500 SY)
Awd $57,500.00$23.00
2 $87,500.00$35.00
3 $55,000.00$22.00
4 $50,000.00$20.00
5 $112,500.00$45.00
6 $60,000.00$24.00
Ref #7 253E02001 PAVEMENT REPAIR, AS PER PLAN, (100 CY)
Awd $18,500.00$185.00
2 $24,000.00$240.00
3 $21,000.00$210.00
4 $20,000.00$200.00
5 $33,000.00$330.00
6 $18,000.00$180.00
Ref #8 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (7218 GAL)
Awd $18,045.00$2.50
2 $12,631.50$1.75
3 $18,045.00$2.50
4 $14,436.00$2.00
5 $21,654.00$3.00
6 $28,872.00$4.00
Ref #9 424E12000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, (2504 CY)
Awd $333,032.00$133.00
2 $375,600.00$150.00
3 $375,600.00$150.00
4 $355,568.00$142.00
5 $450,720.00$180.00
6 $463,240.00$185.00
Ref #10 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (46 CY)
Awd $13,800.00$300.00
2 $15,640.00$340.00
3 $12,420.00$270.00
4 $9,200.00$200.00
5 $17,250.00$375.00
6 $10,120.00$220.00
Ref #11 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (69 CY)
Awd $19,320.00$280.00
2 $26,220.00$380.00
3 $16,422.00$238.00
4 $13,800.00$200.00
5 $20,700.00$300.00
6 $21,390.00$310.00
160182 - Page 163
Ref #12 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (74 CY)
Awd $2,960.00$40.00
2 $7,030.00$95.00
3 $5,550.00$75.00
4 $2,220.00$30.00
5 $7,030.00$95.00
6 $11,100.00$150.00
Ref #13 875E10000 LONGITUDINAL JOINT ADHESIVE, (4794 LB)
Awd $6,951.30$1.45
2 $3,595.50$0.75
3 $6,711.60$1.40
4 $4,794.00$1.00
5 $11,985.00$2.50
6 $8,149.80$1.70
Ref #14 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, (87721 SY)
Awd $26,316.30$0.30
2 $61,404.70$0.70
3 $85,966.58$0.98
4 $87,721.00$1.00
5 $65,790.75$0.75
6 $149,125.70$1.70
Section 4 - PAVEMENT - Totals
Awd $496,424.60
2 $613,621.70
3 $596,715.18
4 $557,739.00
5 $740,629.75
6 $769,997.50
Ref #15 621E00100 RPM, (442 EACH)
Awd $8,840.00$20.00
2 $8,817.90$19.95
3 $8,840.00$20.00
4 $8,840.00$20.00
5 $9,414.60$21.30
6 $8,840.00$20.00
Ref #16 621E54000 RAISED PAVEMENT MARKER REMOVED, (330 EACH)
Awd $1,650.00$5.00
2 $2,392.50$7.25
3 $660.00$2.00
4 $330.00$1.00
5 $1,650.00$5.00
6 $1,980.00$6.00
Ref #17 642E00490 STOP LINE, (317 FT)
Awd $1,109.50$3.50
2 $1,585.00$5.00
3 $1,997.10$6.30
4 $1,997.10$6.30
5 $1,997.10$6.30
6 $1,585.00$5.00
160182 - Page 164
Ref #19 646E10200 CENTER LINE, (5.48 MILE)
Awd $23,564.00$4,300.00
2 $14,193.20$2,590.00
3 $13,124.60$2,395.00
4 $13,124.60$2,395.00
5 $13,124.60$2,395.00
6 $14,193.20$2,590.00
Ref #20 690E98400 SPECIAL - MISC.: INVENTORY EXISTING PAVEMENT MARKI, (LUMP SUM)
Awd $750.00$750.00
2 $300.00$300.00
3 $1,150.00$1,150.00
4 $1,150.00$1,150.00
5 $1,150.00$1,150.00
6 $1,050.00$1,050.00
Ref #100 646E10010 EDGE LINE, 6", (10.96 MILE)
Awd $30,688.00$2,800.00
2 $25,361.44$2,314.00
3 $25,208.00$2,300.00
4 $25,208.00$2,300.00
5 $25,208.00$2,300.00
6 $26,512.24$2,419.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $66,601.50
2 $52,650.04
3 $50,979.70
4 $50,649.70
5 $52,544.30
6 $54,160.44
Ref #21 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (80 HOUR)
Awd $2,000.00$25.00
2 $5,200.00$65.00
3 $5,200.00$65.00
4 $4,800.00$60.00
5 $5,200.00$65.00
6 $5,200.00$65.00
Ref #22 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (25 CY)
Awd $5,000.00$200.00
2 $2,500.00$100.00
3 $3,000.00$120.00
4 $1,875.00$75.00
5 $3,125.00$125.00
6 $3,000.00$120.00
Ref #23 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (120 DAY)
Awd $3,600.00$30.00
2 $3,600.00$30.00
3 $3,600.00$30.00
4 $3,600.00$30.00
5 $6,000.00$50.00
6 $3,600.00$30.00
160182 - Page 165
Ref #24 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (5.48 MILE)
Awd $4,932.00$900.00
2 $5,069.00$925.00
3 $3,616.80$660.00
4 $3,616.80$660.00
5 $5,069.00$925.00
6 $5,069.00$925.00
Ref #25 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (5.48 MILE)
Awd $4,932.00$900.00
2 $3,973.00$725.00
3 $2,794.80$510.00
4 $2,794.80$510.00
5 $3,973.00$725.00
6 $3,973.00$725.00
Ref #26 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (10.96 MILE)
Awd $6,576.00$600.00
2 $4,932.00$450.00
3 $5,644.40$515.00
4 $5,644.40$515.00
5 $4,932.00$450.00
6 $4,932.00$450.00
Ref #27 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (10.96 MILE)
Awd $6,576.00$600.00
2 $4,603.20$420.00
3 $4,000.40$365.00
4 $4,000.40$365.00
5 $4,603.20$420.00
6 $4,603.20$420.00
Ref #28 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (317 FT)
Awd $951.00$3.00
2 $792.50$2.50
3 $792.50$2.50
4 $792.50$2.50
5 $792.50$2.50
6 $792.50$2.50
Ref #29 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (317 FT)
Awd $951.00$3.00
2 $792.50$2.50
3 $760.80$2.40
4 $760.80$2.40
5 $792.50$2.50
6 $792.50$2.50
Ref #30 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, , (300 SF)
Awd $4,800.00$16.00
2 $4,800.00$16.00
3 $4,800.00$16.00
4 $4,350.00$14.50
5 $4,800.00$16.00
6 $4,800.00$16.00
160182 - Page 166
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $40,318.00
2 $36,262.20
3 $34,209.70
4 $32,234.70
5 $39,287.20
6 $36,762.20
Ref #31 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $6,500.00$6,500.00
2 $3,900.00$3,900.00
3 $7,000.00$7,000.00
4 $8,000.00$8,000.00
5 $8,950.00$8,950.00
6 $20,000.00$20,000.00
Ref #32 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $23,500.00$23,500.00
2 $30,000.00$30,000.00
3 $52,000.00$52,000.00
4 $90,000.00$90,000.00
5 $44,000.00$44,000.00
6 $72,000.00$72,000.00
Ref #33 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN, (6 MNTH)
Awd $9,000.00$1,500.00
2 $4,500.00$750.00
3 $10,500.00$1,750.00
4 $4,500.00$750.00
5 $7,500.00$1,250.00
6 $4,200.00$700.00
Ref #34 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,327.64$3,327.64
2 $2,500.00$2,500.00
3 $700.00$700.00
4 $500.00$500.00
5 $2,900.00$2,900.00
6 $2,600.00$2,600.00
Ref #35 624E10000 MOBILIZATION, (LUMP SUM)
Awd $16,300.00$16,300.00
2 $20,000.00$20,000.00
3 $22,000.00$22,000.00
4 $64,900.00$64,900.00
5 $20,000.00$20,000.00
6 $60,000.00$60,000.00
Section 7 - INCIDENTALS - Totals
Awd $58,627.64
2 $60,900.00
3 $92,200.00
4 $167,900.00
5 $83,350.00
6 $158,800.00
160182 - Page 167
Project No. 160183
PID 87157
GRE-US 68-0.82/8.54
Federal
Type: BRIDGE REPAIR
Completion Date: 10/21/2016
Award Amount: $1,163,806.00
Contract Awarded To: DOUBLE Z CONSTRUCTION COMPANY
Letting Date: 4/7/2016
Engineer's Estimate: $1,205,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
DOUBLE Z CONSTRUCTION COMPANY
2550 HARRISON RD
COLUMBUS, OH 43204
Franklin
Bidder 1
Bid $1,163,806.00
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 2
Bid $1,268,044.43
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 3
Bid $1,274,050.71
BRUMBAUGH CONSTRUCTION INC
P O BOX 309
ARCANUM, OH 45304
Darke
Bidder 4
Bid $1,445,000.00
160183 - Page 168
Ref #1 201E11001 CLEARING AND GRUBBING, AS PER PLAN, (LUMP SUM)
Awd $4,500.00$4,500.00
2 $4,900.00$4,900.00
3 $5,000.00$5,000.00
4 $1,100.00$1,100.00
Ref #2 202E23010 PAVEMENT REMOVED, ASPHALT, (218 SY)
Awd $4,796.00$22.00
2 $7,848.00$36.00
3 $5,450.00$25.00
4 $3,815.00$17.50
Ref #3 202E38000 GUARDRAIL REMOVED, (618 FT)
Awd $1,359.60$2.20
2 $1,236.00$2.00
3 $3,090.00$5.00
4 $3,399.00$5.50
Ref #4 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN, (4 EACH)
Awd $980.00$245.00
2 $212.00$53.00
3 $3,000.00$750.00
4 $3,320.00$830.00
Ref #5 202E42011 ANCHOR ASSEMBLY REMOVED, TYPE E, AS PER PLAN, (2 EACH)
Awd $400.00$200.00
2 $106.00$53.00
3 $1,100.00$550.00
4 $1,220.00$610.00
Ref #6 202E42041 ANCHOR ASSEMBLY REMOVED, TYPE T, AS PER PLAN, (2 EACH)
Awd $200.00$100.00
2 $106.00$53.00
3 $1,100.00$550.00
4 $1,220.00$610.00
Ref #7 203E10000 EXCAVATION, (222 CY)
Awd $2,220.00$10.00
2 $4,884.00$22.00
3 $6,660.00$30.00
4 $2,442.00$11.00
Ref #8 203E20001 EMBANKMENT, AS PER PLAN, (78 CY)
Awd $780.00$10.00
2 $1,482.00$19.00
3 $1,950.00$25.00
4 $858.00$11.00
Ref #9 204E10000 SUBGRADE COMPACTION, (390 SY)
Awd $2,340.00$6.00
2 $975.00$2.50
3 $780.00$2.00
4 $468.00$1.20
Ref #10 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (0.16 MILE)
Awd $1,600.00$10,000.00
2 $2,240.00$14,000.00
3 $2,400.00$15,000.00
4 $3,360.00$21,000.00
160183 - Page 169
Ref #11 606E15050 GUARDRAIL, TYPE MGS, (588 FT)
Awd $8,055.60$13.70
2 $9,408.00$16.00
3 $8,055.60$13.70
4 $8,967.00$15.25
Ref #12 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (6 EACH)
Awd $12,210.00$2,035.00
2 $12,000.00$2,000.00
3 $12,210.00$2,035.00
4 $13,560.00$2,260.00
Ref #13 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (2 EACH)
Awd $1,630.00$815.00
2 $1,440.00$720.00
3 $1,630.00$815.00
4 $1,810.00$905.00
Ref #14 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (4 EACH)
Awd $6,680.00$1,670.00
2 $8,000.00$2,000.00
3 $6,680.00$1,670.00
4 $7,420.00$1,855.00
Ref #15 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4, (4 EACH)
Awd $4,400.00$1,100.00
2 $2,644.00$661.00
3 $4,400.00$1,100.00
4 $4,880.00$1,220.00
Section 1 - ROADWAY - Totals
Awd $52,151.20
2 $57,481.00
3 $63,505.60
4 $57,839.00
Ref #16 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH FABRIC FILTER, (381 CY)
Awd $22,860.00$60.00
2 $24,765.00$65.00
3 $22,860.00$60.00
4 $24,003.00$63.00
Ref #17 659E10000 SEEDING AND MULCHING, (905 SY)
Awd $2,488.75$2.75
2 $2,715.00$3.00
3 $2,488.75$2.75
4 $1,900.50$2.10
Ref #18 659E20000 COMMERCIAL FERTILIZER, (0.14 TON)
Awd $105.00$750.00
2 $111.02$793.00
3 $105.00$750.00
4 $91.00$650.00
Ref #19 659E35000 WATER, (8 MGAL)
Awd $8.00$1.00
2 $8.00$1.00
3 $8.00$1.00
4 $80.00$10.00
160183 - Page 170
Ref #20 832E30000 EROSION CONTROL, (10000 EACH)
Awd $10,000.00$1.00
2 $10,000.00$1.00
3 $10,000.00$1.00
4 $10,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $35,461.75
2 $37,599.02
3 $35,461.75
4 $36,074.50
Ref #21 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1120 SY)
Awd $13,440.00$12.00
2 $13,160.00$11.75
3 $13,440.00$12.00
4 $10,640.00$9.50
Ref #22 301E46000 ASPHALT CONCRETE BASE, PG64-22, (126 CY)
Awd $29,610.00$235.00
2 $30,240.00$240.00
3 $29,610.00$235.00
4 $24,822.00$197.00
Ref #23 304E20000 AGGREGATE BASE, (92 CY)
Awd $7,820.00$85.00
2 $8,832.00$96.00
3 $5,980.00$65.00
4 $4,140.00$45.00
Ref #24 407E10000 TACK COAT, (20 GAL)
Awd $60.00$3.00
2 $60.00$3.00
3 $60.00$3.00
4 $200.00$10.00
Ref #25 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (71 GAL)
Awd $213.00$3.00
2 $213.00$3.00
3 $213.00$3.00
4 $710.00$10.00
Ref #26 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (61 CY)
Awd $16,592.00$272.00
2 $17,995.00$295.00
3 $16,592.00$272.00
4 $12,810.00$210.00
Ref #27 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (14 CY)
Awd $9,758.00$697.00
2 $10,500.00$750.00
3 $9,758.00$697.00
4 $2,940.00$210.00
160183 - Page 171
Section 3 - PAVEMENT - Totals
Awd $77,493.00
2 $81,000.00
3 $75,653.00
4 $56,262.00
Ref #28 621E00100 RPM, (12 EACH)
Awd $960.00$80.00
2 $960.00$80.00
3 $960.00$80.00
4 $1,020.00$85.00
Ref #29 621E54000 RAISED PAVEMENT MARKER REMOVED, (10 EACH)
Awd $40.00$4.00
2 $210.00$21.00
3 $300.00$30.00
4 $250.00$25.00
Ref #30 626E00100 BARRIER REFLECTOR, (16 EACH)
Awd $112.00$7.00
2 $176.00$11.00
3 $112.00$7.00
4 $124.00$7.75
Ref #31 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (13 FT)
Awd $120.25$9.25
2 $130.00$10.00
3 $120.25$9.25
4 $133.90$10.30
Ref #32 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (1 EACH)
Awd $45.00$45.00
2 $50.00$50.00
3 $60.00$60.00
4 $65.00$65.00
Ref #33 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $30.00$30.00
2 $31.00$31.00
3 $25.00$25.00
4 $28.00$28.00
Ref #34 644E00104 EDGE LINE, 6", (0.13 MILE)
Awd $1,820.00$14,000.00
2 $2,210.00$17,000.00
3 $1,820.00$14,000.00
4 $2,015.00$15,500.00
Ref #35 644E00300 CENTER LINE, (0.08 MILE)
Awd $1,280.00$16,000.00
2 $1,360.00$17,000.00
3 $1,280.00$16,000.00
4 $1,422.00$17,775.00
Ref #36 644E00500 STOP LINE, (36 FT)
Awd $180.00$5.00
2 $180.00$5.00
3 $180.00$5.00
4 $198.00$5.50
160183 - Page 172
Ref #37 646E10010 EDGE LINE, 6", (0.12 MILE)
Awd $3,960.00$33,000.00
2 $4,200.00$35,000.00
3 $3,960.00$33,000.00
4 $4,398.00$36,650.00
Ref #38 646E10200 CENTER LINE, (0.06 MILE)
Awd $1,980.00$33,000.00
2 $2,100.00$35,000.00
3 $1,980.00$33,000.00
4 $2,199.00$36,650.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $10,527.25
2 $11,607.00
3 $10,797.25
4 $11,852.90
Ref #39 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (8 EACH)
Awd $14,600.00$1,825.00
2 $17,200.00$2,150.00
3 $14,400.00$1,800.00
4 $16,000.00$2,000.00
Ref #40 614E13302 BARRIER REFLECTOR, TYPE B2, (24 EACH)
Awd $216.00$9.00
2 $240.00$10.00
3 $192.00$8.00
4 $212.40$8.85
Ref #41 614E13360 OBJECT MARKER, TWO WAY, (24 EACH)
Awd $312.00$13.00
2 $384.00$16.00
3 $312.00$13.00
4 $348.00$14.50
Ref #42 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I, (0.24 MILE)
Awd $2,640.00$11,000.00
2 $2,640.00$11,000.00
3 $2,640.00$11,000.00
4 $2,934.00$12,225.00
Ref #43 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (0.4 MILE)
Awd $2,040.00$5,100.00
2 $2,040.00$5,100.00
3 $2,040.00$5,100.00
4 $2,268.00$5,670.00
Ref #44 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I, (96 FT)
Awd $576.00$6.00
2 $576.00$6.00
3 $576.00$6.00
4 $643.20$6.70
Ref #45 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $16,000.00$16,000.00
3 $20,000.00$20,000.00
4 $12,700.00$12,700.00
160183 - Page 173
Ref #46 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, (910 SY)
Awd $38,220.00$42.00
2 $54,600.00$60.00
3 $72,800.00$80.00
4 $43,680.00$48.00
Ref #47 622E41000 PORTABLE BARRIER, 32", (970 FT)
Awd $7,760.00$8.00
2 $15,520.00$16.00
3 $15,035.00$15.50
4 $14,550.00$15.00
Ref #48 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, (550 FT)
Awd $6,600.00$12.00
2 $11,000.00$20.00
3 $9,900.00$18.00
4 $9,487.50$17.25
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $82,964.00
2 $120,200.00
3 $137,895.00
4 $102,823.10
Ref #49 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $59,500.00$59,500.00
2 $50,000.00$50,000.00
3 $75,000.00$75,000.00
4 $118,000.00$118,000.00
Ref #50 202E22901 APPROACH SLAB REMOVED, AS PER PLAN, (134 SY)
Awd $4,690.00$35.00
2 $4,690.00$35.00
3 $9,380.00$70.00
4 $13,400.00$100.00
Ref #51 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $8,400.00$8,400.00
3 $18,000.00$18,000.00
4 $52,000.00$52,000.00
Ref #52 503E21100 UNCLASSIFIED EXCAVATION, (109 CY)
Awd $13,080.00$120.00
2 $10,900.00$100.00
3 $13,080.00$120.00
4 $4,905.00$45.00
Ref #53 509E10000 EPOXY COATED REINFORCING STEEL, (79569 LB)
Awd $79,569.00$1.00
2 $73,999.17$0.93
3 $71,612.10$0.90
4 $75,590.55$0.95
Ref #54 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (114 EACH)
Awd $2,280.00$20.00
2 $3,192.00$28.00
3 $2,850.00$25.00
4 $3,078.00$27.00
160183 - Page 174
Ref #55 511E32213 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE, AS , (317 CY)
Awd $236,165.00$745.00
2 $249,162.00$786.00
3 $253,600.00$800.00
4 $317,000.00$1,000.00
Ref #56 511E43513 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING , (10 CY)
Awd $18,000.00$1,800.00
2 $11,300.00$1,130.00
3 $20,750.00$2,075.00
4 $11,750.00$1,175.00
Ref #57 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (191 SY)
Awd $3,438.00$18.00
2 $3,629.00$19.00
3 $3,438.00$18.00
4 $2,865.00$15.00
Ref #58 512E33000 TYPE 2 WATERPROOFING, (3 SY)
Awd $90.00$30.00
2 $174.00$58.00
3 $300.00$100.00
4 $96.00$32.00
Ref #59 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (162 SF)
Awd $1,458.00$9.00
2 $1,458.00$9.00
3 $1,944.00$12.00
4 $405.00$2.50
Ref #60 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (136 SF)
Awd $1,360.00$10.00
2 $1,224.00$9.00
3 $1,632.00$12.00
4 $408.00$3.00
Ref #61 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (124 FT)
Awd $1,736.00$14.00
2 $3,472.00$28.00
3 $3,534.00$28.50
4 $3,100.00$25.00
Ref #62 517E70000 RAILING (TWIN STEEL TUBE), (220 FT)
Awd $34,760.00$158.00
2 $31,680.00$144.00
3 $34,760.00$158.00
4 $40,260.00$183.00
Ref #63 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (65 CY)
Awd $5,525.00$85.00
2 $5,720.00$88.00
3 $5,525.00$85.00
4 $3,770.00$58.00
Ref #64 518E22300 SPECIAL - STEEL DRIP STRIP, (241 FT)
Awd $4,338.00$18.00
2 $4,097.00$17.00
3 $3,012.50$12.50
4 $3,133.00$13.00
160183 - Page 175
Ref #65 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (40 FT)
Awd $520.00$13.00
2 $200.00$5.00
3 $800.00$20.00
4 $280.00$7.00
Ref #66 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (4 SF)
Awd $800.00$200.00
2 $640.00$160.00
3 $880.00$220.00
4 $1,120.00$280.00
Ref #67 526E25011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1, (246 SY)
Awd $60,270.00$245.00
2 $56,580.00$230.00
3 $59,040.00$240.00
4 $71,340.00$290.00
Ref #68 526E90010 TYPE A INSTALLATION, (128 FT)
Awd $16,000.00$125.00
2 $19,200.00$150.00
3 $19,200.00$150.00
4 $12,160.00$95.00
Ref #69 530E00200 SPECIAL - STRUCTURE, MISC.:TEMPORARY CONSTRUCTION , (LUMP SUM)
Awd $40,000.00$40,000.00
2 $69,000.00$69,000.00
3 $10,000.00$10,000.00
4 $19,000.00$19,000.00
Ref #70 601E12110 RIPRAP, USING CONCRETE IN BAGS, (LUMP SUM)
Awd $500.00$500.00
2 $2,000.00$2,000.00
3 $1,500.00$1,500.00
4 $1,550.00$1,550.00
Ref #71 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (4 SY)
Awd $800.00$200.00
2 $800.00$200.00
3 $540.00$135.00
4 $560.00$140.00
Ref #72 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (2 EACH)
Awd $390.00$195.00
2 $400.00$200.00
3 $500.00$250.00
4 $570.00$285.00
Ref #100 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (260 FT)
Awd $3,842.80$14.78
2 $1,040.00$4.00
3 $3,120.00$12.00
4 $1,820.00$7.00
Ref #101 846E00120 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (1.72 CY)
Awd $20,468.00$11,900.00
2 $18,920.00$11,000.00
3 $17,952.36$10,437.42
4 $19,952.00$11,600.00
160183 - Page 176
Section 6 - STRUCTURE REPAIR (GRE-68-0.84) - Totals
Awd $613,579.80
2 $631,877.17
3 $631,949.96
4 $778,112.55
Ref #73 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $6,500.00$6,500.00
2 $7,300.00$7,300.00
3 $40,000.00$40,000.00
4 $10,750.00$10,750.00
Ref #74 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $200.00$200.00
2 $3,300.00$3,300.00
3 $10,000.00$10,000.00
4 $500.00$500.00
Ref #75 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $3,900.00$3,900.00
3 $5,000.00$5,000.00
4 $750.00$750.00
Ref #76 509E10000 EPOXY COATED REINFORCING STEEL, (412 LB)
Awd $1,030.00$2.50
2 $1,038.24$2.52
3 $824.00$2.00
4 $535.60$1.30
Ref #77 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)
Awd $125.00$2.50
2 $200.00$4.00
3 $150.00$3.00
4 $37.50$0.75
Ref #78 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (44 EACH)
Awd $880.00$20.00
2 $1,848.00$42.00
3 $1,100.00$25.00
4 $968.00$22.00
Ref #79 511E45710 CLASS QC1 CONCRETE, ABUTMENT, (7 CY)
Awd $12,600.00$1,800.00
2 $9,450.00$1,350.00
3 $10,500.00$1,500.00
4 $7,700.00$1,100.00
Ref #80 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (195 SY)
Awd $3,510.00$18.00
2 $3,705.00$19.00
3 $3,510.00$18.00
4 $2,730.00$14.00
Ref #81 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (66 SY)
Awd $1,650.00$25.00
2 $1,980.00$30.00
3 $1,650.00$25.00
4 $858.00$13.00
160183 - Page 177
Ref #82 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (24 SF)
Awd $216.00$9.00
2 $216.00$9.00
3 $264.00$11.00
4 $96.00$4.00
Ref #83 517E72710 RAILING (DEEP BEAM BRIDGE RETROFIT RAILING), (159 FT)
Awd $12,084.00$76.00
2 $15,105.00$95.00
3 $12,084.00$76.00
4 $13,515.00$85.00
Ref #84 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (7 CY)
Awd $735.00$105.00
2 $1,302.00$186.00
3 $875.00$125.00
4 $1,505.00$215.00
Ref #85 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (16 SF)
Awd $2,480.00$155.00
2 $1,600.00$100.00
3 $3,600.00$225.00
4 $1,680.00$105.00
Ref #86 690E98400 SPECIAL - MISC.:MISC.: CONSULTANT FOR CONCRETE QU, (LUMP SUM)
Awd $850.00$850.00
2 $2,000.00$2,000.00
3 $880.00$880.00
4 $1,665.00$1,665.00
Ref #87 846E00120 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEMMIS, (1.26 CY)
Awd $15,057.00$11,950.00
2 $13,860.00$11,000.00
3 $13,151.15$10,437.42
4 $14,616.00$11,600.00
Ref #88 848E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO, (485 SY)
Awd $41,225.00$85.00
2 $51,410.00$106.00
3 $24,250.00$50.00
4 $49,955.00$103.00
Ref #89 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (485 SY)
Awd $63,050.00$130.00
2 $67,415.00$139.00
3 $84,875.00$175.00
4 $76,630.00$158.00
Ref #90 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T, (14 CY)
Awd $2,520.00$180.00
2 $2,282.00$163.00
3 $2,450.00$175.00
4 $2,940.00$210.00
Ref #91 848E50000 HAND CHIPPING, (49 SY)
Awd $4,067.00$83.00
2 $1,715.00$35.00
3 $2,450.00$50.00
4 $3,773.00$77.00
160183 - Page 178
Ref #92 848E50100 TEST SLAB, (LUMP SUM)
Awd $500.00$500.00
2 $1,234.00$1,234.00
3 $5,000.00$5,000.00
4 $1,250.00$1,250.00
Ref #93 848E50200 FULL-DEPTH REPAIR, (1 CY)
Awd $850.00$850.00
2 $454.00$454.00
3 $175.00$175.00
4 $2,120.00$2,120.00
Section 7 - STRUCTURE REPAIR (GRE-68-8.54) - Totals
Awd $171,629.00
2 $191,314.24
3 $222,788.15
4 $194,574.10
Ref #94 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $7,000.00$7,000.00
2 $6,966.00$6,966.00
3 $12,000.00$12,000.00
4 $25,000.00$25,000.00
Ref #95 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $65,000.00$65,000.00
2 $80,000.00$80,000.00
3 $41,000.00$41,000.00
4 $120,000.00$120,000.00
Ref #96 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $10,000.00$10,000.00
3 $3,000.00$3,000.00
4 $3,000.00$3,000.00
Ref #97 624E10000 MOBILIZATION, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $40,000.00$40,000.00
3 $40,000.00$40,000.00
4 $59,461.85$59,461.85
Section 8 - INCIDENTALS - Totals
Awd $120,000.00
2 $136,966.00
3 $96,000.00
4 $207,461.85
160183 - Page 179
Project No. 160187
PID 98696
HAS-SR 151-12.90
Federal
Type: TWO LANE RESURFACING
Completion Date: 9/30/2016
Award Amount: $2,129,814.80
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 4/7/2016
Engineer's Estimate: $1,959,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $2,129,814.80
GOLDEN TRIANGLE CONSTRUCTION COMPANY INC
8555 OLD STEUBENVILLE PIKE
IMPERIAL, PA 15126
Bidder 2
Bid $2,396,085.50
160187 - Page 180
Ref #1 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (5 MILE)
Awd $17,500.00$3,500.00
2 $12,500.00$2,500.00
Section 1 - ROADWAY - Totals
Awd $17,500.00
2 $12,500.00
Ref #2 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
Ref #3 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (39327 SY)
Awd $98,317.50$2.50
2 $98,317.50$2.50
Ref #4 408E10001 PRIME COAT, AS PER PLAN, (4840 GAL)
Awd $12,100.00$2.50
2 $18,150.00$3.75
Ref #5 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (74 CY)
Awd $17,390.00$235.00
2 $48,840.00$660.00
Ref #6 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (31 SF)
Awd $48.05$1.55
2 $155.00$5.00
Ref #7 617E10100 COMPACTED AGGREGATE, (1516 CY)
Awd $60,640.00$40.00
2 $48,512.00$32.00
Ref #8 617E20000 SHOULDER PREPARATION, (12100 SY)
Awd $19,360.00$1.60
2 $36,300.00$3.00
Ref #9 618E42000 EDGE LINE, RUMBLE STRIPE (CONCRETE), (5.1 MILE)
Awd $13,515.00$2,650.00
2 $51,000.00$10,000.00
Ref #10 690E98300 SPECIAL - MISC.: 3" FIBER REINFORCED BONDED CONCR, (1734 SY)
Awd $60,690.00$35.00
2 $66,759.00$38.50
Ref #11 690E98300 SPECIAL - MISC.: 4 1/2" FIBER REINFORCED BONDED C, (35570 SY)
Awd $1,413,907.50$39.75
2 $1,614,878.00$45.40
Ref #12 690E98300 SPECIAL - MISC.: 6" N0N-REINFORCED BONDED CONCRET, (2023 SY)
Awd $84,966.00$42.00
2 $97,104.00$48.00
160187 - Page 181
Section 3 - PAVEMENT - Totals
Awd $1,780,934.05
2 $2,080,015.50
Ref #13 621E00100 RPM, (356 EACH)
Awd $13,172.00$37.00
2 $12,816.00$36.00
Ref #14 621E54000 RAISED PAVEMENT MARKER REMOVED, (356 EACH)
Awd $4,539.00$12.75
2 $2,848.00$8.00
Ref #15 646E10000 EDGE LINE, 4", (5.38 MILE)
Awd $13,181.00$2,450.00
2 $13,450.00$2,500.00
Ref #16 646E10200 CENTER LINE, (2.69 MILE)
Awd $6,388.75$2,375.00
2 $6,456.00$2,400.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $37,280.75
2 $35,570.00
Ref #17 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (50 CY)
Awd $5,250.00$105.00
2 $1,750.00$35.00
Ref #18 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (1000 HOUR)
Awd $75,000.00$75.00
2 $60,000.00$60.00
Ref #19 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $6,100.00$6,100.00
2 $10,000.00$10,000.00
Ref #20 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (50 CY)
Awd $16,250.00$325.00
2 $8,750.00$175.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $102,600.00
2 $80,500.00
Ref #21 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $10,500.00$10,500.00
2 $15,000.00$15,000.00
Ref #22 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $65,000.00$65,000.00
2 $55,000.00$55,000.00
Ref #23 619E16010 FIELD OFFICE, TYPE B, (3 MNTH)
Awd $15,000.00$5,000.00
2 $16,500.00$5,500.00
160187 - Page 182
Ref #24 624E10000 MOBILIZATION, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $100,000.00$100,000.00
Section 6 - INCIDENTALS - Totals
Awd $190,500.00
2 $186,500.00
160187 - Page 183
Project No. 160189
PID 95821
HOL-SR 514-4.52
Federal
Type: CULVERT REPLACEMENT
Completion Date: 7/31/2016
Award Amount: $134,302.61
Contract Awarded To: STANLEY MILLER CONSTRUCTION COMPANY
Letting Date: 4/7/2016
Engineer's Estimate: $130,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
STANLEY MILLER CONSTRUCTION COMPANY
2250 HOWENSTINE DR SE
EAST SPARTA, OH 44626
Stark
Bidder 1
Bid $134,302.61
SIMONSON CONSTRUCTION SERVICES INC
2112 TROY RD
ASHLAND, OH 44805
Ashland
Bidder 2
Bid $145,752.23
GLENN O HAWBAKER INC
1952 WADDLE RD SUITE 203
STATE COLLEGE, PA 16803
Bidder 3
Bid $150,226.75
R W ROBINSON INC
87 EAST STATE
BELLVILLE, OH 44813
Richland
Bidder 4
Bid $215,362.00
160189 - Page 184
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,967.00$1,967.00
2 $2,896.71$2,896.71
3 $250.00$250.00
4 $10,000.00$10,000.00
Ref #2 202E23000 PAVEMENT REMOVED, (262 SY)
Awd $2,855.80$10.90
2 $2,004.30$7.65
3 $2,292.50$8.75
4 $2,620.00$10.00
Ref #3 202E35100 PIPE REMOVED, 24" AND UNDER, (102 FT)
Awd $2,142.00$21.00
2 $1,483.08$14.54
3 $1,938.00$19.00
4 $1,020.00$10.00
Ref #4 202E58100 CATCH BASIN REMOVED, (3 EACH)
Awd $300.00$100.00
2 $1,307.58$435.86
3 $1,500.00$500.00
4 $1,500.00$500.00
Ref #5 202E75000 FENCE REMOVED, (75 FT)
Awd $150.00$2.00
2 $662.25$8.83
3 $225.00$3.00
4 $750.00$10.00
Ref #6 203E10000 EXCAVATION, (437 CY)
Awd $9,177.00$21.00
2 $16,426.83$37.59
3 $5,353.25$12.25
4 $5,244.00$12.00
Ref #7 203E20000 EMBANKMENT, (26 CY)
Awd $546.00$21.00
2 $645.58$24.83
3 $357.50$13.75
4 $520.00$20.00
Ref #8 204E10000 SUBGRADE COMPACTION, (371 SY)
Awd $371.00$1.00
2 $1,988.56$5.36
3 $371.00$1.00
4 $1,855.00$5.00
Ref #9 204E50000 GEOTEXTILE FABRIC, (142 SY)
Awd $511.20$3.60
2 $981.22$6.91
3 $390.50$2.75
4 $1,420.00$10.00
Ref #10 861E10000 GEOGRID FOR SUBGRADE STABILIZATION, (568 SY)
Awd $1,136.00$2.00
2 $3,464.80$6.10
3 $1,136.00$2.00
4 $8,520.00$15.00
160189 - Page 185
Section 1 - ROADWAY - Totals
Awd $19,156.00
2 $31,860.91
3 $13,813.75
4 $33,449.00
Ref #11 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $220.00$110.00
2 $604.02$302.01
3 $650.00$325.00
4 $200.00$100.00
Ref #12 659E00300 TOPSOIL, (81 CY)
Awd $3,078.00$38.00
2 $4,047.57$49.97
3 $3,138.75$38.75
4 $4,050.00$50.00
Ref #13 659E10000 SEEDING AND MULCHING, (729 SY)
Awd $1,458.00$2.00
2 $3,477.33$4.77
3 $1,458.00$2.00
4 $3,645.00$5.00
Ref #14 659E20000 COMMERCIAL FERTILIZER, (0.1 TON)
Awd $80.00$800.00
2 $73.69$736.90
3 $78.50$785.00
4 $500.00$5,000.00
Ref #15 659E31000 LIME, (0.15 ACRE)
Awd $75.00$500.00
2 $36.24$241.60
3 $31.50$210.00
4 $501.00$3,340.00
Ref #16 659E35000 WATER, (4 MGAL)
Awd $4.00$1.00
2 $48.32$12.08
3 $5.00$1.25
4 $100.00$25.00
Ref #17 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $5,915.00
2 $9,287.17
3 $6,361.75
4 $9,996.00
160189 - Page 186
Ref #18 605E14000 6" BASE PIPE UNDERDRAINS, (50 FT)
Awd $650.00$13.00
2 $1,815.50$36.31
3 $750.00$15.00
4 $1,750.00$35.00
Ref #19 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (18 FT)
Awd $234.00$13.00
2 $694.98$38.61
3 $558.00$31.00
4 $630.00$35.00
Ref #20 611E04900 12" CONDUIT, TYPE D, (28 FT)
Awd $1,792.00$64.00
2 $1,804.04$64.43
3 $1,176.00$42.00
4 $2,800.00$100.00
Ref #21 611E06400 15" CONDUIT, TYPE D, (29 FT)
Awd $2,175.00$75.00
2 $1,852.52$63.88
3 $1,421.00$49.00
4 $3,045.00$105.00
Ref #22 611E10600 24" CONDUIT, TYPE C, (6 FT)
Awd $510.00$85.00
2 $1,009.38$168.23
3 $600.00$100.00
4 $750.00$125.00
Ref #23 611E98510 CATCH BASIN, NO. 2-3, (1 EACH)
Awd $1,500.00$1,500.00
2 $2,720.20$2,720.20
3 $1,700.00$1,700.00
4 $2,850.00$2,850.00
Section 3 - DRAINAGE - Totals
Awd $6,861.00
2 $9,896.62
3 $6,205.00
4 $11,825.00
Ref #24 301E46000 ASPHALT CONCRETE BASE, PG64-22, (67 CY)
Awd $13,400.00$200.00
2 $17,401.91$259.73
3 $21,105.00$315.00
4 $30,150.00$450.00
Ref #25 304E20000 AGGREGATE BASE, (341 CY)
Awd $24,057.55$70.55
2 $21,827.41$64.01
3 $23,358.50$68.50
4 $20,460.00$60.00
Ref #26 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (10 GAL)
Awd $27.80$2.78
2 $60.40$6.04
3 $52.50$5.25
4 $50.00$5.00
160189 - Page 187
Ref #27 408E10000 PRIME COAT, (34 GAL)
Awd $132.26$3.89
2 $821.44$24.16
3 $1,071.00$31.50
4 $1,292.00$38.00
Ref #28 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (9 CY)
Awd $5,508.00$612.00
2 $3,261.69$362.41
3 $6,615.00$735.00
4 $6,435.00$715.00
Ref #29 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (13 CY)
Awd $7,540.00$580.00
2 $3,926.13$302.01
3 $7,507.50$577.50
4 $11,050.00$850.00
Section 4 - PAVEMENT - Totals
Awd $50,665.61
2 $47,298.98
3 $59,709.50
4 $69,437.00
Ref #30 621E00100 RPM, (3 EACH)
Awd $234.00$78.00
2 $2,482.53$827.51
3 $1,050.00$350.00
4 $2,400.00$800.00
Ref #31 621E54000 RAISED PAVEMENT MARKER REMOVED, (3 EACH)
Awd $45.00$15.00
2 $183.39$61.13
3 $68.25$22.75
4 $450.00$150.00
Ref #32 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $15.00$15.00
2 $30.20$30.20
3 $34.00$34.00
4 $300.00$300.00
Ref #33 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $15.00$15.00
2 $30.20$30.20
3 $34.00$34.00
4 $300.00$300.00
Ref #34 646E10000 EDGE LINE, 4", (0.04 MILE)
Awd $1,400.00$35,000.00
2 $1,981.19$49,529.75
3 $1,722.00$43,050.00
4 $4,800.00$120,000.00
Ref #35 646E10200 CENTER LINE, (0.02 MILE)
Awd $1,400.00$70,000.00
2 $990.60$49,530.00
3 $861.00$43,050.00
4 $2,600.00$130,000.00
160189 - Page 188
Section 5 - TRAFFIC CONTROL - Totals
Awd $3,109.00
2 $5,698.11
3 $3,769.25
4 $10,850.00
Ref #36 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (40 CY)
Awd $1,000.00$25.00
2 $3,219.60$80.49
3 $6,300.00$157.50
4 $4,560.00$114.00
Ref #37 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C, (120 CY)
Awd $3,000.00$25.00
2 $8,931.60$74.43
3 $18,900.00$157.50
4 $14,760.00$123.00
Ref #38 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $6,362.00$6,362.00
2 $6,916.05$6,916.05
3 $6,575.00$6,575.00
4 $6,875.00$6,875.00
Ref #39 616E10000 WATER, (10 MGAL)
Awd $10.00$1.00
2 $120.80$12.08
3 $12.50$1.25
4 $10.00$1.00
Ref #40 617E10100 COMPACTED AGGREGATE, (60 CY)
Awd $1,500.00$25.00
2 $3,140.40$52.34
3 $5,280.00$88.00
4 $6,000.00$100.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $11,872.00
2 $22,328.45
3 $37,067.50
4 $32,205.00
Ref #41 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $1,047.56$1,047.56
3 $1,325.00$1,325.00
4 $5,000.00$5,000.00
Ref #42 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $7,945.00$7,945.00
2 $3,055.14$3,055.14
3 $4,000.00$4,000.00
4 $8,500.00$8,500.00
160189 - Page 189
Ref #43 619E16000 FIELD OFFICE, TYPE A, (3 MNTH)
Awd $7,869.00$2,623.00
2 $570.51$190.17
3 $8,400.00$2,800.00
4 $3,600.00$1,200.00
Ref #44 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $8,466.00$8,466.00
2 $4,469.76$4,469.76
3 $1,575.00$1,575.00
4 $10,000.00$10,000.00
Ref #45 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,444.00$10,444.00
2 $10,239.02$10,239.02
3 $8,000.00$8,000.00
4 $20,500.00$20,500.00
Section 7 - INCIDENTALS - Totals
Awd $36,724.00
2 $19,381.99
3 $23,300.00
4 $47,600.00
160189 - Page 190
Project No. 160190
PID 92961
KNO-SR 13/95-09.15/0.00
Federal
Type: TWO LANE RESURFACING
Completion Date: 10/15/2016
Award Amount: $2,896,377.05
Contract Awarded To: KOKOSING CONSTRUCTION COMPANY INC
Letting Date: 4/7/2016
Engineer's Estimate: $3,122,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
KOKOSING CONSTRUCTION COMPANY INC
886 MC KINLEY AVE
COLUMBUS, OH 43222
Franklin
Bidder 1
Bid $2,896,377.05
160190 - Page 191
Ref #1 202E23500 WEARING COURSE REMOVED, (7970 SY)
Awd $23,910.00$3.00
Ref #2 203E10000 EXCAVATION, (84 CY)
Awd $1,680.00$20.00
Ref #3 204E10000 SUBGRADE COMPACTION, (573 SY)
Awd $573.00$1.00
Ref #4 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (19.72 MILE)
Awd $27,608.00$1,400.00
Section 1 - ROADWAY - Totals
Awd $53,771.00
Ref #5 611E99654 MANHOLE ADJUSTED TO GRADE, (30 EACH)
Awd $13,350.00$445.00
Ref #6 638E53500 VALVE BOX ADJUSTED TO GRADE, (15 EACH)
Awd $5,550.00$370.00
Section 2 - DRAINAGE - Totals
Awd $18,900.00
Ref #7 253E02000 PAVEMENT REPAIR, (2470 CY)
Awd $340,860.00$138.00
Ref #8 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (159826 SY)
Awd $159,826.00$1.00
Ref #9 301E46000 ASPHALT CONCRETE BASE, PG64-22, (48 CY)
Awd $8,160.00$170.00
Ref #10 304E20000 AGGREGATE BASE, (10 CY)
Awd $1,400.00$140.00
Ref #11 407E10000 TACK COAT, (11235 GAL)
Awd $19,099.50$1.70
Ref #12 407E13900 TACK COAT, 702.13, (478 GAL)
Awd $908.20$1.90
Ref #13 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (3563 GAL)
Awd $6,057.10$1.70
Ref #14 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (6637 GAL)
Awd $14,269.55$2.15
Ref #15 407E20510 SPECIAL - TACK COAT, TRACKLESS TACK FOR INTERMEDIA, (4493 GAL)
Awd $9,659.95$2.15
Ref #16 408E10001 PRIME COAT, AS PER PLAN, (9258 GAL)
Awd $34,254.60$3.70
Ref #17 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (222 CY)
Awd $38,850.00$175.00
Ref #18 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (8361 CY)
Awd $1,103,652.00$132.00
Ref #19 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (4476 CY)
Awd $581,880.00$130.00
160190 - Page 192
Ref #20 516E31001 JOINT SEALER, AS PER PLAN, (218 FT)
Awd $3,422.60$15.70
Ref #21 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (1281 CY)
Awd $66,612.00$52.00
Ref #22 617E20000 SHOULDER PREPARATION, (23023 SY)
Awd $2,302.30$0.10
Ref #23 618E41000 EDGE LINE, RUMBLE STRIPE (ASPHALT CONCRETE), (17.88 MILE)
Awd $16,539.00$925.00
Section 3 - PAVEMENT - Totals
Awd $2,407,752.80
Ref #24 621E00100 RPM, (671 EACH)
Awd $13,755.50$20.50
Ref #25 621E54000 RAISED PAVEMENT MARKER REMOVED, (671 EACH)
Awd $5,032.50$7.50
Ref #26 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (84 FT)
Awd $1,008.00$12.00
Ref #27 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (7 EACH)
Awd $525.00$75.00
Ref #28 644E00400 CHANNELIZING LINE, 8", (1724 FT)
Awd $2,413.60$1.40
Ref #29 644E00500 STOP LINE, (749 FT)
Awd $4,494.00$6.00
Ref #30 644E00600 CROSSWALK LINE, (1924 FT)
Awd $5,483.40$2.85
Ref #31 644E00700 TRANSVERSE/DIAGONAL LINE, (780 FT)
Awd $4,680.00$6.00
Ref #32 644E00900 ISLAND MARKING, (95 SF)
Awd $570.00$6.00
Ref #33 644E01100 SCHOOL SYMBOL MARKING, 72", (6 EACH)
Awd $3,150.00$525.00
Ref #34 644E01200 PARKING LOT STALL MARKING, (1570 FT)
Awd $1,962.50$1.25
Ref #35 644E01300 LANE ARROW, (18 EACH)
Awd $1,530.00$85.00
Ref #36 644E01400 WORD ON PAVEMENT, 72", (9 EACH)
Awd $900.00$100.00
Ref #37 648E00100 EDGE LINE, 4", (19.72 MILE)
Awd $19,720.00$1,000.00
Ref #38 648E00200 LANE LINE, 4", (1.62 MILE)
Awd $891.00$550.00
Ref #39 648E00300 CENTER LINE, (14.55 MILE)
Awd $18,915.00$1,300.00
160190 - Page 193
Section 4 - TRAFFIC CONTROL - Totals
Awd $85,030.50
Ref #40 632E26501 DETECTOR LOOP, AS PER PLAN, (6 EACH)
Awd $5,700.00$950.00
Section 5 - TRAFFIC SIGNALS - Totals
Awd $5,700.00
Ref #41 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (40 HOUR)
Awd $2,400.00$60.00
Ref #42 614E12460 WORK ZONE MARKING SIGN, (84 EACH)
Awd $7,392.00$88.00
Ref #43 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (16 CY)
Awd $1,600.00$100.00
Ref #44 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (60 DAY)
Awd $1,920.00$32.00
Ref #45 614E21400 WORK ZONE CENTER LINE, CLASS II, (7.89 MILE)
Awd $5,325.75$675.00
Ref #46 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (12.28 MILE)
Awd $11,666.00$950.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $30,303.75
Ref #47 846E00111 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, A, (25 CF)
Awd $9,990.00$399.60
Section 7 - STRUCTURE REPAIR (KNO-95-0323) - Totals
Awd $9,990.00
Ref #48 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $10,000.00$10,000.00
Ref #49 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $171,729.00$171,729.00
Ref #50 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,200.00$3,200.00
Ref #51 624E10000 MOBILIZATION, (LUMP SUM)
Awd $100,000.00$100,000.00
Section 8 - INCIDENTALS - Totals
Awd $284,929.00
160190 - Page 194
Project No. 160191
PID 101706
MOE-CR 40-0.99
Federal
Type: BRIDGE REPAIR
Completion Date: 10/31/2016
Award Amount: $206,600.00
Contract Awarded To: RIGHTER COMPANY INC
Letting Date: 4/7/2016
Engineer's Estimate: $193,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
RIGHTER COMPANY INC
2424 HARRISON RD
COLUMBUS, OH 43204
Franklin
Bidder 1
Bid $206,600.00
160191 - Page 195
Ref #1 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $25,000.00$25,000.00
Ref #2 513E10001 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN, (LUMP SUM)
Awd $7,500.00$7,500.00
Ref #3 516E47000 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, (LUMP SUM)
Awd $97,500.00$97,500.00
Ref #4 530E00200 SPECIAL - STRUCTURE, MISC.:BOARD AND BATTEN SIDING, (LUMP SUM)
Awd $20,000.00$20,000.00
Ref #5 530E00600 SPECIAL - STRUCTURE, MISC.:BOARD AND BATTEN SIDING, (480 SF)
Awd $4,800.00$10.00
Ref #6 530E00600 SPECIAL - STRUCTURE, MISC.:TIMBER FLOORING, (240 SF)
Awd $3,600.00$15.00
Ref #7 530E10700 SPECIAL - STRUCTURE, MISC.:ADDITIONAL, (0.19 MFBM)
Awd $5,700.00$30,000.00
Ref #8 530E10700 SPECIAL - STRUCTURE, MISC.:MISCELLANEOUS FRAMING, (0.45 MFBM)
Awd $13,500.00$30,000.00
Ref #9 530E10700 SPECIAL - STRUCTURE, MISC.:RESTORATION OF TIMBER T, (0.5 MFBM)
Awd $15,000.00$30,000.00
Section 1 - STRUCTURE REPAIR (BRIDGE MOE-C.R. 40-0.9 - Totals
Awd $192,600.00
Ref #10 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,000.00$4,000.00
Ref #11 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
Section 2 - INCIDENTALS - Totals
Awd $14,000.00
160191 - Page 196
Project No. 160193
PID 88569
MOT-US 35-0.00
Federal
Type: TWO LANE RESURFACING
Completion Date: 10/15/2016
Award Amount: $1,170,860.00
Contract Awarded To: BARRETT PAVING MATERIALS INC
Letting Date: 4/7/2016
Engineer's Estimate: $1,386,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BARRETT PAVING MATERIALS INC
3751 COMMERCE DR
MIDDLETOWN, OH 45005
Warren
Bidder 1
Bid $1,170,860.00
JOHN R JURGENSEN COMPANY
11641 MOSTELLER RD
CINCINNATI, OH 45241
Hamilton
Bidder 2
Bid $1,296,427.40
160193 - Page 197
Ref #1 202E23500 WEARING COURSE REMOVED, (9384 SY)
Awd $39,412.80$4.20
2 $26,462.88$2.82
Section 1 - ROADWAY - Totals
Awd $39,412.80
2 $26,462.88
Ref #2 253E01001 PAVEMENT REPAIR, AS PER PLAN, (650 SY)
Awd $24,700.00$38.00
2 $41,288.00$63.52
Ref #3 301E46001 ASPHALT CONCRETE BASE, PG64-22, AS PER PLAN, (55 CY)
Awd $16,225.00$295.00
2 $17,018.10$309.42
Ref #4 407E10000 TACK COAT, (15543 GAL)
Awd $38,857.50$2.50
2 $38,857.50$2.50
Ref #5 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (4697 CY)
Awd $558,943.00$119.00
2 $583,555.28$124.24
Ref #6 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (2810 CY)
Awd $289,430.00$103.00
2 $339,391.80$120.78
Ref #7 617E10100 COMPACTED AGGREGATE, (818 CY)
Awd $40,900.00$50.00
2 $29,979.70$36.65
Ref #8 618E41000 EDGE LINE, RUMBLE STRIPE (ASPHALT CONCRETE), (12.66 MILE)
Awd $17,724.00$1,400.00
2 $14,774.22$1,167.00
Section 2 - PAVEMENT - Totals
Awd $986,779.50
2 $1,064,864.60
Ref #9 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN, (1 EACH)
Awd $200.00$200.00
2 $1,272.93$1,272.93
Section 3 - WATER WORK - Totals
Awd $200.00
2 $1,272.93
Ref #10 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (1 EACH)
Awd $500.00$500.00
2 $1,272.93$1,272.93
160193 - Page 198
Section 4 - SANITARY SEWER - Totals
Awd $500.00
2 $1,272.93
Ref #11 621E00100 RPM, (497 EACH)
Awd $11,182.50$22.50
2 $8,498.70$17.10
Ref #12 621E54000 RAISED PAVEMENT MARKER REMOVED, (497 EACH)
Awd $2,733.50$5.50
2 $6,252.26$12.58
Ref #13 642E00094 EDGE LINE, 6", (12.66 MILE)
Awd $7,532.70$595.00
2 $7,532.70$595.00
Ref #14 642E00290 CENTER LINE, (6.46 MILE)
Awd $2,907.00$450.00
2 $2,907.00$450.00
Ref #15 644E00400 CHANNELIZING LINE, 8", (189 FT)
Awd $274.05$1.45
2 $274.05$1.45
Ref #16 644E00500 STOP LINE, (102 FT)
Awd $504.90$4.95
2 $504.90$4.95
Ref #17 644E00700 TRANSVERSE/DIAGONAL LINE, (191 FT)
Awd $907.25$4.75
2 $907.25$4.75
Ref #18 644E01300 LANE ARROW, (4 EACH)
Awd $300.00$75.00
2 $300.00$75.00
Ref #19 690E50350 SPECIAL - MAILBOX REMOVED AND RESET, (11 EACH)
Awd $1,980.00$180.00
2 $2,183.83$198.53
Section 5 - TRAFFIC CONTROL - Totals
Awd $28,321.90
2 $29,360.69
Ref #20 632E26501 DETECTOR LOOP, AS PER PLAN, (2 EACH)
Awd $3,600.00$1,800.00
2 $2,150.00$1,075.00
Ref #21 632E27201 LOOP DETECTOR TIE IN, AS PER PLAN, (2 EACH)
Awd $300.00$150.00
2 $350.00$175.00
Section 6 - TRAFFIC SIGNALS - Totals
Awd $3,900.00
2 $2,500.00
160193 - Page 199
Ref #22 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (24 HOUR)
Awd $1,440.00$60.00
2 $1,755.36$73.14
Ref #23 614E12460 WORK ZONE MARKING SIGN, (64 EACH)
Awd $5,632.00$88.00
2 $5,463.68$85.37
Ref #24 614E21400 WORK ZONE CENTER LINE, CLASS II, (12.92 MILE)
Awd $6,912.20$535.00
2 $6,912.20$535.00
Section 7 - MAINTENANCE OF TRAFFIC - Totals
Awd $13,984.20
2 $14,131.24
Ref #25 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J, (80 FT)
Awd $1,040.00$13.00
2 $1,600.00$20.00
Ref #26 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (39 CF)
Awd $9,555.00$245.00
2 $9,446.58$242.22
Section 8 - STRUCTURE REPAIR (MOT-35-0155) - Totals
Awd $10,595.00
2 $11,046.58
Ref #27 512E33010 TYPE 3 WATERPROOFING, (579 SY)
Awd $17,370.00$30.00
2 $17,370.00$30.00
Ref #28 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J, (88 FT)
Awd $1,144.00$13.00
2 $1,760.00$20.00
Ref #29 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (43 CF)
Awd $10,535.00$245.00
2 $10,415.46$242.22
Section 9 - STRUCTURE REPAIR (MER-35-0600) - Totals
Awd $29,049.00
2 $29,545.46
Ref #30 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J, (526 FT)
Awd $6,838.00$13.00
2 $10,520.00$20.00
Ref #31 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (10 SF)
Awd $2,000.00$200.00
2 $2,000.00$200.00
160193 - Page 200
Section 10 - STRUCTURE REPAIR (MOT-35-0613) - Totals
Awd $8,838.00
2 $12,520.00
Ref #32 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J, (80 FT)
Awd $1,040.00$13.00
2 $1,600.00$20.00
Ref #33 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (15 SF)
Awd $3,000.00$200.00
2 $3,000.00$200.00
Ref #34 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (39 CF)
Awd $9,555.00$245.00
2 $9,446.58$242.22
Section 11 - STRUCTURE REPAIR (MOT-35-0871) - Totals
Awd $13,595.00
2 $14,046.58
Ref #35 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $1,593.98$1,593.98
Ref #36 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $24,184.60$24,184.60
2 $47,809.53$47,809.53
Ref #37 624E10000 MOBILIZATION, (LUMP SUM)
Awd $8,500.00$8,500.00
2 $40,000.00$40,000.00
Section 12 - INCIDENTALS - Totals
Awd $35,684.60
2 $89,403.51
160193 - Page 201
Project No. 160194
PID 100342
OTT-/WOO-SR 51-4.91/0.00 Resurf
Federal
Type: TWO LANE RESURFACING
Completion Date: 6/1/2017
Award Amount: $1,871,639.65
Contract Awarded To: SHELLY COMPANY
Letting Date: 4/7/2016
Engineer's Estimate: $1,748,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 1
Bid $1,871,639.65
KOKOSING CONSTRUCTION COMPANY INC
886 MC KINLEY AVE
COLUMBUS, OH 43222
Franklin
Bidder 2
Bid $1,982,236.35
GERKEN PAVING INC
9072 CO RD 424
NAPOLEON, OH 43545
Henry
Bidder 3
Bid $1,990,374.73
160194 - Page 202
Ref #1 611E98630 CATCH BASIN ADJUSTED TO GRADE, (17 EACH)
Awd $10,625.00$625.00
2 $9,350.00$550.00
3 $14,025.00$825.00
Ref #2 611E99654 MANHOLE ADJUSTED TO GRADE, (13 EACH)
Awd $8,125.00$625.00
2 $7,150.00$550.00
3 $10,725.00$825.00
Section 1 - DRAINAGE - Totals
Awd $18,750.00
2 $16,500.00
3 $24,750.00
Ref #3 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (4175 SY)
Awd $78,281.25$18.75
2 $104,375.00$25.00
3 $96,025.00$23.00
Ref #4 255E10110 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (560 SY)
Awd $95,760.00$171.00
2 $84,000.00$150.00
3 $109,200.00$195.00
Ref #5 255E20000 FULL DEPTH PAVEMENT SAWING, (2100 FT)
Awd $9,450.00$4.50
2 $8,400.00$4.00
3 $9,450.00$4.50
Ref #6 407E20100 SPECIAL - TACK COAT, TRACKLESS TACK, SURFACE COURS, (15344 GAL)
Awd $28,386.40$1.85
2 $30,688.00$2.00
3 $26,852.00$1.75
Ref #7 424E12000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, (5483 CY)
Awd $899,212.00$164.00
2 $959,525.00$175.00
3 $926,627.00$169.00
Ref #9 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (438 CY)
Awd $142,350.00$325.00
2 $83,220.00$190.00
3 $98,550.00$225.00
Ref #10 617E10100 COMPACTED AGGREGATE, (1156 CY)
Awd $52,020.00$45.00
2 $23,120.00$20.00
3 $56,644.00$49.00
Ref #11 875E10000 LONGITUDINAL JOINT ADHESIVE, (7800 LB)
Awd $9,750.00$1.25
2 $7,800.00$1.00
3 $15,210.00$1.95
Ref #12 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A, (203904 SY)
Awd $183,513.60$0.90
2 $203,904.00$1.00
3 $244,684.80$1.20
160194 - Page 203
Ref #100 441E50301 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (124 CY)
Awd $34,100.00$275.00
2 $43,400.00$350.00
3 $49,600.00$400.00
Section 2 - PAVEMENT - Totals
Awd $1,532,823.25
2 $1,548,432.00
3 $1,632,842.80
Ref #13 618E41000 EDGE LINE, RUMBLE STRIPE (ASPHALT CONCRETE), (15.76 MILE)
Awd $16,311.60$1,035.00
2 $18,518.00$1,175.00
3 $19,510.88$1,238.00
Ref #14 621E00100 RPM, (917 EACH)
Awd $17,239.60$18.80
2 $17,239.60$18.80
3 $17,239.60$18.80
Ref #15 621E54000 RAISED PAVEMENT MARKER REMOVED, (917 EACH)
Awd $15,589.00$17.00
2 $9,170.00$10.00
3 $12,838.00$14.00
Ref #16 632E26500 DETECTOR LOOP, (18 EACH)
Awd $17,550.00$975.00
2 $17,100.00$950.00
3 $20,556.00$1,142.00
Ref #17 642E00094 EDGE LINE, 6", (17.9 MILE)
Awd $11,635.00$650.00
2 $11,635.00$650.00
3 $11,187.50$625.00
Ref #18 642E00190 LANE LINE, 4", (0.42 MILE)
Awd $168.00$400.00
2 $168.00$400.00
3 $210.00$500.00
Ref #19 642E00290 CENTER LINE, (10.21 MILE)
Awd $8,678.50$850.00
2 $8,678.50$850.00
3 $5,053.95$495.00
Ref #20 644E00400 CHANNELIZING LINE, 8", (2985 FT)
Awd $3,731.25$1.25
2 $3,731.25$1.25
3 $3,731.25$1.25
Ref #21 644E00500 STOP LINE, (273 FT)
Awd $1,501.50$5.50
2 $1,501.50$5.50
3 $1,638.00$6.00
Ref #22 644E00700 TRANSVERSE/DIAGONAL LINE, (1427 FT)
Awd $6,421.50$4.50
2 $6,421.50$4.50
3 $8,562.00$6.00
160194 - Page 204
Ref #23 644E00900 ISLAND MARKING, (162 SF)
Awd $486.00$3.00
2 $486.00$3.00
3 $486.00$3.00
Ref #24 644E01300 LANE ARROW, (75 EACH)
Awd $6,000.00$80.00
2 $6,000.00$80.00
3 $6,000.00$80.00
Ref #25 644E01500 DOTTED LINE, 4", (3022 FT)
Awd $3,022.00$1.00
2 $3,022.00$1.00
3 $3,022.00$1.00
Section 3 - TRAFFIC CONTROL - Totals
Awd $108,333.95
2 $103,671.35
3 $110,035.18
Ref #26 614E12460 WORK ZONE MARKING SIGN, (16 EACH)
Awd $2,160.00$135.00
2 $2,160.00$135.00
3 $1,600.00$100.00
Ref #27 614E21400 WORK ZONE CENTER LINE, CLASS II, (20.3 MILE)
Awd $8,120.00$400.00
2 $7,105.00$350.00
3 $2,030.00$100.00
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $10,280.00
2 $9,265.00
3 $3,630.00
Ref #28 202E23501 WEARING COURSE REMOVED, AS PER PLAN, (316 SY)
Awd $7,900.00$25.00
2 $6,320.00$20.00
3 $4,740.00$15.00
Ref #29 407E20000 SPECIAL - TACK COAT, TRACKLESS TACK, INTERMEDIATE , (24 GAL)
Awd $44.40$1.85
2 $48.00$2.00
3 $42.00$1.75
Ref #30 407E20100 SPECIAL - TACK COAT, TRACKLESS TACK, SURFACE COURS, (13 GAL)
Awd $24.05$1.85
2 $26.00$2.00
3 $22.75$1.75
Ref #31 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (28 CY)
Awd $10,220.00$365.00
2 $9,800.00$350.00
3 $6,608.00$236.00
160194 - Page 205
Ref #32 512E33010 TYPE 3 WATERPROOFING, (316 SY)
Awd $11,060.00$35.00
2 $11,060.00$35.00
3 $11,060.00$35.00
Ref #33 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (278 SY)
Awd $7,784.00$28.00
2 $7,784.00$28.00
3 $7,784.00$28.00
Ref #34 516E31000 JOINT SEALER, (180 FT)
Awd $2,160.00$12.00
2 $2,160.00$12.00
3 $2,520.00$14.00
Ref #35 517E72710 RAILING (DEEP BEAM BRIDGE RETROFIT RAILING), (137.5 FT)
Awd $13,420.00$97.60
2 $13,750.00$100.00
3 $13,420.00$97.60
Ref #36 518E22300 SPECIAL - STEEL DRIP STRIP, (160 FT)
Awd $1,920.00$12.00
2 $1,920.00$12.00
3 $1,920.00$12.00
Section 5 - STRUCTURE REPAIR (OTT-51-5.84) - Totals
Awd $54,532.45
2 $52,868.00
3 $48,116.75
Ref #37 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $10,000.00$10,000.00
3 $11,000.00$11,000.00
Ref #38 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $90,000.00$90,000.00
2 $198,000.00$198,000.00
3 $110,000.00$110,000.00
Ref #39 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $8,920.00$8,920.00
2 $3,500.00$3,500.00
3 $10,000.00$10,000.00
Ref #40 624E10000 MOBILIZATION, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $40,000.00$40,000.00
3 $40,000.00$40,000.00
Section 6 - INCIDENTALS - Totals
Awd $146,920.00
2 $251,500.00
3 $171,000.00
160194 - Page 206
Project No. 160195
PID 97231
ROS-SR 207-4.73 Culvert
Federal
Type: CULVERT REPLACEMENT
Completion Date: 8/12/2016
Award Amount: $318,735.94
Contract Awarded To: PARKER CORPORATION
Letting Date: 4/7/2016
Engineer's Estimate: $325,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
PARKER CORPORATION
ST RT 7
TUPPERS PLAINS, OH 45783
Meigs
Bidder 1
Bid $318,735.94
FOILL INC
201 E NORTH ST
WAVERLY, OH 45690
Pike
Bidder 2
Bid $339,913.00
D G M INC
1881 ADAMS RD
BEAVER, OH 45613
Pike
Bidder 3
Bid $342,629.35
BUDS INC
6260 NEWARK RD
NASHPORT, OH 43830
Muskingum
Bidder 4
Bid $379,713.85
R C CONSTRUCTION COMPANY AND SON INC
8096 FEDERAL ROAD
CUTLER, OH 45724
Washington
Bidder 5
Bid $388,688.21
MASSANA CONSTRUCTION INC
115 HOWELL RD
TYRONE, GA 30290
Bidder 6
Bid $417,473.88
160195 - Page 207
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $38,000.00$38,000.00
2 $16,632.00$16,632.00
3 $14,000.00$14,000.00
4 $7,500.00$7,500.00
5 $4,500.00$4,500.00
6 $9,000.00$9,000.00
Ref #2 202E23000 PAVEMENT REMOVED, (543 SY)
Awd $2,715.00$5.00
2 $5,647.20$10.40
3 $3,801.00$7.00
4 $6,516.00$12.00
5 $5,430.00$10.00
6 $8,362.20$15.40
Ref #3 202E35200 PIPE REMOVED, OVER 24", (57 FT)
Awd $1,140.00$20.00
2 $3,208.53$56.29
3 $3,420.00$60.00
4 $7,125.00$125.00
5 $5,700.00$100.00
6 $1,353.18$23.74
Ref #4 202E38000 GUARDRAIL REMOVED, (308 FT)
Awd $616.00$2.00
2 $1,225.84$3.98
3 $308.00$1.00
4 $924.00$3.00
5 $924.00$3.00
6 $883.96$2.87
Ref #5 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A, (4 EACH)
Awd $800.00$200.00
2 $1,533.00$383.25
3 $1,000.00$250.00
4 $800.00$200.00
5 $2,000.00$500.00
6 $1,433.80$358.45
Ref #6 202E75000 FENCE REMOVED, (86 FT)
Awd $172.00$2.00
2 $307.02$3.57
3 $86.00$1.00
4 $258.00$3.00
5 $860.00$10.00
6 $671.66$7.81
Ref #7 203E10000 EXCAVATION, (1304 CY)
Awd $13,040.00$10.00
2 $13,013.92$9.98
3 $15,648.00$12.00
4 $20,864.00$16.00
5 $13,040.00$10.00
6 $28,388.08$21.77
160195 - Page 208
Ref #8 203E20000 EMBANKMENT, (1951 CY)
Awd $19,510.00$10.00
2 $24,543.58$12.58
3 $23,412.00$12.00
4 $31,216.00$16.00
5 $29,265.00$15.00
6 $44,755.94$22.94
Ref #9 204E10000 SUBGRADE COMPACTION, (1303 SY)
Awd $651.50$0.50
2 $5,928.65$4.55
3 $3,909.00$3.00
4 $2,606.00$2.00
5 $2,606.00$2.00
6 $4,417.17$3.39
Ref #10 606E15050 GUARDRAIL, TYPE MGS, (312.5 FT)
Awd $5,125.00$16.40
2 $5,250.00$16.80
3 $8,437.50$27.00
4 $5,000.00$16.00
5 $7,812.50$25.00
6 $7,168.75$22.94
Ref #11 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (3 EACH)
Awd $5,625.00$1,875.00
2 $6,441.75$2,147.25
3 $7,500.00$2,500.00
4 $6,135.00$2,045.00
5 $5,850.00$1,950.00
6 $8,796.36$2,932.12
Ref #12 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (1 EACH)
Awd $745.00$745.00
2 $745.50$745.50
3 $1,250.00$1,250.00
4 $710.00$710.00
5 $875.00$875.00
6 $1,018.00$1,018.00
Ref #13 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $6,825.00$6,825.00
3 $3,000.00$3,000.00
4 $3,000.00$3,000.00
5 $10,000.00$10,000.00
6 $1,720.56$1,720.56
Section 1 - ROADWAY - Totals
Awd $98,139.50
2 $91,301.99
3 $85,771.50
4 $92,654.00
5 $88,862.50
6 $117,969.66
160195 - Page 209
Ref #14 601E11000 RIPRAP USING 6" REINFORCED CONCRETE SLAB, (5 SY)
Awd $500.00$100.00
2 $4,546.50$909.30
3 $1,250.00$250.00
4 $2,100.00$420.00
5 $1,000.00$200.00
6 $2,449.75$489.95
Ref #15 601E35000 ROCK CHANNEL PROTECTION, MISC.:TYPE B ROCK REMOVED, (21 CY)
Awd $1,155.00$55.00
2 $1,478.40$70.40
3 $1,260.00$60.00
4 $2,520.00$120.00
5 $1,680.00$80.00
6 $2,309.16$109.96
Ref #16 659E00300 TOPSOIL, (36 CY)
Awd $1,980.00$55.00
2 $2,314.44$64.29
3 $540.00$15.00
4 $1,260.00$35.00
5 $1,080.00$30.00
6 $540.00$15.00
Ref #17 659E10000 SEEDING AND MULCHING, (3170 SY)
Awd $3,170.00$1.00
2 $6,498.50$2.05
3 $6,340.00$2.00
4 $2,536.00$0.80
5 $6,340.00$2.00
6 $6,149.80$1.94
Ref #18 659E14000 REPAIR SEEDING AND MULCHING, (159 SY)
Awd $7.95$0.05
2 $333.90$2.10
3 $7.95$0.05
4 $95.40$0.60
5 $31.80$0.20
6 $1.59$0.01
Ref #19 659E20000 COMMERCIAL FERTILIZER, (0.43 TON)
Awd $500.00$1,162.79
2 $337.05$783.84
3 $129.00$300.00
4 $301.00$700.00
5 $516.00$1,200.00
6 $322.50$750.00
Ref #20 659E31000 LIME, (0.65 ACRE)
Awd $500.00$769.23
2 $512.40$788.31
3 $65.00$100.00
4 $100.75$155.00
5 $520.00$800.00
6 $130.00$200.00
160195 - Page 210
Ref #21 659E35000 WATER, (17.1 MGAL)
Awd $0.86$0.05
2 $35.74$2.09
3 $17.10$1.00
4 $17.10$1.00
5 $0.86$0.05
6 $17.10$1.00
Ref #22 670E00700 DITCH EROSION PROTECTION, (88 SY)
Awd $176.00$2.00
2 $693.44$7.88
3 $264.00$3.00
4 $132.00$1.50
5 $1,320.00$15.00
6 $315.04$3.58
Ref #23 671E14000 EROSION CONTROL MAT, (352 SY)
Awd $704.00$2.00
2 $1,848.00$5.25
3 $1,056.00$3.00
4 $528.00$1.50
5 $5,280.00$15.00
6 $2,270.40$6.45
Ref #24 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $4,305.00$4,305.00
3 $3,250.00$3,250.00
4 $4,000.00$4,000.00
5 $12,500.00$12,500.00
6 $3,584.50$3,584.50
Ref #25 832E30000 EROSION CONTROL, (12500 EACH)
Awd $12,500.00$1.00
2 $12,500.00$1.00
3 $12,500.00$1.00
4 $12,500.00$1.00
5 $12,500.00$1.00
6 $12,500.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $31,193.81
2 $35,403.37
3 $26,679.05
4 $26,090.25
5 $42,768.66
6 $30,589.84
Ref #26 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (16 SY)
Awd $192.00$12.00
2 $537.60$33.60
3 $640.00$40.00
4 $1,280.00$80.00
5 $800.00$50.00
6 $827.20$51.70
160195 - Page 211
Ref #27 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (7 CY)
Awd $1,204.00$172.00
2 $1,199.10$171.30
3 $700.00$100.00
4 $1,050.00$150.00
5 $560.00$80.00
6 $557.76$79.68
Ref #28 602E20000 CONCRETE MASONRY, (14.6 CY)
Awd $8,760.00$600.00
2 $16,483.98$1,129.04
3 $8,760.00$600.00
4 $19,710.00$1,350.00
5 $10,950.00$750.00
6 $18,927.59$1,296.41
Ref #29 605E31100 AGGREGATE DRAINS, (94 FT)
Awd $940.00$10.00
2 $2,353.76$25.04
3 $1,128.00$12.00
4 $1,128.00$12.00
5 $940.00$10.00
6 $1,128.94$12.01
Ref #30 611E01400 6" CONDUIT, TYPE E, (50 FT)
Awd $500.00$10.00
2 $1,192.00$23.84
3 $100.00$2.00
4 $686.00$13.72
5 $250.00$5.00
6 $1,447.50$28.95
Ref #31 611E01500 6" CONDUIT, TYPE F, (50 FT)
Awd $500.00$10.00
2 $856.00$17.12
3 $100.00$2.00
4 $686.00$13.72
5 $250.00$5.00
6 $1,591.00$31.82
Ref #32 611E07900 18" CONDUIT, TYPE D, (26 FT)
Awd $1,950.00$75.00
2 $2,624.18$100.93
3 $1,300.00$50.00
4 $1,690.00$65.00
5 $2,210.00$85.00
6 $2,418.00$93.00
Ref #33 611E19200 42" CONDUIT, TYPE A, (92 FT)
Awd $18,400.00$200.00
2 $21,265.80$231.15
3 $34,500.00$375.00
4 $41,400.00$450.00
5 $36,800.00$400.00
6 $33,218.44$361.07
160195 - Page 212
Ref #34 611E99574 MANHOLE, NO. 3, (1 EACH)
Awd $5,000.00$5,000.00
2 $7,612.50$7,612.50
3 $9,000.00$9,000.00
4 $6,500.00$6,500.00
5 $12,500.00$12,500.00
6 $6,603.70$6,603.70
Section 3 - DRAINAGE - Totals
Awd $37,446.00
2 $54,124.92
3 $56,228.00
4 $74,130.00
5 $65,260.00
6 $66,720.13
Ref #35 252E01500 FULL DEPTH PAVEMENT SAWING, (93 FT)
Awd $930.00$10.00
2 $839.79$9.03
3 $465.00$5.00
4 $1,302.00$14.00
5 $1,860.00$20.00
6 $666.81$7.17
Ref #36 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1313 SY)
Awd $10,504.00$8.00
2 $6,341.79$4.83
3 $6,039.80$4.60
4 $6,039.80$4.60
5 $6,565.00$5.00
6 $6,565.00$5.00
Ref #37 301E46000 ASPHALT CONCRETE BASE, PG64-22, (228 CY)
Awd $27,588.00$121.00
2 $28,728.00$126.00
3 $28,956.00$127.00
4 $27,360.00$120.00
5 $27,360.00$120.00
6 $45,600.00$200.00
Ref #38 304E20000 AGGREGATE BASE, (258 CY)
Awd $14,190.00$55.00
2 $15,438.72$59.84
3 $10,320.00$40.00
4 $21,930.00$85.00
5 $16,770.00$65.00
6 $15,098.16$58.52
Ref #39 407E10000 TACK COAT, (264 GAL)
Awd $594.00$2.25
2 $623.04$2.36
3 $594.00$2.25
4 $1,056.00$4.00
5 $792.00$3.00
6 $1,135.20$4.30
160195 - Page 213
Ref #40 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (55 CY)
Awd $8,305.00$151.00
2 $8,662.50$157.50
3 $8,635.00$157.00
4 $8,250.00$150.00
5 $8,250.00$150.00
6 $12,375.00$225.00
Ref #41 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (92 CY)
Awd $13,892.00$151.00
2 $14,490.00$157.50
3 $14,444.00$157.00
4 $13,800.00$150.00
5 $13,800.00$150.00
6 $23,000.00$250.00
Section 4 - PAVEMENT - Totals
Awd $76,003.00
2 $75,123.84
3 $69,453.80
4 $79,737.80
5 $75,397.00
6 $104,440.17
Ref #42 621E00100 RPM, (8 EACH)
Awd $1,352.00$169.00
2 $5,460.00$682.50
3 $1,360.00$170.00
4 $1,352.00$169.00
5 $960.00$120.00
6 $2,466.16$308.27
Ref #43 621E54000 RAISED PAVEMENT MARKER REMOVED, (8 EACH)
Awd $80.00$10.00
2 $8.40$1.05
3 $8.00$1.00
4 $160.00$20.00
5 $160.00$20.00
6 $573.52$71.69
Ref #44 626E00100 BARRIER REFLECTOR, (7 EACH)
Awd $49.00$7.00
2 $73.50$10.50
3 $70.00$10.00
4 $70.00$10.00
5 $70.00$10.00
6 $40.18$5.74
Ref #45 642E00090 EDGE LINE, 4", (0.23 MILE)
Awd $747.50$3,250.00
2 $785.40$3,414.78
3 $805.00$3,500.00
4 $506.00$2,200.00
5 $805.00$3,500.00
6 $1,071.77$4,659.87
160195 - Page 214
Ref #46 642E00290 CENTER LINE, (0.3 MILE)
Awd $885.00$2,950.00
2 $929.25$3,097.50
3 $900.00$3,000.00
4 $1,320.00$4,400.00
5 $1,050.00$3,500.00
6 $1,268.91$4,229.70
Section 5 - TRAFFIC CONTROL - Totals
Awd $3,113.50
2 $7,256.55
3 $3,143.00
4 $3,408.00
5 $3,045.00
6 $5,420.54
Ref #47 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $13,860.00$13,860.00
3 $12,000.00$12,000.00
4 $22,000.00$22,000.00
5 $18,000.00$18,000.00
6 $1,500.00$1,500.00
Ref #48 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (16 HOUR)
Awd $160.00$10.00
2 $1,344.00$84.00
3 $800.00$50.00
4 $1,120.00$70.00
5 $2,400.00$150.00
6 $960.00$60.00
Ref #49 614E11630 INCREASED BARRIER DELINEATION, (460 FT)
Awd $2,300.00$5.00
2 $483.00$1.05
3 $690.00$1.50
4 $920.00$2.00
5 $1,380.00$3.00
6 $823.40$1.79
Ref #50 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (4 EACH)
Awd $6,000.00$1,500.00
2 $8,589.00$2,147.25
3 $7,200.00$1,800.00
4 $8,400.00$2,100.00
5 $7,600.00$1,900.00
6 $10,800.00$2,700.00
Ref #51 614E13202 BARRIER REFLECTOR, TYPE A2, (8 EACH)
Awd $80.00$10.00
2 $8.40$1.05
3 $140.00$17.50
4 $96.00$12.00
5 $80.00$10.00
6 $103.20$12.90
160195 - Page 215
Ref #52 614E13302 BARRIER REFLECTOR, TYPE B2, (9 EACH)
Awd $90.00$10.00
2 $165.87$18.43
3 $157.50$17.50
4 $108.00$12.00
5 $90.00$10.00
6 $116.10$12.90
Ref #53 614E13360 OBJECT MARKER, TWO WAY, (17 EACH)
Awd $170.00$10.00
2 $312.97$18.41
3 $297.50$17.50
4 $272.00$16.00
5 $340.00$20.00
6 $304.64$17.92
Ref #54 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I, (0.19 MILE)
Awd $500.08$2,632.00
2 $2,317.35$12,196.58
3 $2,280.00$12,000.00
4 $912.00$4,800.00
5 $1,425.00$7,500.00
6 $1,294.55$6,813.42
Ref #55 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (0.4 MILE)
Awd $500.00$1,250.00
2 $2,660.70$6,651.75
3 $2,600.00$6,500.00
4 $1,920.00$4,800.00
5 $3,000.00$7,500.00
6 $2,725.37$6,813.42
Ref #56 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I, (24 FT)
Awd $240.00$10.00
2 $163.92$6.83
3 $168.00$7.00
4 $64.80$2.70
5 $1,440.00$60.00
6 $92.88$3.87
Ref #57 616E10000 WATER, (1 MGAL)
Awd $0.05$0.05
2 $2.10$2.10
3 $1.00$1.00
4 $1.00$1.00
5 $0.05$0.05
6 $1.00$1.00
Ref #58 622E41000 PORTABLE BARRIER, 32", (460 FT)
Awd $4,600.00$10.00
2 $19,057.80$41.43
3 $7,820.00$17.00
4 $8,280.00$18.00
5 $4,600.00$10.00
6 $15,755.00$34.25
160195 - Page 216
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $20,640.13
2 $48,965.11
3 $34,154.00
4 $44,093.80
5 $40,355.05
6 $34,476.14
Ref #59 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $11,900.00$11,900.00
2 $5,010.60$5,010.60
3 $32,500.00$32,500.00
4 $4,200.00$4,200.00
5 $8,500.00$8,500.00
6 $6,130.00$6,130.00
Ref #60 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $18,000.00$18,000.00
2 $5,197.50$5,197.50
3 $17,300.00$17,300.00
4 $28,000.00$28,000.00
5 $35,000.00$35,000.00
6 $19,591.50$19,591.50
Ref #61 619E16000 FIELD OFFICE, TYPE A, (3 MNTH)
Awd $300.00$100.00
2 $3,937.50$1,312.50
3 $2,400.00$800.00
4 $3,900.00$1,300.00
5 $4,500.00$1,500.00
6 $7,500.00$2,500.00
Ref #62 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $2,847.51$2,847.51
3 $5,000.00$5,000.00
4 $3,500.00$3,500.00
5 $10,000.00$10,000.00
6 $7,885.90$7,885.90
Ref #63 624E10000 MOBILIZATION, (LUMP SUM)
Awd $12,000.00$12,000.00
2 $10,744.11$10,744.11
3 $10,000.00$10,000.00
4 $20,000.00$20,000.00
5 $15,000.00$15,000.00
6 $16,750.00$16,750.00
Section 7 - INCIDENTALS - Totals
Awd $52,200.00
2 $27,737.22
3 $67,200.00
4 $59,600.00
5 $73,000.00
6 $57,857.40
160195 - Page 217
Project No. 160196
PID 87331
SCI-SR 140-9.73 Brdg Replace
Federal
Type: CULVERT REPLACEMENT
Completion Date: 8/31/2016
Award Amount: $333,491.09
Contract Awarded To: PARKER CORPORATION
Letting Date: 4/7/2016
Engineer's Estimate: $350,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
PARKER CORPORATION
ST RT 7
TUPPERS PLAINS, OH 45783
Meigs
Bidder 1
Bid $333,491.09
ALLARD EXCAVATION LLC
8336 BENNETT SCHOOL HOUSE RD
SOUTH WEBSTER, OH 45682
Scioto
Bidder 2
Bid $347,704.86
FOILL INC
201 E NORTH ST
WAVERLY, OH 45690
Pike
Bidder 3
Bid $358,921.28
R C CONSTRUCTION COMPANY AND SON INC
8096 FEDERAL ROAD
CUTLER, OH 45724
Washington
Bidder 4
Bid $415,599.55
ALAN STONE CO INC
1324 ELLIS RUN RD
CUTLER, OH 45724
Washington
Bidder 5
Bid $420,414.19
D G M INC
1881 ADAMS RD
BEAVER, OH 45613
Pike
Bidder 6
Bid $431,918.70
WAI CONSTRUCTION GROUP
1571 SHYVILLE RD
PIKETON, OH 45661
Pike
Bidder 7
Bid $470,414.79
160196 - Page 218
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $15,200.00$15,200.00
2 $1,956.00$1,956.00
3 $9,570.00$9,570.00
4 $5,500.00$5,500.00
5 $3,909.00$3,909.00
6 $16,500.00$16,500.00
7 $5,106.00$5,106.00
Ref #2 202E23010 PAVEMENT REMOVED, ASPHALT, (250 SY)
Awd $1,250.00$5.00
2 $1,212.50$4.85
3 $5,915.00$23.66
4 $6,250.00$25.00
5 $2,750.00$11.00
6 $3,000.00$12.00
7 $2,552.50$10.21
Ref #3 202E38000 GUARDRAIL REMOVED, (668 FT)
Awd $1,336.00$2.00
2 $1,088.84$1.63
3 $2,565.12$3.84
4 $2,004.00$3.00
5 $3,941.20$5.90
6 $668.00$1.00
7 $2,965.92$4.44
Ref #4 203E10000 EXCAVATION, (634 CY)
Awd $6,340.00$10.00
2 $3,569.42$5.63
3 $7,703.10$12.15
4 $9,510.00$15.00
5 $18,386.00$29.00
6 $9,510.00$15.00
7 $16,198.70$25.55
Ref #5 203E20000 EMBANKMENT, (369 CY)
Awd $3,690.00$10.00
2 $4,033.17$10.93
3 $4,752.72$12.88
4 $7,380.00$20.00
5 $2,804.40$7.60
6 $5,535.00$15.00
7 $13,892.85$37.65
Ref #6 204E10000 SUBGRADE COMPACTION, (238 SY)
Awd $119.00$0.50
2 $1,137.64$4.78
3 $2,156.28$9.06
4 $476.00$2.00
5 $844.90$3.55
6 $1,190.00$5.00
7 $1,497.02$6.29
160196 - Page 219
Ref #7 606E15050 GUARDRAIL, TYPE MGS, (450 FT)
Awd $7,560.00$16.80
2 $7,245.00$16.10
3 $7,969.50$17.71
4 $9,900.00$22.00
5 $7,200.00$16.00
6 $7,650.00$17.00
7 $29,970.00$66.60
Ref #8 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN, (43.75 FT)
Awd $1,015.00$23.20
2 $743.75$17.00
3 $818.56$18.71
4 $1,006.25$23.00
5 $875.00$20.00
6 $787.50$18.00
7 $3,642.19$83.25
Ref #9 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (4 EACH)
Awd $7,180.00$1,795.00
2 $8,000.00$2,000.00
3 $8,800.00$2,200.00
4 $6,800.00$1,700.00
5 $7,768.00$1,942.00
6 $8,400.00$2,100.00
7 $1,110.00$277.50
Ref #10 623E38500 MONUMENT ASSEMBLY, (4 EACH)
Awd $2,000.00$500.00
2 $1,000.00$250.00
3 $3,080.00$770.00
4 $3,800.00$950.00
5 $1,816.00$454.00
6 $1,200.00$300.00
7 $1,110.00$277.50
Section 1 - ROADWAY - Totals
Awd $45,690.00
2 $29,986.32
3 $53,330.28
4 $52,626.25
5 $50,294.50
6 $54,440.50
7 $78,045.18
Ref #11 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (45 CY)
Awd $2,475.00$55.00
2 $2,700.00$60.00
3 $4,322.25$96.05
4 $3,600.00$80.00
5 $3,780.00$84.00
6 $3,150.00$70.00
7 $4,916.70$109.26
160196 - Page 220
Ref #12 659E10000 SEEDING AND MULCHING, (2664 SY)
Awd $2,664.00$1.00
2 $5,194.80$1.95
3 $6,153.84$2.31
4 $5,328.00$2.00
5 $4,795.20$1.80
6 $6,660.00$2.50
7 $4,262.40$1.60
Ref #13 659E14000 REPAIR SEEDING AND MULCHING, (134 SY)
Awd $6.70$0.05
2 $134.00$1.00
3 $294.80$2.20
4 $26.80$0.20
5 $73.70$0.55
6 $6.70$0.05
7 $301.50$2.25
Ref #14 659E20000 COMMERCIAL FERTILIZER, (0.24 TON)
Awd $250.08$1,042.00
2 $180.00$750.00
3 $206.80$861.67
4 $288.00$1,200.00
5 $133.56$556.50
6 $72.00$300.00
7 $207.79$865.79
Ref #15 659E31000 LIME, (0.55 ACRE)
Awd $250.25$455.00
2 $110.00$200.00
3 $454.30$826.00
4 $440.00$800.00
5 $46.20$84.00
6 $55.00$100.00
7 $207.57$377.40
Ref #16 659E35000 WATER, (8 MGAL)
Awd $0.40$0.05
2 $8.00$1.00
3 $17.60$2.20
4 $0.40$0.05
5 $8.40$1.05
6 $8.00$1.00
7 $8.88$1.11
Ref #17 832E30000 EROSION CONTROL, (4000 EACH)
Awd $4,000.00$1.00
2 $4,000.00$1.00
3 $4,000.00$1.00
4 $4,000.00$1.00
5 $4,000.00$1.00
6 $4,000.00$1.00
7 $4,000.00$1.00
160196 - Page 221
Section 2 - EROSION CONTROL - Totals
Awd $9,646.43
2 $12,326.80
3 $15,449.59
4 $13,683.20
5 $12,837.06
6 $13,951.70
7 $13,904.84
Ref #18 605E31100 AGGREGATE DRAINS, (57 FT)
Awd $570.00$10.00
2 $800.85$14.05
3 $1,212.39$21.27
4 $570.00$10.00
5 $1,197.00$21.00
6 $684.00$12.00
7 $2,363.22$41.46
Section 3 - DRAINAGE - Totals
Awd $570.00
2 $800.85
3 $1,212.39
4 $570.00
5 $1,197.00
6 $684.00
7 $2,363.22
Ref #19 252E01500 FULL DEPTH PAVEMENT SAWING, (60 FT)
Awd $300.00$5.00
2 $150.00$2.50
3 $880.20$14.67
4 $3,000.00$50.00
5 $2,400.00$40.00
6 $480.00$8.00
7 $554.40$9.24
Ref #20 301E46000 ASPHALT CONCRETE BASE, PG64-22, (81 CY)
Awd $21,627.00$267.00
2 $17,516.25$216.25
3 $18,800.10$232.10
4 $22,680.00$280.00
5 $22,619.25$279.25
6 $22,275.00$275.00
7 $40,459.50$499.50
Ref #21 304E20000 AGGREGATE BASE, (39 CY)
Awd $2,145.00$55.00
2 $3,402.75$87.25
3 $2,891.85$74.15
4 $3,120.00$80.00
5 $4,572.75$117.25
6 $2,925.00$75.00
7 $3,162.90$81.10
160196 - Page 222
Ref #22 407E10000 TACK COAT, (21 GAL)
Awd $42.00$2.00
2 $42.00$2.00
3 $69.30$3.30
4 $210.00$10.00
5 $44.10$2.10
6 $42.00$2.00
7 $466.20$22.20
Ref #23 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (11 GAL)
Awd $22.00$2.00
2 $22.00$2.00
3 $58.30$5.30
4 $110.00$10.00
5 $23.10$2.10
6 $22.00$2.00
7 $244.20$22.20
Ref #24 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (23 CY)
Awd $6,601.00$287.00
2 $7,480.75$325.25
3 $6,147.90$267.30
4 $6,440.00$280.00
5 $6,905.75$300.25
6 $6,900.00$300.00
7 $11,488.50$499.50
Section 4 - PAVEMENT - Totals
Awd $30,737.00
2 $28,613.75
3 $28,847.65
4 $35,560.00
5 $36,564.95
6 $32,644.00
7 $56,375.70
Ref #25 621E00100 RPM, (2 EACH)
Awd $1,000.00$500.00
2 $1,000.00$500.00
3 $2,200.00$1,100.00
4 $1,000.00$500.00
5 $1,000.00$500.00
6 $1,640.00$820.00
7 $666.00$333.00
Ref #26 621E54000 RAISED PAVEMENT MARKER REMOVED, (2 EACH)
Awd $20.00$10.00
2 $17.24$8.62
3 $2.20$1.10
4 $40.00$20.00
5 $26.00$13.00
6 $2.00$1.00
7 $22.20$11.10
160196 - Page 223
Ref #27 626E00100 BARRIER REFLECTOR, (10 EACH)
Awd $70.00$7.00
2 $100.00$10.00
3 $110.00$11.00
4 $100.00$10.00
5 $120.00$12.00
6 $80.00$8.00
7 $133.20$13.32
Ref #28 642E00090 EDGE LINE, 4", (0.24 MILE)
Awd $648.00$2,700.00
2 $708.00$2,950.00
3 $778.80$3,245.00
4 $840.00$3,500.00
5 $680.16$2,834.00
6 $840.00$3,500.00
7 $732.48$3,052.00
Ref #29 642E00290 CENTER LINE, (0.12 MILE)
Awd $324.00$2,700.00
2 $708.00$5,900.00
3 $778.80$6,490.00
4 $420.00$3,500.00
5 $340.08$2,834.00
6 $780.00$6,500.00
7 $732.60$6,105.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $2,062.00
2 $2,533.24
3 $3,869.80
4 $2,400.00
5 $2,166.24
6 $3,342.00
7 $2,286.48
Ref #30 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (16 HOUR)
Awd $160.00$10.00
2 $1,040.00$65.00
3 $1,056.00$66.00
4 $2,400.00$150.00
5 $1,264.00$79.00
6 $800.00$50.00
7 $1,065.60$66.60
Ref #31 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (8 EACH)
Awd $12,000.00$1,500.00
2 $14,400.00$1,800.00
3 $17,600.00$2,200.00
4 $14,400.00$1,800.00
5 $15,120.00$1,890.00
6 $14,400.00$1,800.00
7 $32,412.00$4,051.50
160196 - Page 224
Ref #32 614E13200 BARRIER REFLECTOR, TYPE A, (6 EACH)
Awd $60.00$10.00
2 $72.00$12.00
3 $13.20$2.20
4 $60.00$10.00
5 $37.80$6.30
6 $48.00$8.00
7 $79.92$13.32
Ref #33 614E13300 BARRIER REFLECTOR, TYPE B, (32 EACH)
Awd $320.00$10.00
2 $320.00$10.00
3 $352.00$11.00
4 $320.00$10.00
5 $201.60$6.30
6 $320.00$10.00
7 $284.16$8.88
Ref #34 614E13360 OBJECT MARKER, TWO WAY, (38 EACH)
Awd $380.00$10.00
2 $665.00$17.50
3 $731.50$19.25
4 $760.00$20.00
5 $532.00$14.00
6 $665.00$17.50
7 $674.88$17.76
Ref #35 614E22000 WORK ZONE EDGE LINE, CLASS I, (0.66 MILE)
Awd $1,000.56$1,516.00
2 $2,145.00$3,250.00
3 $2,359.50$3,575.00
4 $4,950.00$7,500.00
5 $4,206.84$6,374.00
6 $2,310.00$3,500.00
7 $4,761.90$7,215.00
Ref #36 614E26000 WORK ZONE STOP LINE, CLASS I, (24 FT)
Awd $240.00$10.00
2 $468.00$19.50
3 $514.80$21.45
4 $1,440.00$60.00
5 $151.20$6.30
6 $480.00$20.00
7 $159.84$6.66
Ref #37 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, (355 SY)
Awd $23,075.00$65.00
2 $16,259.00$45.80
3 $27,892.35$78.57
4 $31,950.00$90.00
5 $24,495.00$69.00
6 $18,637.50$52.50
7 $31,133.50$87.70
160196 - Page 225
Ref #38 616E10000 WATER, (2 MGAL)
Awd $0.10$0.05
2 $2.00$1.00
3 $4.40$2.20
4 $0.10$0.05
5 $2.10$1.05
6 $2.00$1.00
7 $2.22$1.11
Ref #39 622E41000 PORTABLE BARRIER, 32", (1250 FT)
Awd $12,500.00$10.00
2 $9,587.50$7.67
3 $44,437.50$35.55
4 $18,750.00$15.00
5 $18,750.00$15.00
6 $13,750.00$11.00
7 $46,337.50$37.07
Ref #40 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, (30 FT)
Awd $300.00$10.00
2 $745.20$24.84
3 $2,623.50$87.45
4 $750.00$25.00
5 $480.00$16.00
6 $360.00$12.00
7 $4,602.90$153.43
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $50,035.66
2 $45,703.70
3 $97,584.75
4 $75,780.10
5 $65,240.54
6 $51,772.50
7 $121,514.42
Ref #41 202E11000 STRUCTURE REMOVED, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $9,918.00$9,918.00
3 $7,975.00$7,975.00
4 $12,500.00$12,500.00
5 $10,322.00$10,322.00
6 $30,000.00$30,000.00
7 $27,572.40$27,572.40
Ref #42 202E23500 WEARING COURSE REMOVED, (55 SY)
Awd $275.00$5.00
2 $319.55$5.81
3 $580.80$10.56
4 $1,650.00$30.00
5 $8,662.50$157.50
6 $385.00$7.00
7 $1,275.45$23.19
160196 - Page 226
Ref #43 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $8,004.00$8,004.00
3 $6,160.00$6,160.00
4 $18,000.00$18,000.00
5 $29,241.00$29,241.00
6 $12,000.00$12,000.00
7 $10,101.00$10,101.00
Ref #44 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $4,843.80$4,843.80
3 $9,592.00$9,592.00
4 $6,500.00$6,500.00
5 $9,771.00$9,771.00
6 $4,500.00$4,500.00
7 $9,046.50$9,046.50
Ref #45 509E10000 EPOXY COATED REINFORCING STEEL, (5428 LB)
Awd $6,785.00$1.25
2 $4,559.52$0.84
3 $6,839.28$1.26
4 $13,570.00$2.50
5 $9,770.40$1.80
6 $8,142.00$1.50
7 $6,893.56$1.27
Ref #46 511E46010 CLASS QC1 CONCRETE, (13 CY)
Awd $7,800.00$600.00
2 $16,083.86$1,237.22
3 $16,345.94$1,257.38
4 $7,150.00$550.00
5 $17,732.00$1,364.00
6 $10,400.00$800.00
7 $10,761.40$827.80
Ref #47 511E46510 CLASS QC1 CONCRETE, FOOTING, (38 CY)
Awd $19,000.00$500.00
2 $14,810.88$389.76
3 $14,058.10$369.95
4 $20,900.00$550.00
5 $20,748.00$546.00
6 $41,800.00$1,100.00
7 $8,599.02$226.29
Ref #48 511E46610 CLASS QC1 CONCRETE, HEADWALL, (1 CY)
Awd $600.00$600.00
2 $1,117.80$1,117.80
3 $4,180.00$4,180.00
4 $550.00$550.00
5 $811.00$811.00
6 $1,250.00$1,250.00
7 $1,635.00$1,635.00
160196 - Page 227
Ref #49 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (67 SY)
Awd $804.00$12.00
2 $2,345.00$35.00
3 $1,302.48$19.44
4 $2,680.00$40.00
5 $2,479.00$37.00
6 $2,345.00$35.00
7 $2,206.98$32.94
Ref #50 512E33000 TYPE 2 WATERPROOFING, (88 SY)
Awd $1,232.00$14.00
2 $4,603.28$52.31
3 $2,130.48$24.21
4 $2,200.00$25.00
5 $2,024.00$23.00
6 $1,584.00$18.00
7 $1,833.04$20.83
Ref #51 512E33010 TYPE 3 WATERPROOFING, (100 SY)
Awd $1,800.00$18.00
2 $6,266.00$62.66
3 $3,410.00$34.10
4 $3,000.00$30.00
5 $3,300.00$33.00
6 $2,750.00$27.50
7 $3,507.00$35.07
Ref #52 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (34 SF)
Awd $170.00$5.00
2 $1,276.36$37.54
3 $65.96$1.94
4 $680.00$20.00
5 $1,632.00$48.00
6 $408.00$12.00
7 $266.90$7.85
Ref #53 518E21231 POROUS BACKFILL WITH FILTER FABRIC, AS PER PLAN, (LUMP SUM)
Awd $1,200.00$1,200.00
2 $3,630.59$3,630.59
3 $3,636.60$3,636.60
4 $6,500.00$6,500.00
5 $2,056.00$2,056.00
6 $1,500.00$1,500.00
7 $4,240.20$4,240.20
Ref #54 611E95200 10' X 6' CONDUIT, TYPE A, 706.05, (66 FT)
Awd $60,984.00$924.00
2 $81,421.56$1,233.66
3 $52,488.48$795.28
4 $72,600.00$1,100.00
5 $57,024.00$864.00
6 $70,620.00$1,070.00
7 $57,136.86$865.71
160196 - Page 228
Section 7 - STRUCTURE UNDER 20 FOOT SPAN (SCI-140-09 - Totals
Awd $113,650.00
2 $159,200.20
3 $128,765.12
4 $168,480.00
5 $175,572.90
6 $187,684.00
7 $145,075.31
Ref #55 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $17,200.00$17,200.00
2 $19,000.00$19,000.00
3 $5,320.70$5,320.70
4 $9,500.00$9,500.00
5 $2,730.00$2,730.00
6 $40,000.00$40,000.00
7 $6,201.00$6,201.00
Ref #56 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $23,200.00$23,200.00
2 $27,640.00$27,640.00
3 $6,050.00$6,050.00
4 $35,000.00$35,000.00
5 $44,649.00$44,649.00
6 $31,000.00$31,000.00
7 $30,525.00$30,525.00
Ref #57 619E16000 FIELD OFFICE, TYPE A, (3 MNTH)
Awd $300.00$100.00
2 $2,400.00$800.00
3 $5,940.00$1,980.00
4 $3,000.00$1,000.00
5 $3,339.00$1,113.00
6 $2,400.00$800.00
7 $2,657.34$885.78
Ref #58 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $15,200.00$15,200.00
2 $2,500.00$2,500.00
3 $4,290.00$4,290.00
4 $9,000.00$9,000.00
5 $6,823.00$6,823.00
6 $4,000.00$4,000.00
7 $4,251.30$4,251.30
Ref #59 624E10000 MOBILIZATION, (LUMP SUM)
Awd $25,200.00$25,200.00
2 $17,000.00$17,000.00
3 $8,261.00$8,261.00
4 $10,000.00$10,000.00
5 $19,000.00$19,000.00
6 $10,000.00$10,000.00
7 $7,215.00$7,215.00
160196 - Page 229
Section 8 - INCIDENTALS - Totals
Awd $81,100.00
2 $68,540.00
3 $29,861.70
4 $66,500.00
5 $76,541.00
6 $87,400.00
7 $50,849.64
160196 - Page 230
Project No. 160197
PID 85076
SUM-Cleve-Mass Road Phase 1
Federal
Type: MINOR WIDENING
Completion Date: 9/30/2017
Award Amount: $2,022,555.13
Contract Awarded To: KARVO COMPANIES INC
Letting Date: 4/7/2016
Engineer's Estimate: $2,002,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
KARVO COMPANIES INC
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 1
Bid $2,022,555.13
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 2
Bid $2,158,869.33
LOCKHART CONCRETE CO
800 W WATERLOO RD
AKRON, OH 44314
Summit
Bidder 3
Bid $2,419,398.00
ECLIPSE CO LLC
11554 EAST WASHINGTON ST
CHAGRIN FALLS, OH 44023
Geauga
Bidder 4
Bid $2,524,895.94
MOUNTAINEER CONTRACTORS INC
ROUTE 26 SOUTH
KINGWOOD, WV 26537
Bidder 5
Bid $2,632,077.70
WENGER EXCAVATING INC
P O BOX 499 26 NORTH COCHRAN STREET
DALTON, OH 44618
Wayne
Bidder 6
Bid $2,671,500.26
160197 - Page 231
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $8,500.00$8,500.00
2 $5,000.00$5,000.00
3 $76,000.00$76,000.00
4 $14,175.00$14,175.00
5 $42,280.00$42,280.00
6 $12,444.00$12,444.00
Ref #2 202E23000 PAVEMENT REMOVED, (1528 SY)
Awd $12,224.00$8.00
2 $16,808.00$11.00
3 $7,640.00$5.00
4 $27,504.00$18.00
5 $10,283.44$6.73
6 $14,363.20$9.40
Ref #3 202E23010 PAVEMENT REMOVED, ASPHALT, (3560 SY)
Awd $33,108.00$9.30
2 $17,800.00$5.00
3 $17,800.00$5.00
4 $55,180.00$15.50
5 $43,610.00$12.25
6 $30,616.00$8.60
Ref #4 202E30000 WALK REMOVED, (474 SF)
Awd $948.00$2.00
2 $474.00$1.00
3 $118.50$0.25
4 $711.00$1.50
5 $1,730.10$3.65
6 $474.00$1.00
Ref #5 202E35100 PIPE REMOVED, 24" AND UNDER, (676 FT)
Awd $16,900.00$25.00
2 $12,168.00$18.00
3 $3,380.00$5.00
4 $22,308.00$33.00
5 $23,119.20$34.20
6 $7,706.40$11.40
Ref #6 202E35200 PIPE REMOVED, OVER 24", (59 FT)
Awd $2,301.00$39.00
2 $1,180.00$20.00
3 $1,180.00$20.00
4 $1,740.50$29.50
5 $10,502.00$178.00
6 $991.20$16.80
Ref #7 202E38000 GUARDRAIL REMOVED, (176 FT)
Awd $880.00$5.00
2 $440.00$2.50
3 $352.00$2.00
4 $880.00$5.00
5 $1,302.40$7.40
6 $704.00$4.00
160197 - Page 232
Ref #8 202E58100 CATCH BASIN REMOVED, (9 EACH)
Awd $3,600.00$400.00
2 $2,250.00$250.00
3 $450.00$50.00
4 $3,712.50$412.50
5 $6,615.00$735.00
6 $3,312.00$368.00
Ref #9 203E10000 EXCAVATION, (1702 CY)
Awd $28,763.80$16.90
2 $17,871.00$10.50
3 $25,530.00$15.00
4 $42,550.00$25.00
5 $57,612.70$33.85
6 $35,401.60$20.80
Ref #10 203E20000 EMBANKMENT, (3243 CY)
Awd $25,457.55$7.85
2 $17,836.50$5.50
3 $48,645.00$15.00
4 $51,888.00$16.00
5 $101,181.60$31.20
6 $108,964.80$33.60
Ref #11 204E10000 SUBGRADE COMPACTION, (5709 SY)
Awd $8,563.50$1.50
2 $25,690.50$4.50
3 $85,635.00$15.00
4 $14,272.50$2.50
5 $5,709.00$1.00
6 $17,127.00$3.00
Ref #12 204E13000 EXCAVATION OF SUBGRADE, (1477 CY)
Awd $22,155.00$15.00
2 $23,632.00$16.00
3 $22,155.00$15.00
4 $36,925.00$25.00
5 $50,218.00$34.00
6 $27,472.20$18.60
Ref #13 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN, (1484 CY)
Awd $65,296.00$44.00
2 $68,264.00$46.00
3 $29,680.00$20.00
4 $92,750.00$62.50
5 $100,125.48$67.47
6 $72,122.40$48.60
Ref #14 204E45000 PROOF ROLLING, (3 HOUR)
Awd $330.00$110.00
2 $900.00$300.00
3 $300.00$100.00
4 $556.50$185.50
5 $294.36$98.12
6 $672.00$224.00
160197 - Page 233
Ref #15 204E50000 GEOTEXTILE FABRIC, (4454 SY)
Awd $5,790.20$1.30
2 $4,454.00$1.00
3 $11,135.00$2.50
4 $2,227.00$0.50
5 $5,344.80$1.20
6 $7,571.80$1.70
Ref #16 608E10000 4" CONCRETE WALK, (15155 SF)
Awd $59,862.25$3.95
2 $75,775.00$5.00
3 $136,395.00$9.00
4 $75,775.00$5.00
5 $75,017.25$4.95
6 $112,147.00$7.40
Ref #17 608E13001 6" CONCRETE WALK, AS PER PLAN, (2951 SF)
Awd $14,164.80$4.80
2 $20,657.00$7.00
3 $29,510.00$10.00
4 $20,657.00$7.00
5 $21,099.65$7.15
6 $31,280.60$10.60
Ref #18 608E15001 8" CONCRETE WALK, AS PER PLAN, (1075 SF)
Awd $5,858.75$5.45
2 $10,750.00$10.00
3 $11,825.00$11.00
4 $10,212.50$9.50
5 $11,825.00$11.00
6 $17,630.00$16.40
Ref #19 608E52060 CURB RAMP, TYPE C2, (815 SF)
Awd $6,927.50$8.50
2 $15,485.00$19.00
3 $8,150.00$10.00
4 $13,447.50$16.50
5 $15,485.00$19.00
6 $14,344.00$17.60
Ref #20 623E38500 MONUMENT ASSEMBLY, (10 EACH)
Awd $9,250.00$925.00
2 $13,000.00$1,300.00
3 $7,000.00$700.00
4 $9,190.00$919.00
5 $10,700.00$1,070.00
6 $8,080.00$808.00
Ref #21 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (19 EACH)
Awd $3,800.00$200.00
2 $4,180.00$220.00
3 $1,900.00$100.00
4 $3,277.50$172.50
5 $5,130.00$270.00
6 $3,591.00$189.00
160197 - Page 234
Ref #22 690E50200 SPECIAL - MAILBOX SUPPORT SYSTEM, DOUBLE, (2 EACH)
Awd $600.00$300.00
2 $700.00$350.00
3 $300.00$150.00
4 $399.00$199.50
5 $1,076.00$538.00
6 $496.00$248.00
Ref #23 861E10000 GEOGRID FOR SUBGRADE STABILIZATION, (3601 SY)
Awd $8,282.30$2.30
2 $7,202.00$2.00
3 $18,005.00$5.00
4 $5,401.50$1.50
5 $8,642.40$2.40
6 $11,163.10$3.10
Section 1 - ROADWAY - Totals
Awd $343,562.65
2 $362,517.00
3 $543,085.50
4 $505,740.00
5 $608,903.38
6 $538,674.30
Ref #24 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (4 SY)
Awd $440.00$110.00
2 $372.00$93.00
3 $160.00$40.00
4 $350.00$87.50
5 $672.00$168.00
6 $248.00$62.00
Ref #25 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (6 CY)
Awd $960.00$160.00
2 $948.00$158.00
3 $600.00$100.00
4 $513.00$85.50
5 $1,752.00$292.00
6 $852.00$142.00
Ref #26 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $300.00$150.00
2 $120.00$60.00
3 $400.00$200.00
4 $158.00$79.00
5 $130.80$65.40
6 $324.00$162.00
Ref #27 659E00300 TOPSOIL, (776 CY)
Awd $24,832.00$32.00
2 $38,800.00$50.00
3 $23,280.00$30.00
4 $39,188.00$50.50
5 $37,092.80$47.80
6 $11,484.80$14.80
160197 - Page 235
Ref #28 659E10000 SEEDING AND MULCHING, (6992 SY)
Awd $7,691.20$1.10
2 $6,992.00$1.00
3 $10,488.00$1.50
4 $10,488.00$1.50
5 $6,992.00$1.00
6 $16,780.80$2.40
Ref #29 659E14000 REPAIR SEEDING AND MULCHING, (350 SY)
Awd $385.00$1.10
2 $350.00$1.00
3 $350.00$1.00
4 $350.00$1.00
5 $350.00$1.00
6 $210.00$0.60
Ref #30 659E15000 INTER-SEEDING, (350 SY)
Awd $385.00$1.10
2 $297.50$0.85
3 $350.00$1.00
4 $350.00$1.00
5 $304.50$0.87
6 $210.00$0.60
Ref #31 659E20000 COMMERCIAL FERTILIZER, (0.98 TON)
Awd $1,078.00$1,100.00
2 $588.00$600.00
3 $980.00$1,000.00
4 $771.75$787.50
5 $597.80$610.00
6 $717.36$732.00
Ref #32 659E31000 LIME, (1.44 ACRE)
Awd $720.00$500.00
2 $46.08$32.00
3 $1,008.00$700.00
4 $680.40$472.50
5 $47.16$32.75
6 $688.32$478.00
Ref #33 659E35000 WATER, (39 MGAL)
Awd $780.00$20.00
2 $39.00$1.00
3 $1,950.00$50.00
4 $78.00$2.00
5 $42.90$1.10
6 $390.00$10.00
Ref #34 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $7,800.00$7,800.00
2 $11,000.00$11,000.00
3 $6,000.00$6,000.00
4 $10,321.50$10,321.50
5 $8,350.00$8,350.00
6 $8,724.00$8,724.00
160197 - Page 236
Ref #35 832E30000 EROSION CONTROL, (100000 EACH)
Awd $100,000.00$1.00
2 $100,000.00$1.00
3 $100,000.00$1.00
4 $100,000.00$1.00
5 $100,000.00$1.00
6 $100,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $145,371.20
2 $159,552.58
3 $145,566.00
4 $163,248.65
5 $156,331.96
6 $140,629.28
Ref #36 602E20000 CONCRETE MASONRY, (0.9 CY)
Awd $2,295.00$2,550.00
2 $1,080.00$1,200.00
3 $900.00$1,000.00
4 $4,795.65$5,328.50
5 $1,104.30$1,227.00
6 $0.00$0.00
Ref #37 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH FABRIC WRAP, (116 FT)
Awd $1,102.00$9.50
2 $1,740.00$15.00
3 $928.00$8.00
4 $1,334.00$11.50
5 $1,136.80$9.80
6 $951.20$8.20
Ref #38 605E14020 6" BASE PIPE UNDERDRAINS WITH FABRIC WRAP, (4037 FT)
Awd $37,947.80$9.40
2 $52,481.00$13.00
3 $32,296.00$8.00
4 $42,388.50$10.50
5 $37,544.10$9.30
6 $33,103.40$8.20
Ref #39 611E00100 4" CONDUIT, TYPE B, (500 FT)
Awd $10,000.00$20.00
2 $4,000.00$8.00
3 $2,500.00$5.00
4 $17,750.00$35.50
5 $7,200.00$14.40
6 $2,300.00$4.60
Ref #40 611E00200 4" CONDUIT, TYPE C, (500 FT)
Awd $7,500.00$15.00
2 $4,000.00$8.00
3 $2,500.00$5.00
4 $12,750.00$25.50
5 $7,200.00$14.40
6 $2,100.00$4.20
160197 - Page 237
Ref #41 611E00400 4" CONDUIT, TYPE E, (500 FT)
Awd $6,000.00$12.00
2 $4,000.00$8.00
3 $2,500.00$5.00
4 $12,000.00$24.00
5 $7,100.00$14.20
6 $2,100.00$4.20
Ref #42 611E00406 4" CONDUIT, TYPE F, (500 FT)
Awd $5,500.00$11.00
2 $4,000.00$8.00
3 $2,500.00$5.00
4 $12,000.00$24.00
5 $7,075.00$14.15
6 $2,100.00$4.20
Ref #43 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (170 FT)
Awd $3,400.00$20.00
2 $3,740.00$22.00
3 $1,020.00$6.00
4 $3,910.00$23.00
5 $3,706.00$21.80
6 $1,394.00$8.20
Ref #44 611E00900 6" CONDUIT, TYPE B, (500 FT)
Awd $10,000.00$20.00
2 $4,000.00$8.00
3 $4,000.00$8.00
4 $18,000.00$36.00
5 $7,465.00$14.93
6 $4,450.00$8.90
Ref #45 611E01100 6" CONDUIT, TYPE C, (1033 FT)
Awd $18,594.00$18.00
2 $8,264.00$8.00
3 $8,264.00$8.00
4 $26,341.50$25.50
5 $34,502.20$33.40
6 $8,470.60$8.20
Ref #46 611E01400 6" CONDUIT, TYPE E, (500 FT)
Awd $6,000.00$12.00
2 $4,000.00$8.00
3 $4,000.00$8.00
4 $12,000.00$24.00
5 $7,700.00$15.40
6 $3,450.00$6.90
Ref #47 611E01500 6" CONDUIT, TYPE F, (550 FT)
Awd $6,050.00$11.00
2 $4,400.00$8.00
3 $4,400.00$8.00
4 $13,200.00$24.00
5 $10,120.00$18.40
6 $3,795.00$6.90
160197 - Page 238
Ref #48 611E04400 12" CONDUIT, TYPE B, (166 FT)
Awd $18,260.00$110.00
2 $15,936.00$96.00
3 $15,770.00$95.00
4 $16,517.00$99.50
5 $22,908.00$138.00
6 $11,918.80$71.80
Ref #49 611E04600 12" CONDUIT, TYPE C, (796 FT)
Awd $30,248.00$38.00
2 $50,944.00$64.00
3 $75,620.00$95.00
4 $55,720.00$70.00
5 $50,307.20$63.20
6 $56,436.40$70.90
Ref #50 611E05900 15" CONDUIT, TYPE B, (28 FT)
Awd $3,080.00$110.00
2 $3,080.00$110.00
3 $2,744.00$98.00
4 $2,268.00$81.00
5 $4,858.00$173.50
6 $2,419.20$86.40
Ref #51 611E06100 15" CONDUIT, TYPE C, (315 FT)
Awd $14,175.00$45.00
2 $21,735.00$69.00
3 $32,445.00$103.00
4 $18,900.00$60.00
5 $22,333.50$70.90
6 $26,712.00$84.80
Ref #52 611E07400 18" CONDUIT, TYPE B, (291 FT)
Awd $19,497.00$67.00
2 $27,936.00$96.00
3 $32,592.00$112.00
4 $25,171.50$86.50
5 $24,473.10$84.10
6 $28,314.30$97.30
Ref #53 611E07600 18" CONDUIT, TYPE C, (173 FT)
Awd $10,726.00$62.00
2 $12,110.00$70.00
3 $19,376.00$112.00
4 $12,369.50$71.50
5 $9,722.60$56.20
6 $16,642.60$96.20
Ref #54 611E10400 24" CONDUIT, TYPE B, (43 FT)
Awd $5,160.00$120.00
2 $4,988.00$116.00
3 $5,504.00$128.00
4 $5,762.00$134.00
5 $5,843.70$135.90
6 $5,142.80$119.60
160197 - Page 239
Ref #55 611E10600 24" CONDUIT, TYPE C, (44 FT)
Awd $3,080.00$70.00
2 $4,620.00$105.00
3 $5,632.00$128.00
4 $4,884.00$111.00
5 $7,625.20$173.30
6 $5,605.60$127.40
Ref #56 611E16400 36" CONDUIT, TYPE B, (103 FT)
Awd $11,433.00$111.00
2 $15,965.00$155.00
3 $21,424.00$208.00
4 $14,780.50$143.50
5 $14,924.70$144.90
6 $14,358.20$139.40
Ref #57 611E19600 42" CONDUIT, TYPE C, (41 FT)
Awd $6,068.00$148.00
2 $5,248.00$128.00
3 $8,938.00$218.00
4 $5,945.00$145.00
5 $7,519.40$183.40
6 $6,756.80$164.80
Ref #58 611E98150 CATCH BASIN, NO. 3, (4 EACH)
Awd $13,200.00$3,300.00
2 $12,800.00$3,200.00
3 $10,000.00$2,500.00
4 $10,234.00$2,558.50
5 $11,444.00$2,861.00
6 $17,808.00$4,452.00
Ref #59 611E98180 CATCH BASIN, NO. 3A, (11 EACH)
Awd $22,000.00$2,000.00
2 $28,820.00$2,620.00
3 $15,400.00$1,400.00
4 $26,548.50$2,413.50
5 $26,947.25$2,449.75
6 $41,646.00$3,786.00
Ref #60 611E98390 CATCH BASIN, NO. 7, (11 EACH)
Awd $18,700.00$1,700.00
2 $19,250.00$1,750.00
3 $11,000.00$1,000.00
4 $17,556.00$1,596.00
5 $21,175.00$1,925.00
6 $9,922.00$902.00
Ref #61 611E98470 CATCH BASIN, NO. 2-2B, (2 EACH)
Awd $3,000.00$1,500.00
2 $4,560.00$2,280.00
3 $2,000.00$1,000.00
4 $3,570.00$1,785.00
5 $3,880.00$1,940.00
6 $4,464.00$2,232.00
160197 - Page 240
Ref #62 611E98540 CATCH BASIN, NO. 2-4, (1 EACH)
Awd $2,100.00$2,100.00
2 $2,500.00$2,500.00
3 $1,200.00$1,200.00
4 $1,886.50$1,886.50
5 $2,500.00$2,500.00
6 $4,211.00$4,211.00
Ref #63 611E99574 MANHOLE, NO. 3, (12 EACH)
Awd $31,200.00$2,600.00
2 $39,600.00$3,300.00
3 $20,400.00$1,700.00
4 $31,524.00$2,627.00
5 $38,844.00$3,237.00
6 $43,656.00$3,638.00
Ref #64 611E99690 MANHOLE, MISC.:JUNCTION CHAMBER, (2 EACH)
Awd $24,200.00$12,100.00
2 $14,800.00$7,400.00
3 $14,000.00$7,000.00
4 $19,408.00$9,704.00
5 $12,506.00$6,253.00
6 $9,974.00$4,987.00
Ref #65 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (2 EACH)
Awd $340.00$170.00
2 $500.00$250.00
3 $300.00$150.00
4 $597.00$298.50
5 $654.00$327.00
6 $424.00$212.00
Ref #66 611E99720 INSPECTION WELL, (5 EACH)
Awd $7,000.00$1,400.00
2 $3,150.00$630.00
3 $3,500.00$700.00
4 $2,870.00$574.00
5 $9,355.00$1,871.00
6 $1,120.00$224.00
Ref #67 611E99820 SPECIAL - MISCELLANEOUS METAL, (2500 LB)
Awd $3,750.00$1.50
2 $4,750.00$1.90
3 $2,500.00$1.00
4 $8,750.00$3.50
5 $6,500.00$2.60
6 $3,750.00$1.50
Section 3 - DRAINAGE - Totals
Awd $361,605.80
2 $388,997.00
3 $366,153.00
4 $461,731.15
5 $436,174.05
6 $375,495.90
160197 - Page 241
Ref #68 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (427 SY)
Awd $16,653.00$39.00
2 $18,361.00$43.00
3 $25,620.00$60.00
4 $31,384.50$73.50
5 $40,650.40$95.20
6 $24,339.00$57.00
Ref #69 253E01000 PAVEMENT REPAIR, (427 SY)
Awd $40,565.00$95.00
2 $33,306.00$78.00
3 $29,890.00$70.00
4 $39,924.50$93.50
5 $53,588.50$125.50
6 $29,463.00$69.00
Ref #70 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (6104 SY)
Awd $13,428.80$2.20
2 $12,208.00$2.00
3 $9,156.00$1.50
4 $18,312.00$3.00
5 $14,954.80$2.45
6 $17,091.20$2.80
Ref #71 301E46000 ASPHALT CONCRETE BASE, PG64-22, (31 CY)
Awd $4,650.00$150.00
2 $6,200.00$200.00
3 $6,510.00$210.00
4 $9,672.00$312.00
5 $9,207.00$297.00
6 $4,730.60$152.60
Ref #72 302E46000 ASPHALT CONCRETE BASE, PG64-22, (864 CY)
Awd $101,088.00$117.00
2 $112,320.00$130.00
3 $116,640.00$135.00
4 $123,552.00$143.00
5 $117,504.00$136.00
6 $119,145.60$137.90
Ref #73 304E20001 AGGREGATE BASE, AS PER PLAN, (1031 CY)
Awd $84,542.00$82.00
2 $77,325.00$75.00
3 $46,395.00$45.00
4 $62,375.50$60.50
5 $69,798.70$67.70
6 $58,973.20$57.20
Ref #74 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (698 GAL)
Awd $1,884.60$2.70
2 $2,443.00$3.50
3 $2,792.00$4.00
4 $2,792.00$4.00
5 $2,792.00$4.00
6 $2,094.00$3.00
160197 - Page 242
Ref #75 407E20510 SPECIAL - TACK COAT, TRACKLESS TACK FOR INTERMEDIA, (384 GAL)
Awd $1,036.80$2.70
2 $1,344.00$3.50
3 $1,536.00$4.00
4 $1,536.00$4.00
5 $1,536.00$4.00
6 $1,152.00$3.00
Ref #76 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (391 CY)
Awd $55,913.00$143.00
2 $48,875.00$125.00
3 $50,830.00$130.00
4 $62,755.50$160.50
5 $59,823.00$153.00
6 $12,042.80$30.80
Ref #77 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (441 CY)
Awd $73,206.00$166.00
2 $59,535.00$135.00
3 $61,740.00$140.00
4 $76,954.50$174.50
5 $73,206.00$166.00
6 $62,886.60$142.60
Ref #78 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (20 CY)
Awd $7,100.00$355.00
2 $12,000.00$600.00
3 $12,600.00$630.00
4 $9,790.00$489.50
5 $9,320.00$466.00
6 $7,920.00$396.00
Ref #79 441E50600 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (13 CY)
Awd $4,615.00$355.00
2 $7,800.00$600.00
3 $8,190.00$630.00
4 $8,749.00$673.00
5 $8,333.00$641.00
6 $5,148.00$396.00
Ref #80 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, (512 SY)
Awd $23,040.00$45.00
2 $37,888.00$74.00
3 $28,160.00$55.00
4 $42,240.00$82.50
5 $23,029.76$44.98
6 $26,828.80$52.40
Ref #81 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS, (100 SY)
Awd $5,600.00$56.00
2 $11,500.00$115.00
3 $6,000.00$60.00
4 $11,400.00$114.00
5 $7,187.00$71.87
6 $8,280.00$82.80
160197 - Page 243
Ref #82 609E12000 COMBINATION CURB AND GUTTER, TYPE 2, (4151 FT)
Awd $74,718.00$18.00
2 $116,228.00$28.00
3 $124,530.00$30.00
4 $99,624.00$24.00
5 $126,190.40$30.40
6 $119,341.25$28.75
Ref #83 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN, (344 FT)
Awd $10,320.00$30.00
2 $16,512.00$48.00
3 $7,224.00$21.00
4 $14,620.00$42.50
5 $11,988.40$34.85
6 $11,076.80$32.20
Ref #84 609E14000 CURB, TYPE 2-A, (382 FT)
Awd $4,966.00$13.00
2 $9,168.00$24.00
3 $764.00$2.00
4 $5,539.00$14.50
5 $5,199.02$13.61
6 $6,455.80$16.90
Section 4 - PAVEMENT - Totals
Awd $523,326.20
2 $583,013.00
3 $538,577.00
4 $621,220.50
5 $634,307.98
6 $516,968.65
Ref #85 638E00704 6" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 53, MEC, (60 FT)
Awd $18,000.00$300.00
2 $10,440.00$174.00
3 $4,500.00$75.00
4 $17,880.00$298.00
5 $12,220.80$203.68
6 $4,716.00$78.60
Ref #86 638E01304 8" WATER MAIN DUCTILE IRON PIPE ANSI CLASS 53, MEC, (80 FT)
Awd $9,280.00$116.00
2 $9,280.00$116.00
3 $7,200.00$90.00
4 $14,440.00$180.50
5 $16,256.80$203.21
6 $6,736.00$84.20
Ref #87 638E04900 1" COPPER SERVICE BRANCH, (280 FT)
Awd $8,400.00$30.00
2 $11,760.00$42.00
3 $4,200.00$15.00
4 $20,580.00$73.50
5 $7,366.80$26.31
6 $8,344.00$29.80
160197 - Page 244
Ref #88 638E10200 6" FIRE HYDRANT, (2 EACH)
Awd $7,000.00$3,500.00
2 $10,200.00$5,100.00
3 $8,000.00$4,000.00
4 $10,461.00$5,230.50
5 $15,080.00$7,540.00
6 $9,572.00$4,786.00
Ref #89 638E10300 FIRE HYDRANT EXTENDED AND ADJUSTED TO GRADE, (6 EACH)
Awd $13,200.00$2,200.00
2 $5,250.00$875.00
3 $9,000.00$1,500.00
4 $25,260.00$4,210.00
5 $9,420.00$1,570.00
6 $10,266.00$1,711.00
Ref #90 638E10700 FIRE HYDRANT REMOVED AND DISPOSED OF, (1 EACH)
Awd $480.00$480.00
2 $1,250.00$1,250.00
3 $1,000.00$1,000.00
4 $1,078.50$1,078.50
5 $1,230.00$1,230.00
6 $464.00$464.00
Ref #91 638E10800 VALVE BOX ADJUSTED TO GRADE, (36 EACH)
Awd $7,200.00$200.00
2 $31,680.00$880.00
3 $2,880.00$80.00
4 $12,708.00$353.00
5 $10,620.00$295.00
6 $4,032.00$112.00
Ref #92 638E10900 SERVICE BOX ADJUSTED TO GRADE, (14 EACH)
Awd $2,800.00$200.00
2 $5,950.00$425.00
3 $980.00$70.00
4 $4,942.00$353.00
5 $8,162.00$583.00
6 $868.00$62.00
Ref #93 638E10901 SERVICE BOX ADJUSTED TO GRADE, AS PER PLAN, (14 EACH)
Awd $5,600.00$400.00
2 $12,600.00$900.00
3 $980.00$70.00
4 $15,141.00$1,081.50
5 $9,982.00$713.00
6 $952.00$68.00
Section 5 - WATER WORK - Totals
Awd $71,960.00
2 $98,410.00
3 $38,740.00
4 $122,490.50
5 $90,338.40
6 $45,950.00
160197 - Page 245
Ref #94 611E00100 4" CONDUIT, TYPE B, (50 FT)
Awd $1,950.00$39.00
2 $1,600.00$32.00
3 $4,500.00$90.00
4 $6,100.00$122.00
5 $4,150.00$83.00
6 $2,110.00$42.20
Ref #95 611E00200 4" CONDUIT, TYPE C, (50 FT)
Awd $1,100.00$22.00
2 $1,300.00$26.00
3 $4,500.00$90.00
4 $5,675.00$113.50
5 $1,978.50$39.57
6 $2,030.00$40.60
Ref #96 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN, (10 EACH)
Awd $5,550.00$555.00
2 $7,000.00$700.00
3 $2,500.00$250.00
4 $10,625.00$1,062.50
5 $3,701.30$370.13
6 $6,010.00$601.00
Ref #97 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN, (1 EACH)
Awd $1,250.00$1,250.00
2 $1,900.00$1,900.00
3 $1,500.00$1,500.00
4 $1,459.00$1,459.00
5 $1,661.00$1,661.00
6 $1,142.00$1,142.00
Section 6 - SANITARY SEWER - Totals
Awd $9,850.00
2 $11,800.00
3 $13,000.00
4 $23,859.00
5 $11,490.80
6 $11,292.00
Ref #98 625E00450 CONNECTION, FUSED PULL APART, (4 EACH)
Awd $352.00$88.00
2 $360.00$90.00
3 $368.00$92.00
4 $370.00$92.50
5 $352.00$88.00
6 $388.00$97.00
Ref #99 625E00480 CONNECTION, UNFUSED PERMANENT, (8 EACH)
Awd $758.40$94.80
2 $720.00$90.00
3 $800.00$100.00
4 $796.00$99.50
5 $758.40$94.80
6 $816.00$102.00
160197 - Page 246
Ref #100 625E18200 BRACKET ARM, 15', (1 EACH)
Awd $980.40$980.40
2 $900.00$900.00
3 $1,000.00$1,000.00
4 $1,029.50$1,029.50
5 $980.40$980.40
6 $1,012.00$1,012.00
Ref #101 625E18500 BRACKET ARM, 25', (1 EACH)
Awd $1,518.80$1,518.80
2 $1,480.00$1,480.00
3 $1,600.00$1,600.00
4 $1,595.00$1,595.00
5 $1,518.80$1,518.80
6 $1,602.00$1,602.00
Ref #102 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE, (683 FT)
Awd $1,516.26$2.22
2 $2,049.00$3.00
3 $2,049.00$3.00
4 $1,707.50$2.50
5 $1,516.26$2.22
6 $1,775.80$2.60
Ref #103 625E23400 NO. 10 AWG POLE AND BRACKET CABLE, (330 FT)
Awd $382.80$1.16
2 $660.00$2.00
3 $495.00$1.50
4 $330.00$1.00
5 $382.80$1.16
6 $462.00$1.40
Ref #104 625E25402 CONDUIT, 2", 725.05, (37 FT)
Awd $577.20$15.60
2 $370.00$10.00
3 $629.00$17.00
4 $610.50$16.50
5 $577.20$15.60
6 $621.60$16.80
Ref #105 625E25500 CONDUIT, 3", 725.04, (140 FT)
Awd $3,192.00$22.80
2 $2,660.00$19.00
3 $3,360.00$24.00
4 $3,360.00$24.00
5 $3,192.00$22.80
6 $3,696.00$26.40
Ref #106 625E26250 LUMINAIRE, CONVENTIONAL200W, HPS, TYPE II, MVOLT, (2 EACH)
Awd $940.80$470.40
2 $680.00$340.00
3 $1,000.00$500.00
4 $988.00$494.00
5 $940.80$470.40
6 $1,036.00$518.00
160197 - Page 247
Ref #107 625E29002 TRENCH, 24" DEEP, (37 FT)
Awd $207.20$5.60
2 $481.00$13.00
3 $259.00$7.00
4 $222.00$6.00
5 $207.20$5.60
6 $910.20$24.60
Ref #108 625E30702 PULL BOX, 725.06, 18", (3 EACH)
Awd $2,220.00$740.00
2 $2,280.00$760.00
3 $2,400.00$800.00
4 $2,331.00$777.00
5 $2,220.00$740.00
6 $2,472.00$824.00
Ref #109 625E36000 PLASTIC CAUTION TAPE, (37 FT)
Awd $13.32$0.36
2 $11.10$0.30
3 $37.00$1.00
4 $18.50$0.50
5 $13.32$0.36
6 $25.90$0.70
Section 7 - LIGHTING - Totals
Awd $12,659.18
2 $12,651.10
3 $13,997.00
4 $13,358.00
5 $12,659.18
6 $14,817.50
Ref #110 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (38 FT)
Awd $228.00$6.00
2 $228.00$6.00
3 $266.00$7.00
4 $247.00$6.50
5 $228.00$6.00
6 $478.80$12.60
Ref #111 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (210 FT)
Awd $1,470.00$7.00
2 $1,470.00$7.00
3 $1,470.00$7.00
4 $1,575.00$7.50
5 $1,470.00$7.00
6 $2,982.00$14.20
Ref #112 630E08501 STREET NAME SIGN SUPPORT, AS PER PLAN, (2 EACH)
Awd $230.00$115.00
2 $240.00$120.00
3 $400.00$200.00
4 $242.00$121.00
5 $230.00$115.00
6 $484.00$242.00
160197 - Page 248
Ref #113 630E08600 SIGN POST REFLECTOR, (2 EACH)
Awd $44.00$22.00
2 $46.00$23.00
3 $70.00$35.00
4 $46.00$23.00
5 $44.00$22.00
6 $92.00$46.00
Ref #114 630E79100 SIGN HANGER ASSEMBLY, MAST ARM, (3 EACH)
Awd $855.00$285.00
2 $900.00$300.00
3 $1,350.00$450.00
4 $898.50$299.50
5 $855.00$285.00
6 $1,782.00$594.00
Ref #115 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, (3 EACH)
Awd $120.00$40.00
2 $126.00$42.00
3 $270.00$90.00
4 $126.00$42.00
5 $120.00$40.00
6 $396.00$132.00
Ref #116 630E80100 SIGN, FLAT SHEET, (138 SF)
Awd $1,932.00$14.00
2 $2,070.00$15.00
3 $2,070.00$15.00
4 $2,001.00$14.50
5 $1,932.00$14.00
6 $3,146.40$22.80
Ref #117 630E80500 SIGN, DOUBLE FACED, STREET NAME, (5 EACH)
Awd $400.00$80.00
2 $420.00$84.00
3 $500.00$100.00
4 $420.00$84.00
5 $400.00$80.00
6 $810.00$162.00
Ref #118 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (17 EACH)
Awd $255.00$15.00
2 $272.00$16.00
3 $170.00$10.00
4 $272.00$16.00
5 $255.00$15.00
6 $1,326.00$78.00
Ref #119 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (1 EACH)
Awd $20.00$20.00
2 $21.00$21.00
3 $72.00$72.00
4 $21.00$21.00
5 $20.00$20.00
6 $102.00$102.00
160197 - Page 249
Ref #120 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (13 EACH)
Awd $195.00$15.00
2 $208.00$16.00
3 $234.00$18.00
4 $208.00$16.00
5 $195.00$15.00
6 $1,092.00$84.00
Ref #121 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $475.00$475.00
2 $500.00$500.00
3 $300.00$300.00
4 $499.00$499.00
5 $475.00$475.00
6 $311.00$311.00
Ref #122 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL, (2 EACH)
Awd $40.00$20.00
2 $42.00$21.00
3 $50.00$25.00
4 $42.00$21.00
5 $40.00$20.00
6 $96.00$48.00
Ref #123 644E00100 EDGE LINE, 4", (0.47 MILE)
Awd $1,057.50$2,250.00
2 $1,081.00$2,300.00
3 $1,504.00$3,200.00
4 $1,110.38$2,362.51
5 $1,057.50$2,250.00
6 $4,288.28$9,124.00
Ref #124 644E00104 EDGE LINE, 6", (0.01 MILE)
Awd $125.00$12,500.00
2 $132.50$13,250.00
3 $40.00$4,000.00
4 $131.25$13,125.00
5 $125.00$12,500.00
6 $102.42$10,242.00
Ref #125 644E00200 LANE LINE, 4", (0.15 MILE)
Awd $375.00$2,500.00
2 $397.50$2,650.00
3 $300.00$2,000.00
4 $393.75$2,625.00
5 $375.00$2,500.00
6 $1,450.80$9,672.00
Ref #126 644E00300 CENTER LINE, (0.89 MILE)
Awd $3,537.75$3,975.00
2 $3,738.00$4,200.00
3 $6,230.00$7,000.00
4 $3,714.86$4,174.00
5 $3,537.75$3,975.00
6 $4,340.53$4,877.00
160197 - Page 250
Ref #127 644E00400 CHANNELIZING LINE, 8", (368 FT)
Awd $460.00$1.25
2 $478.40$1.30
3 $552.00$1.50
4 $552.00$1.50
5 $460.00$1.25
6 $1,619.20$4.40
Ref #128 644E00500 STOP LINE, (126 FT)
Awd $693.00$5.50
2 $730.80$5.80
3 $882.00$7.00
4 $756.00$6.00
5 $693.00$5.50
6 $982.80$7.80
Ref #129 644E00600 CROSSWALK LINE, (353 FT)
Awd $1,006.05$2.85
2 $1,059.00$3.00
3 $1,412.00$4.00
4 $1,059.00$3.00
5 $1,006.05$2.85
6 $2,435.70$6.90
Ref #130 644E00700 TRANSVERSE/DIAGONAL LINE, (226 FT)
Awd $1,130.00$5.00
2 $1,130.00$5.00
3 $1,356.00$6.00
4 $1,243.00$5.50
5 $1,130.00$5.00
6 $1,265.60$5.60
Ref #131 644E00900 ISLAND MARKING, (88 SF)
Awd $352.00$4.00
2 $352.00$4.00
3 $352.00$4.00
4 $352.00$4.00
5 $352.00$4.00
6 $1,645.60$18.70
Ref #132 644E01300 LANE ARROW, (10 EACH)
Awd $900.00$90.00
2 $950.00$95.00
3 $1,300.00$130.00
4 $945.00$94.50
5 $900.00$90.00
6 $2,420.00$242.00
Section 8 - TRAFFIC CONTROL - Totals
Awd $15,900.30
2 $16,592.20
3 $21,150.00
4 $16,854.74
5 $15,900.30
6 $33,649.13
160197 - Page 251
Ref #133 625E18500 BRACKET ARM, 25', (1 EACH)
Awd $1,518.80$1,518.80
2 $1,480.00$1,480.00
3 $1,600.00$1,600.00
4 $1,595.00$1,595.00
5 $1,518.00$1,518.00
6 $1,612.00$1,612.00
Ref #134 625E25400 CONDUIT, 2", 725.04, (46 FT)
Awd $828.00$18.00
2 $690.00$15.00
3 $920.00$20.00
4 $874.00$19.00
5 $828.00$18.00
6 $966.00$21.00
Ref #135 625E25500 CONDUIT, 3", 725.04, (31 FT)
Awd $830.80$26.80
2 $589.00$19.00
3 $868.00$28.00
4 $868.00$28.00
5 $830.80$26.80
6 $868.00$28.00
Ref #136 625E25600 CONDUIT, 4", 725.04, (20 FT)
Awd $920.00$46.00
2 $740.00$37.00
3 $1,000.00$50.00
4 $970.00$48.50
5 $920.00$46.00
6 $980.00$49.00
Ref #137 625E25900 CONDUIT, JACKED OR DRILLED3", (199 FT)
Awd $10,746.00$54.00
2 $7,363.00$37.00
3 $11,940.00$60.00
4 $11,243.50$56.50
5 $10,746.00$54.00
6 $11,542.00$58.00
Ref #138 625E29000 TRENCH, (87 FT)
Awd $870.00$10.00
2 $1,131.00$13.00
3 $1,044.00$12.00
4 $913.50$10.50
5 $870.00$10.00
6 $1,218.00$14.00
Ref #139 625E30700 PULL BOX, 725.08, 18", (3 EACH)
Awd $2,400.00$800.00
2 $2,280.00$760.00
3 $2,550.00$850.00
4 $2,520.00$840.00
5 $2,400.00$800.00
6 $2,601.00$867.00
160197 - Page 252
Ref #140 625E30706 PULL BOX, 725.08, 24", (1 EACH)
Awd $940.00$940.00
2 $925.00$925.00
3 $1,000.00$1,000.00
4 $987.00$987.00
5 $940.00$940.00
6 $974.00$974.00
Ref #141 625E32000 GROUND ROD, (7 EACH)
Awd $798.00$114.00
2 $1,750.00$250.00
3 $826.00$118.00
4 $836.50$119.50
5 $798.00$114.00
6 $833.00$119.00
Ref #142 625E36000 PLASTIC CAUTION TAPE, (87 FT)
Awd $24.36$0.28
2 $26.10$0.30
3 $43.50$0.50
4 $43.50$0.50
5 $24.36$0.28
6 $60.90$0.70
Ref #143 632E05007 VEHICULAR SIGNAL HEAD, (LED), BLACK, 3-SECTION, 12, (5 EACH)
Awd $4,170.00$834.00
2 $4,750.00$950.00
3 $4,250.00$850.00
4 $4,377.50$875.50
5 $4,170.00$834.00
6 $5,110.00$1,022.00
Ref #144 632E05087 VEHICULAR SIGNAL HEAD, (LED), BLACK, 5-SECTION, 12, (1 EACH)
Awd $1,364.00$1,364.00
2 $1,380.00$1,380.00
3 $1,400.00$1,400.00
4 $1,432.00$1,432.00
5 $1,364.00$1,364.00
6 $1,768.00$1,768.00
Ref #145 632E20731 PEDESTRIAN SIGNAL HEAD (LED) , (COUNTDOWN), TYPE D, (6 EACH)
Awd $3,024.00$504.00
2 $3,480.00$580.00
3 $3,150.00$525.00
4 $3,174.00$529.00
5 $3,021.60$503.60
6 $4,584.00$764.00
Ref #146 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN, (6 EACH)
Awd $2,100.00$350.00
2 $1,398.00$233.00
3 $2,400.00$400.00
4 $2,202.00$367.00
5 $2,097.60$349.60
6 $2,190.00$365.00
160197 - Page 253
Ref #147 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG, (669 FT)
Awd $1,244.34$1.86
2 $1,505.25$2.25
3 $1,338.00$2.00
4 $1,338.00$2.00
5 $1,244.34$1.86
6 $1,338.00$2.00
Ref #148 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, (519 FT)
Awd $1,089.90$2.10
2 $1,297.50$2.50
3 $1,557.00$3.00
4 $1,038.00$2.00
5 $1,089.90$2.10
6 $1,245.60$2.40
Ref #149 632E64010 SIGNAL SUPPORT FOUNDATION, (1 EACH)
Awd $2,060.00$2,060.00
2 $4,500.00$4,500.00
3 $2,200.00$2,200.00
4 $2,163.00$2,163.00
5 $2,060.00$2,060.00
6 $2,206.00$2,206.00
Ref #150 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN, (2 EACH)
Awd $4,360.00$2,180.00
2 $9,200.00$4,600.00
3 $4,700.00$2,350.00
4 $4,578.00$2,289.00
5 $4,360.00$2,180.00
6 $4,686.00$2,343.00
Ref #151 632E64020 PEDESTAL FOUNDATION, (3 EACH)
Awd $1,770.00$590.00
2 $2,220.00$740.00
3 $1,950.00$650.00
4 $1,858.50$619.50
5 $1,770.00$590.00
6 $2,124.00$708.00
Ref #152 632E65200 LOOP DETECTOR LEAD-IN CABLE, (645 FT)
Awd $1,264.20$1.96
2 $838.50$1.30
3 $1,935.00$3.00
4 $1,290.00$2.00
5 $1,264.20$1.96
6 $2,064.00$3.20
Ref #153 632E70001 POWER SERVICE, AS PER PLAN, (1 EACH)
Awd $2,400.00$2,400.00
2 $3,400.00$3,400.00
3 $2,500.00$2,500.00
4 $2,520.00$2,520.00
5 $2,400.00$2,400.00
6 $2,486.00$2,486.00
160197 - Page 254
Ref #154 632E80971 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN , (1 EACH)
Awd $5,592.00$5,592.00
2 $5,300.00$5,300.00
3 $6,000.00$6,000.00
4 $5,871.00$5,871.00
5 $5,591.60$5,591.60
6 $5,852.00$5,852.00
Ref #155 632E81001 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN , (1 EACH)
Awd $8,250.00$8,250.00
2 $7,800.00$7,800.00
3 $9,000.00$9,000.00
4 $8,661.50$8,661.50
5 $8,148.80$8,148.80
6 $9,789.00$9,789.00
Ref #156 632E81071 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN , (1 EACH)
Awd $9,380.00$9,380.00
2 $9,200.00$9,200.00
3 $10,000.00$10,000.00
4 $9,848.50$9,848.50
5 $9,379.20$9,379.20
6 $10,342.00$10,342.00
Ref #157 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN, (3 EACH)
Awd $2,214.00$738.00
2 $1,740.00$580.00
3 $2,400.00$800.00
4 $2,325.00$775.00
5 $2,214.00$738.00
6 $2,841.00$947.00
Ref #158 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA, (1 EACH)
Awd $3,168.00$3,168.00
2 $1,270.00$1,270.00
3 $3,300.00$3,300.00
4 $3,326.50$3,326.50
5 $3,168.00$3,168.00
6 $3,895.00$3,895.00
Ref #159 632E90400 SIGNALIZATION, MISC.:TEST HOLE PERFORMED, (3 EACH)
Awd $660.00$220.00
2 $555.00$185.00
3 $750.00$250.00
4 $693.00$231.00
5 $660.00$220.00
6 $792.00$264.00
Ref #160 633E01581 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T, (1 EACH)
Awd $7,720.00$7,720.00
2 $9,300.00$9,300.00
3 $7,500.00$7,500.00
4 $8,106.00$8,106.00
5 $7,720.00$7,720.00
6 $13,224.00$13,224.00
160197 - Page 255
Ref #161 633E67000 CABINET RISER, (2 EACH)
Awd $1,784.00$892.00
2 $1,060.00$530.00
3 $1,800.00$900.00
4 $1,873.00$936.50
5 $1,784.00$892.00
6 $1,942.00$971.00
Ref #162 633E67101 CABINET FOUNDATION, AS PER PLAN, (1 EACH)
Awd $1,340.00$1,340.00
2 $2,700.00$2,700.00
3 $1,500.00$1,500.00
4 $1,407.00$1,407.00
5 $1,340.00$1,340.00
6 $1,368.00$1,368.00
Ref #163 633E67201 CONTROLLER WORK PAD, AS PER PLAN, (1 EACH)
Awd $590.00$590.00
2 $318.00$318.00
3 $600.00$600.00
4 $619.50$619.50
5 $590.00$590.00
6 $708.00$708.00
Ref #164 633E67300 PREEMPTION, (1 EACH)
Awd $375.00$375.00
2 $318.00$318.00
3 $400.00$400.00
4 $391.00$391.00
5 $372.40$372.40
6 $402.00$402.00
Ref #165 633E67310 PREEMPTION RECEIVING UNIT, (3 EACH)
Awd $1,932.00$644.00
2 $2,010.00$670.00
3 $2,100.00$700.00
4 $2,028.00$676.00
5 $1,932.00$644.00
6 $2,034.00$678.00
Ref #166 633E67320 PREEMPTION DETECTOR CABLE, (475 FT)
Awd $902.50$1.90
2 $1,045.00$2.20
3 $950.00$2.00
4 $950.00$2.00
5 $902.50$1.90
6 $950.00$2.00
Ref #167 633E67350 PREEMPTION PHASE SELECTOR, (1 EACH)
Awd $1,804.00$1,804.00
2 $1,908.00$1,908.00
3 $2,000.00$2,000.00
4 $1,894.00$1,894.00
5 $1,804.00$1,804.00
6 $1,907.00$1,907.00
160197 - Page 256
Ref #168 633E67400 PREEMPTION CONFIRMATION LIGHT, (3 EACH)
Awd $1,164.00$388.00
2 $1,431.00$477.00
3 $1,200.00$400.00
4 $1,222.50$407.50
5 $1,164.00$388.00
6 $1,218.00$406.00
Ref #169 633E74001 UNINTERRUPTIBLE POWER SUPPLY (UPS), AS PER PLAN, (1 EACH)
Awd $4,522.00$4,522.00
2 $4,770.00$4,770.00
3 $4,800.00$4,800.00
4 $4,748.00$4,748.00
5 $4,522.00$4,522.00
6 $4,727.00$4,727.00
Ref #170 816E30000 VIDEO DETECTION SYSTEM, (1 EACH)
Awd $13,632.00$13,632.00
2 $15,500.00$15,500.00
3 $15,000.00$15,000.00
4 $14,313.50$14,313.50
5 $13,632.00$13,632.00
6 $14,874.00$14,874.00
Ref #171 816E30100 TRAINING FOR VIDEO DETECTION SYSTEM, (LUMP SUM)
Awd $920.00$920.00
2 $740.00$740.00
3 $1,000.00$1,000.00
4 $966.00$966.00
5 $920.00$920.00
6 $983.00$983.00
Section 9 - TRAFFIC SIGNALS - Totals
Awd $110,671.90
2 $117,908.35
3 $119,471.50
4 $116,066.00
5 $110,561.30
6 $129,304.50
Ref #172 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (250 CY)
Awd $3,750.00$15.00
2 $12,500.00$50.00
3 $10,000.00$40.00
4 $15,125.00$60.50
5 $18,362.50$73.45
6 $13,150.00$52.60
Ref #173 411E10000 STABILIZED CRUSHED AGGREGATE, (68 CY)
Awd $4,080.00$60.00
2 $6,120.00$90.00
3 $2,720.00$40.00
4 $6,630.00$97.50
5 $6,674.20$98.15
6 $3,454.40$50.80
160197 - Page 257
Ref #174 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (64 HOUR)
Awd $4,480.00$70.00
2 $4,864.00$76.00
3 $3,200.00$50.00
4 $4,384.00$68.50
5 $4,534.40$70.85
6 $5,248.00$82.00
Ref #175 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL, (1 EACH)
Awd $15,800.00$15,800.00
2 $20,000.00$20,000.00
3 $16,000.00$16,000.00
4 $16,590.00$16,590.00
5 $15,800.00$15,800.00
6 $17,692.00$17,692.00
Ref #176 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (2 EACH)
Awd $4,000.00$2,000.00
2 $4,200.00$2,100.00
3 $6,000.00$3,000.00
4 $9,240.00$4,620.00
5 $4,000.00$2,000.00
6 $5,248.00$2,624.00
Ref #177 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $9,000.00$9,000.00
2 $9,500.00$9,500.00
3 $12,500.00$12,500.00
4 $8,925.00$8,925.00
5 $9,000.00$9,000.00
6 $17,052.00$17,052.00
Ref #178 614E12460 WORK ZONE MARKING SIGN, (6 EACH)
Awd $450.00$75.00
2 $480.00$80.00
3 $900.00$150.00
4 $882.00$147.00
5 $450.00$75.00
6 $1,188.00$198.00
Ref #179 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (35 CY)
Awd $7,700.00$220.00
2 $7,000.00$200.00
3 $7,000.00$200.00
4 $10,010.00$286.00
5 $9,870.00$282.00
6 $4,970.00$142.00
Ref #180 614E13302 BARRIER REFLECTOR, TYPE B2, (3 EACH)
Awd $15.00$5.00
2 $15.00$5.00
3 $27.00$9.00
4 $28.50$9.50
5 $15.00$5.00
6 $108.00$36.00
160197 - Page 258
Ref #181 614E13360 OBJECT MARKER, TWO WAY, (3 EACH)
Awd $45.00$15.00
2 $48.00$16.00
3 $42.00$14.00
4 $39.00$13.00
5 $45.00$15.00
6 $108.00$36.00
Ref #182 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (9 SNMT)
Awd $7,650.00$850.00
2 $9,000.00$1,000.00
3 $9,000.00$1,000.00
4 $8,977.50$997.50
5 $7,650.00$850.00
6 $28,116.00$3,124.00
Ref #183 614E20000 WORK ZONE LANE LINE, CLASS I, (0.02 MILE)
Awd $200.00$10,000.00
2 $212.00$10,600.00
3 $108.00$5,400.00
4 $210.00$10,500.00
5 $200.00$10,000.00
6 $142.52$7,126.00
Ref #184 614E21000 WORK ZONE CENTER LINE, CLASS I, (1.32 MILE)
Awd $1,452.00$1,100.00
2 $1,531.20$1,160.00
3 $12,540.00$9,500.00
4 $1,524.60$1,155.00
5 $1,452.00$1,100.00
6 $14,182.08$10,744.00
Ref #185 614E22000 WORK ZONE EDGE LINE, CLASS I, (1.7 MILE)
Awd $977.50$575.00
2 $1,020.00$600.00
3 $8,840.00$5,200.00
4 $1,026.80$604.00
5 $977.50$575.00
6 $9,795.40$5,762.00
Ref #186 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, (241 FT)
Awd $204.85$0.85
2 $216.90$0.90
3 $482.00$2.00
4 $241.00$1.00
5 $204.85$0.85
6 $915.80$3.80
Ref #187 614E25000 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, (231 FT)
Awd $658.35$2.85
2 $693.00$3.00
3 $1,386.00$6.00
4 $693.00$3.00
5 $658.35$2.85
6 $1,755.60$7.60
160197 - Page 259
Ref #188 614E26000 WORK ZONE STOP LINE, CLASS I, (130 FT)
Awd $357.50$2.75
2 $390.00$3.00
3 $780.00$6.00
4 $390.00$3.00
5 $357.50$2.75
6 $1,014.00$7.80
Ref #189 614E30000 WORK ZONE ARROW, CLASS I, (4 EACH)
Awd $120.00$30.00
2 $124.00$31.00
3 $800.00$200.00
4 $126.00$31.50
5 $120.00$30.00
6 $808.00$202.00
Ref #190 614E32700 WORK ZONE ISLAND MARKING, CLASS I, (119 SF)
Awd $327.25$2.75
2 $357.00$3.00
3 $833.00$7.00
4 $357.00$3.00
5 $327.25$2.75
6 $975.80$8.20
Ref #191 614E40051 BUSINESS ENTRANCE SIGN, AS PER PLAN, (4 EACH)
Awd $500.00$125.00
2 $528.00$132.00
3 $1,200.00$300.00
4 $526.00$131.50
5 $500.00$125.00
6 $1,112.00$278.00
Ref #192 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)
Awd $42,000.00$42,000.00
2 $8,500.00$8,500.00
3 $90,000.00$90,000.00
4 $15,896.00$15,896.00
5 $9,676.00$9,676.00
6 $44,962.00$44,962.00
Ref #193 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, (1241 SY)
Awd $45,234.45$36.45
2 $44,676.00$36.00
3 $62,050.00$50.00
4 $62,050.00$50.00
5 $24,571.80$19.80
6 $52,370.20$42.20
Ref #194 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER , (61 SY)
Awd $2,196.00$36.00
2 $3,233.00$53.00
3 $3,050.00$50.00
4 $4,666.50$76.50
5 $14,274.00$234.00
6 $2,818.20$46.20
160197 - Page 260
Ref #195 616E10000 WATER, (80 MGAL)
Awd $800.00$10.00
2 $1,920.00$24.00
3 $4,000.00$50.00
4 $1,840.00$23.00
5 $9,520.00$119.00
6 $800.00$10.00
Ref #196 622E41000 PORTABLE BARRIER, 32", (80 FT)
Awd $2,400.00$30.00
2 $2,800.00$35.00
3 $3,200.00$40.00
4 $4,200.00$52.50
5 $14,400.00$180.00
6 $2,912.00$36.40
Section 10 - MAINTENANCE OF TRAFFIC - Totals
Awd $154,397.90
2 $139,928.10
3 $256,658.00
4 $174,577.90
5 $153,640.35
6 $230,898.00
Ref #197 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $18,000.00$18,000.00
2 $10,000.00$10,000.00
3 $96,000.00$96,000.00
4 $28,749.50$28,749.50
5 $14,622.00$14,622.00
6 $79,948.00$79,948.00
Ref #198 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $140,000.00$140,000.00
2 $93,000.00$93,000.00
3 $90,000.00$90,000.00
4 $130,000.00$130,000.00
5 $165,600.00$165,600.00
6 $268,772.00$268,772.00
Ref #199 619E16020 FIELD OFFICE, TYPE C, (7 MNTH)
Awd $12,250.00$1,750.00
2 $24,500.00$3,500.00
3 $7,000.00$1,000.00
4 $7,000.00$1,000.00
5 $22,400.00$3,200.00
6 $21,546.00$3,078.00
Ref #200 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $40,000.00$40,000.00
3 $100,000.00$100,000.00
4 $40,000.00$40,000.00
5 $38,208.00$38,208.00
6 $31,027.00$31,027.00
160197 - Page 261
Ref #201 624E10000 MOBILIZATION, (LUMP SUM)
Awd $73,000.00$73,000.00
2 $100,000.00$100,000.00
3 $70,000.00$70,000.00
4 $100,000.00$100,000.00
5 $160,940.00$160,940.00
6 $232,528.00$232,528.00
Section 11 - INCIDENTALS - Totals
Awd $273,250.00
2 $267,500.00
3 $363,000.00
4 $305,749.50
5 $401,770.00
6 $633,821.00
160197 - Page 262
Project No. 160198
PID 96563
SUM-SR 303-05.49
Federal
Type: PREVENTIVE MAINTENANCE
Completion Date: 9/1/2016
Award Amount: $793,630.10
Contract Awarded To: RONYAK PAVING INC
Letting Date: 4/7/2016
Engineer's Estimate: $897,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
RONYAK PAVING INC
14376 N CHESHIRE ST
BURTON, OH 44021
Geauga
Bidder 1
Bid $793,630.10
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 2
Bid $806,996.65
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 3
Bid $855,131.50
CHAGRIN VALLEY PAVING INC
17290 MUNN RD
CHAGRIN FALLS, OH 44023
Geauga
Bidder 4
Bid $877,968.25
BARBICAS CONSTRUCTION COMPANY INC
124 DARROW RD
AKRON, OH 44305
Summit
Bidder 5
Bid $957,713.00
160198 - Page 263
Ref #1 202E23000 PAVEMENT REMOVED, (2 SY)
Awd $200.00$100.00
2 $260.00$130.00
3 $400.00$200.00
4 $200.00$100.00
5 $200.00$100.00
Ref #2 202E23500 WEARING COURSE REMOVED, (1255 SY)
Awd $8,785.00$7.00
2 $4,392.50$3.50
3 $10,667.50$8.50
4 $2,196.25$1.75
5 $8,785.00$7.00
Ref #3 202E30000 WALK REMOVED, (732 SF)
Awd $1,464.00$2.00
2 $1,464.00$2.00
3 $2,196.00$3.00
4 $5,124.00$7.00
5 $2,196.00$3.00
Ref #4 202E32000 CURB REMOVED, (26 FT)
Awd $260.00$10.00
2 $260.00$10.00
3 $390.00$15.00
4 $260.00$10.00
5 $520.00$20.00
Ref #5 203E10000 EXCAVATION (FOR WALK OR CURB RAMP INSTALLATION), (11 CY)
Awd $495.00$45.00
2 $253.00$23.00
3 $1,100.00$100.00
4 $990.00$90.00
5 $1,100.00$100.00
Ref #6 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (447 STA)
Awd $7,152.00$16.00
2 $20,115.00$45.00
3 $12,404.25$27.75
4 $6,705.00$15.00
5 $8,940.00$20.00
Ref #7 608E10000 4" CONCRETE WALK, (683 SF)
Awd $6,147.00$9.00
2 $5,464.00$8.00
3 $9,015.60$13.20
4 $10,245.00$15.00
5 $6,830.00$10.00
Ref #8 608E52000 CURB RAMP, (52 SF)
Awd $988.00$19.00
2 $988.00$19.00
3 $1,456.00$28.00
4 $1,040.00$20.00
5 $780.00$15.00
160198 - Page 264
Ref #9 608E53020 DETECTABLE WARNING, (224 SF)
Awd $6,720.00$30.00
2 $4,256.00$19.00
3 $5,824.00$26.00
4 $1,120.00$5.00
5 $2,240.00$10.00
Ref #10 623E39500 MONUMENT BOX ADJUSTED TO GRADE, (3 EACH)
Awd $1,800.00$600.00
2 $360.00$120.00
3 $1,500.00$500.00
4 $1,500.00$500.00
5 $1,350.00$450.00
Section 1 - ROADWAY - Totals
Awd $34,011.00
2 $37,812.50
3 $44,953.35
4 $29,380.25
5 $32,941.00
Ref #11 659E10000 SEEDING AND MULCHING, (29 SY)
Awd $638.00$22.00
2 $406.00$14.00
3 $638.00$22.00
4 $290.00$10.00
5 $290.00$10.00
Ref #12 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
5 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,638.00
2 $1,406.00
3 $1,638.00
4 $1,290.00
5 $1,290.00
Ref #13 611E99654 MANHOLE ADJUSTED TO GRADE, (2 EACH)
Awd $1,300.00$650.00
2 $600.00$300.00
3 $1,100.00$550.00
4 $1,500.00$750.00
5 $1,200.00$600.00
160198 - Page 265
Section 3 - DRAINAGE - Totals
Awd $1,300.00
2 $600.00
3 $1,100.00
4 $1,500.00
5 $1,200.00
Ref #14 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (600 SY)
Awd $27,600.00$46.00
2 $24,000.00$40.00
3 $21,000.00$35.00
4 $15,000.00$25.00
5 $16,800.00$28.00
Ref #15 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (7387 SY)
Awd $11,819.20$1.60
2 $9,233.75$1.25
3 $19,575.55$2.65
4 $11,080.50$1.50
5 $22,161.00$3.00
Ref #16 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (6722 GAL)
Awd $23,527.00$3.50
2 $18,485.50$2.75
3 $18,485.50$2.75
4 $13,444.00$2.00
5 $26,888.00$4.00
Ref #17 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P, (2928 CY)
Awd $398,208.00$136.00
2 $424,560.00$145.00
3 $436,272.00$149.00
4 $418,704.00$143.00
5 $512,400.00$175.00
Ref #18 609E26000 CURB, TYPE 6, (26 FT)
Awd $780.00$30.00
2 $962.00$37.00
3 $1,045.20$40.20
4 $780.00$30.00
5 $650.00$25.00
Ref #19 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (546 CY)
Awd $21,840.00$40.00
2 $29,484.00$54.00
3 $26,071.50$47.75
4 $13,650.00$25.00
5 $32,760.00$60.00
Section 4 - PAVEMENT - Totals
Awd $483,774.20
2 $506,725.25
3 $522,449.75
4 $472,658.50
5 $611,659.00
160198 - Page 266
Ref #20 621E00100 RPM, (395 EACH)
Awd $8,200.20$20.76
2 $9,875.00$25.00
3 $8,200.20$20.76
4 $8,295.00$21.00
5 $9,164.00$23.20
Ref #21 621E54000 RAISED PAVEMENT MARKER REMOVED, (316 EACH)
Awd $3,792.00$12.00
2 $1,738.00$5.50
3 $1,485.20$4.70
4 $316.00$1.00
5 $1,580.00$5.00
Ref #22 644E00100 EDGE LINE, 4", (8.83 MILE)
Awd $16,777.00$1,900.00
2 $17,660.00$2,000.00
3 $16,777.00$1,900.00
4 $16,777.00$1,900.00
5 $16,777.00$1,900.00
Ref #23 644E00300 CENTER LINE, (4.51 MILE)
Awd $16,236.00$3,600.00
2 $18,040.00$4,000.00
3 $17,138.00$3,800.00
4 $17,138.00$3,800.00
5 $17,138.00$3,800.00
Ref #24 644E00400 CHANNELIZING LINE, 8", (230 FT)
Awd $345.00$1.50
2 $276.00$1.20
3 $253.00$1.10
4 $253.00$1.10
5 $253.00$1.10
Ref #25 644E00500 STOP LINE, (131 FT)
Awd $786.00$6.00
2 $707.40$5.40
3 $687.75$5.25
4 $687.75$5.25
5 $687.75$5.25
Ref #26 644E00600 CROSSWALK LINE, (328 FT)
Awd $984.00$3.00
2 $820.00$2.50
3 $770.80$2.35
4 $770.80$2.35
5 $770.80$2.35
Ref #27 644E00700 TRANSVERSE/DIAGONAL LINE, (78 FT)
Awd $312.00$4.00
2 $374.40$4.80
3 $351.00$4.50
4 $351.00$4.50
5 $351.00$4.50
160198 - Page 267
Ref #28 644E01000 RAILROAD SYMBOL MARKING, (2 EACH)
Awd $1,148.00$574.00
2 $840.00$420.00
3 $790.00$395.00
4 $790.00$395.00
5 $790.00$395.00
Ref #29 644E01200 PARKING LOT STALL MARKING, (274 FT)
Awd $685.00$2.50
2 $274.00$1.00
3 $260.30$0.95
4 $260.30$0.95
5 $260.30$0.95
Ref #30 644E01300 LANE ARROW, (4 EACH)
Awd $480.00$120.00
2 $320.00$80.00
3 $300.00$75.00
4 $300.00$75.00
5 $300.00$75.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $49,745.20
2 $50,924.80
3 $47,013.25
4 $45,938.85
5 $48,071.85
Ref #31 614E12460 WORK ZONE MARKING SIGN, (18 EACH)
Awd $1,620.00$90.00
2 $2,304.00$128.00
3 $1,260.00$70.00
4 $1,620.00$90.00
5 $1,260.00$70.00
Ref #32 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (20 CY)
Awd $2,000.00$100.00
2 $3,520.00$176.00
3 $2,500.00$125.00
4 $1,500.00$75.00
5 $2,800.00$140.00
Ref #33 614E21400 WORK ZONE CENTER LINE, CLASS II, (4.51 MILE)
Awd $1,758.90$390.00
2 $1,894.20$420.00
3 $1,781.45$395.00
4 $1,781.45$395.00
5 $1,781.45$395.00
Ref #34 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (4.51 MILE)
Awd $3,427.60$760.00
2 $3,111.90$690.00
3 $2,931.50$650.00
4 $2,931.50$650.00
5 $2,931.50$650.00
160198 - Page 268
Ref #35 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (8.82 MILE)
Awd $3,492.72$396.00
2 $3,528.00$400.00
3 $3,395.70$385.00
4 $3,395.70$385.00
5 $3,395.70$385.00
Ref #36 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, (230 FT)
Awd $207.00$0.90
2 $115.00$0.50
3 $115.00$0.50
4 $115.00$0.50
5 $115.00$0.50
Ref #37 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (230 FT)
Awd $184.00$0.80
2 $115.00$0.50
3 $115.00$0.50
4 $115.00$0.50
5 $115.00$0.50
Ref #38 614E26000 WORK ZONE STOP LINE, CLASS I, (131 FT)
Awd $393.00$3.00
2 $393.00$3.00
3 $360.25$2.75
4 $360.25$2.75
5 $360.25$2.75
Ref #39 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (131 FT)
Awd $353.70$2.70
2 $393.00$3.00
3 $360.25$2.75
4 $360.25$2.75
5 $360.25$2.75
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $13,436.92
2 $15,374.10
3 $12,819.15
4 $12,179.15
5 $13,119.15
Ref #40 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,418.50$3,418.50
2 $3,000.00$3,000.00
3 $3,000.00$3,000.00
4 $3,000.00$3,000.00
5 $3,000.00$3,000.00
Ref #41 202E32800 CONCRETE SLOPE PROTECTION REMOVED, (10 SY)
Awd $1,890.00$189.00
2 $1,000.00$100.00
3 $1,500.00$150.00
4 $3,150.00$315.00
5 $2,000.00$200.00
160198 - Page 269
Ref #42 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1329 SY)
Awd $38,567.58$29.02
2 $45,186.00$34.00
3 $42,528.00$32.00
4 $31,231.50$23.50
5 $23,922.00$18.00
Ref #43 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE, (1040 SY)
Awd $16,556.80$15.92
2 $19,760.00$19.00
3 $18,720.00$18.00
4 $17,680.00$17.00
5 $15,600.00$15.00
Ref #44 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (200 SF)
Awd $21,600.00$108.00
2 $19,000.00$95.00
3 $18,000.00$90.00
4 $20,000.00$100.00
5 $16,000.00$80.00
Ref #45 519E12304 SPECIAL - PATCHING CONCRETE BRIDGE DECK - TYPE C, (10 SY)
Awd $4,728.00$472.80
2 $13,000.00$1,300.00
3 $5,000.00$500.00
4 $6,950.00$695.00
5 $5,000.00$500.00
Ref #46 601E21000 CONCRETE SLOPE PROTECTION, (10 SY)
Awd $6,792.90$679.29
2 $1,580.00$158.00
3 $2,000.00$200.00
4 $4,500.00$450.00
5 $3,500.00$350.00
Ref #47 613E41200 LOW STRENGTH MORTAR BACKFILL, (1 CY)
Awd $921.00$921.00
2 $106.00$106.00
3 $100.00$100.00
4 $900.00$900.00
5 $700.00$700.00
Ref #48 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (15 FT)
Awd $1,050.00$70.00
2 $150.00$10.00
3 $420.00$28.00
4 $420.00$28.00
5 $420.00$28.00
Ref #49 630E80100 SIGN, FLAT SHEET, (2 SF)
Awd $400.00$200.00
2 $60.00$30.00
3 $130.00$65.00
4 $130.00$65.00
5 $130.00$65.00
160198 - Page 270
Ref #50 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, 730.2, (2 EACH)
Awd $400.00$200.00
2 $30.00$15.00
3 $30.00$15.00
4 $30.00$15.00
5 $30.00$15.00
Ref #51 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (2 EACH)
Awd $400.00$200.00
2 $32.00$16.00
3 $30.00$15.00
4 $30.00$15.00
5 $30.00$15.00
Ref #52 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (150 SF)
Awd $20,250.00$135.00
2 $14,250.00$95.00
3 $13,500.00$90.00
4 $12,000.00$80.00
5 $12,000.00$80.00
Section 7 - STRUCTURE REPAIR (SUM-303-0719) - Totals
Awd $116,974.78
2 $117,154.00
3 $104,958.00
4 $100,021.50
5 $82,332.00
Ref #53 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)
Awd $5,000.00$5,000.00
2 $1,000.00$1,000.00
3 $3,500.00$3,500.00
4 $7,500.00$7,500.00
5 $10,000.00$10,000.00
Ref #54 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $6,800.00$6,800.00
2 $5,300.00$5,300.00
3 $4,500.00$4,500.00
4 $7,500.00$7,500.00
5 $15,000.00$15,000.00
Ref #55 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $52,000.00$52,000.00
2 $40,000.00$40,000.00
3 $83,500.00$83,500.00
4 $105,000.00$105,000.00
5 $55,000.00$55,000.00
Ref #56 619E16010 FIELD OFFICE, TYPE B, (3 MNTH)
Awd $4,500.00$1,500.00
2 $8,700.00$2,900.00
3 $5,700.00$1,900.00
4 $4,500.00$1,500.00
5 $2,100.00$700.00
160198 - Page 271
Ref #57 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $2,850.00$2,850.00
2 $2,000.00$2,000.00
3 $3,000.00$3,000.00
4 $500.00$500.00
5 $5,000.00$5,000.00
Ref #58 624E10000 MOBILIZATION, (LUMP SUM)
Awd $21,600.00$21,600.00
2 $20,000.00$20,000.00
3 $20,000.00$20,000.00
4 $90,000.00$90,000.00
5 $80,000.00$80,000.00
Section 8 - INCIDENTALS - Totals
Awd $92,750.00
2 $77,000.00
3 $120,200.00
4 $215,000.00
5 $167,100.00
160198 - Page 272
Project No. 160199
PID 101756
SUM-SR 8-07.94
Federal
Type: SPOT PATCHING
Completion Date: 9/30/2016
Award Amount: $927,844.00
Contract Awarded To: LOCKHART CONCRETE CO
Letting Date: 4/7/2016
Engineer's Estimate: $985,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
LOCKHART CONCRETE CO
800 W WATERLOO RD
AKRON, OH 44314
Summit
Bidder 1
Bid $927,844.00
KARVO COMPANIES INC
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 2
Bid $959,834.00
PARELLA-PANNUNZIO INC
720 NORTH MERIDIAN RD
YOUNGSTOWN, OH 44509
Mahoning
Bidder 3
Bid $1,089,602.50
CATTS CONSTRUCTION INC
21223 AURORA RD
WARRENSVILLE HTS, OH 44146
Cuyahoga
Bidder 4
Bid $1,115,708.23
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 5
Bid $1,306,965.00
STANLEY MILLER CONSTRUCTION COMPANY
2250 HOWENSTINE DR SE
EAST SPARTA, OH 44626
Stark
Bidder 6
Bid $1,310,990.60
160199 - Page 273
Ref #1 203E10000 EXCAVATION (FOR PAVEMENT REPAIR), (1350 CY)
Awd $27,000.00$20.00
2 $27,000.00$20.00
3 $11,002.50$8.15
4 $20,250.00$15.00
5 $27,000.00$20.00
6 $49,275.00$36.50
Section 1 - ROADWAY - Totals
Awd $27,000.00
2 $27,000.00
3 $11,002.50
4 $20,250.00
5 $27,000.00
6 $49,275.00
Ref #2 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
5 $1,000.00$1.00
6 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
4 $1,000.00
5 $1,000.00
6 $1,000.00
Ref #3 255E10010 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (1800 SY)
Awd $306,000.00$170.00
2 $219,600.00$122.00
3 $338,400.00$188.00
4 $423,000.00$235.00
5 $333,000.00$185.00
6 $378,000.00$210.00
Ref #4 255E10500 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (900 SY)
Awd $198,900.00$221.00
2 $247,500.00$275.00
3 $295,200.00$328.00
4 $261,000.00$290.00
5 $430,200.00$478.00
6 $316,800.00$352.00
Ref #5 255E20000 FULL DEPTH PAVEMENT SAWING, (10200 FT)
Awd $20,400.00$2.00
2 $25,500.00$2.50
3 $25,500.00$2.50
4 $20,400.00$2.00
5 $40,800.00$4.00
6 $29,580.00$2.90
160199 - Page 274
Ref #6 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR), (1350 CY)
Awd $67,500.00$50.00
2 $45,900.00$34.00
3 $33,750.00$25.00
4 $54,000.00$40.00
5 $54,000.00$40.00
6 $103,950.00$77.00
Ref #7 451E30000 SPECIAL - PRESSURE RELIEF JOINT, TYPE A, (1018 FT)
Awd $152,700.00$150.00
2 $79,404.00$78.00
3 $66,170.00$65.00
4 $57,079.26$56.07
5 $50,900.00$50.00
6 $139,160.60$136.70
Section 3 - PAVEMENT - Totals
Awd $745,500.00
2 $617,904.00
3 $759,020.00
4 $815,479.26
5 $908,900.00
6 $967,490.60
Ref #8 642E00094 EDGE LINE, 6", (2 MILE)
Awd $3,000.00$1,500.00
2 $2,370.00$1,185.00
3 $1,960.00$980.00
4 $2,855.32$1,427.66
5 $4,300.00$2,150.00
6 $4,426.00$2,213.00
Ref #9 642E00194 LANE LINE, 6", (2 MILE)
Awd $5,000.00$2,500.00
2 $2,140.00$1,070.00
3 $770.00$385.00
4 $2,578.22$1,289.11
5 $3,600.00$1,800.00
6 $3,766.00$1,883.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $8,000.00
2 $4,510.00
3 $2,730.00
4 $5,433.54
5 $7,900.00
6 $8,192.00
Ref #10 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (800 HOUR)
Awd $40,000.00$50.00
2 $40,000.00$50.00
3 $48,000.00$60.00
4 $48,000.00$60.00
5 $60,800.00$76.00
6 $53,600.00$67.00
160199 - Page 275
Ref #11 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $4,000.00$4,000.00
3 $8,830.00$8,830.00
4 $21,305.00$21,305.00
5 $12,000.00$12,000.00
6 $9,811.00$9,811.00
Ref #12 614E12460 WORK ZONE MARKING SIGN, (14 EACH)
Awd $294.00$21.00
2 $1,330.00$95.00
3 $2,100.00$150.00
4 $1,673.00$119.50
5 $1,470.00$105.00
6 $1,470.00$105.00
Ref #13 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (15 DAY)
Awd $450.00$30.00
2 $450.00$30.00
3 $4,500.00$300.00
4 $16,740.00$1,116.00
5 $1,875.00$125.00
6 $900.00$60.00
Ref #14 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (2 MILE)
Awd $10,400.00$5,200.00
2 $1,200.00$600.00
3 $290.00$145.00
4 $1,520.00$760.00
5 $1,470.00$735.00
6 $2,400.00$1,200.00
Ref #15 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (2 MILE)
Awd $10,400.00$5,200.00
2 $1,440.00$720.00
3 $1,140.00$570.00
4 $1,826.00$913.00
5 $2,050.00$1,025.00
6 $2,400.00$1,200.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $62,544.00
2 $48,420.00
3 $64,860.00
4 $91,064.00
5 $79,665.00
6 $70,581.00
Ref #16 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $25,000.00$25,000.00
3 $11,000.00$11,000.00
4 $11,481.43$11,481.43
5 $6,500.00$6,500.00
6 $15,000.00$15,000.00
160199 - Page 276
Ref #17 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $45,000.00$45,000.00
2 $125,000.00$125,000.00
3 $108,000.00$108,000.00
4 $105,000.00$105,000.00
5 $190,000.00$190,000.00
6 $81,756.00$81,756.00
Ref #18 619E16010 FIELD OFFICE, TYPE B, (6 MNTH)
Awd $1,800.00$300.00
2 $9,000.00$1,500.00
3 $12,000.00$2,000.00
4 $6,000.00$1,000.00
5 $21,000.00$3,500.00
6 $14,976.00$2,496.00
Ref #19 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $2,000.00$2,000.00
3 $500.00$500.00
4 $3,000.00$3,000.00
5 $25,000.00$25,000.00
6 $42,164.00$42,164.00
Ref #20 624E10000 MOBILIZATION, (LUMP SUM)
Awd $19,000.00$19,000.00
2 $100,000.00$100,000.00
3 $119,490.00$119,490.00
4 $57,000.00$57,000.00
5 $40,000.00$40,000.00
6 $60,556.00$60,556.00
Section 6 - INCIDENTALS - Totals
Awd $83,800.00
2 $261,000.00
3 $250,990.00
4 $182,481.43
5 $282,500.00
6 $214,452.00
160199 - Page 277
Project No. 160200
PID 100309
TRU-SR 5-14.39
Federal
Type: PREVENTIVE MAINTENANCE
Completion Date: 8/18/2016
Award Amount: $718,036.25
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 4/7/2016
Engineer's Estimate: $915,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $718,036.25
KIRILA CONTRACTORS INC
505 BEDFORD RD PO BOX 179
BROOKFIELD, OH 44403
Trumbull
Bidder 2
Bid $726,378.00
KARVO COMPANIES INC
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 3
Bid $753,249.15
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 4
Bid $784,793.55
BARBICAS CONSTRUCTION COMPANY INC
124 DARROW RD
AKRON, OH 44305
Summit
Bidder 5
Bid $845,433.35
160200 - Page 278
Ref #1 202E23500 WEARING COURSE REMOVED, (708 SY)
Awd $4,956.00$7.00
2 $3,186.00$4.50
3 $6,372.00$9.00
4 $7,080.00$10.00
5 $4,248.00$6.00
Ref #2 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (396 STA)
Awd $13,860.00$35.00
2 $11,880.00$30.00
3 $8,712.00$22.00
4 $15,840.00$40.00
5 $7,920.00$20.00
Ref #3 623E39500 MONUMENT BOX ADJUSTED TO GRADE, (3 EACH)
Awd $375.00$125.00
2 $900.00$300.00
3 $300.00$100.00
4 $1,275.00$425.00
5 $1,650.00$550.00
Section 1 - ROADWAY - Totals
Awd $19,191.00
2 $15,966.00
3 $15,384.00
4 $24,195.00
5 $13,818.00
Ref #4 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
5 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
4 $1,000.00
5 $1,000.00
Ref #5 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (500 SY)
Awd $17,500.00$35.00
2 $17,000.00$34.00
3 $18,000.00$36.00
4 $17,500.00$35.00
5 $14,000.00$28.00
Ref #6 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (12672 SY)
Awd $22,809.60$1.80
2 $19,008.00$1.50
3 $17,740.80$1.40
4 $19,641.60$1.55
5 $50,688.00$4.00
160200 - Page 279
Ref #7 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (8186 GAL)
Awd $22,511.50$2.75
2 $32,744.00$4.00
3 $20,465.00$2.50
4 $16,372.00$2.00
5 $32,744.00$4.00
Ref #8 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P, (3341 CY)
Awd $467,740.00$140.00
2 $506,161.50$151.50
3 $521,196.00$156.00
4 $511,173.00$153.00
5 $594,698.00$178.00
Ref #9 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (459 CY)
Awd $22,950.00$50.00
2 $19,737.00$43.00
3 $20,655.00$45.00
4 $22,950.00$50.00
5 $27,540.00$60.00
Section 3 - PAVEMENT - Totals
Awd $553,511.10
2 $594,650.50
3 $598,056.80
4 $587,636.60
5 $719,670.00
Ref #10 621E00100 RPM, (656 EACH)
Awd $14,432.00$22.00
2 $14,287.68$21.78
3 $13,874.40$21.15
4 $13,448.00$20.50
5 $13,874.40$21.15
Ref #11 621E54000 RAISED PAVEMENT MARKER REMOVED, (656 EACH)
Awd $3,280.00$5.00
2 $5,412.00$8.25
3 $1,968.00$3.00
4 $5,248.00$8.00
5 $3,280.00$5.00
Ref #12 644E00100 EDGE LINE, 4", (7.72 MILE)
Awd $15,440.00$2,000.00
2 $15,131.20$1,960.00
3 $14,668.00$1,900.00
4 $14,668.00$1,900.00
5 $14,668.00$1,900.00
Ref #13 644E00200 LANE LINE, 4", (1.83 MILE)
Awd $1,830.00$1,000.00
2 $1,793.40$980.00
3 $1,738.50$950.00
4 $1,738.50$950.00
5 $1,738.50$950.00
160200 - Page 280
Ref #14 644E00300 CENTER LINE, (3.86 MILE)
Awd $14,282.00$3,700.00
2 $14,320.60$3,710.00
3 $13,896.00$3,600.00
4 $13,896.00$3,600.00
5 $13,896.00$3,600.00
Ref #15 644E00400 CHANNELIZING LINE, 8", (1846 FT)
Awd $2,122.90$1.15
2 $2,122.90$1.15
3 $2,030.60$1.10
4 $2,030.60$1.10
5 $2,030.60$1.10
Ref #16 644E00500 STOP LINE, (373 FT)
Awd $2,051.50$5.50
2 $2,051.50$5.50
3 $1,958.25$5.25
4 $1,958.25$5.25
5 $1,958.25$5.25
Ref #17 644E00700 TRANSVERSE/DIAGONAL LINE, (354 FT)
Awd $1,681.50$4.75
2 $1,646.10$4.65
3 $1,593.00$4.50
4 $1,593.00$4.50
5 $1,593.00$4.50
Ref #18 644E00900 ISLAND MARKING, (39 SF)
Awd $185.25$4.75
2 $181.35$4.65
3 $175.50$4.50
4 $175.50$4.50
5 $175.50$4.50
Ref #19 644E01300 LANE ARROW, (40 EACH)
Awd $3,040.00$76.00
2 $3,200.00$80.00
3 $3,000.00$75.00
4 $3,000.00$75.00
5 $3,000.00$75.00
Ref #20 644E01500 DOTTED LINE, 4", (1400 FT)
Awd $1,400.00$1.00
2 $1,470.00$1.05
3 $1,400.00$1.00
4 $1,400.00$1.00
5 $1,400.00$1.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $59,745.15
2 $61,616.73
3 $56,302.25
4 $59,155.85
5 $57,614.25
160200 - Page 281
Ref #21 632E26501 DETECTOR LOOP, AS PER PLAN, (1 EACH)
Awd $1,100.00$1,100.00
2 $1,150.00$1,150.00
3 $1,100.00$1,100.00
4 $1,100.00$1,100.00
5 $2,000.00$2,000.00
Section 5 - TRAFFIC SIGNALS - Totals
Awd $1,100.00
2 $1,150.00
3 $1,100.00
4 $1,100.00
5 $2,000.00
Ref #22 614E12460 WORK ZONE MARKING SIGN, (15 EACH)
Awd $1,500.00$100.00
2 $1,350.00$90.00
3 $1,275.00$85.00
4 $1,275.00$85.00
5 $900.00$60.00
Ref #23 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (20 CY)
Awd $1,700.00$85.00
2 $3,500.00$175.00
3 $2,400.00$120.00
4 $2,500.00$125.00
5 $2,600.00$130.00
Ref #24 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (2.25 MILE)
Awd $1,237.50$550.00
2 $1,282.50$570.00
3 $1,237.50$550.00
4 $1,237.50$550.00
5 $1,237.50$550.00
Ref #25 614E21400 WORK ZONE CENTER LINE, CLASS II, (0.21 MILE)
Awd $210.00$1,000.00
2 $216.30$1,030.00
3 $210.00$1,000.00
4 $210.00$1,000.00
5 $210.00$1,000.00
Ref #26 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (3.86 MILE)
Awd $3,088.00$800.00
2 $3,126.60$810.00
3 $3,030.10$785.00
4 $3,030.10$785.00
5 $3,030.10$785.00
Ref #27 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (2907 FT)
Awd $1,453.50$0.50
2 $1,511.64$0.52
3 $1,453.50$0.50
4 $1,453.50$0.50
5 $1,453.50$0.50
160200 - Page 282
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $9,189.00
2 $10,987.04
3 $9,606.10
4 $9,706.10
5 $9,431.10
Ref #28 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $4,307.73$4,307.73
3 $7,000.00$7,000.00
4 $2,500.00$2,500.00
5 $6,000.00$6,000.00
Ref #29 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $45,000.00$45,000.00
2 $24,000.00$24,000.00
3 $40,000.00$40,000.00
4 $72,500.00$72,500.00
5 $28,000.00$28,000.00
Ref #30 619E16010 FIELD OFFICE, TYPE B, (2 MNTH)
Awd $5,300.00$2,650.00
2 $3,000.00$1,500.00
3 $3,500.00$1,750.00
4 $2,000.00$1,000.00
5 $1,400.00$700.00
Ref #31 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $1,700.00$1,700.00
3 $1,300.00$1,300.00
4 $5,000.00$5,000.00
5 $2,500.00$2,500.00
Ref #32 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $8,000.00$8,000.00
3 $20,000.00$20,000.00
4 $20,000.00$20,000.00
5 $4,000.00$4,000.00
Section 7 - INCIDENTALS - Totals
Awd $74,300.00
2 $41,007.73
3 $71,800.00
4 $102,000.00
5 $41,900.00
160200 - Page 283
Project No. 160201
PID 100474
TUS-SR 39-19.94
Federal
Type: PREVENTIVE MAINTENANCE
Completion Date: 8/31/2016
Award Amount: $320,311.44
Contract Awarded To: PAVEMENT MAINTENANCE SYSTEMS LLC
Letting Date: 4/7/2016
Engineer's Estimate: $329,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
PAVEMENT MAINTENANCE SYSTEMS LLC
384 INDUSTRIAL PARK DR
IMLAY CITY, MI 48444
Bidder 1
Bid $320,311.44
STRAWSER CONSTRUCTION INC
1392 DUBLIN RD
COLUMBUS, OH 43215
Franklin
Bidder 2
Bid $348,810.03
AMERICAN PAVEMENTS LLC
7475 MONTGOMERY DR
PLAIN CITY, OH 43064
Madison
Bidder 3
Bid $348,915.77
NY-MAC ENTERPRISES INC
3415 S CREYTS RD
LANSING, MI 48917
Bidder 4
Bid $401,691.19
160201 - Page 284
Ref #1 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
Section 1 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
4 $1,000.00
Ref #2 421E10011 MICROSURFACING, SURFACE COURSE, AS PER PLAN, (89787 SY)
Awd $182,267.61$2.03
2 $237,037.68$2.64
3 $210,101.58$2.34
4 $212,795.19$2.37
Ref #3 423E00220 CRACK SEALING, TYPE II OR TYPE III, (89787 SY)
Awd $35,016.93$0.39
2 $26,936.10$0.30
3 $37,710.54$0.42
4 $40,404.15$0.45
Section 2 - PAVEMENT - Totals
Awd $217,284.54
2 $263,973.78
3 $247,812.12
4 $253,199.34
Ref #4 621E00100 RPM, (700 EACH)
Awd $18,550.00$26.50
2 $14,000.00$20.00
3 $14,000.00$20.00
4 $15,400.00$22.00
Ref #5 621E54000 RAISED PAVEMENT MARKER REMOVED, (700 EACH)
Awd $15,750.00$22.50
2 $10,150.00$14.50
3 $9,800.00$14.00
4 $7,000.00$10.00
Ref #6 642E00090 EDGE LINE, 4", (10.58 MILE)
Awd $5,607.40$530.00
2 $5,819.00$550.00
3 $5,554.50$525.00
4 $4,549.40$430.00
Ref #7 642E00290 CENTER LINE, (5.29 MILE)
Awd $3,385.60$640.00
2 $3,703.00$700.00
3 $2,909.50$550.00
4 $4,046.85$765.00
160201 - Page 285
Section 3 - TRAFFIC CONTROL - Totals
Awd $43,293.00
2 $33,672.00
3 $32,264.00
4 $30,996.25
Ref #8 614E12460 WORK ZONE MARKING SIGN, (61 EACH)
Awd $6,405.00$105.00
2 $4,270.00$70.00
3 $6,100.00$100.00
4 $3,965.00$65.00
Ref #9 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT, (5.29 MILE)
Awd $3,676.55$695.00
2 $2,645.00$500.00
3 $2,459.85$465.00
4 $2,195.35$415.00
Ref #10 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (5.29 MILE)
Awd $3,782.35$715.00
2 $3,835.25$725.00
3 $3,279.80$620.00
4 $3,835.25$725.00
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $13,863.90
2 $10,750.25
3 $11,839.65
4 $9,995.60
Ref #11 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $3,380.00$3,380.00
2 $1,500.00$1,500.00
3 $1,500.00$1,500.00
4 $4,500.00$4,500.00
Ref #12 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $27,880.00$27,880.00
2 $15,768.00$15,768.00
3 $45,000.00$45,000.00
4 $45,000.00$45,000.00
Ref #13 624E10000 MOBILIZATION, (LUMP SUM)
Awd $13,610.00$13,610.00
2 $22,146.00$22,146.00
3 $9,500.00$9,500.00
4 $57,000.00$57,000.00
Section 5 - INCIDENTALS - Totals
Awd $44,870.00
2 $39,414.00
3 $56,000.00
4 $106,500.00
160201 - Page 286
Project No. 160202
PID 100449
WAS-SR 26-11.85
Federal
Type: PREVENTIVE MAINTENANCE
Completion Date: 7/31/2016
Award Amount: $328,822.20
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 4/7/2016
Engineer's Estimate: $352,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $328,822.20
160202 - Page 287
Ref #1 422E10001 SINGLE CHIP SEAL, AS PER PLAN, (61889 SY)
Awd $148,533.60$2.40
Ref #2 422E20001 DOUBLE CHIP SEAL, AS PER PLAN, (22730 SY)
Awd $63,644.00$2.80
Ref #3 690E98900 SPECIAL - MISC.:FOG SEAL, (10154 GAL)
Awd $25,892.70$2.55
Section 1 - PAVEMENT - Totals
Awd $238,070.30
Ref #4 621E00100 RPM, (872 EACH)
Awd $17,440.00$20.00
Ref #5 621E54000 RAISED PAVEMENT MARKER REMOVED, (872 EACH)
Awd $6,278.40$7.20
Ref #6 642E00090 EDGE LINE, 4", (13.2 MILE)
Awd $6,600.00$500.00
Ref #7 642E00290 CENTER LINE, (6.6 MILE)
Awd $6,171.00$935.00
Ref #8 644E00500 STOP LINE, (120 FT)
Awd $636.00$5.30
Section 2 - TRAFFIC CONTROL - Totals
Awd $37,125.40
Ref #9 614E12460 WORK ZONE MARKING SIGN, (44 EACH)
Awd $4,400.00$100.00
Ref #10 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (16.94 MILE)
Awd $18,634.00$1,100.00
Ref #11 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT, (16.94 MILE)
Awd $2,117.50$125.00
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $25,151.50
Ref #12 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,000.00$1,000.00
Ref #13 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $15,975.00$15,975.00
Ref #14 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $1,500.00$1,500.00
Ref #15 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
Section 4 - INCIDENTALS - Totals
Awd $28,475.00
160202 - Page 288
Project No. 160203
PID 100485
WAS-SR 7-14.05
Federal
Type: TWO LANE RESURFACING
Completion Date: 9/15/2016
Award Amount: $700,444.02
Contract Awarded To: STRAWSER CONSTRUCTION INC
Letting Date: 4/7/2016
Engineer's Estimate: $674,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
STRAWSER CONSTRUCTION INC
1392 DUBLIN RD
COLUMBUS, OH 43215
Franklin
Bidder 1
Bid $700,444.02
AMERICAN PAVEMENTS LLC
7475 MONTGOMERY DR
PLAIN CITY, OH 43064
Madison
Bidder 2
Bid $725,977.40
NY-MAC ENTERPRISES INC
3415 S CREYTS RD
LANSING, MI 48917
Bidder 3
Bid $748,974.63
160203 - Page 289
Ref #1 421E10011 MICROSURFACING, SURFACE COURSE, AS PER PLAN, (187932 SY)
Awd $419,088.36$2.23
2 $447,278.16$2.38
3 $351,432.84$1.87
Ref #2 421E10021 MICROSURFACING, LEVELING COURSE, AS PER PLAN, (27137 SY)
Awd $90,908.95$3.35
2 $58,073.18$2.14
3 $50,746.19$1.87
Section 1 - PAVEMENT - Totals
Awd $509,997.31
2 $505,351.34
3 $402,179.03
Ref #3 621E10000 RPM, LOW PROFILE, YELLOW/YELLOW, (199 EACH)
Awd $3,980.00$20.00
2 $4,467.55$22.45
3 $4,378.00$22.00
Ref #4 621E10020 RPM, LOW PROFILE WHITE/RED, (554 EACH)
Awd $11,080.00$20.00
2 $12,437.30$22.45
3 $12,188.00$22.00
Ref #5 621E54000 RAISED PAVEMENT MARKER REMOVED, (753 EACH)
Awd $12,048.00$16.00
2 $10,542.00$14.00
3 $6,024.00$8.00
Ref #6 642E00090 EDGE LINE, 4", (3.5 MILE)
Awd $2,100.00$600.00
2 $1,872.50$535.00
3 $1,837.50$525.00
Ref #7 642E00290 CENTER LINE, (1.75 MILE)
Awd $1,706.25$975.00
2 $16.71$9.55
3 $2,100.00$1,200.00
Ref #8 642E00390 CHANNELIZING LINE, 8", (534 FT)
Awd $299.04$0.56
2 $293.70$0.55
3 $267.00$0.50
Ref #9 642E00690 TRANSVERSE/DIAGONAL LINE, (58 FT)
Awd $188.50$3.25
2 $165.30$2.85
3 $171.10$2.95
Ref #10 642E01290 LANE ARROW, (6 EACH)
Awd $300.00$50.00
2 $252.00$42.00
3 $270.00$45.00
Ref #11 644E00104 EDGE LINE, 6", (14.2 MILE)
Awd $41,180.00$2,900.00
2 $39,760.00$2,800.00
3 $49,700.00$3,500.00
160203 - Page 290
Ref #12 644E00204 LANE LINE, 6", (7.1 MILE)
Awd $9,940.00$1,400.00
2 $9,940.00$1,400.00
3 $8,520.00$1,200.00
Ref #13 644E00300 CENTER LINE, (0.26 MILE)
Awd $1,404.00$5,400.00
2 $1,365.00$5,250.00
3 $1,300.00$5,000.00
Ref #14 644E00404 CHANNELIZING LINE, 12", (2040 FT)
Awd $3,876.00$1.90
2 $3,774.00$1.85
3 $2,550.00$1.25
Ref #15 644E00500 STOP LINE, (480 FT)
Awd $2,880.00$6.00
2 $2,664.00$5.55
3 $2,880.00$6.00
Ref #16 644E00700 TRANSVERSE/DIAGONAL LINE, (499 FT)
Awd $2,495.00$5.00
2 $2,495.00$5.00
3 $2,994.00$6.00
Ref #17 644E00900 ISLAND MARKING, (540 SF)
Awd $1,350.00$2.50
2 $1,350.00$2.50
3 $3,240.00$6.00
Ref #18 644E01300 LANE ARROW, (25 EACH)
Awd $2,125.00$85.00
2 $2,000.00$80.00
3 $2,500.00$100.00
Section 2 - TRAFFIC CONTROL - Totals
Awd $96,951.79
2 $93,395.06
3 $100,919.60
Ref #19 614E12410 SPEED ZONE AHEAD SYMBOL SIGN, (4 EACH)
Awd $440.00$110.00
2 $800.00$200.00
3 $400.00$100.00
Ref #20 614E12460 WORK ZONE MARKING SIGN, (16 EACH)
Awd $1,760.00$110.00
2 $3,200.00$200.00
3 $1,600.00$100.00
Ref #21 614E12470 WORK ZONE SPEED LIMIT SIGN, (24 EACH)
Awd $2,640.00$110.00
2 $4,800.00$200.00
3 $2,400.00$100.00
Ref #22 614E12490 RESUME LEGAL SPEED SIGN, (4 EACH)
Awd $440.00$110.00
2 $800.00$200.00
3 $400.00$100.00
160203 - Page 291
Ref #23 614E20100 WORK ZONE LANE LINE, CLASS I, 642 PAINT, (7.1 MILE)
Awd $4,260.00$600.00
2 $3,195.00$450.00
3 $3,798.50$535.00
Ref #24 614E20500 WORK ZONE LANE LINE, CLASS II, 642 PAINT, (7.1 MILE)
Awd $3,550.00$500.00
2 $6,390.00$900.00
3 $6,177.00$870.00
Ref #25 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (7.1 MILE)
Awd $4,260.00$600.00
2 $3,195.00$450.00
3 $3,088.50$435.00
Ref #26 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (1.75 MILE)
Awd $2,187.50$1,250.00
2 $2,100.00$1,200.00
3 $1,391.25$795.00
Ref #27 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT, (1.75 MILE)
Awd $1,050.00$600.00
2 $1,575.00$900.00
3 $1,522.50$870.00
Ref #28 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (1.75 MILE)
Awd $1,487.50$850.00
2 $2,100.00$1,200.00
3 $1,216.25$695.00
Ref #29 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (14.2 MILE)
Awd $11,005.00$775.00
2 $7,100.00$500.00
3 $9,301.00$655.00
Ref #30 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (0.48 MILE)
Awd $2,880.00$6,000.00
2 $432.00$900.00
3 $480.00$1,000.00
Ref #31 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (14.2 MILE)
Awd $7,952.00$560.00
2 $7,100.00$500.00
3 $9,301.00$655.00
Ref #32 614E24400 WORK ZONE DOTTED LINE, CLASS I, 740.06, TYPE I, (1472 FT)
Awd $1,633.92$1.11
2 $2,944.00$2.00
3 $36,800.00$25.00
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $45,545.92
2 $45,731.00
3 $77,876.00
Ref #33 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,750.00$2,750.00
2 $3,000.00$3,000.00
3 $8,000.00$8,000.00
160203 - Page 292
Ref #34 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $23,699.00$23,699.00
2 $57,000.00$57,000.00
3 $92,000.00$92,000.00
Ref #35 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $500.00$500.00
2 $1,000.00$1,000.00
3 $1,000.00$1,000.00
Ref #36 624E10000 MOBILIZATION, (LUMP SUM)
Awd $21,000.00$21,000.00
2 $20,500.00$20,500.00
3 $67,000.00$67,000.00
Section 4 - INCIDENTALS - Totals
Awd $47,949.00
2 $81,500.00
3 $168,000.00
160203 - Page 293
Project No. 160204
PID 102142
WAS-SR 821-0.60
Federal
Type: PREVENTIVE MAINTENANCE
Completion Date: 9/15/2016
Award Amount: $441,436.16
Contract Awarded To: STRAWSER CONSTRUCTION INC
Letting Date: 4/7/2016
Engineer's Estimate: $372,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
STRAWSER CONSTRUCTION INC
1392 DUBLIN RD
COLUMBUS, OH 43215
Franklin
Bidder 1
Bid $441,436.16
AMERICAN PAVEMENTS LLC
7475 MONTGOMERY DR
PLAIN CITY, OH 43064
Madison
Bidder 2
Bid $466,665.33
NY-MAC ENTERPRISES INC
3415 S CREYTS RD
LANSING, MI 48917
Bidder 3
Bid $497,963.44
160204 - Page 294
Ref #1 421E10011 MICROSURFACING, SURFACE COURSE, AS PER PLAN, (67192 SY)
Awd $174,699.20$2.60
2 $157,229.28$2.34
3 $139,087.44$2.07
Ref #2 421E10030 MICROSURFACING, RUT FILL COURSE, (1000 TON)
Awd $175,000.00$175.00
2 $205,000.00$205.00
3 $225,000.00$225.00
Section 1 - PAVEMENT - Totals
Awd $349,699.20
2 $362,229.28
3 $364,087.44
Ref #3 621E10000 RPM, LOW PROFILE, YELLOW/YELLOW, (342 EACH)
Awd $7,182.00$21.00
2 $8,703.90$25.45
3 $7,524.00$22.00
Ref #4 621E10020 RPM, LOW PROFILE WHITE/RED, (3 EACH)
Awd $63.00$21.00
2 $76.35$25.45
3 $90.00$30.00
Ref #5 621E54000 RAISED PAVEMENT MARKER REMOVED, (345 EACH)
Awd $5,865.00$17.00
2 $4,830.00$14.00
3 $3,450.00$10.00
Ref #6 642E00090 EDGE LINE, 4", (6.15 MILE)
Awd $3,075.00$500.00
2 $2,952.00$480.00
3 $4,612.50$750.00
Ref #7 642E00290 CENTER LINE, (3.25 MILE)
Awd $3,250.00$1,000.00
2 $3,120.00$960.00
3 $2,437.50$750.00
Ref #8 644E00400 CHANNELIZING LINE, 8", (50 FT)
Awd $100.50$2.01
2 $100.00$2.00
3 $500.00$10.00
Ref #9 644E00500 STOP LINE, (250 FT)
Awd $1,792.50$7.17
2 $1,750.00$7.00
3 $2,500.00$10.00
Ref #10 644E00700 TRANSVERSE/DIAGONAL LINE, (480 FT)
Awd $2,520.00$5.25
2 $2,400.00$5.00
3 $4,800.00$10.00
Ref #11 644E00900 ISLAND MARKING, (140 SF)
Awd $385.00$2.75
2 $385.00$2.75
3 $1,400.00$10.00
160204 - Page 295
Ref #12 644E01300 LANE ARROW, (2 EACH)
Awd $200.00$100.00
2 $200.00$100.00
3 $20.00$10.00
Section 2 - TRAFFIC CONTROL - Totals
Awd $24,433.00
2 $24,517.25
3 $27,334.00
Ref #13 614E12460 WORK ZONE MARKING SIGN, (32 EACH)
Awd $3,200.00$100.00
2 $3,360.00$105.00
3 $3,840.00$120.00
Ref #14 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (6.16 MILE)
Awd $3,732.96$606.00
2 $3,696.00$600.00
3 $2,772.00$450.00
Ref #15 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT, (6.16 MILE)
Awd $3,080.00$500.00
2 $4,312.00$700.00
3 $2,772.00$450.00
Ref #16 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (3.08 MILE)
Awd $1,694.00$550.00
2 $1,694.00$550.00
3 $1,386.00$450.00
Ref #17 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (6.16 MILE)
Awd $3,080.00$500.00
2 $2,956.80$480.00
3 $2,772.00$450.00
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $14,786.96
2 $16,018.80
3 $13,542.00
Ref #18 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,600.00$1,600.00
2 $1,900.00$1,900.00
3 $5,000.00$5,000.00
Ref #19 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $24,000.00$24,000.00
2 $37,000.00$37,000.00
3 $50,000.00$50,000.00
Ref #20 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $500.00$500.00
2 $1,000.00$1,000.00
3 $1,000.00$1,000.00
160204 - Page 296
Ref #21 624E10000 MOBILIZATION, (LUMP SUM)
Awd $26,417.00$26,417.00
2 $24,000.00$24,000.00
3 $37,000.00$37,000.00
Section 4 - INCIDENTALS - Totals
Awd $52,517.00
2 $63,900.00
3 $93,000.00
160204 - Page 297
Project No. 160205
PID 94799
WAS-SR 821-6.56
Federal
Type: BRIDGE REPAIR
Completion Date: 10/15/2016
Award Amount: $2,060,065.23
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 4/7/2016
Engineer's Estimate: $1,778,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $2,060,065.23
RUHLIN COMPANY
P O BOX 190
SHARON CENTER, OH 44274
Medina
Bidder 2
Bid $2,118,227.05
TRITON CONSTRUCTION INC
P O BOX 1360
SAINT ALBANS, WV 25177
Bidder 3
Bid $2,278,000.00
160205 - Page 298
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $4,500.00$4,500.00
2 $10,000.00$10,000.00
3 $145,048.09$145,048.09
Ref #2 202E38000 GUARDRAIL REMOVED, (549 FT)
Awd $1,098.00$2.00
2 $1,235.25$2.25
3 $779.58$1.42
Ref #3 203E10000 EXCAVATION, (693 CY)
Awd $19,057.50$27.50
2 $20,790.00$30.00
3 $8,316.00$12.00
Ref #4 203E20000 EMBANKMENT, (87 CY)
Awd $1,422.45$16.35
2 $2,610.00$30.00
3 $1,131.00$13.00
Ref #5 204E10000 SUBGRADE COMPACTION, (361 SY)
Awd $1,444.00$4.00
2 $1,263.50$3.50
3 $866.40$2.40
Ref #6 606E13000 GUARDRAIL, TYPE 5, (300 FT)
Awd $5,400.00$18.00
2 $5,214.00$17.38
3 $4,320.00$14.40
Ref #7 606E25000 ANCHOR ASSEMBLY, TYPE A, (1 EACH)
Awd $1,100.00$1,100.00
2 $1,050.00$1,050.00
3 $920.00$920.00
Ref #8 606E26100 ANCHOR ASSEMBLY, TYPE E, (3 EACH)
Awd $5,325.00$1,775.00
2 $5,040.00$1,680.00
3 $5,355.00$1,785.00
Ref #9 606E32160 BRIDGE TERMINAL ASSEMBLY, TYPE TST, (4 EACH)
Awd $5,600.00$1,400.00
2 $5,300.00$1,325.00
3 $5,580.00$1,395.00
Section 1 - ROADWAY - Totals
Awd $44,946.95
2 $52,502.75
3 $172,316.07
Ref #10 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (835 CY)
Awd $52,605.00$63.00
2 $66,800.00$80.00
3 $61,272.30$73.38
Ref #11 659E10000 SEEDING AND MULCHING, (2002 SY)
Awd $2,102.10$1.05
2 $2,842.84$1.42
3 $3,803.80$1.90
160205 - Page 299
Ref #12 659E20000 COMMERCIAL FERTILIZER, (0.18 TON)
Awd $142.20$790.00
2 $99.00$550.00
3 $126.90$705.00
Ref #13 659E31000 LIME, (0.42 ACRE)
Awd $65.10$155.00
2 $58.80$140.00
3 $37.80$90.00
Ref #14 659E35000 WATER, (6 MGAL)
Awd $6.00$1.00
2 $0.06$0.01
3 $6.00$1.00
Ref #15 832E30000 EROSION CONTROL, (1500 EACH)
Awd $1,500.00$1.00
2 $1,500.00$1.00
3 $1,500.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $56,420.40
2 $71,300.70
3 $66,746.80
Ref #16 605E31100 AGGREGATE DRAINS, (57 FT)
Awd $1,197.00$21.00
2 $684.00$12.00
3 $912.00$16.00
Section 3 - DRAINAGE - Totals
Awd $1,197.00
2 $684.00
3 $912.00
Ref #17 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1476 SY)
Awd $13,284.00$9.00
2 $5,904.00$4.00
3 $7,380.00$5.00
Ref #18 301E46000 ASPHALT CONCRETE BASE, PG64-22, (25 CY)
Awd $12,000.00$480.00
2 $12,000.00$480.00
3 $12,000.00$480.00
Ref #19 304E20000 AGGREGATE BASE, (57 CY)
Awd $5,472.00$96.00
2 $4,275.00$75.00
3 $3,625.77$63.61
Ref #20 407E10000 TACK COAT, (96 GAL)
Awd $240.00$2.50
2 $240.00$2.50
3 $240.00$2.50
160205 - Page 300
Ref #21 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (14 GAL)
Awd $35.00$2.50
2 $35.00$2.50
3 $35.00$2.50
Ref #22 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (81 CY)
Awd $24,300.00$300.00
2 $24,300.00$300.00
3 $24,300.00$300.00
Section 4 - PAVEMENT - Totals
Awd $55,331.00
2 $46,754.00
3 $47,580.77
Ref #23 621E54000 RAISED PAVEMENT MARKER REMOVED, (17 EACH)
Awd $314.50$18.50
2 $136.00$8.00
3 $204.00$12.00
Ref #24 626E00100 BARRIER REFLECTOR, (20 EACH)
Awd $140.00$7.00
2 $130.00$6.50
3 $200.00$10.00
Ref #25 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (4 EACH)
Awd $40.00$10.00
2 $40.00$10.00
3 $40.00$10.00
Ref #26 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (3 EACH)
Awd $120.00$40.00
2 $120.00$40.00
3 $150.00$50.00
Ref #27 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (4 EACH)
Awd $40.00$10.00
2 $40.00$10.00
3 $60.00$15.00
Ref #28 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT, (3 EACH)
Awd $120.00$40.00
2 $120.00$40.00
3 $345.00$115.00
Ref #29 642E00090 EDGE LINE, 4", (0.29 MILE)
Awd $455.30$1,570.00
2 $1,092.72$3,768.00
3 $430.65$1,485.00
Ref #30 642E00290 CENTER LINE, (0.15 MILE)
Awd $450.00$3,000.00
2 $1,168.05$7,787.00
3 $434.25$2,895.00
Ref #31 642E00490 STOP LINE, (30 FT)
Awd $210.00$7.00
2 $150.00$5.00
3 $195.00$6.50
160205 - Page 301
Section 5 - TRAFFIC CONTROL - Totals
Awd $1,889.80
2 $2,996.77
3 $2,058.90
Ref #32 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (4 EACH)
Awd $10,400.00$2,600.00
2 $10,000.00$2,500.00
3 $7,200.00$1,800.00
Ref #33 614E12740 WORK ZONE LIGHTING SYSTEM, (1 EACH)
Awd $28,000.00$28,000.00
2 $5,000.00$5,000.00
3 $6,000.00$6,000.00
Ref #34 614E13302 BARRIER REFLECTOR, TYPE B2, (40 EACH)
Awd $480.00$12.00
2 $900.00$22.50
3 $900.00$22.50
Ref #35 614E13360 OBJECT MARKER, TWO WAY, (40 EACH)
Awd $680.00$17.00
2 $900.00$22.50
3 $900.00$22.50
Ref #36 614E22000 WORK ZONE EDGE LINE, CLASS I, (0.5 MILE)
Awd $1,250.00$2,500.00
2 $5,280.00$10,560.00
3 $1,200.00$2,400.00
Ref #37 614E26000 WORK ZONE STOP LINE, CLASS I, (23 FT)
Awd $161.00$7.00
2 $149.50$6.50
3 $149.50$6.50
Ref #38 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $5,000.00$5,000.00
3 $10,000.00$10,000.00
Ref #39 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, (123 SY)
Awd $8,856.00$72.00
2 $19,680.00$160.00
3 $9,840.00$80.00
Ref #40 622E41000 PORTABLE BARRIER, 32", (380 FT)
Awd $5,320.00$14.00
2 $3,800.00$10.00
3 $8,360.00$22.00
Ref #41 622E41020 PORTABLE BARRIER, 32", BRIDGE MOUNTED, (540 FT)
Awd $7,020.00$13.00
2 $5,400.00$10.00
3 $12,960.00$24.00
160205 - Page 302
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $70,167.00
2 $56,109.50
3 $57,509.50
Ref #42 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $131,000.00$131,000.00
2 $160,000.00$160,000.00
3 $130,000.00$130,000.00
Ref #43 202E23500 WEARING COURSE REMOVED, (823 SY)
Awd $16,460.00$20.00
2 $11,522.00$14.00
3 $13,168.00$16.00
Ref #44 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $28,000.00$28,000.00
2 $24,500.00$24,500.00
3 $50,000.00$50,000.00
Ref #45 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $35,000.00$35,000.00
2 $60,000.00$60,000.00
3 $15,000.00$15,000.00
Ref #46 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)
Awd $23,500.00$23,500.00
2 $50,000.00$50,000.00
3 $35,000.00$35,000.00
Ref #47 507E00200 STEEL PILES HP12X53, FURNISHED, (570 FT)
Awd $14,244.30$24.99
2 $17,100.00$30.00
3 $12,540.00$22.00
Ref #48 507E00251 STEEL PILES HP12X53, DRIVEN, AS PER PLAN, (510 FT)
Awd $22,950.00$45.00
2 $7,650.00$15.00
3 $20,400.00$40.00
Ref #49 507E00410 STEEL PILES, MISC.:PILE SPLICE, (4 EACH)
Awd $1,732.00$433.00
2 $1,700.00$425.00
3 $2,400.00$600.00
Ref #50 509E10000 EPOXY COATED REINFORCING STEEL, (63945 LB)
Awd $83,128.50$1.30
2 $91,441.35$1.43
3 $89,523.00$1.40
Ref #51 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)
Awd $200.00$2.00
2 $300.00$3.00
3 $300.00$3.00
Ref #52 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (723 EACH)
Awd $15,183.00$21.00
2 $12,312.69$17.03
3 $14,460.00$20.00
160205 - Page 303
Ref #53 511E21520 CLASS QC2 CONCRETE, SUPERSTRUCTURE, (275 CY)
Awd $269,500.00$980.00
2 $220,000.00$800.00
3 $258,500.00$940.00
Ref #54 511E43210 CLASS QC1 CONCRETE, PIER, (63 CY)
Awd $81,900.00$1,300.00
2 $63,000.00$1,000.00
3 $81,900.00$1,300.00
Ref #55 511E45710 CLASS QC1 CONCRETE, ABUTMENT, (107 CY)
Awd $67,731.00$633.00
2 $80,250.00$750.00
3 $64,200.00$600.00
Ref #56 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY), (716 SY)
Awd $9,308.00$13.00
2 $7,518.00$10.50
3 $12,172.00$17.00
Ref #57 512E33000 TYPE 2 WATERPROOFING, (65 SY)
Awd $1,430.00$22.00
2 $1,625.00$25.00
3 $2,600.00$40.00
Ref #58 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3, (307700 LB)
Awd $529,244.00$1.72
2 $553,860.00$1.80
3 $553,860.00$1.80
Ref #59 513E20000 WELDED STUD SHEAR CONNECTORS, (3987 EACH)
Awd $11,961.00$3.00
2 $11,163.60$2.80
3 $17,941.50$4.50
Ref #60 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (16658 SF)
Awd $131,598.20$7.90
2 $66,632.00$4.00
3 $49,974.00$3.00
Ref #61 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (16658 SF)
Awd $42,644.48$2.56
2 $66,632.00$4.00
3 $49,974.00$3.00
Ref #62 514E10000 FINAL INSPECTION REPAIR, (12 EACH)
Awd $4,032.00$336.00
2 $4,800.00$400.00
3 $1,800.00$150.00
Ref #63 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (76 FT)
Awd $35,340.00$465.00
2 $34,200.00$450.00
3 $30,400.00$400.00
Ref #64 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (12 EACH)
Awd $9,180.00$765.00
2 $10,800.00$900.00
3 $9,000.00$750.00
160205 - Page 304
Ref #65 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (12 EACH)
Awd $9,180.00$765.00
2 $10,800.00$900.00
3 $9,240.00$770.00
Ref #66 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (12 EACH)
Awd $9,180.00$765.00
2 $22,200.00$1,850.00
3 $13,200.00$1,100.00
Ref #67 517E70000 RAILING (TWIN STEEL TUBE), (537.06 FT)
Awd $75,188.40$140.00
2 $71,117.49$132.42
3 $100,430.22$187.00
Ref #68 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (74 CY)
Awd $7,400.00$100.00
2 $6,660.00$90.00
3 $9,398.00$127.00
Ref #69 518E22300 SPECIAL - STEEL DRIP STRIP, (647.52 FT)
Awd $6,475.20$10.00
2 $6,475.20$10.00
3 $7,770.24$12.00
Ref #70 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (105 FT)
Awd $735.00$7.00
2 $2,100.00$20.00
3 $525.00$5.00
Ref #71 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (138 FT)
Awd $828.00$6.00
2 $4,830.00$35.00
3 $1,104.00$8.00
Ref #72 519E11100 PATCHING CONCRETE STRUCTURE, (44 SF)
Awd $7,260.00$165.00
2 $5,940.00$135.00
3 $6,336.00$144.00
Ref #73 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15"), (179 SY)
Awd $53,700.00$300.00
2 $44,750.00$250.00
3 $42,960.00$240.00
Section 7 - STRUCTURE REPAIR (BRIDGE No. WAS-821-065 - Totals
Awd $1,735,213.08
2 $1,731,879.33
3 $1,706,075.96
Ref #74 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $13,000.00$13,000.00
3 $14,800.00$14,800.00
Ref #75 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $35,000.00$35,000.00
2 $25,000.00$25,000.00
3 $65,000.00$65,000.00
160205 - Page 305
Ref #76 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $9,900.00$9,900.00
2 $18,000.00$18,000.00
3 $45,000.00$45,000.00
Ref #77 624E10000 MOBILIZATION, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $100,000.00$100,000.00
3 $100,000.00$100,000.00
Section 8 - INCIDENTALS - Totals
Awd $94,900.00
2 $156,000.00
3 $224,800.00
160205 - Page 306
Project No. 160206
PID 97853
ATB-US 322-3.57/12.49
Non-Federal
Type: SIGNALIZATION
Completion Date: 10/30/2016
Award Amount: $53,560.00
Contract Awarded To: PERRAM ELECTRIC INC
Letting Date: 4/7/2016
Engineer's Estimate: $75,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
PERRAM ELECTRIC INC
6882 RIDGE RD
WADSWORTH, OH 44281
Medina
Bidder 1
Bid $53,560.00
GREENWICH ELECTRIC INC
1050 LAFAYETTE RD
MEDINA, OH 44256-3549
Bidder 2
Bid $57,285.50
MILLER CABLE COMPANY
210 S BROADWAY ST P O BOX 68
GREEN SPRINGS, OH 44836
Seneca
Bidder 3
Bid $84,500.00
160206 - Page 307
Ref #1 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
Section 1 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
Ref #2 625E32000 GROUND ROD, (4 EACH)
Awd $820.00$205.00
2 $900.00$225.00
3 $940.00$235.00
Ref #3 632E04801 VEHICULAR SIGNAL HEAD, (LED), 1 SECTION, 12" LENS,, (8 EACH)
Awd $2,080.00$260.00
2 $2,680.00$335.00
3 $4,400.00$550.00
Ref #4 632E04805 VEHICULAR SIGNAL HEAD, (LED), 1 SECTION, 12" LENS,, (4 EACH)
Awd $2,100.00$525.00
2 $2,320.00$580.00
3 $4,400.00$1,100.00
Ref #5 632E25000 COVERING OF VEHICULAR SIGNAL HEAD, (16 EACH)
Awd $80.00$5.00
2 $240.00$15.00
3 $1,200.00$75.00
Ref #6 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES, (199 FT)
Awd $1,641.75$8.25
2 $1,691.50$8.50
3 $4,378.00$22.00
Ref #7 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG, (824 FT)
Awd $1,812.80$2.20
2 $1,648.00$2.00
3 $2,472.00$3.00
Ref #8 632E64000 STRAIN POLE FOUNDATION, (4 EACH)
Awd $12,980.00$3,245.00
2 $10,000.00$2,500.00
3 $16,400.00$4,100.00
Ref #9 632E69300 POWER CABLE, 3 CONDUCTOR, NO. 4 AWG, (60 FT)
Awd $258.00$4.30
2 $336.00$5.60
3 $300.00$5.00
Ref #10 632E70001 POWER SERVICE, AS PER PLAN, (2 EACH)
Awd $2,430.00$1,215.00
2 $3,400.00$1,700.00
3 $4,300.00$2,150.00
Ref #11 632E82600 STRAIN POLE, TYPE TC-81.10, DESIGN 6, (2 EACH)
Awd $5,920.00$2,960.00
2 $6,800.00$3,400.00
3 $8,000.00$4,000.00
160206 - Page 308
Ref #12 632E83000 STRAIN POLE, TYPE TC-81.10, DESIGN 10, (2 EACH)
Awd $8,950.00$4,475.00
2 $9,930.00$4,965.00
3 $11,600.00$5,800.00
Ref #13 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, (2 EACH)
Awd $2,620.00$1,310.00
2 $2,000.00$1,000.00
3 $4,500.00$2,250.00
Ref #14 633E67200 CONTROLLER WORK PAD, (2 EACH)
Awd $100.00$50.00
2 $580.00$290.00
3 $700.00$350.00
Ref #15 633E71000 FLASHER CONTROLLER, (2 EACH)
Awd $1,520.00$760.00
2 $1,620.00$810.00
3 $4,000.00$2,000.00
Section 2 - TRAFFIC SIGNALS - Totals
Awd $43,312.55
2 $44,145.50
3 $67,590.00
Ref #16 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (16 HOUR)
Awd $1,040.00$65.00
2 $1,040.00$65.00
3 $1,120.00$70.00
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $1,040.00
2 $1,040.00
3 $1,120.00
Ref #17 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,937.45$1,937.45
2 $1,750.00$1,750.00
3 $770.00$770.00
Ref #18 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $520.00$520.00
2 $1,000.00$1,000.00
3 $8,570.00$8,570.00
Ref #19 619E16010 FIELD OFFICE, TYPE B, (3 MNTH)
Awd $3,000.00$1,000.00
2 $3,900.00$1,300.00
3 $2,550.00$850.00
Ref #20 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $750.00$750.00
2 $850.00$850.00
3 $900.00$900.00
160206 - Page 309
Ref #21 624E10000 MOBILIZATION, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $3,600.00$3,600.00
3 $2,000.00$2,000.00
Section 4 - INCIDENTALS - Totals
Awd $8,207.45
2 $11,100.00
3 $14,790.00
160206 - Page 310
Project No. 160207
PID 100117
CLE-SR 222-0.70
Non-Federal
Type: SLIDE REPAIR
Completion Date: 8/1/2016
Award Amount: $203,064.77
Contract Awarded To: ALAN STONE CO INC
Letting Date: 4/7/2016
Engineer's Estimate: $192,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
ALAN STONE CO INC
1324 ELLIS RUN RD
CUTLER, OH 45724
Washington
Bidder 1
Bid $203,064.77
S P DRILLING SERVICES INC
103 MOUND AVE
MILFORD, OH 45150
Clermont
Bidder 2
Bid $207,127.91
JOHN R JURGENSEN COMPANY
11641 MOSTELLER RD
CINCINNATI, OH 45241
Hamilton
Bidder 3
Bid $208,279.28
FORD DEVELOPMENT CORP
11148 WOODWARD LANE
SHARONVILLE, OH 45241
Hamilton
Bidder 4
Bid $258,058.30
160207 - Page 311
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,600.00$1,600.00
2 $1,000.00$1,000.00
3 $2,310.50$2,310.50
4 $2,000.00$2,000.00
Ref #2 202E23010 PAVEMENT REMOVED, ASPHALT, (153 SY)
Awd $2,142.00$14.00
2 $6,120.00$40.00
3 $2,541.33$16.61
4 $765.00$5.00
Ref #3 202E38000 GUARDRAIL REMOVED, (98 FT)
Awd $205.80$2.10
2 $294.00$3.00
3 $196.00$2.00
4 $196.00$2.00
Ref #4 202E38201 GUARDRAIL REMOVED FOR REUSE, AS PER PLAN, (211 FT)
Awd $3,165.00$15.00
2 $844.00$4.00
3 $2,848.50$13.50
4 $3,165.00$15.00
Ref #5 203E10000 EXCAVATION, (30 CY)
Awd $8,257.50$275.25
2 $600.00$20.00
3 $4,338.90$144.63
4 $1,500.00$50.00
Ref #6 203E35001 GRANULAR EMBANKMENT, AS PER PLAN, (26 CY)
Awd $2,314.00$89.00
2 $2,002.00$77.00
3 $3,297.06$126.81
4 $2,080.00$80.00
Ref #7 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING, (100 FT)
Awd $3,000.00$30.00
2 $3,850.00$38.50
3 $2,820.00$28.20
4 $3,500.00$35.00
Ref #8 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER, (LUMP SUM)
Awd $2,519.00$2,519.00
2 $1,450.00$1,450.00
3 $5,000.00$5,000.00
4 $3,000.00$3,000.00
Section 1 - ROADWAY - Totals
Awd $23,203.30
2 $16,160.00
3 $23,352.29
4 $16,206.00
Ref #9 659E10000 SEEDING AND MULCHING, (240 SY)
Awd $2,880.00$12.00
2 $600.00$2.50
3 $2,208.00$9.20
4 $1,200.00$5.00
160207 - Page 312
Ref #10 659E20000 COMMERCIAL FERTILIZER, (0.1 TON)
Awd $61.40$614.00
2 $100.00$1,000.00
3 $58.50$585.00
4 $100.00$1,000.00
Ref #11 659E31000 LIME, (0.05 ACRE)
Awd $0.55$11.00
2 $6.00$120.00
3 $0.50$10.00
4 $5.00$100.00
Ref #12 659E35000 WATER, (1 MGAL)
Awd $1.05$1.05
2 $10.00$10.00
3 $1.00$1.00
4 $10.00$10.00
Ref #13 832E30000 EROSION CONTROL, (5000 EACH)
Awd $5,000.00$1.00
2 $5,000.00$1.00
3 $5,000.00$1.00
4 $5,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $7,943.00
2 $5,716.00
3 $7,268.00
4 $6,315.00
Ref #14 203E35120 GRANULAR MATERIAL, TYPE C, (67 CY)
Awd $3,350.00$50.00
2 $2,948.00$44.00
3 $3,847.81$57.43
4 $5,360.00$80.00
Ref #15 204E10000 SUBGRADE COMPACTION, (171 SY)
Awd $607.05$3.55
2 $1,026.00$6.00
3 $969.57$5.67
4 $342.00$2.00
Ref #16 204E13000 EXCAVATION OF SUBGRADE, (67 CY)
Awd $1,742.00$26.00
2 $1,340.00$20.00
3 $1,437.82$21.46
4 $3,350.00$50.00
Ref #17 204E45000 PROOF ROLLING, (1 HOUR)
Awd $175.00$175.00
2 $300.00$300.00
3 $163.45$163.45
4 $50.00$50.00
Ref #18 204E50000 GEOTEXTILE FABRIC, (171 SY)
Awd $1,085.85$6.35
2 $470.25$2.75
3 $465.12$2.72
4 $684.00$4.00
160207 - Page 313
Ref #19 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (790 SY)
Awd $10,270.00$13.00
2 $4,740.00$6.00
3 $8,919.10$11.29
4 $5,530.00$7.00
Ref #20 301E46000 ASPHALT CONCRETE BASE, PG64-22, (49 CY)
Awd $10,902.50$222.50
2 $7,399.00$151.00
3 $9,822.05$200.45
4 $8,330.00$170.00
Ref #21 304E20000 AGGREGATE BASE, (29 CY)
Awd $2,610.00$90.00
2 $1,885.00$65.00
3 $2,291.00$79.00
4 $2,320.00$80.00
Ref #22 407E10000 TACK COAT, (71 GAL)
Awd $298.20$4.20
2 $355.00$5.00
3 $177.50$2.50
4 $426.00$6.00
Ref #23 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (38 GAL)
Awd $532.00$14.00
2 $190.00$5.00
3 $95.00$2.50
4 $228.00$6.00
Ref #24 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (33 CY)
Awd $10,403.25$315.25
2 $6,567.00$199.00
3 $7,368.57$223.29
4 $7,920.00$240.00
Ref #25 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (46 CY)
Awd $8,648.00$188.00
2 $9,154.00$199.00
3 $7,663.60$166.60
4 $11,040.00$240.00
Section 3 - PAVEMENT - Totals
Awd $50,623.85
2 $36,374.25
3 $43,220.59
4 $45,580.00
Ref #26 621E00100 RPM, (6 EACH)
Awd $945.00$157.50
2 $900.00$150.00
3 $1,350.00$225.00
4 $990.00$165.00
Ref #27 621E54000 RAISED PAVEMENT MARKER REMOVED, (6 EACH)
Awd $78.00$13.00
2 $30.00$5.00
3 $106.14$17.69
4 $30.00$5.00
160207 - Page 314
Ref #28 626E00100 BARRIER REFLECTOR, (5 EACH)
Awd $42.00$8.40
2 $41.25$8.25
3 $30.50$6.10
4 $35.00$7.00
Ref #29 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (28.3 FT)
Awd $311.30$11.00
2 $424.50$15.00
3 $424.50$15.00
4 $311.30$11.00
Ref #30 630E80100 SIGN, FLAT SHEET, (17 SF)
Awd $289.00$17.00
2 $340.00$20.00
3 $450.50$26.50
4 $306.00$18.00
Ref #31 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (4 EACH)
Awd $64.00$16.00
2 $20.00$5.00
3 $40.00$10.00
4 $40.00$10.00
Ref #32 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (2 EACH)
Awd $42.00$21.00
2 $10.00$5.00
3 $30.00$15.00
4 $20.00$10.00
Ref #33 644E00100 EDGE LINE, 4", (0.14 MILE)
Awd $2,791.88$19,942.00
2 $2,660.00$19,000.00
3 $1,201.48$8,582.00
4 $2,940.00$21,000.00
Ref #34 644E00300 CENTER LINE, (0.07 MILE)
Awd $1,542.94$22,042.00
2 $1,470.00$21,000.00
3 $1,201.55$17,165.00
4 $1,610.00$23,000.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $6,106.12
2 $5,895.75
3 $4,834.67
4 $6,282.30
Ref #35 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $7,279.00$7,279.00
2 $6,935.00$6,935.00
3 $8,637.56$8,637.56
4 $6,000.00$6,000.00
Ref #100 614E18002 MAINTAINING TRAFFIC, MISC.:REMOVAL OF EXISTING MOT, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $5,500.00$5,500.00
3 $4,949.48$4,949.48
4 $7,000.00$7,000.00
160207 - Page 315
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $11,279.00
2 $12,435.00
3 $13,587.04
4 $13,000.00
Ref #36 203E35141 GRANULAR MATERIAL, TYPE E, AS PER PLAN, (34 CY)
Awd $10,965.00$322.50
2 $3,060.00$90.00
3 $4,454.00$131.00
4 $2,720.00$80.00
Ref #37 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $497.50$497.50
2 $500.00$500.00
3 $7,149.53$7,149.53
4 $21,600.00$21,600.00
Ref #38 507E00400 STEEL PILES, MISC.: SOLDIER PILES HP12X53, (319.5 FT)
Awd $8,946.00$28.00
2 $7,600.91$23.79
3 $9,294.26$29.09
4 $15,975.00$50.00
Ref #39 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE, (161 FT)
Awd $9,177.00$57.00
2 $10,787.00$67.00
3 $12,166.77$75.57
4 $25,760.00$160.00
Ref #40 524E94605 DRILLED SHAFTS, 30" DIAMETER INTO BEDROCK, AS PER , (120 FT)
Awd $11,280.00$94.00
2 $27,840.00$232.00
3 $20,629.20$171.91
4 $24,000.00$200.00
Ref #41 530E00600 SPECIAL - STRUCTURE, MISC.:6"X10" ROUGH CUT PRESSU, (2054 SF)
Awd $32,864.00$16.00
2 $65,728.00$32.00
3 $46,256.08$22.52
4 $61,620.00$30.00
Section 6 - RETAINING WALLS (SPL) - Totals
Awd $73,729.50
2 $115,515.91
3 $99,949.84
4 $151,675.00
Ref #42 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,575.00$1,575.00
2 $4,046.00$4,046.00
3 $337.01$337.01
4 $3,000.00$3,000.00
160207 - Page 316
Ref #43 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $5,456.00$5,456.00
2 $100.00$100.00
3 $4,642.36$4,642.36
4 $3,000.00$3,000.00
Ref #44 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,149.00$3,149.00
2 $2,000.00$2,000.00
3 $4,093.36$4,093.36
4 $3,000.00$3,000.00
Ref #45 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $8,885.00$8,885.00
3 $6,994.12$6,994.12
4 $10,000.00$10,000.00
Section 7 - INCIDENTALS - Totals
Awd $30,180.00
2 $15,031.00
3 $16,066.85
4 $19,000.00
160207 - Page 317
Project No. 160209
PID 99701
SUM-SP FY2016 (East)
Non-Federal
Type: SPOT SAFETY
Completion Date: 9/30/2016
Award Amount: $877,344.00
Contract Awarded To: KARVO COMPANIES INC
Letting Date: 4/7/2016
Engineer's Estimate: $1,043,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
KARVO COMPANIES INC
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 1
Bid $877,344.00
CHAGRIN VALLEY PAVING INC
17290 MUNN RD
CHAGRIN FALLS, OH 44023
Geauga
Bidder 2
Bid $928,688.00
BARBICAS CONSTRUCTION COMPANY INC
124 DARROW RD
AKRON, OH 44305
Summit
Bidder 3
Bid $1,035,510.00
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 4
Bid $1,242,545.00
160209 - Page 318
Ref #1 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (28440 SY)
Awd $763,614.00$26.85
2 $787,788.00$27.70
3 $824,760.00$29.00
4 $1,080,720.00$38.00
Section 1 - PAVEMENT - Totals
Awd $763,614.00
2 $787,788.00
3 $824,760.00
4 $1,080,720.00
Ref #2 621E54000 RAISED PAVEMENT MARKER REMOVED, (10 EACH)
Awd $80.00$8.00
2 $100.00$10.00
3 $250.00$25.00
4 $75.00$7.50
Ref #3 642E00100 EDGE LINE, 4", TYPE 1, (3 MILE)
Awd $1,500.00$500.00
2 $3,600.00$1,200.00
3 $3,600.00$1,200.00
4 $1,575.00$525.00
Ref #4 642E00104 EDGE LINE, 6", TYPE 1, (1 MILE)
Awd $500.00$500.00
2 $1,400.00$1,400.00
3 $1,400.00$1,400.00
4 $525.00$525.00
Ref #5 642E00200 LANE LINE, 4", TYPE 1, (2 MILE)
Awd $1,000.00$500.00
2 $2,400.00$1,200.00
3 $2,400.00$1,200.00
4 $1,050.00$525.00
Ref #6 642E00204 LANE LINE, 6", TYPE 1, (2 MILE)
Awd $1,000.00$500.00
2 $2,400.00$1,200.00
3 $2,400.00$1,200.00
4 $1,050.00$525.00
Ref #7 642E00300 CENTER LINE, TYPE 1, (2 MILE)
Awd $2,000.00$1,000.00
2 $3,000.00$1,500.00
3 $3,000.00$1,500.00
4 $2,000.00$1,000.00
Ref #8 642E00404 CHANNELIZING LINE, 12", TYPE 1, (400 FT)
Awd $400.00$1.00
2 $600.00$1.50
3 $600.00$1.50
4 $400.00$1.00
Ref #9 642E00500 STOP LINE, TYPE 1, (100 FT)
Awd $400.00$4.00
2 $450.00$4.50
3 $450.00$4.50
4 $400.00$4.00
160209 - Page 319
Ref #10 642E00600 CROSSWALK LINE, TYPE 1, (100 FT)
Awd $400.00$4.00
2 $350.00$3.50
3 $350.00$3.50
4 $400.00$4.00
Ref #11 642E01300 LANE ARROW, TYPE 1, (6 EACH)
Awd $300.00$50.00
2 $300.00$50.00
3 $300.00$50.00
4 $300.00$50.00
Section 2 - TRAFFIC CONTROL - Totals
Awd $7,580.00
2 $14,600.00
3 $14,750.00
4 $7,775.00
Ref #12 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (300 HOUR)
Awd $19,500.00$65.00
2 $18,000.00$60.00
3 $21,000.00$70.00
4 $24,000.00$80.00
Ref #13 614E12460 WORK ZONE MARKING SIGN, (50 EACH)
Awd $5,750.00$115.00
2 $5,750.00$115.00
3 $3,500.00$70.00
4 $6,250.00$125.00
Ref #14 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (10 CY)
Awd $900.00$90.00
2 $750.00$75.00
3 $1,500.00$150.00
4 $2,500.00$250.00
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $26,150.00
2 $24,500.00
3 $26,000.00
4 $32,750.00
Ref #15 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $10,000.00$10,000.00
3 $10,000.00$10,000.00
4 $4,300.00$4,300.00
Ref #16 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $51,800.00$51,800.00
3 $120,000.00$120,000.00
4 $77,000.00$77,000.00
160209 - Page 320
Ref #17 624E10000 MOBILIZATION, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $40,000.00$40,000.00
3 $40,000.00$40,000.00
4 $40,000.00$40,000.00
Section 4 - INCIDENTALS - Totals
Awd $80,000.00
2 $101,800.00
3 $170,000.00
4 $121,300.00
160209 - Page 321
Project No. 160210
PID 99019
AUG-PPM FY16
Non-Federal
Type: PAVEMENT MARKING
Completion Date: 8/31/2016
Award Amount: $618,000.00
Contract Awarded To: AERO-MARK INC
Letting Date: 4/7/2016
Engineer's Estimate: $680,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
AERO-MARK INC
10423 DANNER DR
STREETSBORO, OH 44241
Portage
Bidder 1
Bid $618,000.00
OGLESBY CONSTRUCTION INC
1600 TOLEDO RD
NORWALK, OH 44857
Huron
Bidder 2
Bid $659,248.40
160210 - Page 322
Ref #1 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (24 HOUR)
Awd $936.00$39.00
2 $840.00$35.00
Ref #3 643E00204 LANE LINE, 6", (488.77 MILE)
Awd $185,243.83$379.00
2 $188,176.45$385.00
Ref #4 643E00400 CHANNELIZING LINE, 8", (56939 FT)
Awd $22,206.21$0.39
2 $22,775.60$0.40
Ref #5 643E00404 CHANNELIZING LINE, 12", (148858 FT)
Awd $72,940.42$0.49
2 $74,429.00$0.50
Ref #6 643E00500 STOP LINE, (22401 FT)
Awd $66,978.99$2.99
2 $73,923.30$3.30
Ref #7 643E00600 CROSSWALK LINE, (12522 FT)
Awd $21,162.18$1.69
2 $21,287.40$1.70
Ref #8 643E00700 TRANSVERSE/DIAGONAL LINE, (53454 FT)
Awd $84,991.86$1.59
2 $85,526.40$1.60
Ref #9 643E01000 RAILROAD SYMBOL MARKING, (47 EACH)
Awd $11,703.00$249.00
2 $11,750.00$250.00
Ref #10 643E01110 SCHOOL SYMBOL MARKING, 96", (41 EACH)
Awd $10,619.00$259.00
2 $10,660.00$260.00
Ref #11 643E01300 LANE ARROW, (1108 EACH)
Awd $54,292.00$49.00
2 $64,264.00$58.00
Ref #12 643E01410 WORD ON PAVEMENT, 96", (140 EACH)
Awd $9,660.00$69.00
2 $10,360.00$74.00
Ref #13 643E01500 DOTTED LINE, 4", (3851 FT)
Awd $1,886.99$0.49
2 $2,888.25$0.75
Ref #14 643E01510 DOTTED LINE, 6", (69455 FT)
Awd $34,032.95$0.49
2 $41,673.00$0.60
Ref #15 643E01602 BIKE LANE SYMBOL MARKING, (4 EACH)
Awd $596.00$149.00
2 $600.00$150.00
Ref #16 643E20802 YIELD LINE, (68 FT)
Awd $1,156.00$17.00
2 $680.00$10.00
Ref #17 643E40000 SPECIAL - AIR SPEED ZONE MARKING, (53 EACH)
Awd $21,147.00$399.00
2 $25,440.00$480.00
160210 - Page 323
Ref #18 643E50100 PAVEMENT MARKING, MISC.:"MERGE", (6 EACH)
Awd $1,494.00$249.00
2 $2,400.00$400.00
Ref #19 643E50100 PAVEMENT MARKING, MISC.:MERGE ARROW, (12 EACH)
Awd $4,788.00$399.00
2 $3,000.00$250.00
Section 1 - ITEMS OF WORK - Totals
Awd $605,834.43
2 $640,673.40
Ref #20 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $3,165.57$3,165.57
2 $4,000.00$4,000.00
Ref #21 614E11001 MAINTAINING TRAFFIC, AS PER PLAN, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $9,575.00$9,575.00
Ref #22 624E10000 MOBILIZATION, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $5,000.00$5,000.00
Section 2 - INCIDENTALS - Totals
Awd $12,165.57
2 $18,575.00
160210 - Page 324
Project No. 160211
PID 87033
BUT-PM/RPM FY2016
Non-Federal
Type: PAVEMENT MARKING
Completion Date: 4/30/2017
Award Amount: $2,399,250.88
Contract Awarded To: A & A SAFETY INC
Letting Date: 4/7/2016
Engineer's Estimate: $2,403,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
A & A SAFETY INC
1126 FERRIS RD
AMELIA, OH 45102
Clermont
Bidder 1
Bid $2,399,250.88
AERO-MARK INC
10423 DANNER DR
STREETSBORO, OH 44241
Portage
Bidder 2
Bid $2,585,585.85
OGLESBY CONSTRUCTION INC
1600 TOLEDO RD
NORWALK, OH 44857
Huron
Bidder 3
Bid $2,599,873.31
160211 - Page 325
Ref #1 621E00100 RPM, (2000 EACH)
Awd $34,000.00$17.00
2 $48,000.00$24.00
3 $48,000.00$24.00
Ref #2 621E00301 RPM REFLECTOR, AS PER PLAN, (67651 EACH)
Awd $301,723.46$4.46
2 $287,516.75$4.25
3 $287,516.75$4.25
Ref #3 621E54000 RAISED PAVEMENT MARKER REMOVED, (2000 EACH)
Awd $10,000.00$5.00
2 $9,000.00$4.50
3 $9,000.00$4.50
Ref #4 642E00090 EDGE LINE, 4", (1477.82 MILE)
Awd $523,148.28$354.00
2 $623,640.04$422.00
3 $576,349.80$390.00
Ref #5 642E00094 EDGE LINE, 6", (921.88 MILE)
Awd $460,940.00$500.00
2 $532,846.64$578.00
3 $483,987.00$525.00
Ref #6 642E00190 LANE LINE, 4", (147.56 MILE)
Awd $21,396.20$145.00
2 $34,233.92$232.00
3 $26,560.80$180.00
Ref #7 642E00194 LANE LINE, 6", (774.77 MILE)
Awd $155,728.77$201.00
2 $227,007.61$293.00
3 $178,197.10$230.00
Ref #8 642E00290 CENTER LINE, (777.21 MILE)
Awd $372,283.59$479.00
2 $432,905.97$557.00
3 $443,009.70$570.00
Ref #9 642E00390 CHANNELIZING LINE, 8", (87293 FT)
Awd $26,187.90$0.30
2 $26,187.90$0.30
3 $27,933.76$0.32
Ref #10 642E00394 CHANNELIZING LINE, 12", (23590 FT)
Awd $8,256.50$0.35
2 $8,728.30$0.37
3 $8,964.20$0.38
Ref #11 642E00490 STOP LINE, (18118 FT)
Awd $39,859.60$2.20
2 $40,946.68$2.26
3 $48,918.60$2.70
Ref #12 642E00590 CROSSWALK LINE, (15670 FT)
Awd $22,721.50$1.45
2 $23,191.60$1.48
3 $24,288.50$1.55
160211 - Page 326
Ref #13 642E00690 TRANSVERSE/DIAGONAL LINE, (61406 FT)
Awd $78,599.68$1.28
2 $82,284.04$1.34
3 $82,898.10$1.35
Ref #14 642E00910 ISLAND MARKING, (3966 SF)
Awd $3,966.00$1.00
2 $3,926.34$0.99
3 $3,966.00$1.00
Ref #15 642E00990 RAILROAD SYMBOL MARKING, (25 EACH)
Awd $3,750.00$150.00
2 $5,625.00$225.00
3 $3,750.00$150.00
Ref #16 642E01108 SCHOOL SYMBOL MARKING, 96", (48 EACH)
Awd $7,200.00$150.00
2 $10,800.00$225.00
3 $7,200.00$150.00
Ref #17 642E01290 LANE ARROW, (1134 EACH)
Awd $45,360.00$40.00
2 $40,824.00$36.00
3 $52,164.00$46.00
Ref #18 642E01408 WORD ON PAVEMENT, 96", (240 EACH)
Awd $12,000.00$50.00
2 $11,040.00$46.00
3 $14,400.00$60.00
Ref #19 642E20000 TWO-WAY RADIO EQUIPMENT, (LUMP SUM)
Awd $1.00$1.00
2 $1.00$1.00
3 $1.00$1.00
Ref #20 642E20800 YIELD LINE, (32 FT)
Awd $128.00$4.00
2 $528.00$16.50
3 $320.00$10.00
Ref #21 642E30000 REMOVAL OF PAVEMENT MARKING, (1000 FT)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $2,000.00$2.00
Ref #22 642E30020 REMOVAL OF PAVEMENT MARKING, (10 EACH)
Awd $500.00$50.00
2 $760.00$76.00
3 $600.00$60.00
Ref #23 642E50010 PAVEMENT MARKING, MISC.: SUPPLEMENTAL WORK REQUEST, (50 EACH)
Awd $5,000.00$100.00
2 $5,000.00$100.00
3 $5,000.00$100.00
Ref #24 644E01301 LANE ARROW, AS PER PLAN, (6 EACH)
Awd $3,300.00$550.00
2 $3,510.00$585.00
3 $1,200.00$200.00
160211 - Page 327
Ref #25 644E01500 DOTTED LINE, 4", (2100 FT)
Awd $2,205.00$1.05
2 $4,200.00$2.00
3 $4,200.00$2.00
Ref #26 646E10010 EDGE LINE, 6", (1.11 MILE)
Awd $5,150.40$4,640.00
2 $8,483.73$7,643.00
3 $5,328.00$4,800.00
Section 1 - TRAFFIC CONTROL - Totals
Awd $2,144,405.88
2 $2,472,187.52
3 $2,345,753.31
Ref #27 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (500 HOUR)
Awd $30,000.00$60.00
2 $20,000.00$40.00
3 $30,000.00$60.00
Ref #28 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (1 SNMT)
Awd $100.00$100.00
2 $900.00$900.00
3 $3,000.00$3,000.00
Section 2 - MAINTENANCE OF TRAFFIC - Totals
Awd $30,100.00
2 $20,900.00
3 $33,000.00
Ref #29 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $12,998.33$12,998.33
3 $15,000.00$15,000.00
Ref #30 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $169,745.00$169,745.00
2 $57,500.00$57,500.00
3 $151,000.00$151,000.00
Ref #31 624E10000 MOBILIZATION, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $22,000.00$22,000.00
3 $55,120.00$55,120.00
Section 3 - INCIDENTALS - Totals
Awd $224,745.00
2 $92,498.33
3 $221,120.00
160211 - Page 328
Project No. 160212
PID 97301
GEA-TSG FY2016
Non-Federal
Type: SIGNALIZATION
Completion Date: 6/30/2017
Award Amount: $256,355.29
Contract Awarded To: GREENWICH ELECTRIC INC
Letting Date: 4/7/2016
Engineer's Estimate: $289,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
GREENWICH ELECTRIC INC
1050 LAFAYETTE RD
MEDINA, OH 44256-3549
Bidder 1
Bid $256,355.29
MILLER CABLE COMPANY
210 S BROADWAY ST P O BOX 68
GREEN SPRINGS, OH 44836
Seneca
Bidder 2
Bid $261,000.00
PERRAM ELECTRIC INC
6882 RIDGE RD
WADSWORTH, OH 44281
Medina
Bidder 3
Bid $269,069.00
160212 - Page 329
Ref #1 608E10000 4" CONCRETE WALK, (46 SF)
Awd $920.00$20.00
2 $1,150.00$25.00
3 $276.00$6.00
Ref #2 608E52130 CURB RAMP, TYPE B1, (4 EACH)
Awd $4,800.00$1,200.00
2 $2,000.00$500.00
3 $4,400.00$1,100.00
Ref #3 608E53020 DETECTABLE WARNING, (16 SF)
Awd $640.00$40.00
2 $800.00$50.00
3 $320.00$20.00
Section 1 - ROADWAY - Totals
Awd $6,360.00
2 $3,950.00
3 $4,996.00
Ref #4 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
Ref #5 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (28 FT)
Awd $378.00$13.50
2 $420.00$15.00
3 $387.80$13.85
Ref #6 630E09102 SURFACE PREPARATION, NEW SUPPORT SECTION, (16 EACH)
Awd $896.00$56.00
2 $800.00$50.00
3 $80.00$5.00
Ref #7 630E09106 COATING, EPOXY INTERMEDIATE COAT, SUPPORT SECTION, (16 EACH)
Awd $896.00$56.00
2 $800.00$50.00
3 $80.00$5.00
Ref #8 630E09108 COATING, URETHANE TOP COAT, SUPPORT SECTION, (16 EACH)
Awd $896.00$56.00
2 $800.00$50.00
3 $80.00$5.00
Ref #9 630E09120 COATING, ORGANIC ZINC PRIME COAT, SUPPORT SECTION, (16 EACH)
Awd $896.00$56.00
2 $320.00$20.00
3 $80.00$5.00
160212 - Page 330
Ref #10 630E80100 SIGN, FLAT SHEET, (12.38 SF)
Awd $284.74$23.00
2 $272.36$22.00
3 $263.08$21.25
Ref #11 642E00600 CROSSWALK LINE, TYPE 1, (133 FT)
Awd $931.00$7.00
2 $864.50$6.50
3 $864.50$6.50
Section 3 - TRAFFIC CONTROL - Totals
Awd $5,177.74
2 $4,276.86
3 $1,835.38
Ref #12 625E25408 CONDUIT, 2", 725.051, (34 FT)
Awd $221.00$6.50
2 $408.00$12.00
3 $360.40$10.60
Ref #13 625E25504 CONDUIT, 3", 725.051, (145 FT)
Awd $1,160.00$8.00
2 $1,595.00$11.00
3 $1,334.00$9.20
Ref #14 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4", (162 FT)
Awd $5,589.00$34.50
2 $7,452.00$46.00
3 $6,042.60$37.30
Ref #15 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 4", (219 FT)
Awd $6,241.50$28.50
2 $8,322.00$38.00
3 $6,044.40$27.60
Ref #16 625E29000 TRENCH, (193 FT)
Awd $1,351.00$7.00
2 $2,412.50$12.50
3 $2,180.90$11.30
Ref #17 625E30700 PULL BOX, 725.08, 18", (7 EACH)
Awd $5,215.00$745.00
2 $4,725.00$675.00
3 $6,755.00$965.00
Ref #18 625E30706 PULL BOX, 725.08, 24", (2 EACH)
Awd $1,810.00$905.00
2 $1,700.00$850.00
3 $2,070.00$1,035.00
Ref #19 625E32000 GROUND ROD, (10 EACH)
Awd $1,900.00$190.00
2 $2,350.00$235.00
3 $2,000.00$200.00
Ref #20 632E05005 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS,, (20 EACH)
Awd $11,760.00$588.00
2 $18,000.00$900.00
3 $12,900.00$645.00
160212 - Page 331
Ref #21 632E20731 PEDESTRIAN SIGNAL HEAD (LED) , (COUNTDOWN), TYPE D, (6 EACH)
Awd $2,538.00$423.00
2 $3,300.00$550.00
3 $2,490.00$415.00
Ref #22 632E25000 COVERING OF VEHICULAR SIGNAL HEAD, (20 EACH)
Awd $300.00$15.00
2 $1,000.00$50.00
3 $200.00$10.00
Ref #23 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD, (6 EACH)
Awd $48.00$8.00
2 $210.00$35.00
3 $30.00$5.00
Ref #24 632E26000 PEDESTRIAN PUSHBUTTON, (2 EACH)
Awd $310.00$155.00
2 $250.00$125.00
3 $420.00$210.00
Ref #25 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG, (598 FT)
Awd $1,076.40$1.80
2 $1,196.00$2.00
3 $956.80$1.60
Ref #26 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, (2019 FT)
Awd $4,239.90$2.10
2 $4,361.04$2.16
3 $3,533.25$1.75
Ref #27 632E64010 SIGNAL SUPPORT FOUNDATION, (8 EACH)
Awd $16,400.00$2,050.00
2 $27,200.00$3,400.00
3 $29,400.00$3,675.00
Ref #28 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG, (155 FT)
Awd $674.25$4.35
2 $155.00$1.00
3 $643.25$4.15
Ref #29 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG, (65 FT)
Awd $227.50$3.50
2 $67.60$1.04
3 $217.75$3.35
Ref #30 632E70001 POWER SERVICE, AS PER PLAN, (2 EACH)
Awd $3,300.00$1,650.00
2 $1,700.00$850.00
3 $2,420.00$1,210.00
Ref #31 632E80203 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 2, AS PER PL, (4 EACH)
Awd $15,484.00$3,871.00
2 $13,400.00$3,350.00
3 $17,000.00$4,250.00
Ref #32 632E80303 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 3, AS PER PL, (4 EACH)
Awd $16,232.00$4,058.00
2 $14,200.00$3,550.00
3 $18,000.00$4,500.00
160212 - Page 332
Ref #33 632E90103 REMOVAL OF TRAFFIC SIGNAL INSTALLATION FOR STORAGE, (2 EACH)
Awd $3,900.00$1,950.00
2 $1,000.00$500.00
3 $1,400.00$700.00
Ref #34 633E01671 CONTROLLER UNIT, TYPE 2070E, WITH CABINET, TYPE 33, (2 EACH)
Awd $16,870.00$8,435.00
2 $15,000.00$7,500.00
3 $15,690.00$7,845.00
Ref #35 633E67000 CABINET RISER, (2 EACH)
Awd $470.00$235.00
2 $600.00$300.00
3 $340.00$170.00
Ref #36 633E67100 CABINET FOUNDATION, (2 EACH)
Awd $3,400.00$1,700.00
2 $5,300.00$2,650.00
3 $5,440.00$2,720.00
Ref #37 633E67200 CONTROLLER WORK PAD, (2 EACH)
Awd $900.00$450.00
2 $200.00$100.00
3 $1,420.00$710.00
Ref #38 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS , (2 EACH)
Awd $9,100.00$4,550.00
2 $9,300.00$4,650.00
3 $9,520.00$4,760.00
Ref #39 809E69000 ADVANCE RADAR DETECTION, (8 EACH)
Awd $53,200.00$6,650.00
2 $56,000.00$7,000.00
3 $50,680.00$6,335.00
Ref #40 809E69100 STOP-BAR RADAR DETECTION, (4 EACH)
Awd $23,400.00$5,850.00
2 $24,000.00$6,000.00
3 $21,980.00$5,495.00
Section 4 - TRAFFIC SIGNALS - Totals
Awd $207,317.55
2 $225,404.14
3 $221,468.35
Ref #41 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $8,100.00$8,100.00
2 $2,394.00$2,394.00
3 $3,774.27$3,774.27
Ref #42 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $4,750.00$4,750.00
3 $16,795.00$16,795.00
Ref #43 619E16000 FIELD OFFICE, TYPE A, (13 MNTH)
Awd $15,600.00$1,200.00
2 $7,475.00$575.00
3 $9,100.00$700.00
160212 - Page 333
Ref #44 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $1,800.00$1,800.00
2 $1,750.00$1,750.00
3 $100.00$100.00
Ref #45 624E10000 MOBILIZATION, (LUMP SUM)
Awd $7,000.00$7,000.00
2 $10,000.00$10,000.00
3 $10,000.00$10,000.00
Section 5 - INCIDENTALS - Totals
Awd $36,500.00
2 $26,369.00
3 $39,769.27
160212 - Page 334
Project No. 160213
PID 101834
HUR-SR 99-02.00
Non-Federal
Type: SPOT PATCHING
Completion Date: 10/31/2016
Award Amount: $424,058.24
Contract Awarded To: GERKEN PAVING INC
Letting Date: 4/7/2016
Engineer's Estimate: $504,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
GERKEN PAVING INC
9072 CO RD 424
NAPOLEON, OH 43545
Henry
Bidder 1
Bid $424,058.24
ERIE BLACKTOP INC
4507 TIFFIN AVE
SANDUSKY, OH 44870
Erie
Bidder 2
Bid $439,973.20
KARVO COMPANIES INC
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 3
Bid $647,269.24
160213 - Page 335
Ref #1 251E01010 PARTIAL DEPTH PAVEMENT REPAIR, (1324 CY)
Awd $268,772.00$203.00
2 $270,096.00$204.00
3 $405,144.00$306.00
Ref #2 253E02000 PAVEMENT REPAIR, (527 CY)
Awd $106,981.00$203.00
2 $129,115.00$245.00
3 $126,480.00$240.00
Section 1 - PAVEMENT - Totals
Awd $375,753.00
2 $399,211.00
3 $531,624.00
Ref #3 642E00100 EDGE LINE, 4", TYPE 1, (21.54 MILE)
Awd $8,745.24$406.00
2 $9,262.20$430.00
3 $8,745.24$406.00
Section 2 - TRAFFIC CONTROL - Totals
Awd $8,745.24
2 $9,262.20
3 $8,745.24
Ref #4 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (50 CY)
Awd $7,500.00$150.00
2 $6,500.00$130.00
3 $5,000.00$100.00
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $7,500.00
2 $6,500.00
3 $5,000.00
Ref #5 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,300.00$2,300.00
2 $2,000.00$2,000.00
3 $5,000.00$5,000.00
Ref #6 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $12,000.00$12,000.00
2 $10,000.00$10,000.00
3 $50,000.00$50,000.00
Ref #7 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $7,760.00$7,760.00
2 $3,000.00$3,000.00
3 $1,900.00$1,900.00
Ref #8 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $10,000.00$10,000.00
3 $45,000.00$45,000.00
160213 - Page 336
Section 4 - INCIDENTALS - Totals
Awd $32,060.00
2 $25,000.00
3 $101,900.00
160213 - Page 337
Project No. 160214
PID 97485
MAH-Culverts FY2016B
Non-Federal
Type: CULVERT REPLACEMENT
Completion Date: 10/31/2016
Award Amount: $443,731.24
Contract Awarded To: MARUCCI & GAFFNEY EXCAVATING CO
Letting Date: 4/7/2016
Engineer's Estimate: $497,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
MARUCCI & GAFFNEY EXCAVATING CO
18 HOGUE ST
YOUNGSTOWN, OH 44502
Mahoning
Bidder 1
Bid $443,731.24
AMERICON INDUSTRIAL SERVICES LLC
3651 LEHARPS RD
AUSTINTOWN, OH 44515
Mahoning
Bidder 2
Bid $446,869.83
STANLEY MILLER CONSTRUCTION COMPANY
2250 HOWENSTINE DR SE
EAST SPARTA, OH 44626
Stark
Bidder 3
Bid $492,411.55
PARELLA-PANNUNZIO INC
720 NORTH MERIDIAN RD
YOUNGSTOWN, OH 44509
Mahoning
Bidder 4
Bid $496,698.50
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 5
Bid $536,080.90
UNITED EARTHWORKS LLC
P O BOX 124
DEERFIELD, OH 44411
Portage
Bidder 6
Bid $612,048.08
CRAIG EDWARD SUSANY INC
13535 MARKET STREET
NORTH LIMA, OH 44452
Mahoning
Bidder 7
Bid $939,927.00
160214 - Page 338
Ref #1 201E11000 CLEARING AND GRUBBING (MAH-14-4.83), (LUMP SUM)
Awd $7,000.00$7,000.00
2 $2,000.00$2,000.00
3 $500.00$500.00
4 $12,000.00$12,000.00
5 $6,000.00$6,000.00
6 $6,200.00$6,200.00
7 $10,000.00$10,000.00
Ref #2 201E11000 CLEARING AND GRUBBING (MAH-534-4.05), (LUMP SUM)
Awd $1,500.00$1,500.00
2 $2,000.00$2,000.00
3 $500.00$500.00
4 $800.00$800.00
5 $7,000.00$7,000.00
6 $2,375.00$2,375.00
7 $10,000.00$10,000.00
Ref #3 201E11000 CLEARING AND GRUBBING (MAH-534-6.05), (LUMP SUM)
Awd $1,000.00$1,000.00
2 $2,000.00$2,000.00
3 $500.00$500.00
4 $200.00$200.00
5 $2,000.00$2,000.00
6 $2,375.00$2,375.00
7 $10,000.00$10,000.00
Ref #4 201E11000 CLEARING AND GRUBBING (MAH-534-6.11), (LUMP SUM)
Awd $2,500.00$2,500.00
2 $2,000.00$2,000.00
3 $500.00$500.00
4 $1,000.00$1,000.00
5 $2,000.00$2,000.00
6 $2,475.00$2,475.00
7 $10,000.00$10,000.00
Ref #5 201E11000 CLEARING AND GRUBBING (MAH-62-5.01), (LUMP SUM)
Awd $500.00$500.00
2 $2,000.00$2,000.00
3 $500.00$500.00
4 $100.00$100.00
5 $2,000.00$2,000.00
6 $990.00$990.00
7 $10,000.00$10,000.00
Ref #6 202E23000 PAVEMENT REMOVED, (298 SY)
Awd $3,972.34$13.33
2 $2,139.64$7.18
3 $7,235.44$24.28
4 $4,470.00$15.00
5 $4,470.00$15.00
6 $4,172.00$14.00
7 $10,430.00$35.00
160214 - Page 339
Ref #7 202E35100 PIPE REMOVED, 24" AND UNDER, (517 FT)
Awd $7,238.00$14.00
2 $8,608.05$16.65
3 $5,170.00$10.00
4 $6,204.00$12.00
5 $15,510.00$30.00
6 $6,503.86$12.58
7 $5,170.00$10.00
Ref #8 202E35200 PIPE REMOVED, OVER 24", (48 FT)
Awd $2,160.00$45.00
2 $5,688.00$118.50
3 $3,100.80$64.60
4 $1,104.00$23.00
5 $2,160.00$45.00
6 $2,075.04$43.23
7 $4,800.00$100.00
Ref #9 202E38000 GUARDRAIL REMOVED, (288 FT)
Awd $576.00$2.00
2 $1,425.60$4.95
3 $288.00$1.00
4 $432.00$1.50
5 $1,440.00$5.00
6 $699.84$2.43
7 $2,880.00$10.00
Ref #10 202E58100 CATCH BASIN REMOVED, (1 EACH)
Awd $70.00$70.00
2 $321.00$321.00
3 $100.00$100.00
4 $300.00$300.00
5 $350.00$350.00
6 $550.00$550.00
7 $500.00$500.00
Ref #11 202E98200 REMOVAL MISC.: CONCRETE WALL, (150 FT)
Awd $9,900.00$66.00
2 $4,824.00$32.16
3 $5,400.00$36.00
4 $3,750.00$25.00
5 $11,250.00$75.00
6 $3,250.50$21.67
7 $3,750.00$25.00
Ref #12 203E10000 EXCAVATION, (992 CY)
Awd $15,872.00$16.00
2 $7,122.56$7.18
3 $22,032.32$22.21
4 $25,792.00$26.00
5 $24,800.00$25.00
6 $17,856.00$18.00
7 $49,600.00$50.00
160214 - Page 340
Ref #13 203E20000 EMBANKMENT, (682 CY)
Awd $12,958.00$19.00
2 $2,277.88$3.34
3 $19,355.16$28.38
4 $16,368.00$24.00
5 $11,253.00$16.50
6 $13,640.00$20.00
7 $40,920.00$60.00
Ref #14 203E35110 GRANULAR MATERIAL, TYPE B, (108 CY)
Awd $5,605.20$51.90
2 $6,095.52$56.44
3 $7,410.96$68.62
4 $6,156.00$57.00
5 $8,100.00$75.00
6 $11,340.00$105.00
7 $8,100.00$75.00
Ref #15 204E10000 SUBGRADE COMPACTION, (298 SY)
Awd $596.00$2.00
2 $1,826.74$6.13
3 $298.00$1.00
4 $596.00$2.00
5 $1,937.00$6.50
6 $298.00$1.00
7 $1,490.00$5.00
Ref #16 209E60201 LINEAR GRADING, AS PER PLAN, (1 STA)
Awd $240.00$240.00
2 $228.00$228.00
3 $1,120.00$1,120.00
4 $1,000.00$1,000.00
5 $800.00$800.00
6 $1,560.00$1,560.00
7 $5,000.00$5,000.00
Ref #17 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (8 STA)
Awd $1,920.00$240.00
2 $1,368.00$171.00
3 $5,648.00$706.00
4 $480.00$60.00
5 $6,000.00$750.00
6 $4,960.00$620.00
7 $40,000.00$5,000.00
Ref #18 606E15050 GUARDRAIL, TYPE MGS, (313 FT)
Awd $4,695.00$15.00
2 $5,787.37$18.49
3 $5,843.71$18.67
4 $5,321.00$17.00
5 $6,260.00$20.00
6 $10,955.00$35.00
7 $7,825.00$25.00
160214 - Page 341
Ref #19 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (2 EACH)
Awd $3,650.00$1,825.00
2 $4,460.00$2,230.00
3 $4,212.00$2,106.00
4 $3,800.00$1,900.00
5 $5,000.00$2,500.00
6 $5,000.00$2,500.00
7 $4,000.00$2,000.00
Ref #20 623E40000 MONUMENT ASSEMBLY REMOVED AND RESET
Awd $500.00$500.00
2 $300.00$300.00
3 $600.00$600.00
4 $800.00$800.00
5 $2,500.00$2,500.00
6 $2,500.00$2,500.00
7 $2,000.00$2,000.00
Ref #21 623E40000 MONUMENT ASSEMBLY REMOVED AND RESET
Awd $500.00$500.00
2 $300.00$300.00
3 $600.00$600.00
4 $800.00$800.00
5 $2,500.00$2,500.00
6 $2,500.00$2,500.00
7 $2,000.00$2,000.00
Ref #22 690E12000 SPECIAL - FILTER FABRIC, 712.09, TYPE A, (531 SY)
Awd $1,062.00$2.00
2 $1,161.83$2.19
3 $531.00$1.00
4 $3,186.00$6.00
5 $1,593.00$3.00
6 $759.33$1.43
7 $1,062.00$2.00
Section 1 - ROADWAY - Totals
Awd $84,014.54
2 $63,934.19
3 $91,445.39
4 $94,659.00
5 $124,923.00
6 $103,034.57
7 $239,527.00
Ref #23 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH FABRIC FILTER, (6 CY)
Awd $480.00$80.00
2 $651.00$108.50
3 $600.00$100.00
4 $600.00$100.00
5 $930.00$155.00
6 $760.02$126.67
7 $2,400.00$400.00
160214 - Page 342
Ref #24 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (4 CY)
Awd $360.00$90.00
2 $461.00$115.25
3 $400.00$100.00
4 $800.00$200.00
5 $940.00$235.00
6 $400.00$100.00
7 $1,600.00$400.00
Ref #25 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER, (10 CY)
Awd $900.00$90.00
2 $1,157.00$115.70
3 $1,000.00$100.00
4 $2,000.00$200.00
5 $1,800.00$180.00
6 $1,266.70$126.67
7 $4,000.00$400.00
Ref #26 601E34400 ROCK CHANNEL PROTECTION, WITH GROUT, TYPE A WITH F, (235 CY)
Awd $24,675.00$105.00
2 $22,825.55$97.13
3 $31,490.00$134.00
4 $42,300.00$180.00
5 $24,675.00$105.00
6 $37,130.00$158.00
7 $58,750.00$250.00
Ref #27 659E00300 TOPSOIL, (434 CY)
Awd $6,510.00$15.00
2 $6,944.00$16.00
3 $14,322.00$33.00
4 $8,680.00$20.00
5 $26,040.00$60.00
6 $13,020.00$30.00
7 $10,850.00$25.00
Ref #28 659E00550 SEEDING AND MULCHING, CLASS 4A, (3900 SY)
Awd $3,510.00$0.90
2 $2,769.00$0.71
3 $6,279.00$1.61
4 $4,680.00$1.20
5 $11,700.00$3.00
6 $18,018.00$4.62
7 $11,700.00$3.00
Ref #29 659E14000 REPAIR SEEDING AND MULCHING, (196 SY)
Awd $39.20$0.20
2 $99.96$0.51
3 $107.80$0.55
4 $88.20$0.45
5 $294.00$1.50
6 $3,149.72$16.07
7 $588.00$3.00
160214 - Page 343
Ref #30 659E20000 COMMERCIAL FERTILIZER, (0.53 TON)
Awd $132.50$250.00
2 $318.00$600.00
3 $271.36$512.00
4 $243.80$460.00
5 $283.55$535.00
6 $530.00$1,000.00
7 $530.00$1,000.00
Ref #31 659E31000 LIME, (0.8 ACRE)
Awd $20.00$25.00
2 $100.00$125.00
3 $80.00$100.00
4 $71.20$89.00
5 $88.00$110.00
6 $640.00$800.00
7 $480.00$600.00
Ref #32 659E35000 WATER, (23 MGAL)
Awd $11.50$0.50
2 $92.00$4.00
3 $23.00$1.00
4 $23.00$1.00
5 $25.30$1.10
6 $23.00$1.00
7 $23.00$1.00
Ref #33 670E00500 SLOPE EROSION PROTECTION, (260 SY)
Awd $780.00$3.00
2 $1,898.00$7.30
3 $624.00$2.40
4 $559.00$2.15
5 $10,400.00$40.00
6 $520.00$2.00
7 $3,900.00$15.00
Ref #34 832E30000 EROSION CONTROL, (5000 EACH)
Awd $5,000.00$1.00
2 $5,000.00$1.00
3 $5,000.00$1.00
4 $5,000.00$1.00
5 $5,000.00$1.00
6 $5,000.00$1.00
7 $5,000.00$1.00
Ref #35 838E20700 GABIONS, (363 CY)
Awd $54,087.00$149.00
2 $69,986.40$192.80
3 $49,368.00$136.00
4 $52,272.00$144.00
5 $58,080.00$160.00
6 $78,045.00$215.00
7 $127,050.00$350.00
160214 - Page 344
Section 2 - EROSION CONTROL - Totals
Awd $96,505.20
2 $112,301.91
3 $109,565.16
4 $117,317.20
5 $140,255.85
6 $158,502.44
7 $226,871.00
Ref #36 503E11100 COFFERDAMS AND EXCAVATION BRACING(MAH-534-4.05), (LUMP SUM)
Awd $1,000.00$1,000.00
2 $2,100.00$2,100.00
3 $4,189.00$4,189.00
4 $2,000.00$2,000.00
5 $4,000.00$4,000.00
6 $4,000.00$4,000.00
7 $10,000.00$10,000.00
Ref #37 503E11100 COFFERDAMS AND EXCAVATION BRACING(MAH-534-6.11), (LUMP SUM)
Awd $500.00$500.00
2 $2,100.00$2,100.00
3 $4,189.00$4,189.00
4 $2,000.00$2,000.00
5 $4,000.00$4,000.00
6 $2,000.00$2,000.00
7 $10,000.00$10,000.00
Ref #38 602E20000 CONCRETE MASONRY, (5.43 CY)
Awd $8,145.00$1,500.00
2 $4,344.00$800.00
3 $4,441.74$818.00
4 $5,973.00$1,100.00
5 $10,317.00$1,900.00
6 $5,175.01$953.04
7 $5,430.00$1,000.00
Ref #39 611E00900 6" CONDUIT, TYPE B, (60 FT)
Awd $300.00$5.00
2 $300.00$5.00
3 $180.00$3.00
4 $360.00$6.00
5 $1,170.00$19.50
6 $900.00$15.00
7 $3,000.00$50.00
Ref #40 611E01400 6" CONDUIT, TYPE E, (60 FT)
Awd $300.00$5.00
2 $300.00$5.00
3 $180.00$3.00
4 $360.00$6.00
5 $1,170.00$19.50
6 $900.00$15.00
7 $3,000.00$50.00
160214 - Page 345
Ref #41 611E01500 6" CONDUIT, TYPE F, (60 FT)
Awd $300.00$5.00
2 $300.00$5.00
3 $180.00$3.00
4 $360.00$6.00
5 $1,170.00$19.50
6 $900.00$15.00
7 $3,000.00$50.00
Ref #42 611E04600 12" CONDUIT, TYPE C, (50 FT)
Awd $2,750.00$55.00
2 $730.00$14.60
3 $2,800.00$56.00
4 $4,900.00$98.00
5 $3,250.00$65.00
6 $3,000.00$60.00
7 $5,000.00$100.00
Ref #43 611E05900 15" CONDUIT, TYPE B, (160 FT)
Awd $10,560.00$66.00
2 $6,012.80$37.58
3 $10,048.00$62.80
4 $8,428.80$52.68
5 $14,400.00$90.00
6 $12,200.00$76.25
7 $32,000.00$200.00
Ref #44 611E07400 18" CONDUIT, TYPE B, (172 FT)
Awd $11,696.00$68.00
2 $6,604.80$38.40
3 $17,767.60$103.30
4 $12,900.00$75.00
5 $15,480.00$90.00
6 $16,895.56$98.23
7 $38,700.00$225.00
Ref #45 611E08700 21" CONDUIT, TYPE A
Awd $6,586.00$89.00
2 $5,896.32$79.68
3 $7,770.00$105.00
4 $4,810.00$65.00
5 $7,400.00$100.00
6 $9,250.00$125.00
7 $18,500.00$250.00
Ref #46 611E10400 24" CONDUIT, TYPE B, (51 FT)
Awd $4,590.00$90.00
2 $3,688.83$72.33
3 $5,355.00$105.00
4 $5,610.00$110.00
5 $5,610.00$110.00
6 $6,375.00$125.00
7 $14,025.00$275.00
160214 - Page 346
Ref #47 611E11900 27" CONDUIT, TYPE B, (51 FT)
Awd $8,670.00$170.00
2 $6,568.80$128.80
3 $7,354.20$144.20
4 $6,885.00$135.00
5 $7,395.00$145.00
6 $7,701.00$151.00
7 $15,300.00$300.00
Ref #48 611E19200 42" CONDUIT, TYPE A 706.02, 707.01, OR 707.33, (90 FT)
Awd $13,500.00$150.00
2 $14,266.80$158.52
3 $14,400.00$160.00
4 $16,200.00$180.00
5 $18,630.00$207.00
6 $19,350.00$215.00
7 $36,000.00$400.00
Ref #49 611E98450 CATCH BASIN, NO. 2-2A, (2 EACH)
Awd $4,000.00$2,000.00
2 $4,000.00$2,000.00
3 $1,654.00$827.00
4 $3,750.00$1,875.00
5 $4,360.00$2,180.00
6 $3,500.00$1,750.00
7 $4,000.00$2,000.00
Ref #50 611E98510 CATCH BASIN, NO. 2-3, (2 EACH)
Awd $6,000.00$3,000.00
2 $4,000.00$2,000.00
3 $1,866.00$933.00
4 $2,800.00$1,400.00
5 $4,670.00$2,335.00
6 $4,400.00$2,200.00
7 $6,000.00$3,000.00
Section 3 - DRAINAGE - Totals
Awd $78,897.00
2 $61,212.35
3 $82,374.54
4 $77,336.80
5 $103,022.00
6 $96,546.57
7 $203,955.00
Ref #51 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (2093 SY)
Awd $20,930.00$10.00
2 $18,837.00$9.00
3 $20,930.00$10.00
4 $18,837.00$9.00
5 $15,697.50$7.50
6 $23,023.00$11.00
7 $52,325.00$25.00
160214 - Page 347
Ref #52 301E46000 ASPHALT CONCRETE BASE, PG64-22, (63 CY)
Awd $11,970.00$190.00
2 $12,789.00$203.00
3 $14,238.00$226.00
4 $15,120.00$240.00
5 $15,876.00$252.00
6 $14,805.00$235.00
7 $18,900.00$300.00
Ref #53 304E20001 AGGREGATE BASE, AS PER PLAN, (52 CY)
Awd $6,240.00$120.00
2 $4,178.72$80.36
3 $9,360.00$180.00
4 $4,160.00$80.00
5 $7,800.00$150.00
6 $4,420.00$85.00
7 $10,400.00$200.00
Ref #54 407E20510 SPECIAL - TACK COAT, TRACKLESS TACK FOR INTERMEDIA, (111 GAL)
Awd $555.00$5.00
2 $444.00$4.00
3 $493.95$4.45
4 $444.00$4.00
5 $416.25$3.75
6 $666.00$6.00
7 $2,775.00$25.00
Ref #55 408E10000 PRIME COAT, (119 GAL)
Awd $357.00$3.00
2 $415.31$3.49
3 $462.91$3.89
4 $416.50$3.50
5 $380.80$3.20
6 $714.00$6.00
7 $2,975.00$25.00
Ref #56 411E10000 STABILIZED CRUSHED AGGREGATE, (4 CY)
Awd $480.00$120.00
2 $400.00$100.00
3 $460.00$115.00
4 $320.00$80.00
5 $680.00$170.00
6 $2,000.00$500.00
7 $800.00$200.00
Ref #57 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (117 CY)
Awd $52,650.00$450.00
2 $51,714.00$442.00
3 $57,564.00$492.00
4 $57,564.00$492.00
5 $29,250.00$250.00
6 $51,714.00$442.00
7 $35,100.00$300.00
160214 - Page 348
Ref #58 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (6 CY)
Awd $2,400.00$400.00
2 $2,892.00$482.00
3 $3,216.00$536.00
4 $2,892.00$482.00
5 $3,450.00$575.00
6 $3,000.00$500.00
7 $3,600.00$600.00
Ref #59 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (15 CY)
Awd $1,500.00$100.00
2 $1,206.00$80.40
3 $1,200.00$80.00
4 $1,200.00$80.00
5 $5,400.00$360.00
6 $1,470.00$98.00
7 $3,000.00$200.00
Section 4 - PAVEMENT - Totals
Awd $97,082.00
2 $92,876.03
3 $107,924.86
4 $100,953.50
5 $78,950.55
6 $101,812.00
7 $129,875.00
Ref #60 626E00100 BARRIER REFLECTOR, TYPE A2, (6 EACH)
Awd $36.00$6.00
2 $36.00$6.00
3 $43.98$7.33
4 $48.00$8.00
5 $72.00$12.00
6 $45.00$7.50
7 $120.00$20.00
Ref #61 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (45 FT)
Awd $765.00$17.00
2 $136.35$3.03
3 $652.50$14.50
4 $810.00$18.00
5 $540.00$12.00
6 $450.00$10.00
7 $900.00$20.00
Ref #62 630E80100 SIGN, FLAT SHEET, 730.20, (4.5 SF)
Awd $202.50$45.00
2 $54.00$12.00
3 $202.50$45.00
4 $180.00$40.00
5 $112.50$25.00
6 $112.50$25.00
7 $225.00$50.00
160214 - Page 349
Ref #63 642E00090 EDGE LINE, 4", (0.13 MILE)
Awd $325.00$2,500.00
2 $7,000.00$53,846.16
3 $361.14$2,778.00
4 $390.00$3,000.00
5 $1,365.00$10,500.00
6 $910.00$7,000.00
7 $3,250.00$25,000.00
Ref #64 642E00290 CENTER LINE, (0.08 MILE)
Awd $400.00$5,000.00
2 $7,000.00$87,500.00
3 $444.48$5,556.00
4 $400.00$5,000.00
5 $840.00$10,500.00
6 $560.00$7,000.00
7 $3,200.00$40,000.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $1,728.50
2 $14,226.35
3 $1,704.60
4 $1,828.00
5 $2,929.50
6 $2,077.50
7 $7,695.00
Ref #65 614E12420 DETOUR SIGNING (MAH-14-4.83), (LUMP SUM)
Awd $3,300.00$3,300.00
2 $4,215.00$4,215.00
3 $3,667.00$3,667.00
4 $3,500.00$3,500.00
5 $3,300.00$3,300.00
6 $4,250.00$4,250.00
7 $10,000.00$10,000.00
Ref #66 614E12420 DETOUR SIGNING (MAH-534-4.05), (LUMP SUM)
Awd $5,365.00$5,365.00
2 $4,215.00$4,215.00
3 $5,962.00$5,962.00
4 $5,400.00$5,400.00
5 $5,400.00$5,400.00
6 $4,250.00$4,250.00
7 $10,000.00$10,000.00
Ref #67 614E12420 DETOUR SIGNING (MAH-534-6.05 & 6.11), (LUMP SUM)
Awd $6,070.00$6,070.00
2 $3,925.00$3,925.00
3 $6,745.00$6,745.00
4 $6,200.00$6,200.00
5 $5,400.00$5,400.00
6 $4,125.00$4,125.00
7 $10,000.00$10,000.00
160214 - Page 350
Ref #68 614E12420 DETOUR SIGNING (MAH-62-5.01), (LUMP SUM)
Awd $4,165.00$4,165.00
2 $3,000.00$3,000.00
3 $4,629.00$4,629.00
4 $4,200.00$4,200.00
5 $3,500.00$3,500.00
6 $3,050.00$3,050.00
7 $10,000.00$10,000.00
Ref #69 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (20 CY)
Awd $1,800.00$90.00
2 $4,100.00$205.00
3 $200.00$10.00
4 $3,000.00$150.00
5 $5,000.00$250.00
6 $6,000.00$300.00
7 $6,000.00$300.00
Ref #70 616E10000 WATER, (4 MGAL)
Awd $4.00$1.00
2 $4.00$1.00
3 $4.00$1.00
4 $4.00$1.00
5 $400.00$100.00
6 $400.00$100.00
7 $4.00$1.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $20,704.00
2 $19,459.00
3 $21,207.00
4 $22,304.00
5 $23,000.00
6 $22,075.00
7 $46,004.00
Ref #71 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $7,000.00$7,000.00
3 $6,667.00$6,667.00
4 $7,500.00$7,500.00
5 $3,000.00$3,000.00
6 $15,000.00$15,000.00
7 $19,000.00$19,000.00
Ref #72 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $35,000.00$35,000.00
2 $11,660.00$11,660.00
3 $14,556.00$14,556.00
4 $20,000.00$20,000.00
5 $14,000.00$14,000.00
6 $40,000.00$40,000.00
7 $25,000.00$25,000.00
160214 - Page 351
Ref #73 619E16010 FIELD OFFICE, TYPE B, (4 MNTH)
Awd $4,800.00$1,200.00
2 $7,000.00$1,750.00
3 $9,900.00$2,475.00
4 $4,800.00$1,200.00
5 $12,000.00$3,000.00
6 $8,000.00$2,000.00
7 $12,000.00$3,000.00
Ref #74 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $16,200.00$16,200.00
3 $21,067.00$21,067.00
4 $8,000.00$8,000.00
5 $14,000.00$14,000.00
6 $15,000.00$15,000.00
7 $10,000.00$10,000.00
Ref #75 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $41,000.00$41,000.00
3 $26,000.00$26,000.00
4 $42,000.00$42,000.00
5 $20,000.00$20,000.00
6 $50,000.00$50,000.00
7 $20,000.00$20,000.00
Section 7 - INCIDENTALS - Totals
Awd $64,800.00
2 $82,860.00
3 $78,190.00
4 $82,300.00
5 $63,000.00
6 $128,000.00
7 $86,000.00
160214 - Page 352
Project No. 160215
PID 94389
MED-SR 606-00.00
Non-Federal
Type: TWO LANE RESURFACING
Completion Date: 10/31/2016
Award Amount: $769,209.95
Contract Awarded To: SHELLY COMPANY
Letting Date: 4/7/2016
Engineer's Estimate: $937,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 1
Bid $769,209.95
KOKOSING CONSTRUCTION COMPANY INC
886 MC KINLEY AVE
COLUMBUS, OH 43222
Franklin
Bidder 2
Bid $776,421.45
CHAGRIN VALLEY PAVING INC
17290 MUNN RD
CHAGRIN FALLS, OH 44023
Geauga
Bidder 3
Bid $781,109.85
KARVO COMPANIES INC
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 4
Bid $782,644.60
BARBICAS CONSTRUCTION COMPANY INC
124 DARROW RD
AKRON, OH 44305
Summit
Bidder 5
Bid $955,616.70
160215 - Page 353
Ref #1 202E38200 GUARDRAIL REMOVED FOR REUSE, (300 FT)
Awd $420.00$1.40
2 $420.00$1.40
3 $750.00$2.50
4 $420.00$1.40
5 $420.00$1.40
Ref #2 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A, (2 EACH)
Awd $400.00$200.00
2 $400.00$200.00
3 $400.00$200.00
4 $400.00$200.00
5 $400.00$200.00
Ref #3 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T, (2 EACH)
Awd $110.00$55.00
2 $110.00$55.00
3 $180.00$90.00
4 $110.00$55.00
5 $110.00$55.00
Ref #5 209E15000 RESHAPING UNDER GUARDRAIL, (3.76 STA)
Awd $235.00$62.50
2 $235.00$62.50
3 $188.00$50.00
4 $235.00$62.50
5 $235.00$62.50
Ref #6 209E80000 GRADING MAILBOX APPROACHES, (34 EACH)
Awd $2,550.00$75.00
2 $850.00$25.00
3 $1,700.00$50.00
4 $1,870.00$55.00
5 $3,400.00$100.00
Ref #8 606E25000 ANCHOR ASSEMBLY, TYPE A, (2 EACH)
Awd $1,870.00$935.00
2 $1,870.00$935.00
3 $2,000.00$1,000.00
4 $1,870.00$935.00
5 $1,870.00$935.00
Ref #9 606E26500 ANCHOR ASSEMBLY, TYPE T, (2 EACH)
Awd $1,290.00$645.00
2 $1,290.00$645.00
3 $1,400.00$700.00
4 $1,290.00$645.00
5 $1,290.00$645.00
Ref #10 623E39500 MONUMENT BOX ADJUSTED TO GRADE, (7 EACH)
Awd $4,410.00$630.00
2 $2,625.00$375.00
3 $3,500.00$500.00
4 $3,208.24$458.32
5 $3,500.00$500.00
160215 - Page 354
Ref #11 626E00100 BARRIER REFLECTOR, (10 EACH)
Awd $65.00$6.50
2 $65.00$6.50
3 $65.00$6.50
4 $65.00$6.50
5 $65.00$6.50
Ref #12 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (9 EACH)
Awd $1,125.00$125.00
2 $1,125.00$125.00
3 $1,125.00$125.00
4 $1,125.00$125.00
5 $1,125.00$125.00
Ref #100 203E20001 EMBANKMENT, AS PER PLAN, (75 CY)
Awd $4,080.00$54.40
2 $4,080.00$54.40
3 $3,750.00$50.00
4 $4,087.50$54.50
5 $4,080.00$54.40
Ref #101 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (8.5 MILE)
Awd $10,200.00$1,200.00
2 $7,225.00$850.00
3 $4,250.00$500.00
4 $16,575.00$1,950.00
5 $12,750.00$1,500.00
Ref #102 606E16500 GUARDRAIL REBUILT, TYPE 5, (300 FT)
Awd $3,180.00$10.60
2 $3,180.00$10.60
3 $4,500.00$15.00
4 $3,180.00$10.60
5 $3,180.00$10.60
Section 1 - ROADWAY - Totals
Awd $29,935.00
2 $23,475.00
3 $23,808.00
4 $34,435.74
5 $32,425.00
Ref #14 251E01010 PARTIAL DEPTH PAVEMENT REPAIR, (650 CY)
Awd $100,750.00$155.00
2 $94,250.00$145.00
3 $97,500.00$150.00
4 $109,200.00$168.00
5 $123,500.00$190.00
Ref #15 253E02000 PAVEMENT REPAIR, (35 CY)
Awd $6,125.00$175.00
2 $5,775.00$165.00
3 $5,250.00$150.00
4 $6,020.00$172.00
5 $7,000.00$200.00
160215 - Page 355
Ref #16 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (65353 SY)
Awd $65,353.00$1.00
2 $52,282.40$0.80
3 $58,817.70$0.90
4 $52,282.40$0.80
5 $117,635.40$1.80
Ref #17 254E01600 PATCHING PLANED SURFACE, (653 SY)
Awd $653.00$1.00
2 $979.50$1.50
3 $653.00$1.00
4 $163.25$0.25
5 $848.90$1.30
Ref #18 407E10000 TACK COAT, (5276 GAL)
Awd $9,233.00$1.75
2 $8,441.60$1.60
3 $10,552.00$2.00
4 $8,705.40$1.65
5 $11,079.60$2.10
Ref #19 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (2885 CY)
Awd $323,120.00$112.00
2 $364,952.50$126.50
3 $334,660.00$116.00
4 $343,315.00$119.00
5 $377,935.00$131.00
Ref #20 617E10100 COMPACTED AGGREGATE, (435 CY)
Awd $18,270.00$42.00
2 $21,750.00$50.00
3 $10,875.00$25.00
4 $16,965.00$39.00
5 $26,100.00$60.00
Section 2 - PAVEMENT - Totals
Awd $523,504.00
2 $548,431.00
3 $518,307.70
4 $536,651.05
5 $664,098.90
Ref #21 621E00100 RPM, (440 EACH)
Awd $9,526.00$21.65
2 $8,830.80$20.07
3 $9,526.00$21.65
4 $9,900.00$22.50
5 $9,526.00$21.65
Ref #22 621E54000 RAISED PAVEMENT MARKER REMOVED, (440 EACH)
Awd $2,640.00$6.00
2 $1,056.00$2.40
3 $440.00$1.00
4 $880.00$2.00
5 $3,520.00$8.00
160215 - Page 356
Ref #23 642E00104 EDGE LINE, 6", TYPE 1, (8.52 MILE)
Awd $4,984.20$585.00
2 $4,984.20$585.00
3 $4,984.20$585.00
4 $4,984.20$585.00
5 $4,984.20$585.00
Ref #24 642E00300 CENTER LINE, TYPE 1, (4.26 MILE)
Awd $3,216.30$755.00
2 $3,216.30$755.00
3 $3,216.30$755.00
4 $3,216.30$755.00
5 $3,216.30$755.00
Ref #103 644E00500 STOP LINE, (164 FT)
Awd $1,353.00$8.25
2 $2,296.00$14.00
3 $1,353.00$8.25
4 $1,353.00$8.25
5 $1,353.00$8.25
Section 3 - TRAFFIC CONTROL - Totals
Awd $21,719.50
2 $20,383.30
3 $19,519.50
4 $20,333.50
5 $22,599.50
Ref #26 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $2,400.00$2,400.00
3 $2,400.00$2,400.00
4 $2,400.00$2,400.00
5 $2,400.00$2,400.00
Ref #27 614E12460 WORK ZONE MARKING SIGN, (21 EACH)
Awd $1,785.00$85.00
2 $2,100.00$100.00
3 $2,205.00$105.00
4 $1,575.00$75.00
5 $1,260.00$60.00
Ref #28 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (20 CY)
Awd $2,300.00$115.00
2 $3,000.00$150.00
3 $1,500.00$75.00
4 $2,000.00$100.00
5 $2,800.00$140.00
Ref #29 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT, (8.52 MILE)
Awd $3,322.80$390.00
2 $3,322.80$390.00
3 $3,322.80$390.00
4 $5,964.00$700.00
5 $3,322.80$390.00
160215 - Page 357
Ref #30 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (91 FT)
Awd $250.25$2.75
2 $250.25$2.75
3 $250.25$2.75
4 $250.25$2.75
5 $250.25$2.75
Ref #31 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (91 FT)
Awd $250.25$2.75
2 $250.25$2.75
3 $250.25$2.75
4 $250.25$2.75
5 $250.25$2.75
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $12,908.30
2 $11,323.30
3 $9,928.30
4 $12,439.50
5 $10,283.30
Ref #32 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (8 CY)
Awd $14,056.00$1,757.00
2 $14,055.04$1,756.88
3 $14,055.04$1,756.88
4 $14,056.00$1,757.00
5 $12,000.00$1,500.00
Ref #33 202E98200 REMOVAL MISC.:JOINT SEAL, (80 FT)
Awd $88.00$1.10
2 $85.60$1.07
3 $85.60$1.07
4 $85.60$1.07
5 $80.00$1.00
Ref #34 511E21520 CLASS QC2 CONCRETE, SUPERSTRUCTURE, (6 CY)
Awd $8,046.00$1,341.00
2 $8,046.00$1,341.00
3 $8,046.00$1,341.00
4 $8,046.00$1,341.00
5 $1,380.00$230.00
Ref #35 511E45510 CLASS QC1 CONCRETE, ABUTMENT, (2 CY)
Awd $3,486.20$1,743.10
2 $3,486.20$1,743.10
3 $3,486.20$1,743.10
4 $3,486.20$1,743.10
5 $700.00$350.00
Ref #36 516E31000 JOINT SEALER, (80 FT)
Awd $1,292.00$16.15
2 $1,290.40$16.13
3 $1,290.40$16.13
4 $1,290.40$16.13
5 $1,560.00$19.50
160215 - Page 358
Ref #37 517E72710 RAILING (DEEP BEAM BRIDGE RETROFIT RAILING), (125 FT)
Awd $11,775.00$94.20
2 $11,775.00$94.20
3 $11,250.00$90.00
4 $11,775.00$94.20
5 $11,250.00$90.00
Ref #38 519E11100 PATCHING CONCRETE STRUCTURE, (22 SF)
Awd $3,147.10$143.05
2 $3,147.10$143.05
3 $3,147.10$143.05
4 $3,147.10$143.05
5 $2,640.00$120.00
Ref #39 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (217 SY)
Awd $19,671.05$90.65
2 $19,666.71$90.63
3 $19,666.71$90.63
4 $19,666.71$90.63
5 $43,400.00$200.00
Ref #40 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (217 SY)
Awd $27,993.00$129.00
2 $27,993.00$129.00
3 $27,993.00$129.00
4 $27,993.00$129.00
5 $54,250.00$250.00
Ref #41 848E30201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (2 CY)
Awd $645.00$322.50
2 $645.00$322.50
3 $645.00$322.50
4 $645.00$322.50
5 $1,000.00$500.00
Ref #42 848E50000 HAND CHIPPING, (10 SY)
Awd $2,400.00$240.00
2 $2,400.00$240.00
3 $2,400.00$240.00
4 $2,400.00$240.00
5 $2,500.00$250.00
Ref #43 848E50100 TEST SLAB, (LUMP SUM)
Awd $1,139.00$1,139.00
2 $1,139.00$1,139.00
3 $1,139.00$1,139.00
4 $1,139.00$1,139.00
5 $1,000.00$1,000.00
Ref #104 202E38603 BRIDGE RAILING REMOVED FOR REUSE, AS PER PLAN, (125 FT)
Awd $2,025.00$16.20
2 $2,025.00$16.20
3 $562.50$4.50
4 $2,025.00$16.20
5 $1,875.00$15.00
160215 - Page 359
Ref #105 848E50320 EXISTING CONCRETE OVERLAY REMOVED(2" NOMINAL THICK, (217 SY)
Awd $6,379.80$29.40
2 $6,379.80$29.40
3 $6,379.80$29.40
4 $6,379.80$29.40
5 $16,275.00$75.00
Section 5 - STRUCTURE 20 FOOT SPAN AND OVER (MED-606 - Totals
Awd $102,143.15
2 $102,133.85
3 $100,146.35
4 $102,134.81
5 $149,910.00
Ref #45 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $4,275.00$4,275.00
3 $8,000.00$8,000.00
4 $7,000.00$7,000.00
5 $6,500.00$6,500.00
Ref #46 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $45,000.00$45,000.00
2 $41,900.00$41,900.00
3 $60,000.00$60,000.00
4 $42,000.00$42,000.00
5 $25,000.00$25,000.00
Ref #48 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $1,500.00$1,500.00
3 $500.00$500.00
4 $1,400.00$1,400.00
5 $3,000.00$3,000.00
Ref #49 624E10000 MOBILIZATION, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $20,000.00$20,000.00
3 $36,400.00$36,400.00
4 $21,000.00$21,000.00
5 $40,000.00$40,000.00
Ref #106 619E16010 FIELD OFFICE, TYPE B, (3 MNTH)
Awd $6,000.00$2,000.00
2 $3,000.00$1,000.00
3 $4,500.00$1,500.00
4 $5,250.00$1,750.00
5 $1,800.00$600.00
Section 6 - INCIDENTALS - Totals
Awd $79,000.00
2 $70,675.00
3 $109,400.00
4 $76,650.00
5 $76,300.00
160215 - Page 360
Project No. 160216
PID 100792
MOT-VAR VAR
Non-Federal
Type: MISCELLANEOUS
Completion Date: 7/11/2016
Award Amount: $382,190.54
Contract Awarded To: JOHN R JURGENSEN COMPANY
Letting Date: 4/7/2016
Engineer's Estimate: $248,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
JOHN R JURGENSEN COMPANY
11641 MOSTELLER RD
CINCINNATI, OH 45241
Hamilton
Bidder 1
Bid $382,190.54
160216 - Page 361
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $7,982.55$7,982.55
Ref #2 202E11501 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (2 EACH)
Awd $9,056.78$4,528.39
Ref #3 202E23000 PAVEMENT REMOVED, (136 SY)
Awd $8,713.52$64.07
Ref #4 202E23010 PAVEMENT REMOVED, ASPHALT, (28 SY)
Awd $2,554.72$91.24
Ref #5 202E30700 CONCRETE BARRIER REMOVED, (415 FT)
Awd $15,429.70$37.18
Ref #6 202E38000 GUARDRAIL REMOVED, (282 FT)
Awd $423.00$1.50
Ref #7 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E, (1 EACH)
Awd $145.00$145.00
Ref #8 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (4 EACH)
Awd $192.00$48.00
Ref #9 203E10000 EXCAVATION, (152 CY)
Awd $6,548.16$43.08
Ref #10 203E20000 EMBANKMENT, (32 CY)
Awd $2,522.56$78.83
Ref #11 204E10000 SUBGRADE COMPACTION, (18 SY)
Awd $1,066.32$59.24
Ref #12 209E60200 LINEAR GRADING, (6 STA)
Awd $3,554.16$592.36
Ref #13 606E13000 GUARDRAIL, TYPE 5, (433 FT)
Awd $6,408.40$14.80
Ref #14 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS, (100 FT)
Awd $1,720.00$17.20
Ref #15 606E26100 ANCHOR ASSEMBLY, TYPE E, (1 EACH)
Awd $1,825.00$1,825.00
Ref #16 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (1 EACH)
Awd $2,060.00$2,060.00
Ref #17 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, (1 EACH)
Awd $385.00$385.00
Ref #18 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA, (25 FT)
Awd $9,688.75$387.55
Ref #19 622E24000 CONCRETE BARRIER, TYPE D, (230 FT)
Awd $35,859.30$155.91
Ref #20 622E24001 CONCRETE BARRIER, TYPE D, AS PER PLAN, (373 FT)
Awd $88,359.97$236.89
Ref #21 622E25001 CONCRETE BARRIER END SECTION, TYPE D, AS PER PLAN, (2 EACH)
Awd $12,834.66$6,417.33
Ref #22 622E41000 PORTABLE BARRIER, 32", (310 FT)
Awd $5,890.00$19.00
160216 - Page 362
Section 1 - ROADWAY - Totals
Awd $223,219.55
Ref #23 659E00510 SEEDING AND MULCHING, CLASS 2, (45 SY)
Awd $549.00$12.20
Ref #24 659E00530 SEEDING AND MULCHING, CLASS 3B, (112 SY)
Awd $1,624.00$14.50
Ref #25 659E14000 REPAIR SEEDING AND MULCHING, (8 SY)
Awd $8.80$1.10
Ref #26 659E20000 COMMERCIAL FERTILIZER, (0.02 TON)
Awd $19.50$975.00
Ref #27 659E35000 WATER, (0.87 MGAL)
Awd $8.70$10.00
Ref #28 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $3,210.00
Ref #29 613E41200 LOW STRENGTH MORTAR BACKFILL, (0.2 CY)
Awd $862.53$4,312.65
Section 3 - DRAINAGE - Totals
Awd $862.53
Ref #30 304E20000 AGGREGATE BASE, (65 CY)
Awd $9,807.85$150.89
Ref #31 452E16010 13" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (141 SY)
Awd $21,733.74$154.14
Ref #32 617E10100 COMPACTED AGGREGATE, (14 CY)
Awd $7,089.60$506.40
Section 4 - PAVEMENT - Totals
Awd $38,631.19
Ref #33 626E00100 BARRIER REFLECTOR, (18 EACH)
Awd $111.60$6.20
Ref #34 644E00100 EDGE LINE, 4", (0.04 MILE)
Awd $680.00$17,000.00
Ref #35 644E00400 CHANNELIZING LINE, 8", (478 FT)
Awd $478.00$1.00
Ref #36 644E01500 DOTTED LINE, 4", (427 FT)
Awd $427.00$1.00
160216 - Page 363
Section 5 - TRAFFIC CONTROL - Totals
Awd $1,696.60
Ref #37 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (50 HOUR)
Awd $4,234.50$84.69
Ref #38 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (1 EACH)
Awd $1,800.00$1,800.00
Ref #39 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $6,050.00$6,050.00
Ref #40 614E12500 REPLACEMENT SIGN, (5 EACH)
Awd $625.00$125.00
Ref #41 614E12600 REPLACEMENT DRUM, (10 EACH)
Awd $500.00$50.00
Ref #42 614E13300 BARRIER REFLECTOR, TYPE B, (6 EACH)
Awd $48.00$8.00
Ref #43 614E13350 OBJECT MARKER, ONE WAY, (6 EACH)
Awd $66.00$11.00
Ref #44 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (1 SNMT)
Awd $900.00$900.00
Ref #45 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (0.11 MILE)
Awd $1,320.00$12,000.00
Ref #46 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (143 FT)
Awd $42.90$0.30
Ref #47 614E24610 WORK ZONE DOTTED LINE, CLASS III, 642 PAINT, (207 FT)
Awd $207.00$1.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $15,793.40
Ref #48 509E10000 EPOXY COATED REINFORCING STEEL, (13941 LB)
Awd $9,758.70$0.70
Ref #49 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (20 EACH)
Awd $60.00$3.00
Ref #50 516E31000 JOINT SEALER, (60 FT)
Awd $1,090.20$18.17
Section 7 - MISCELLANEOUS STRUCTURE - Totals
Awd $10,908.90
Ref #51 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (190 SF)
Awd $15,200.00$80.00
Ref #52 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (190 SF)
Awd $3,800.00$20.00
Ref #53 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (190 SF)
Awd $3,800.00$20.00
160216 - Page 364
Ref #54 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (190 SF)
Awd $1,900.00$10.00
Ref #55 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (1 MNHR)
Awd $100.00$100.00
Ref #56 514E10000 FINAL INSPECTION REPAIR, (1 EACH)
Awd $450.00$450.00
Section 8 - STRUCTURE REPAIR (MOT-75-2033) - Totals
Awd $25,250.00
Ref #57 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,362.00$1,362.00
Ref #58 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $51,256.37$51,256.37
Ref #59 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
Section 9 - INCIDENTALS - Totals
Awd $62,618.37
160216 - Page 365
Project No. 160217
PID 97488
TRU-Culverts FY2016 Various
Non-Federal
Type: CULVERT REPLACEMENT
Completion Date: 9/30/2016
Award Amount: $326,241.20
Contract Awarded To: MARUCCI & GAFFNEY EXCAVATING CO
Letting Date: 4/7/2016
Engineer's Estimate: $316,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
MARUCCI & GAFFNEY EXCAVATING CO
18 HOGUE ST
YOUNGSTOWN, OH 44502
Mahoning
Bidder 1
Bid $326,241.20
AMERICON INDUSTRIAL SERVICES LLC
3651 LEHARPS RD
AUSTINTOWN, OH 44515
Mahoning
Bidder 2
Bid $355,546.56
STANLEY MILLER CONSTRUCTION COMPANY
2250 HOWENSTINE DR SE
EAST SPARTA, OH 44626
Stark
Bidder 3
Bid $373,216.45
ECLIPSE CO LLC
11554 EAST WASHINGTON ST
CHAGRIN FALLS, OH 44023
Geauga
Bidder 4
Bid $389,741.81
JET EXCAVATING COMPANY
4354 SOUTH RANGE RD
NEW MIDDLETOWN, OH 44442
Mahoning
Bidder 5
Bid $409,563.25
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 6
Bid $444,688.14
FOUST CONSTRUCTION INC
1700 WILSON AVE
GIRARD, OH 44420
Trumbull
Bidder 7
Bid $516,784.34
160217 - Page 366
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $1,450.00$1,450.00
3 $1,967.00$1,967.00
4 $9,909.50$9,909.50
5 $2,500.00$2,500.00
6 $5,000.00$5,000.00
7 $5,000.00$5,000.00
Ref #2 202E23000 PAVEMENT REMOVED, (275 SY)
Awd $4,125.00$15.00
2 $2,400.75$8.73
3 $5,555.00$20.20
4 $2,200.00$8.00
5 $2,750.00$10.00
6 $3,300.00$12.00
7 $4,625.50$16.82
Ref #3 202E38000 GUARDRAIL REMOVED, (825 FT)
Awd $825.00$1.00
2 $2,937.00$3.56
3 $825.00$1.00
4 $5,775.00$7.00
5 $1,650.00$2.00
6 $4,125.00$5.00
7 $8,250.00$10.00
Ref #4 202E58100 CATCH BASIN REMOVED, (1 EACH)
Awd $50.00$50.00
2 $1,320.00$1,320.00
3 $500.00$500.00
4 $524.00$524.00
5 $2,000.00$2,000.00
6 $600.00$600.00
7 $200.00$200.00
Ref #5 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, (86 FT)
Awd $1,892.00$22.00
2 $1,040.60$12.10
3 $3,010.00$35.00
4 $2,279.00$26.50
5 $3,870.00$45.00
6 $4,300.00$50.00
7 $2,494.00$29.00
Ref #6 203E10000 EXCAVATION, (21 CY)
Awd $840.00$40.00
2 $300.30$14.30
3 $525.00$25.00
4 $1,029.00$49.00
5 $1,050.00$50.00
6 $1,155.00$55.00
7 $735.00$35.00
160217 - Page 367
Ref #7 203E20000 EMBANKMENT, (54 CY)
Awd $1,080.00$20.00
2 $1,099.98$20.37
3 $1,350.00$25.00
4 $1,026.00$19.00
5 $1,620.00$30.00
6 $1,620.00$30.00
7 $2,700.00$50.00
Ref #8 204E10000 SUBGRADE COMPACTION, (282 SY)
Awd $846.00$3.00
2 $1,494.60$5.30
3 $282.00$1.00
4 $282.00$1.00
5 $564.00$2.00
6 $1,903.50$6.75
7 $846.00$3.00
Ref #9 606E15050 GUARDRAIL, TYPE MGS, (250 FT)
Awd $3,375.00$13.50
2 $3,880.00$15.52
3 $3,835.00$15.34
4 $4,125.00$16.50
5 $4,000.00$16.00
6 $4,000.00$16.00
7 $3,875.00$15.50
Ref #10 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS, (287.5 FT)
Awd $4,600.00$16.00
2 $4,973.75$17.30
3 $4,985.25$17.34
4 $5,175.00$18.00
5 $6,037.50$21.00
6 $5,462.50$19.00
7 $5,261.25$18.30
Ref #11 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN, (88 FT)
Awd $1,760.00$20.00
2 $1,452.00$16.50
3 $1,956.24$22.23
4 $1,540.00$17.50
5 $1,540.00$17.50
6 $2,376.00$27.00
7 $1,540.00$17.50
Ref #12 606E26050 ANCHOR ASSEMBLY, MGS TYPE B, (2 EACH)
Awd $2,800.00$1,400.00
2 $3,400.00$1,700.00
3 $3,512.00$1,756.00
4 $3,573.00$1,786.50
5 $3,600.00$1,800.00
6 $1,490.00$745.00
7 $3,600.00$1,800.00
160217 - Page 368
Ref #13 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (5 EACH)
Awd $9,000.00$1,800.00
2 $9,850.00$1,970.00
3 $9,975.00$1,995.00
4 $10,350.00$2,070.00
5 $10,875.00$2,175.00
6 $4,000.00$800.00
7 $10,350.00$2,070.00
Section 1 - ROADWAY - Totals
Awd $36,193.00
2 $35,598.98
3 $38,277.49
4 $47,787.50
5 $42,056.50
6 $39,332.00
7 $49,476.75
Ref #14 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (4 CY)
Awd $320.00$80.00
2 $500.00$125.00
3 $400.00$100.00
4 $376.00$94.00
5 $500.00$125.00
6 $1,800.00$450.00
7 $400.00$100.00
Ref #15 616E10000 WATER, (1 MGAL)
Awd $1.00$1.00
2 $70.00$70.00
3 $1.00$1.00
4 $2.00$2.00
5 $1.00$1.00
6 $175.00$175.00
7 $10.00$10.00
Ref #16 659E00300 TOPSOIL, (344 CY)
Awd $3,440.00$10.00
2 $3,440.00$10.00
3 $19,952.00$58.00
4 $14,448.00$42.00
5 $6,880.00$20.00
6 $20,640.00$60.00
7 $12,040.00$35.00
Ref #17 659E00550 SEEDING AND MULCHING, CLASS 4A, (3100 SY)
Awd $4,650.00$1.50
2 $2,325.00$0.75
3 $5,115.00$1.65
4 $4,650.00$1.50
5 $3,875.00$1.25
6 $7,750.00$2.50
7 $6,200.00$2.00
160217 - Page 369
Ref #18 659E14000 REPAIR SEEDING AND MULCHING, (155 SY)
Awd $31.00$0.20
2 $77.50$0.50
3 $77.50$0.50
4 $155.00$1.00
5 $38.75$0.25
6 $209.25$1.35
7 $65.10$0.42
Ref #19 659E20000 COMMERCIAL FERTILIZER, (0.41 TON)
Awd $102.50$250.00
2 $246.00$600.00
3 $137.35$335.00
4 $301.56$735.51
5 $307.50$750.00
6 $221.40$540.00
7 $164.00$400.00
Ref #20 659E31000 LIME, (0.6 ACRE)
Awd $15.00$25.00
2 $75.00$125.00
3 $60.00$100.00
4 $283.80$473.00
5 $150.00$250.00
6 $90.00$150.00
7 $180.00$300.00
Ref #21 659E35000 WATER, (16 MGAL)
Awd $8.00$0.50
2 $960.00$60.00
3 $16.00$1.00
4 $32.00$2.00
5 $16.00$1.00
6 $32.00$2.00
7 $160.00$10.00
Section 2 - EROSION CONTROL - Totals
Awd $8,567.50
2 $7,693.50
3 $25,758.85
4 $20,248.36
5 $11,768.25
6 $30,917.65
7 $19,219.10
Ref #22 503E11100 COFFERDAMS AND EXCAVATION BRACING (TRU-45-18.13), (LUMP SUM)
Awd $1,000.00$1,000.00
2 $3,500.00$3,500.00
3 $2,522.00$2,522.00
4 $4,990.00$4,990.00
5 $3,000.00$3,000.00
6 $5,000.00$5,000.00
7 $5,000.00$5,000.00
160217 - Page 370
Ref #23 602E20000 CONCRETE MASONRY, (0.5 CY)
Awd $750.00$1,500.00
2 $450.00$900.00
3 $387.00$774.00
4 $799.25$1,598.50
5 $975.00$1,950.00
6 $1,500.00$3,000.00
7 $750.00$1,500.00
Ref #24 611E00900 6" CONDUIT, TYPE B, (30 FT)
Awd $150.00$5.00
2 $495.00$16.50
3 $120.00$4.00
4 $1,515.00$50.50
5 $240.00$8.00
6 $540.00$18.00
7 $750.00$25.00
Ref #25 611E01400 6" CONDUIT, TYPE E, (30 FT)
Awd $150.00$5.00
2 $480.00$16.00
3 $120.00$4.00
4 $945.00$31.50
5 $240.00$8.00
6 $540.00$18.00
7 $750.00$25.00
Ref #26 611E01500 6" CONDUIT, TYPE F, (30 FT)
Awd $150.00$5.00
2 $450.00$15.00
3 $120.00$4.00
4 $945.00$31.50
5 $240.00$8.00
6 $540.00$18.00
7 $750.00$25.00
Ref #27 611E03100 10" CONDUIT, TYPE B, (4 FT)
Awd $200.00$50.00
2 $520.00$130.00
3 $600.00$150.00
4 $380.00$95.00
5 $700.00$175.00
6 $780.00$195.00
7 $200.00$50.00
Ref #28 611E04400 12" CONDUIT, TYPE B, (4 FT)
Awd $240.00$60.00
2 $540.00$135.00
3 $1,200.00$300.00
4 $428.00$107.00
5 $720.00$180.00
6 $880.00$220.00
7 $200.00$50.00
160217 - Page 371
Ref #29 611E05900 15" CONDUIT, TYPE B, (4 FT)
Awd $280.00$70.00
2 $560.00$140.00
3 $1,600.00$400.00
4 $456.00$114.00
5 $760.00$190.00
6 $880.00$220.00
7 $200.00$50.00
Ref #30 611E10400 24" CONDUIT, TYPE B, (97 FT)
Awd $25,220.00$260.00
2 $24,080.25$248.25
3 $20,370.00$210.00
4 $14,501.50$149.50
5 $47,045.00$485.00
6 $21,825.00$225.00
7 $7,275.00$75.00
Ref #31 611E98510 CATCH BASIN, NO. 2-3, (1 EACH)
Awd $2,560.00$2,560.00
2 $2,019.00$2,019.00
3 $1,877.00$1,877.00
4 $4,313.50$4,313.50
5 $6,500.00$6,500.00
6 $4,600.00$4,600.00
7 $2,500.00$2,500.00
Section 3 - DRAINAGE - Totals
Awd $30,700.00
2 $33,094.25
3 $28,916.00
4 $29,273.25
5 $60,420.00
6 $37,085.00
7 $18,375.00
Ref #32 252E01500 FULL DEPTH PAVEMENT SAWING, (127 FT)
Awd $635.00$5.00
2 $317.50$2.50
3 $381.00$3.00
4 $508.00$4.00
5 $762.00$6.00
6 $317.50$2.50
7 $635.00$5.00
Ref #33 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1010 SY)
Awd $10,100.00$10.00
2 $19,190.00$19.00
3 $17,957.80$17.78
4 $11,110.00$11.00
5 $7,070.00$7.00
6 $15,150.00$15.00
7 $20,200.00$20.00
160217 - Page 372
Ref #34 301E46000 ASPHALT CONCRETE BASE, PG64-22, (73 CY)
Awd $14,600.00$200.00
2 $23,214.00$318.00
3 $25,842.00$354.00
4 $23,761.50$325.50
5 $21,900.00$300.00
6 $14,600.00$200.00
7 $14,600.00$200.00
Ref #35 301E46000 ASPHALT CONCRETE BASE, PG64-22(VARIABLE DEPTH), (16 CY)
Awd $3,200.00$200.00
2 $5,088.00$318.00
3 $5,664.00$354.00
4 $8,240.00$515.00
5 $4,720.00$295.00
6 $3,200.00$200.00
7 $3,200.00$200.00
Ref #36 304E20001 AGGREGATE BASE, AS PER PLAN, (47 CY)
Awd $7,050.00$150.00
2 $3,451.21$73.43
3 $5,358.00$114.00
4 $3,619.00$77.00
5 $3,995.00$85.00
6 $5,405.00$115.00
7 $3,525.00$75.00
Ref #37 407E20500 SPECIAL - TACK COAT, TRACKLESS TACK, (101 GAL)
Awd $505.00$5.00
2 $505.00$5.00
3 $505.00$5.00
4 $2,070.50$20.50
5 $404.00$4.00
6 $378.75$3.75
7 $404.00$4.00
Ref #38 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (84 CY)
Awd $21,000.00$250.00
2 $18,480.00$220.00
3 $21,000.00$250.00
4 $28,266.00$336.50
5 $31,500.00$375.00
6 $21,000.00$250.00
7 $22,260.00$265.00
Ref #39 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (8 CY)
Awd $1,200.00$150.00
2 $670.00$83.75
3 $1,856.00$232.00
4 $616.00$77.00
5 $1,800.00$225.00
6 $3,200.00$400.00
7 $600.00$75.00
160217 - Page 373
Section 4 - PAVEMENT - Totals
Awd $58,290.00
2 $70,915.71
3 $78,563.80
4 $78,191.00
5 $72,151.00
6 $63,251.25
7 $65,424.00
Ref #40 626E00100 BARRIER REFLECTOR, (10 EACH)
Awd $50.00$5.00
2 $100.00$10.00
3 $110.00$11.00
4 $105.00$10.50
5 $110.00$11.00
6 $100.00$10.00
7 $150.00$15.00
Ref #41 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (14 FT)
Awd $210.00$15.00
2 $186.20$13.30
3 $233.38$16.67
4 $196.00$14.00
5 $196.00$14.00
6 $252.00$18.00
7 $350.00$25.00
Ref #42 630E80100 SIGN, FLAT SHEET, (1.5 SF)
Awd $37.50$25.00
2 $58.80$39.20
3 $66.75$44.50
4 $61.50$41.00
5 $67.50$45.00
6 $82.50$55.00
7 $60.00$40.00
Ref #43 642E00090 EDGE LINE, 4", (0.11 MILE)
Awd $682.00$6,200.00
2 $770.00$7,000.00
3 $749.87$6,817.00
4 $709.12$6,446.55
5 $1,430.00$13,000.00
6 $1,430.00$13,000.00
7 $685.85$6,235.00
Ref #44 642E00290 CENTER LINE, (0.06 MILE)
Awd $738.00$12,300.00
2 $420.00$7,000.00
3 $817.98$13,633.00
4 $773.58$12,893.00
5 $780.00$13,000.00
6 $780.00$13,000.00
7 $738.00$12,300.00
160217 - Page 374
Section 5 - TRAFFIC CONTROL - Totals
Awd $1,717.50
2 $1,535.00
3 $1,977.98
4 $1,845.20
5 $2,583.50
6 $2,644.50
7 $1,983.85
Ref #45 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $12,685.00$12,685.00
3 $8,890.00$8,890.00
4 $10,040.00$10,040.00
5 $10,000.00$10,000.00
6 $10,000.00$10,000.00
7 $12,000.00$12,000.00
Ref #46 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (20 CY)
Awd $1,600.00$80.00
2 $3,000.00$150.00
3 $2,400.00$120.00
4 $4,010.00$200.50
5 $2,000.00$100.00
6 $10,000.00$500.00
7 $10,000.00$500.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $11,600.00
2 $15,685.00
3 $11,290.00
4 $14,050.00
5 $12,000.00
6 $20,000.00
7 $22,000.00
Ref #47 202E11000 STRUCTURE REMOVED(TRU-7-2511), (LUMP SUM)
Awd $5,500.00$5,500.00
2 $12,884.00$12,884.00
3 $4,756.00$4,756.00
4 $4,582.50$4,582.50
5 $9,500.00$9,500.00
6 $21,750.91$21,750.91
7 $10,000.00$10,000.00
Ref #48 203E10000 EXCAVATION, (40 CY)
Awd $1,600.00$40.00
2 $1,240.00$31.00
3 $1,200.00$30.00
4 $1,020.00$25.50
5 $400.00$10.00
6 $3,000.00$75.00
7 $2,000.00$50.00
160217 - Page 375
Ref #49 203E35120 GRANULAR MATERIAL, TYPE C, (40 CY)
Awd $2,400.00$60.00
2 $2,760.00$69.00
3 $2,040.00$51.00
4 $2,300.00$57.50
5 $1,800.00$45.00
6 $3,800.00$95.00
7 $2,400.00$60.00
Ref #50 204E50000 GEOTEXTILE FABRIC TYPE D, (62 SY)
Awd $496.00$8.00
2 $62.00$1.00
3 $403.00$6.50
4 $279.00$4.50
5 $124.00$2.00
6 $46.50$0.75
7 $620.00$10.00
Ref #51 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $12,810.00$12,810.00
2 $6,500.00$6,500.00
3 $3,633.00$3,633.00
4 $5,294.00$5,294.00
5 $7,500.00$7,500.00
6 $15,000.00$15,000.00
7 $10,000.00$10,000.00
Ref #52 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $1,500.00$1,500.00
3 $7,422.00$7,422.00
4 $7,857.00$7,857.00
5 $15,000.00$15,000.00
6 $21,200.00$21,200.00
7 $10,000.00$10,000.00
Ref #53 509E10000 EPOXY COATED REINFORCING STEEL, (5704 LB)
Awd $10,267.20$1.80
2 $9,012.32$1.58
3 $10,951.68$1.92
4 $2,852.00$0.50
5 $5,704.00$1.00
6 $17,112.00$3.00
7 $17,112.00$3.00
Ref #54 511E46010 CLASS QC1 CONCRETE WINGWALL/ FORESLOPE, (22 CY)
Awd $16,170.00$735.00
2 $17,204.00$782.00
3 $16,412.00$746.00
4 $23,012.00$1,046.00
5 $17,600.00$800.00
6 $19,800.00$900.00
7 $35,002.00$1,591.00
160217 - Page 376
Ref #55 511E46510 CLASS QC1 CONCRETE, FOOTING, (49 CY)
Awd $17,640.00$360.00
2 $12,593.00$257.00
3 $13,573.00$277.00
4 $51,327.50$1,047.50
5 $22,050.00$450.00
6 $21,315.00$435.00
7 $56,350.00$1,150.00
Ref #56 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (63 SY)
Awd $1,260.00$20.00
2 $1,890.00$30.00
3 $1,862.28$29.56
4 $1,480.50$23.50
5 $1,386.00$22.00
6 $1,890.00$30.00
7 $2,841.93$45.11
Ref #57 512E33000 TYPE 2 WATERPROOFING, (71 SY)
Awd $1,775.00$25.00
2 $1,775.00$25.00
3 $1,402.25$19.75
4 $1,846.00$26.00
5 $1,420.00$20.00
6 $1,775.00$25.00
7 $2,627.71$37.01
Ref #58 512E33010 TYPE 3 WATERPROOFING, (71 SY)
Awd $2,485.00$35.00
2 $2,485.00$35.00
3 $2,747.70$38.70
4 $2,769.00$39.00
5 $2,840.00$40.00
6 $2,485.00$35.00
7 $2,982.00$42.00
Ref #59 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (36 SF)
Awd $180.00$5.00
2 $108.00$3.00
3 $57.60$1.60
4 $234.00$6.50
5 $180.00$5.00
6 $720.00$20.00
7 $1,080.00$30.00
Ref #60 518E21230 POROUS BACKFILL WITH FILTER FABRIC, (LUMP SUM)
Awd $4,800.00$4,800.00
2 $1,440.00$1,440.00
3 $6,239.00$6,239.00
4 $2,406.50$2,406.50
5 $4,000.00$4,000.00
6 $6,500.00$6,500.00
7 $10,000.00$10,000.00
160217 - Page 377
Ref #61 601E10000 RIPRAP, (59 SY)
Awd $8,555.00$145.00
2 $6,000.30$101.70
3 $7,552.00$128.00
4 $2,596.00$44.00
5 $7,965.00$135.00
6 $9,196.33$155.87
7 $4,425.00$75.00
Ref #62 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH FABRIC FILTER, (39 CY)
Awd $3,120.00$80.00
2 $4,422.60$113.40
3 $2,925.00$75.00
4 $2,554.50$65.50
5 $3,315.00$85.00
6 $5,850.00$150.00
7 $3,315.00$85.00
Ref #63 611E95800 12' X 6' CONDUIT, TYPE A, 706.05, (40 FT)
Awd $35,000.00$875.00
2 $53,820.00$1,345.50
3 $47,920.00$1,198.00
4 $46,520.00$1,163.00
5 $60,000.00$1,500.00
6 $36,000.00$900.00
7 $100,000.00$2,500.00
Ref #64 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (15 FT)
Awd $225.00$15.00
2 $199.50$13.30
3 $221.70$14.78
4 $210.00$14.00
5 $210.00$14.00
6 $225.00$15.00
7 $300.00$20.00
Ref #65 630E80100 SIGN, FLAT SHEET, (2 SF)
Awd $50.00$25.00
2 $78.40$39.20
3 $87.12$43.56
4 $82.00$41.00
5 $90.00$45.00
6 $52.00$26.00
7 $50.00$25.00
Ref #66 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (2 EACH)
Awd $20.00$10.00
2 $25.00$12.50
3 $40.00$20.00
4 $107.00$53.50
5 $50.00$25.00
6 $20.00$10.00
7 $100.00$50.00
160217 - Page 378
Ref #67 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (2 EACH)
Awd $20.00$10.00
2 $25.00$12.50
3 $40.00$20.00
4 $107.00$53.50
5 $50.00$25.00
6 $20.00$10.00
7 $100.00$50.00
Section 7 - STRUCTURE UNDER 20 FOOT SPAN (TRU-7-2511 - Totals
Awd $126,373.20
2 $136,024.12
3 $131,485.33
4 $159,436.50
5 $161,184.00
6 $187,757.74
7 $271,305.64
Ref #68 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $7,200.00$7,200.00
3 $4,667.00$4,667.00
4 $6,844.50$6,844.50
5 $15,000.00$15,000.00
6 $3,000.00$3,000.00
7 $8,000.00$8,000.00
Ref #69 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $23,000.00$23,000.00
2 $8,600.00$8,600.00
3 $2,778.00$2,778.00
4 $10,040.00$10,040.00
5 $3,500.00$3,500.00
6 $17,000.00$17,000.00
7 $20,000.00$20,000.00
Ref #70 619E16010 FIELD OFFICE, TYPE B, (3 MNTH)
Awd $1,800.00$600.00
2 $3,000.00$1,000.00
3 $7,869.00$2,623.00
4 $4,728.00$1,576.00
5 $5,400.00$1,800.00
6 $8,700.00$2,900.00
7 $6,000.00$2,000.00
Ref #71 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $13,000.00$13,000.00
2 $3,200.00$3,200.00
3 $15,589.00$15,589.00
4 $3,047.50$3,047.50
5 $5,000.00$5,000.00
6 $25,000.00$25,000.00
7 $5,000.00$5,000.00
160217 - Page 379
Ref #72 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $33,000.00$33,000.00
3 $26,044.00$26,044.00
4 $14,250.00$14,250.00
5 $18,500.00$18,500.00
6 $10,000.00$10,000.00
7 $30,000.00$30,000.00
Section 8 - INCIDENTALS - Totals
Awd $52,800.00
2 $55,000.00
3 $56,947.00
4 $38,910.00
5 $47,400.00
6 $63,700.00
7 $69,000.00
160217 - Page 380
Project No. 161030
PID 88669
BUT-GCS FY2016
Non-Federal
Type: CRACK SEALING
Completion Date: 11/1/2016
Award Amount: $144,731.49
Contract Awarded To: STRAWSER PAVING CO INC
Letting Date: 4/7/2016
Engineer's Estimate: $170,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
STRAWSER PAVING CO INC
1595 FRANK RD
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $144,731.49
STRAWSER CONSTRUCTION INC
1392 DUBLIN RD
COLUMBUS, OH 43215
Franklin
Bidder 2
Bid $146,359.91
AMERICAN PAVEMENTS LLC
7475 MONTGOMERY DR
PLAIN CITY, OH 43064
Madison
Bidder 3
Bid $160,239.78
SCODELLER CONSTRUCTION INC
51722 GRAND RIVER AVE
WIXOM, MI 48393-2303
Bidder 4
Bid $165,891.62
161030 - Page 381
Ref #1 423E00220 CRACK SEALING, TYPE II OR TYPE III, (185184 SY)
Awd $62,962.56$0.34
2 $68,518.08$0.37
3 $87,036.48$0.47
4 $88,888.32$0.48
Section 1 - PAVEMENT - Totals
Awd $62,962.56
2 $68,518.08
3 $87,036.48
4 $88,888.32
Ref #2 642E00100 EDGE LINE, 4", TYPE 1, (27.3 MILE)
Awd $12,822.26$469.68
2 $12,558.00$460.00
3 $11,329.50$415.00
4 $11,329.50$415.00
Ref #3 642E00200 LANE LINE, 4", TYPE 1, (4.58 MILE)
Awd $1,415.22$309.00
2 $1,419.80$310.00
3 $1,374.00$300.00
4 $1,374.00$300.00
Ref #4 642E00300 CENTER LINE, TYPE 1, (13.65 MILE)
Awd $9,869.77$723.06
2 $9,828.00$720.00
3 $7,644.00$560.00
4 $7,644.00$560.00
Ref #5 642E00400 CHANNELIZING LINE, 8", TYPE 1, (5783 FT)
Awd $3,007.16$0.52
2 $2,949.33$0.51
3 $2,313.20$0.40
4 $2,313.20$0.40
Ref #6 642E00500 STOP LINE, TYPE 1, (686 FT)
Awd $1,756.16$2.56
2 $1,715.00$2.50
3 $1,474.90$2.15
4 $1,474.90$2.15
Ref #7 642E00600 CROSSWALK LINE, TYPE 1, (766 FT)
Awd $1,294.54$1.69
2 $1,263.90$1.65
3 $1,187.30$1.55
4 $1,187.30$1.55
Ref #8 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1, (4422 FT)
Awd $5,704.38$1.29
2 $5,748.60$1.30
3 $7,959.60$1.80
4 $7,959.60$1.80
Ref #9 642E00900 ISLAND MARKING, TYPE 1, (336 SF)
Awd $319.20$0.95
2 $319.20$0.95
3 $520.80$1.55
4 $520.80$1.55
161030 - Page 382
Ref #10 642E01000 RAILROAD SYMBOL MARKING, TYPE 1, (2 EACH)
Awd $494.40$247.20
2 $500.00$250.00
3 $400.00$200.00
4 $400.00$200.00
Ref #11 642E01300 LANE ARROW, TYPE 1, (70 EACH)
Awd $2,739.80$39.14
2 $2,800.00$40.00
3 $3,500.00$50.00
4 $3,500.00$50.00
Ref #12 642E01410 WORD ON PAVEMENT, 96", TYPE 1, (13 EACH)
Awd $642.72$49.44
2 $650.00$50.00
3 $780.00$60.00
4 $780.00$60.00
Section 2 - TRAFFIC CONTROL - Totals
Awd $40,065.61
2 $39,751.83
3 $38,483.30
4 $38,483.30
Ref #13 614E20000 WORK ZONE LANE LINE, CLASS I, (3 MILE)
Awd $927.00$309.00
2 $225.00$75.00
3 $1,575.00$525.00
4 $1,575.00$525.00
Ref #14 614E21000 WORK ZONE CENTER LINE, CLASS I, (10 MILE)
Awd $9,270.00$927.00
2 $1,000.00$100.00
3 $7,850.00$785.00
4 $7,850.00$785.00
Ref #15 614E22000 WORK ZONE EDGE LINE, CLASS I, (10 MILE)
Awd $5,150.00$515.00
2 $800.00$80.00
3 $6,400.00$640.00
4 $6,400.00$640.00
Ref #16 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, (500 FT)
Awd $260.00$0.52
2 $50.00$0.10
3 $275.00$0.55
4 $275.00$0.55
Ref #17 614E25000 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, (500 FT)
Awd $260.00$0.52
2 $50.00$0.10
3 $1,125.00$2.25
4 $1,125.00$2.25
Ref #18 614E26000 WORK ZONE STOP LINE, CLASS I, (100 FT)
Awd $258.00$2.58
2 $25.00$0.25
3 $250.00$2.50
4 $250.00$2.50
161030 - Page 383
Ref #19 614E27000 WORK ZONE CROSSWALK LINE, CLASS I, (20 FT)
Awd $164.80$8.24
2 $40.00$2.00
3 $40.00$2.00
4 $40.00$2.00
Ref #20 614E30000 WORK ZONE ARROW, CLASS I, (10 EACH)
Awd $309.00$30.90
2 $30.00$3.00
3 $550.00$55.00
4 $550.00$55.00
Ref #21 614E31000 WORK ZONE WORD ON PAVEMENT, 72", CLASS I, (7 EACH)
Awd $288.40$41.20
2 $70.00$10.00
3 $455.00$65.00
4 $455.00$65.00
Ref #22 614E32000 WORK ZONE RAILROAD SYMBOL MARKING, CLASS I, (2 EACH)
Awd $416.12$208.06
2 $100.00$50.00
3 $500.00$250.00
4 $500.00$250.00
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $17,303.32
2 $2,390.00
3 $19,020.00
4 $19,020.00
Ref #23 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $500.00$500.00
3 $700.00$700.00
4 $3,500.00$3,500.00
Ref #24 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $13,400.00$13,400.00
2 $19,000.00$19,000.00
3 $8,000.00$8,000.00
4 $7,500.00$7,500.00
Ref #25 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $16,200.00$16,200.00
3 $7,000.00$7,000.00
4 $8,500.00$8,500.00
Section 4 - INCIDENTALS - Totals
Awd $24,400.00
2 $35,700.00
3 $15,700.00
4 $19,500.00
161030 - Page 384
Project No. 161036
PID 93671
ASD-PM FY2016
Non-Federal
Type: PAVEMENT MARKING
Completion Date: 10/15/2016
Award Amount: $1,414,098.14
Contract Awarded To: OGLESBY CONSTRUCTION INC
Letting Date: 4/7/2016
Engineer's Estimate: $1,361,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
OGLESBY CONSTRUCTION INC
1600 TOLEDO RD
NORWALK, OH 44857
Huron
Bidder 1
Bid $1,414,098.14
AERO-MARK INC
10423 DANNER DR
STREETSBORO, OH 44241
Portage
Bidder 2
Bid $1,478,486.04
161036 - Page 385
Ref #1 642E00104 EDGE LINE, 6", TYPE 1, (1043.96 MILE)
Awd $579,397.80$555.00
2 $601,320.96$576.00
Ref #2 642E00204 LANE LINE, 6", TYPE 1, (158.55 MILE)
Awd $44,394.00$280.00
2 $45,662.40$288.00
Ref #3 642E00300 CENTER LINE, TYPE 1, (386.57 MILE)
Awd $184,780.46$478.00
2 $194,444.71$503.00
Ref #4 642E01510 DOTTED LINE, 6", TYPE 1, (200 FT)
Awd $200.00$1.00
2 $200.00$1.00
Ref #5 642E30000 REMOVAL OF PAVEMENT MARKING, (200 FT)
Awd $500.00$2.50
2 $200.00$1.00
Ref #6 642E30010 REMOVAL OF PAVEMENT MARKING, (100 SF)
Awd $400.00$4.00
2 $300.00$3.00
Ref #7 642E30020 REMOVAL OF PAVEMENT MARKING, (50 EACH)
Awd $2,150.00$43.00
2 $2,000.00$40.00
Ref #8 643E00104 EDGE LINE, 6", (340.34 MILE)
Awd $302,221.92$888.00
2 $298,137.84$876.00
Ref #9 643E00204 LANE LINE, 6", (4.7 MILE)
Awd $2,303.00$490.00
2 $2,773.00$590.00
Ref #10 643E00300 CENTER LINE, (176.28 MILE)
Awd $133,620.24$758.00
2 $142,257.96$807.00
Ref #11 643E00400 CHANNELIZING LINE, 8", (34577 FT)
Awd $15,905.42$0.46
2 $15,905.42$0.46
Ref #12 643E00404 CHANNELIZING LINE, 12", (14505 FT)
Awd $8,703.00$0.60
2 $8,557.95$0.59
Ref #13 643E00500 STOP LINE, (6034 FT)
Awd $20,213.90$3.35
2 $19,912.20$3.30
Ref #14 643E00700 TRANSVERSE/DIAGONAL LINE, (23878 FT)
Awd $42,980.40$1.80
2 $45,368.20$1.90
Ref #15 643E01000 RAILROAD SYMBOL MARKING, (27 EACH)
Awd $6,210.00$230.00
2 $9,450.00$350.00
Ref #16 643E01110 SCHOOL SYMBOL MARKING, 96", (15 EACH)
Awd $3,600.00$240.00
2 $5,250.00$350.00
161036 - Page 386
Ref #17 643E01300 LANE ARROW, (561 EACH)
Awd $33,099.00$59.00
2 $34,782.00$62.00
Ref #18 643E01410 WORD ON PAVEMENT, 96", (58 EACH)
Awd $4,350.00$75.00
2 $4,524.00$78.00
Ref #19 643E01510 DOTTED LINE, 6", (1415 FT)
Awd $849.00$0.60
2 $2,490.40$1.76
Ref #20 643E40000 SPECIAL - AIR SPEED ZONE MARKING, (17 EACH)
Awd $8,500.00$500.00
2 $7,803.00$459.00
Ref #21 643E50100 PAVEMENT MARKING, MISC.:LANE REDUCTION ARROW, (20 EACH)
Awd $3,500.00$175.00
2 $9,400.00$470.00
Ref #22 644E00500 STOP LINE, (12 FT)
Awd $420.00$35.00
2 $996.00$83.00
Ref #23 644E01350 LANE REDUCTION ARROW, (6 EACH)
Awd $3,000.00$500.00
2 $4,050.00$675.00
Section 1 - TRAFFIC CONTROL - Totals
Awd $1,401,298.14
2 $1,455,786.04
Ref #24 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $9,000.00$9,000.00
2 $7,500.00$7,500.00
Ref #25 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $7,600.00$7,600.00
Ref #26 624E10000 MOBILIZATION, (LUMP SUM)
Awd $1,800.00$1,800.00
2 $7,600.00$7,600.00
Section 2 - INCIDENTALS - Totals
Awd $12,800.00
2 $22,700.00
161036 - Page 387
Project No. 161037
PID 96806
PIK-Kincaid SFH Coat & Chip Seal
Non-Federal
Type: PREVENTIVE MAINTENANCE
Completion Date: 8/15/2016
Award Amount: $73,348.97
Contract Awarded To: FOILL INC
Letting Date: 4/7/2016
Engineer's Estimate: $113,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
FOILL INC
201 E NORTH ST
WAVERLY, OH 45690
Pike
Bidder 1
Bid $73,348.97
COX PAVING LLC
2754 US HIGHWAY 22 NW
WASHINGTON COURT HOUSE, OH 43160-9510
Bidder 2
Bid $108,414.01
D G M INC
1881 ADAMS RD
BEAVER, OH 45613
Pike
Bidder 3
Bid $168,503.50
161037 - Page 388
Ref #1 209E61000 SPECIAL - SHAPING, (7706 SY)
Awd $3,853.00$0.50
2 $6,395.98$0.83
3 $23,118.00$3.00
Section 1 - ROADWAY - Totals
Awd $3,853.00
2 $6,395.98
3 $23,118.00
Ref #2 832E30000 EROSION CONTROL, (500 EACH)
Awd $500.00$1.00
2 $500.00$1.00
3 $500.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $500.00
2 $500.00
3 $500.00
Ref #3 411E10001 STABILIZED CRUSHED AGGREGATE, AS PER PLAN, (643 CY)
Awd $23,501.65$36.55
2 $33,815.37$52.59
3 $32,150.00$50.00
Ref #4 422E20001 DOUBLE CHIP SEAL, AS PER PLAN, (7706 SY)
Awd $32,673.44$4.24
2 $54,789.66$7.11
3 $38,530.00$5.00
Ref #5 423E00100 CRACK SEALING, TYPE I, (1200 LB)
Awd $4,080.00$3.40
2 $2,520.00$2.10
3 $6,000.00$5.00
Ref #6 617E25000 WATER, (2 MGAL)
Awd $2.20$1.10
2 $600.00$300.00
3 $2.00$1.00
Ref #7 690E98300 SPECIAL - MISC.:SEAL COAT, (2505 SY)
Awd $4,058.10$1.62
2 $3,757.50$1.50
3 $12,525.00$5.00
Section 3 - PAVEMENT - Totals
Awd $64,315.39
2 $95,482.53
3 $89,207.00
Ref #8 616E10000 WATER, (1 MGAL)
Awd $1.10$1.10
2 $400.00$400.00
3 $1.00$1.00
161037 - Page 389
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $1.10
2 $400.00
3 $1.00
Ref #9 642E01190 PARKING LOT STALL MARKING, (153 FT)
Awd $302.48$1.98
2 $535.50$3.50
3 $2,677.50$17.50
Section 5 - ITEMS OF WORK - Totals
Awd $302.48
2 $535.50
3 $2,677.50
Ref #10 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,209.00$1,209.00
2 $600.00$600.00
3 $30,000.00$30,000.00
Ref #11 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $550.00$550.00
2 $1,500.00$1,500.00
3 $13,000.00$13,000.00
Ref #12 624E10000 MOBILIZATION, (LUMP SUM)
Awd $2,618.00$2,618.00
2 $3,000.00$3,000.00
3 $10,000.00$10,000.00
Section 6 - INCIDENTALS - Totals
Awd $4,377.00
2 $5,100.00
3 $53,000.00
161037 - Page 390
Project No. 161038
PID 100514
CLE-US 52-2.69
Non-Federal
Type: SPOT SAFETY
Completion Date: 10/31/2016
Award Amount: $246,834.40
Contract Awarded To: BARRETT PAVING MATERIALS INC
Letting Date: 4/7/2016
Engineer's Estimate: $181,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
BARRETT PAVING MATERIALS INC
3751 COMMERCE DR
MIDDLETOWN, OH 45005
Warren
Bidder 1
Bid $246,834.40
JOHN R JURGENSEN COMPANY
11641 MOSTELLER RD
CINCINNATI, OH 45241
Hamilton
Bidder 2
Bid $247,989.54
161038 - Page 391
Ref #1 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (3731 SY)
Awd $149,240.00$40.00
2 $169,499.33$45.43
Ref #2 251E01001 PARTIAL DEPTH PAVEMENT REPAIR, AS PER PLAN, (500 SY)
Awd $22,000.00$44.00
2 $22,735.00$45.47
Section 1 - PAVEMENT - Totals
Awd $171,240.00
2 $192,234.33
Ref #3 621E00100 RPM, (192 EACH)
Awd $4,598.40$23.95
2 $4,598.40$23.95
Ref #4 621E54000 RAISED PAVEMENT MARKER REMOVED, (192 EACH)
Awd $1,344.00$7.00
2 $3,617.28$18.84
Ref #5 642E00104 EDGE LINE, 6", TYPE 1, (1 MILE)
Awd $588.00$588.00
2 $588.00$588.00
Ref #6 642E00204 LANE LINE, 6", TYPE 1, (2.4 MILE)
Awd $1,440.00$600.00
2 $1,440.00$600.00
Section 2 - TRAFFIC CONTROL - Totals
Awd $7,970.40
2 $10,243.68
Ref #7 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $42,000.00$42,000.00
2 $30,857.47$30,857.47
Ref #8 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (50 HOUR)
Awd $4,000.00$80.00
2 $3,621.50$72.43
Ref #9 614E20000 WORK ZONE LANE LINE, CLASS I, (2.4 MILE)
Awd $3,024.00$1,260.00
2 $2,111.62$879.84
Ref #10 614E22000 WORK ZONE EDGE LINE, CLASS I, (1 MILE)
Awd $1,300.00$1,300.00
2 $2,283.43$2,283.43
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $50,324.00
2 $38,874.02
Ref #11 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $931.97$931.97
161038 - Page 392
Ref #12 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,300.00$3,300.00
2 $2,493.28$2,493.28
Ref #13 624E10000 MOBILIZATION, (LUMP SUM)
Awd $13,000.00$13,000.00
2 $3,212.26$3,212.26
Section 4 - INCIDENTALS - Totals
Awd $17,300.00
2 $6,637.51
161038 - Page 393
Project No. 163013
PID 97841
BEL-OBPP CR 2 2.19
Federal
Type: BRIDGE REPLACEMENT (1 BRIDGE)
Completion Date: 10/31/2016
Award Amount: $338,200.00
Contract Awarded To: OHIO-WEST VIRGINIA EXCAVATING CO
Letting Date: 4/7/2016
Engineer's Estimate: $370,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
OHIO-WEST VIRGINIA EXCAVATING CO
56461 FERRY LANDING ROAD
SHADYSIDE, OH 43947
Belmont
Bidder 1
Bid $338,200.00
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 2
Bid $718,050.00
163013 - Page 394
Ref #1 690E20240 SPECIAL - ROADWAY, (LUMP SUM)
Awd $32,000.00$32,000.00
2 $62,000.00$62,000.00
Section 1 - ROADWAY - Totals
Awd $32,000.00
2 $62,000.00
Ref #2 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $15,000.00$15,000.00
Ref #3 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (9500 EACH)
Awd $9,500.00$1.00
2 $9,500.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $12,500.00
2 $24,500.00
Ref #4 611E97800 SPECIAL - DRAINAGE, (LUMP SUM)
Awd $750.00$750.00
2 $4,700.00$4,700.00
Section 3 - DRAINAGE - Totals
Awd $750.00
2 $4,700.00
Ref #5 690E20250 SPECIAL - MISC. PAVEMENT:, (LUMP SUM)
Awd $44,750.00$44,750.00
2 $23,000.00$23,000.00
Section 4 - PAVEMENT - Totals
Awd $44,750.00
2 $23,000.00
Ref #6 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $900.00$900.00
2 $1,200.00$1,200.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $900.00
2 $1,200.00
Ref #7 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $7,100.00$7,100.00
2 $9,000.00$9,000.00
163013 - Page 395
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $7,100.00
2 $9,000.00
Ref #8 530E99040 SPECIAL - STRUCTURES (SFN:0730010), (LUMP SUM)
Awd $190,000.00$190,000.00
2 $475,100.00$475,100.00
Section 7 - STRUCTURE 20 FOOT SPAN AND OVER (BEL-CR0 - Totals
Awd $190,000.00
2 $475,100.00
Ref #9 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $800.00$800.00
2 $450.00$450.00
Ref #10 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $2,300.00$2,300.00
2 $12,000.00$12,000.00
Ref #11 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $4,000.00$4,000.00
Ref #12 690E20200 SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $10,500.00$10,500.00
2 $21,000.00$21,000.00
Ref #13 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $8,300.00$8,300.00
2 $29,000.00$29,000.00
Section 8 - ENGINEERING AND SURVEYING SERVICES - Totals
Awd $27,900.00
2 $66,450.00
Ref #14 100E99010 SPECIAL - PROFESSIONAL LIABILITY INSURANCE, (LUMP SUM)
Awd $3,200.00$3,200.00
2 $100.00$100.00
Ref #15 103E99010 SPECIAL - PREMIUM FOR CONTRACT PERFORMANCE BOND AN, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $5,000.00$5,000.00
Ref #16 619E99000 SPECIAL - FIELD OFFICE, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $12,000.00$12,000.00
Ref #17 623E99000 SPECIAL - CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $1,600.00$1,600.00
2 $15,000.00$15,000.00
Ref #18 624E99000 SPECIAL - MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $20,000.00$20,000.00
163013 - Page 396
Section 9 - INCIDENTALS - Totals
Awd $22,300.00
2 $52,100.00
163013 - Page 397
Project No. 163015
PID 97852
FRA-Beechtree Rd/MAD-CR 85-0.12
Federal
Type: BRIDGE REPLACEMENT (2 BRIDGES)
Completion Date: 9/1/2017
Award Amount: $931,800.00
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 4/7/2016
Engineer's Estimate: $938,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $931,800.00
EAGLE BRIDGE CO
800 S VAN DEMARK RD
SIDNEY, OH 45365
Shelby
Bidder 2
Bid $1,102,252.00
BUDS INC
6260 NEWARK RD
NASHPORT, OH 43830
Muskingum
Bidder 3
Bid $1,170,500.00
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 4
Bid $1,563,265.00
163015 - Page 398
Ref #1 690E20240 SPECIAL - ROADWAY, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $55,000.00$55,000.00
3 $35,000.00$35,000.00
4 $46,000.00$46,000.00
Section 1 - ROADWAY (PART 1) - Totals
Awd $30,000.00
2 $55,000.00
3 $35,000.00
4 $46,000.00
Ref #2 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $17,000.00$17,000.00
2 $3,250.00$3,250.00
3 $12,500.00$12,500.00
4 $2,000.00$2,000.00
Ref #3 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (1500 EACH)
Awd $1,500.00$1.00
2 $1,500.00$1.00
3 $1,500.00$1.00
4 $1,500.00$1.00
Section 2 - EROSION CONTROL (PART 1) - Totals
Awd $18,500.00
2 $4,750.00
3 $14,000.00
4 $3,500.00
Ref #4 611E97800 SPECIAL - DRAINAGE, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $1,000.00$1,000.00
3 $3,000.00$3,000.00
4 $1,500.00$1,500.00
Section 3 - DRAINAGE (PART 1) - Totals
Awd $1,500.00
2 $1,000.00
3 $3,000.00
4 $1,500.00
Ref #5 690E20250 SPECIAL - MISC. PAVEMENT:, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $42,000.00$42,000.00
3 $55,000.00$55,000.00
4 $40,000.00$40,000.00
163015 - Page 399
Section 4 - PAVEMENT (PART 1) - Totals
Awd $40,000.00
2 $42,000.00
3 $55,000.00
4 $40,000.00
Ref #6 638E99000 SPECIAL - WATER WORKS, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $37,000.00$37,000.00
3 $35,000.00$35,000.00
4 $30,000.00$30,000.00
Section 5 - WATER WORK (PART 1) - Totals
Awd $20,000.00
2 $37,000.00
3 $35,000.00
4 $30,000.00
Ref #7 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $1.00$1.00
3 $1,000.00$1,000.00
4 $330.00$330.00
Section 6 - TRAFFIC CONTROL (PART 1) - Totals
Awd $2,500.00
2 $1.00
3 $1,000.00
4 $330.00
Ref #8 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $50,000.00$50,000.00
3 $60,000.00$60,000.00
4 $35,000.00$35,000.00
Section 7 - MAINTENANCE OF TRAFFIC (PART 1) - Totals
Awd $30,000.00
2 $50,000.00
3 $60,000.00
4 $35,000.00
Ref #9 530E99040 SPECIAL - STRUCTURES, (LUMP SUM)
Awd $250,000.00$250,000.00
2 $325,000.00$325,000.00
3 $440,000.00$440,000.00
4 $600,000.00$600,000.00
163015 - Page 400
Section 8 - STRUCTURE 20 FOOT SPAN AND OVER FRA-M025 - Totals
Awd $250,000.00
2 $325,000.00
3 $440,000.00
4 $600,000.00
Ref #10 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $500.00$500.00
3 $4,000.00$4,000.00
4 $12,400.00$12,400.00
Ref #11 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $100.00$100.00
2 $500.00$500.00
3 $4,000.00$4,000.00
4 $2,000.00$2,000.00
Ref #12 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $1,000.00$1,000.00
3 $4,000.00$4,000.00
4 $6,400.00$6,400.00
Ref #13 690E20200 SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $18,000.00$18,000.00
3 $28,000.00$28,000.00
4 $14,800.00$14,800.00
Ref #14 690E20210 SPECIAL - FINAL PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $17,000.00$17,000.00
3 $11,000.00$11,000.00
4 $10,200.00$10,200.00
Ref #15 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $500.00$500.00
2 $1,500.00$1,500.00
3 $9,000.00$9,000.00
4 $6,200.00$6,200.00
Section 9 - ENGINEERING AND SURVEYING SERVICES (PART - Totals
Awd $38,600.00
2 $38,500.00
3 $60,000.00
4 $52,000.00
Ref #16 690E20240 SPECIAL - ROADWAY, (LUMP SUM)
Awd $50,000.00$50,000.00
2 $47,500.00$47,500.00
3 $35,000.00$35,000.00
4 $37,000.00$37,000.00
163015 - Page 401
Section 10 - ROADWAY (PART 2) - Totals
Awd $50,000.00
2 $47,500.00
3 $35,000.00
4 $37,000.00
Ref #17 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $12,500.00$12,500.00
3 $12,500.00$12,500.00
4 $5,000.00$5,000.00
Ref #18 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (1500 EACH)
Awd $1,500.00$1.00
2 $1,500.00$1.00
3 $1,500.00$1.00
4 $1,500.00$1.00
Section 11 - EROSION CONTROL (PART 2) - Totals
Awd $21,500.00
2 $14,000.00
3 $14,000.00
4 $6,500.00
Ref #19 611E97800 SPECIAL - DRAINAGE, (LUMP SUM)
Awd $4,500.00$4,500.00
2 $3,000.00$3,000.00
3 $2,500.00$2,500.00
4 $1,500.00$1,500.00
Section 12 - DRAINAGE (PART 2) - Totals
Awd $4,500.00
2 $3,000.00
3 $2,500.00
4 $1,500.00
Ref #20 690E20250 SPECIAL - MISC. PAVEMENT:, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $45,000.00$45,000.00
3 $35,000.00$35,000.00
4 $35,000.00$35,000.00
Section 13 - PAVEMENT (PART 2) - Totals
Awd $25,000.00
2 $45,000.00
3 $35,000.00
4 $35,000.00
163015 - Page 402
Ref #21 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1.00$1.00
3 $1,000.00$1,000.00
4 $495.00$495.00
Section 14 - TRAFFIC CONTROL (PART 2) - Totals
Awd $1,000.00
2 $1.00
3 $1,000.00
4 $495.00
Ref #22 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $3,500.00$3,500.00
3 $5,000.00$5,000.00
4 $6,000.00$6,000.00
Section 15 - MAINTENANCE OF TRAFFIC (PART 2) - Totals
Awd $5,000.00
2 $3,500.00
3 $5,000.00
4 $6,000.00
Ref #23 530E99040 SPECIAL - STRUCTURES, (LUMP SUM)
Awd $295,500.00$295,500.00
2 $330,000.00$330,000.00
3 $265,000.00$265,000.00
4 $530,000.00$530,000.00
Section 16 - STRUCTURE 20 FOOT SPAN AND OVER MAD-CR85 - Totals
Awd $295,500.00
2 $330,000.00
3 $265,000.00
4 $530,000.00
Ref #24 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $500.00$500.00
2 $500.00$500.00
3 $2,000.00$2,000.00
4 $2,500.00$2,500.00
Ref #25 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $100.00$100.00
2 $500.00$500.00
3 $2,000.00$2,000.00
4 $3,200.00$3,200.00
Ref #26 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $1,000.00$1,000.00
3 $4,000.00$4,000.00
4 $6,400.00$6,400.00
163015 - Page 403
Ref #27 690E20200 SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $24,000.00$24,000.00
2 $18,000.00$18,000.00
3 $16,000.00$16,000.00
4 $18,400.00$18,400.00
Ref #28 690E20210 SPECIAL - FINAL PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $14,500.00$14,500.00
2 $16,000.00$16,000.00
3 $8,000.00$8,000.00
4 $16,200.00$16,200.00
Ref #29 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $500.00$500.00
2 $1,500.00$1,500.00
3 $7,000.00$7,000.00
4 $8,240.00$8,240.00
Section 17 - ENGINEERING AND SURVEYING SERVICES (PART - Totals
Awd $41,100.00
2 $37,500.00
3 $39,000.00
4 $54,940.00
Ref #30 100E99010 SPECIAL - PROFESSIONAL LIABILITY INSURANCE(PART 1 , (LUMP SUM)
Awd $100.00$100.00
2 $5,000.00$5,000.00
3 $7,000.00$7,000.00
4 $1,000.00$1,000.00
Ref #31 103E99010 SPECIAL - PREMIUM FOR CONTRACT PERFORMANCE BOND AN, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $10,000.00$10,000.00
3 $10,000.00$10,000.00
4 $17,000.00$17,000.00
Ref #32 108E99000 SPECIAL - CPM PROGRESS SCHEDULE(PART 1 AND PART 2), (LUMP SUM)
Awd $1,000.00$1,000.00
2 $2,000.00$2,000.00
3 $2,000.00$2,000.00
4 $1,500.00$1,500.00
Ref #33 619E99000 SPECIAL - FIELD OFFICE(PART 1 AND PART 2), (LUMP SUM)
Awd $20,000.00$20,000.00
2 $5,500.00$5,500.00
3 $7,000.00$7,000.00
4 $12,000.00$12,000.00
Ref #34 623E99000 SPECIAL - CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $6,000.00$6,000.00
3 $5,000.00$5,000.00
4 $12,000.00$12,000.00
Ref #35 624E99000 SPECIAL - MOBILIZATION(PART 1 AND PART 2), (LUMP SUM)
Awd $20,000.00$20,000.00
2 $40,000.00$40,000.00
3 $40,000.00$40,000.00
4 $40,000.00$40,000.00
163015 - Page 404
Section 18 - INCIDENTALS - Totals
Awd $57,100.00
2 $68,500.00
3 $71,000.00
4 $83,500.00
163015 - Page 405
Project No. 163016
PID 98580
KNO-TR 127-0.10
Federal
Type: BRIDGE REPLACEMENT (1 BRIDGE)
Completion Date: 10/15/2016
Award Amount: $817,900.00
Contract Awarded To: MC CONNELL CONTRACTING INC
Letting Date: 4/7/2016
Engineer's Estimate: $621,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
MC CONNELL CONTRACTING INC
56194 CR 5
WEST LAFAYETTE, OH 43845
Coshocton
Bidder 1
Bid $817,900.00
V O MENUEZ & SON INC
1016 S WASHINGTON ST
MILLERSBURG, OH 44654
Holmes
Bidder 2
Bid $823,994.35
R & I CONSTRUCTION INC
2931 STATE ROUTE 67 SOUTH
TIFFIN, OH 44883
Seneca
Bidder 3
Bid $866,574.00
OHIO BRIDGE CORPORATION
P O BOX 757
CAMBRIDGE, OH 43725
Guernsey
Bidder 4
Bid $877,900.00
RIETSCHLIN CONSTRUCTION INC
4240 BAKER RD
CRESTLINE, OH 44827
Crawford
Bidder 5
Bid $886,238.00
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 6
Bid $958,192.00
163016 - Page 406
Ref #1 690E20240 SPECIAL - ROADWAY, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $38,047.90$38,047.90
3 $24,000.00$24,000.00
4 $10,000.00$10,000.00
5 $47,485.50$47,485.50
6 $100,000.00$100,000.00
Section 1 - ROADWAY - Totals
Awd $15,000.00
2 $38,047.90
3 $24,000.00
4 $10,000.00
5 $47,485.50
6 $100,000.00
Ref #2 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $24,239.75$24,239.75
3 $10,000.00$10,000.00
4 $1,000.00$1,000.00
5 $17,299.00$17,299.00
6 $19,000.00$19,000.00
Ref #3 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (5000 EACH)
Awd $5,000.00$1.00
2 $5,000.00$1.00
3 $5,000.00$1.00
4 $5,000.00$1.00
5 $5,000.00$1.00
6 $5,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $15,000.00
2 $29,239.75
3 $15,000.00
4 $6,000.00
5 $22,299.00
6 $24,000.00
Ref #4 611E97800 SPECIAL - DRAINAGE, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $566.10$566.10
3 $100.00$100.00
4 $100.00$100.00
5 $1.00$1.00
6 $4,000.00$4,000.00
163016 - Page 407
Section 3 - DRAINAGE - Totals
Awd $1,500.00
2 $566.10
3 $100.00
4 $100.00
5 $1.00
6 $4,000.00
Ref #5 690E20250 SPECIAL - MISC. PAVEMENT:, (LUMP SUM)
Awd $45,000.00$45,000.00
2 $38,319.45$38,319.45
3 $65,000.00$65,000.00
4 $10,000.00$10,000.00
5 $43,030.00$43,030.00
6 $81,000.00$81,000.00
Section 4 - PAVEMENT - Totals
Awd $45,000.00
2 $38,319.45
3 $65,000.00
4 $10,000.00
5 $43,030.00
6 $81,000.00
Ref #6 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $500.00$500.00
2 $3,160.80$3,160.80
3 $100.00$100.00
4 $100.00$100.00
5 $742.50$742.50
6 $1,100.00$1,100.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $500.00
2 $3,160.80
3 $100.00
4 $100.00
5 $742.50
6 $1,100.00
Ref #7 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $5,375.00$5,375.00
3 $5,000.00$5,000.00
4 $2,000.00$2,000.00
5 $5,412.00$5,412.00
6 $4,000.00$4,000.00
163016 - Page 408
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $15,000.00
2 $5,375.00
3 $5,000.00
4 $2,000.00
5 $5,412.00
6 $4,000.00
Ref #8 530E99040 SPECIAL - STRUCTURES, (LUMP SUM)
Awd $644,000.00$644,000.00
2 $548,338.75$548,338.75
3 $642,773.00$642,773.00
4 $718,500.00$718,500.00
5 $664,043.00$664,043.00
6 $622,000.00$622,000.00
Section 7 - STRUCTURE 20 FOOT SPAN AND OVER (KNO-TR1 - Totals
Awd $644,000.00
2 $548,338.75
3 $642,773.00
4 $718,500.00
5 $664,043.00
6 $622,000.00
Ref #9 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $2,000.00$2,000.00
3 $1,000.00$1,000.00
4 $1,200.00$1,200.00
5 $1,694.00$1,694.00
6 $1,160.00$1,160.00
Ref #10 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $2,200.00$2,200.00
2 $6,000.00$6,000.00
3 $1,000.00$1,000.00
4 $1,000.00$1,000.00
5 $889.00$889.00
6 $1,690.00$1,690.00
Ref #11 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $6,800.00$6,800.00
2 $5,000.00$5,000.00
3 $2,500.00$2,500.00
4 $7,500.00$7,500.00
5 $4,285.00$4,285.00
6 $6,342.00$6,342.00
Ref #12 690E20200 SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $14,500.00$14,500.00
2 $50,000.00$50,000.00
3 $37,000.00$37,000.00
4 $30,000.00$30,000.00
5 $33,454.00$33,454.00
6 $29,600.00$29,600.00
163016 - Page 409
Ref #13 690E20210 SPECIAL - FINAL PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $12,200.00$12,200.00
2 $22,000.00$22,000.00
3 $17,000.00$17,000.00
4 $25,000.00$25,000.00
5 $9,558.00$9,558.00
6 $26,000.00$26,000.00
Ref #14 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $7,400.00$7,400.00
2 $5,000.00$5,000.00
3 $1,000.00$1,000.00
4 $12,000.00$12,000.00
5 $4,780.00$4,780.00
6 $9,900.00$9,900.00
Section 8 - ENGINEERING AND SURVEYING SERVICES - Totals
Awd $44,100.00
2 $90,000.00
3 $59,500.00
4 $76,700.00
5 $54,660.00
6 $74,692.00
Ref #15 100E99010 SPECIAL - PROFESSIONAL LIABILITY INSURANCE, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $1,000.00$1,000.00
3 $1.00$1.00
4 $15,000.00$15,000.00
5 $550.00$550.00
6 $1,100.00$1,100.00
Ref #16 103E99010 SPECIAL - PREMIUM FOR CONTRACT PERFORMANCE BOND AN, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $9,100.00$9,100.00
3 $11,000.00$11,000.00
4 $15,000.00$15,000.00
5 $8,000.00$8,000.00
6 $6,000.00$6,000.00
Ref #17 619E16000 FIELD OFFICE, TYPE A, (3 MNTH)
Awd $3,600.00$1,200.00
2 $13,200.00$4,400.00
3 $2,100.00$700.00
4 $1,500.00$500.00
5 $4,275.00$1,425.00
6 $12,000.00$4,000.00
Ref #18 623E99000 SPECIAL - CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $1,200.00$1,200.00
2 $7,646.60$7,646.60
3 $2,000.00$2,000.00
4 $3,000.00$3,000.00
5 $3,740.00$3,740.00
6 $8,300.00$8,300.00
163016 - Page 410
Ref #19 624E99000 SPECIAL - MOBILIZATION, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $40,000.00$40,000.00
3 $40,000.00$40,000.00
4 $20,000.00$20,000.00
5 $32,000.00$32,000.00
6 $20,000.00$20,000.00
Section 9 - INCIDENTALS - Totals
Awd $37,800.00
2 $70,946.60
3 $55,101.00
4 $54,500.00
5 $48,565.00
6 $47,400.00
163016 - Page 411
Project No. 163017
PID 97850
MAR-CR 138C/MRW TR 129/TR 152 (6-8)
Federal
Type: BRIDGE REPLACEMENT (3 BRIDGES)
Completion Date: 9/15/2017
Award Amount: $1,495,000.00
Contract Awarded To: OHIO BRIDGE CORPORATION
Letting Date: 4/7/2016
Engineer's Estimate: $1,508,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
OHIO BRIDGE CORPORATION
P O BOX 757
CAMBRIDGE, OH 43725
Guernsey
Bidder 1
Bid $1,495,000.00
EAGLE BRIDGE CO
800 S VAN DEMARK RD
SIDNEY, OH 45365
Shelby
Bidder 2
Bid $1,555,502.00
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 3
Bid $1,612,060.00
R & I CONSTRUCTION INC
2931 STATE ROUTE 67 SOUTH
TIFFIN, OH 44883
Seneca
Bidder 4
Bid $1,628,224.00
RIETSCHLIN CONSTRUCTION INC
4240 BAKER RD
CRESTLINE, OH 44827
Crawford
Bidder 5
Bid $1,689,660.86
R G ZACHRICH CONSTRUCTION INC
10105 HALLER ST
DEFIANCE, OH 43512
Defiance
Bidder 6
Bid $1,697,223.00
MOSSER CONSTRUCTION INC
122 S WILSON AVE
FREMONT, OH 43420
Sandusky
Bidder 7
Bid $1,792,050.00
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 8
Bid $1,938,500.00
163017 - Page 412
Ref #1 690E20240 SPECIAL - ROADWAY, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $50,000.00$50,000.00
3 $19,000.00$19,000.00
4 $30,000.00$30,000.00
5 $37,297.00$37,297.00
6 $19,769.00$19,769.00
7 $32,000.00$32,000.00
8 $55,000.00$55,000.00
Section 1 - ROADWAY (PART 1) - Totals
Awd $10,000.00
2 $50,000.00
3 $19,000.00
4 $30,000.00
5 $37,297.00
6 $19,769.00
7 $32,000.00
8 $55,000.00
Ref #2 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $7,500.00$7,500.00
3 $16,000.00$16,000.00
4 $9,000.00$9,000.00
5 $10,542.00$10,542.00
6 $9,826.00$9,826.00
7 $2,000.00$2,000.00
8 $15,000.00$15,000.00
Ref #3 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (1500 EACH)
Awd $1,500.00$1.00
2 $1,500.00$1.00
3 $1,500.00$1.00
4 $1,500.00$1.00
5 $1,500.00$1.00
6 $1,500.00$1.00
7 $1,500.00$1.00
8 $1,500.00$1.00
Section 2 - EROSION CONTROL (PART 1) - Totals
Awd $2,500.00
2 $9,000.00
3 $17,500.00
4 $10,500.00
5 $12,042.00
6 $11,326.00
7 $3,500.00
8 $16,500.00
163017 - Page 413
Ref #4 611E97800 SPECIAL - DRAINAGE, (LUMP SUM)
Awd $100.00$100.00
2 $1,500.00$1,500.00
3 $1,200.00$1,200.00
4 $4,500.00$4,500.00
5 $6,030.00$6,030.00
6 $8,000.00$8,000.00
7 $5,000.00$5,000.00
8 $15,000.00$15,000.00
Section 3 - DRAINAGE (PART 1) - Totals
Awd $100.00
2 $1,500.00
3 $1,200.00
4 $4,500.00
5 $6,030.00
6 $8,000.00
7 $5,000.00
8 $15,000.00
Ref #5 690E20250 SPECIAL - MISC. PAVEMENT:, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $45,000.00$45,000.00
3 $39,000.00$39,000.00
4 $40,000.00$40,000.00
5 $31,629.00$31,629.00
6 $55,269.00$55,269.00
7 $42,000.00$42,000.00
8 $35,000.00$35,000.00
Section 4 - PAVEMENT (PART 1) - Totals
Awd $10,000.00
2 $45,000.00
3 $39,000.00
4 $40,000.00
5 $31,629.00
6 $55,269.00
7 $42,000.00
8 $35,000.00
Ref #6 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $100.00$100.00
2 $250.00$250.00
3 $2,700.00$2,700.00
4 $100.00$100.00
5 $1,335.26$1,335.26
6 $500.00$500.00
7 $1,250.00$1,250.00
8 $500.00$500.00
163017 - Page 414
Section 5 - TRAFFIC CONTROL (PART 1) - Totals
Awd $100.00
2 $250.00
3 $2,700.00
4 $100.00
5 $1,335.26
6 $500.00
7 $1,250.00
8 $500.00
Ref #7 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $3,000.00$3,000.00
3 $8,000.00$8,000.00
4 $5,000.00$5,000.00
5 $6,880.00$6,880.00
6 $6,500.00$6,500.00
7 $5,000.00$5,000.00
8 $5,000.00$5,000.00
Section 6 - MAINTENANCE OF TRAFFIC (PART 1) - Totals
Awd $1,000.00
2 $3,000.00
3 $8,000.00
4 $5,000.00
5 $6,880.00
6 $6,500.00
7 $5,000.00
8 $5,000.00
Ref #8 530E99040 SPECIAL - STRUCTURES, (LUMP SUM)
Awd $200,000.00$200,000.00
2 $210,000.00$210,000.00
3 $165,000.00$165,000.00
4 $271,974.00$271,974.00
5 $261,836.00$261,836.00
6 $293,324.00$293,324.00
7 $290,000.00$290,000.00
8 $475,000.00$475,000.00
Section 7 - STRUCTURE 20 FOOT SPAN AND OVER (MAR-CR1 - Totals
Awd $200,000.00
2 $210,000.00
3 $165,000.00
4 $271,974.00
5 $261,836.00
6 $293,324.00
7 $290,000.00
8 $475,000.00
163017 - Page 415
Ref #9 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $1,200.00$1,200.00
2 $500.00$500.00
3 $1,000.00$1,000.00
4 $2,000.00$2,000.00
5 $1,127.00$1,127.00
6 $1,100.00$1,100.00
7 $2,100.00$2,100.00
8 $500.00$500.00
Ref #10 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $1,600.00$1,600.00
2 $500.00$500.00
3 $106.00$106.00
4 $1,000.00$1,000.00
5 $889.00$889.00
6 $1,800.00$1,800.00
7 $1,500.00$1,500.00
8 $5,000.00$5,000.00
Ref #11 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $1,000.00$1,000.00
3 $1,900.00$1,900.00
4 $2,500.00$2,500.00
5 $3,277.00$3,277.00
6 $4,700.00$4,700.00
7 $4,500.00$4,500.00
8 $4,500.00$4,500.00
Ref #12 690E20200 SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $14,000.00$14,000.00
3 $22,000.00$22,000.00
4 $18,000.00$18,000.00
5 $21,251.00$21,251.00
6 $28,500.00$28,500.00
7 $16,700.00$16,700.00
8 $15,000.00$15,000.00
Ref #13 690E20210 SPECIAL - FINAL PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $13,000.00$13,000.00
3 $10,000.00$10,000.00
4 $9,000.00$9,000.00
5 $6,072.00$6,072.00
6 $12,600.00$12,600.00
7 $15,600.00$15,600.00
8 $20,000.00$20,000.00
Ref #14 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $1,500.00$1,500.00
3 $1.00$1.00
4 $1,000.00$1,000.00
5 $3,036.00$3,036.00
6 $4,200.00$4,200.00
7 $6,000.00$6,000.00
8 $4,000.00$4,000.00
163017 - Page 416
Section 8 - ENGINEERING AND SURVEYING SERVICES (PART - Totals
Awd $62,800.00
2 $30,500.00
3 $35,007.00
4 $33,500.00
5 $35,652.00
6 $52,900.00
7 $46,400.00
8 $49,000.00
Ref #15 690E20240 SPECIAL - ROADWAY, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $60,000.00$60,000.00
3 $53,000.00$53,000.00
4 $20,000.00$20,000.00
5 $43,818.00$43,818.00
6 $35,329.00$35,329.00
7 $28,000.00$28,000.00
8 $65,000.00$65,000.00
Section 9 - ROADWAY (PART 2) - Totals
Awd $10,000.00
2 $60,000.00
3 $53,000.00
4 $20,000.00
5 $43,818.00
6 $35,329.00
7 $28,000.00
8 $65,000.00
Ref #16 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $17,500.00$17,500.00
3 $23,000.00$23,000.00
4 $9,000.00$9,000.00
5 $20,363.50$20,363.50
6 $9,826.00$9,826.00
7 $2,000.00$2,000.00
8 $15,000.00$15,000.00
Ref #17 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (1500 EACH)
Awd $1,500.00$1.00
2 $1,500.00$1.00
3 $1,500.00$1.00
4 $1,500.00$1.00
5 $1,500.00$1.00
6 $1,500.00$1.00
7 $1,500.00$1.00
8 $1,500.00$1.00
163017 - Page 417
Section 10 - EROSION CONTROL (PART 2) - Totals
Awd $2,500.00
2 $19,000.00
3 $24,500.00
4 $10,500.00
5 $21,863.50
6 $11,326.00
7 $3,500.00
8 $16,500.00
Ref #18 611E97800 SPECIAL - DRAINAGE, (LUMP SUM)
Awd $100.00$100.00
2 $3,500.00$3,500.00
3 $4,500.00$4,500.00
4 $1,000.00$1,000.00
5 $1.00$1.00
6 $1,000.00$1,000.00
7 $10,000.00$10,000.00
8 $500.00$500.00
Section 11 - DRAINAGE (PART 2) - Totals
Awd $100.00
2 $3,500.00
3 $4,500.00
4 $1,000.00
5 $1.00
6 $1,000.00
7 $10,000.00
8 $500.00
Ref #19 690E20250 SPECIAL - MISC. PAVEMENT:, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $47,500.00$47,500.00
3 $36,000.00$36,000.00
4 $40,000.00$40,000.00
5 $21,504.50$21,504.50
6 $35,414.00$35,414.00
7 $38,000.00$38,000.00
8 $35,000.00$35,000.00
Section 12 - PAVEMENT (PART 2) - Totals
Awd $10,000.00
2 $47,500.00
3 $36,000.00
4 $40,000.00
5 $21,504.50
6 $35,414.00
7 $38,000.00
8 $35,000.00
163017 - Page 418
Ref #20 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $100.00$100.00
2 $1.00$1.00
3 $2,000.00$2,000.00
4 $100.00$100.00
5 $1,510.00$1,510.00
6 $500.00$500.00
7 $1,250.00$1,250.00
8 $500.00$500.00
Section 13 - TRAFFIC CONTROL (PART 2) - Totals
Awd $100.00
2 $1.00
3 $2,000.00
4 $100.00
5 $1,510.00
6 $500.00
7 $1,250.00
8 $500.00
Ref #21 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $3,000.00$3,000.00
3 $10,000.00$10,000.00
4 $5,000.00$5,000.00
5 $4,682.00$4,682.00
6 $6,500.00$6,500.00
7 $5,000.00$5,000.00
8 $5,000.00$5,000.00
Section 14 - MAINTENANCE OF TRAFFIC (PART 2) - Totals
Awd $1,000.00
2 $3,000.00
3 $10,000.00
4 $5,000.00
5 $4,682.00
6 $6,500.00
7 $5,000.00
8 $5,000.00
Ref #22 530E99040 SPECIAL - STRUCTURES, (LUMP SUM)
Awd $350,000.00$350,000.00
2 $374,000.00$374,000.00
3 $400,000.00$400,000.00
4 $432,079.00$432,079.00
5 $390,892.50$390,892.50
6 $446,347.00$446,347.00
7 $485,000.00$485,000.00
8 $300,000.00$300,000.00
163017 - Page 419
Section 15 - STRUCTURE 20 FOOT SPAN AND OVER (MRW-TR1 - Totals
Awd $350,000.00
2 $374,000.00
3 $400,000.00
4 $432,079.00
5 $390,892.50
6 $446,347.00
7 $485,000.00
8 $300,000.00
Ref #23 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $1,200.00$1,200.00
2 $500.00$500.00
3 $525.00$525.00
4 $1,000.00$1,000.00
5 $1,127.00$1,127.00
6 $1,100.00$1,100.00
7 $2,100.00$2,100.00
8 $500.00$500.00
Ref #24 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $1,600.00$1,600.00
2 $500.00$500.00
3 $100.00$100.00
4 $1,000.00$1,000.00
5 $889.00$889.00
6 $1,800.00$1,800.00
7 $1,500.00$1,500.00
8 $5,000.00$5,000.00
Ref #25 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $1,000.00$1,000.00
3 $1,900.00$1,900.00
4 $2,500.00$2,500.00
5 $3,277.00$3,277.00
6 $4,700.00$4,700.00
7 $4,500.00$4,500.00
8 $4,500.00$4,500.00
Ref #26 690E20200 SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $18,000.00$18,000.00
3 $26,000.00$26,000.00
4 $23,500.00$23,500.00
5 $26,110.00$26,110.00
6 $28,500.00$28,500.00
7 $16,700.00$16,700.00
8 $15,000.00$15,000.00
163017 - Page 420
Ref #27 690E20210 SPECIAL - FINAL PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $16,000.00$16,000.00
3 $15,000.00$15,000.00
4 $12,500.00$12,500.00
5 $7,461.00$7,461.00
6 $12,600.00$12,600.00
7 $15,600.00$15,600.00
8 $20,000.00$20,000.00
Ref #28 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $2,000.00$2,000.00
3 $100.00$100.00
4 $1,000.00$1,000.00
5 $3,731.00$3,731.00
6 $4,200.00$4,200.00
7 $6,000.00$6,000.00
8 $4,000.00$4,000.00
Section 16 - ENGINEERING AND SURVEYING SERVICES (PART - Totals
Awd $62,800.00
2 $38,000.00
3 $43,625.00
4 $41,500.00
5 $42,595.00
6 $52,900.00
7 $46,400.00
8 $49,000.00
Ref #29 690E20240 SPECIAL - ROADWAY, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $55,000.00$55,000.00
3 $56,000.00$56,000.00
4 $22,000.00$22,000.00
5 $40,100.00$40,100.00
6 $28,660.00$28,660.00
7 $48,000.00$48,000.00
8 $70,000.00$70,000.00
Section 17 - ROADWAY (PART 3) - Totals
Awd $10,000.00
2 $55,000.00
3 $56,000.00
4 $22,000.00
5 $40,100.00
6 $28,660.00
7 $48,000.00
8 $70,000.00
163017 - Page 421
Ref #30 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $11,500.00$11,500.00
3 $23,000.00$23,000.00
4 $9,000.00$9,000.00
5 $7,626.00$7,626.00
6 $9,826.00$9,826.00
7 $2,000.00$2,000.00
8 $15,000.00$15,000.00
Ref #31 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (1500 EACH)
Awd $1,500.00$1.00
2 $1,500.00$1.00
3 $1,500.00$1.00
4 $1,500.00$1.00
5 $1,500.00$1.00
6 $1,500.00$1.00
7 $1,500.00$1.00
8 $1,500.00$1.00
Section 18 - EROSION CONTROL (PART 3) - Totals
Awd $2,500.00
2 $13,000.00
3 $24,500.00
4 $10,500.00
5 $9,126.00
6 $11,326.00
7 $3,500.00
8 $16,500.00
Ref #32 611E97800 SPECIAL - DRAINAGE, (LUMP SUM)
Awd $100.00$100.00
2 $1,250.00$1,250.00
3 $4,000.00$4,000.00
4 $100.00$100.00
5 $1.00$1.00
6 $1,000.00$1,000.00
7 $14,000.00$14,000.00
8 $500.00$500.00
Section 19 - DRAINAGE (PART 3) - Totals
Awd $100.00
2 $1,250.00
3 $4,000.00
4 $100.00
5 $1.00
6 $1,000.00
7 $14,000.00
8 $500.00
163017 - Page 422
Ref #33 690E20250 SPECIAL - MISC. PAVEMENT:, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $50,000.00$50,000.00
3 $38,500.00$38,500.00
4 $40,000.00$40,000.00
5 $28,607.00$28,607.00
6 $40,326.00$40,326.00
7 $45,000.00$45,000.00
8 $35,000.00$35,000.00
Section 20 - PAVEMENT (PART 3) - Totals
Awd $10,000.00
2 $50,000.00
3 $38,500.00
4 $40,000.00
5 $28,607.00
6 $40,326.00
7 $45,000.00
8 $35,000.00
Ref #34 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $100.00$100.00
2 $1.00$1.00
3 $1,100.00$1,100.00
4 $100.00$100.00
5 $1,701.60$1,701.60
6 $500.00$500.00
7 $1,250.00$1,250.00
8 $500.00$500.00
Section 21 - TRAFFIC CONTROL (PART 3) - Totals
Awd $100.00
2 $1.00
3 $1,100.00
4 $100.00
5 $1,701.60
6 $500.00
7 $1,250.00
8 $500.00
Ref #35 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $3,000.00$3,000.00
3 $4,200.00$4,200.00
4 $5,000.00$5,000.00
5 $5,412.00$5,412.00
6 $6,500.00$6,500.00
7 $5,000.00$5,000.00
8 $5,000.00$5,000.00
163017 - Page 423
Section 22 - MAINTENANCE OF TRAFFIC (PART 3) - Totals
Awd $1,000.00
2 $3,000.00
3 $4,200.00
4 $5,000.00
5 $5,412.00
6 $6,500.00
7 $5,000.00
8 $5,000.00
Ref #36 530E99040 SPECIAL - STRUCTURES, (LUMP SUM)
Awd $589,500.00$589,500.00
2 $415,000.00$415,000.00
3 $475,000.00$475,000.00
4 $459,270.00$459,270.00
5 $517,696.50$517,696.50
6 $423,342.00$423,342.00
7 $515,000.00$515,000.00
8 $530,000.00$530,000.00
Section 23 - STRUCTURE 20 FOOT SPAN AND OVER (MRW-TR1 - Totals
Awd $589,500.00
2 $415,000.00
3 $475,000.00
4 $459,270.00
5 $517,696.50
6 $423,342.00
7 $515,000.00
8 $530,000.00
Ref #37 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $1,200.00$1,200.00
2 $500.00$500.00
3 $528.00$528.00
4 $1,000.00$1,000.00
5 $1,127.00$1,127.00
6 $1,100.00$1,100.00
7 $2,100.00$2,100.00
8 $500.00$500.00
Ref #38 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $1,600.00$1,600.00
2 $500.00$500.00
3 $100.00$100.00
4 $1,000.00$1,000.00
5 $889.00$889.00
6 $1,800.00$1,800.00
7 $1,500.00$1,500.00
8 $5,000.00$5,000.00
163017 - Page 424
Ref #39 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $1,000.00$1,000.00
3 $1,900.00$1,900.00
4 $2,500.00$2,500.00
5 $3,277.00$3,277.00
6 $4,700.00$4,700.00
7 $4,500.00$4,500.00
8 $4,500.00$4,500.00
Ref #40 690E20200 SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $18,000.00$18,000.00
3 $29,000.00$29,000.00
4 $23,500.00$23,500.00
5 $26,110.00$26,110.00
6 $28,500.00$28,500.00
7 $15,700.00$15,700.00
8 $15,000.00$15,000.00
Ref #41 690E20210 SPECIAL - FINAL PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $17,000.00$17,000.00
3 $16,000.00$16,000.00
4 $12,500.00$12,500.00
5 $7,461.00$7,461.00
6 $12,600.00$12,600.00
7 $14,700.00$14,700.00
8 $20,000.00$20,000.00
Ref #42 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $2,000.00$2,000.00
3 $100.00$100.00
4 $1,000.00$1,000.00
5 $3,731.00$3,731.00
6 $4,200.00$4,200.00
7 $5,500.00$5,500.00
8 $3,500.00$3,500.00
Section 24 - ENGINEERING AND SURVEYING SERVICES (PART - Totals
Awd $62,800.00
2 $39,000.00
3 $47,628.00
4 $41,500.00
5 $42,595.00
6 $52,900.00
7 $44,000.00
8 $48,500.00
163017 - Page 425
Ref #43 100E99010 SPECIAL - PROFESSIONAL LIABILITY INSURANCE(PART 1,, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $5,000.00$5,000.00
3 $100.00$100.00
4 $1.00$1.00
5 $1,650.00$1,650.00
6 $5,000.00$5,000.00
7 $1,000.00$1,000.00
8 $5,000.00$5,000.00
Ref #44 103E99010 SPECIAL - PREMIUM FOR CONTRACT PERFORMANCE BOND AN, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $20,000.00$20,000.00
3 $10,000.00$10,000.00
4 $22,500.00$22,500.00
5 $17,283.00$17,283.00
6 $24,000.00$24,000.00
7 $17,000.00$17,000.00
8 $30,000.00$30,000.00
Ref #45 619E99000 SPECIAL - FIELD OFFICE(PART 1, 2 AND 3), (LUMP SUM)
Awd $1,000.00$1,000.00
2 $7,500.00$7,500.00
3 $25,000.00$25,000.00
4 $3,500.00$3,500.00
5 $11,600.00$11,600.00
6 $8,400.00$8,400.00
7 $10,000.00$10,000.00
8 $25,000.00$25,000.00
Ref #46 623E99000 SPECIAL - CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $12,500.00$12,500.00
3 $25,000.00$25,000.00
4 $8,000.00$8,000.00
5 $11,121.00$11,121.00
6 $10,365.00$10,365.00
7 $6,000.00$6,000.00
8 $10,000.00$10,000.00
Ref #47 624E99000 SPECIAL - MOBILIZATION(PART 1, 2 AND 3), (LUMP SUM)
Awd $40,000.00$40,000.00
2 $40,000.00$40,000.00
3 $40,000.00$40,000.00
4 $70,000.00$70,000.00
5 $83,200.00$83,200.00
6 $48,000.00$48,000.00
7 $40,000.00$40,000.00
8 $40,000.00$40,000.00
163017 - Page 426
Section 25 - INCIDENTALS - Totals
Awd $96,000.00
2 $85,000.00
3 $100,100.00
4 $104,001.00
5 $124,854.00
6 $95,765.00
7 $74,000.00
8 $110,000.00
163017 - Page 427
Project No. 163018
PID 97630
MRW-TR 82/TR 175/CR 180 (6-7)
Federal
Type: BRIDGE REPLACEMENT (3 BRIDGES)
Completion Date: 7/1/2017
Award Amount: $1,367,162.00
Contract Awarded To: CRAWFORD CONSTRUCTION COMPANY INC
Letting Date: 4/7/2016
Engineer's Estimate: $1,372,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
CRAWFORD CONSTRUCTION COMPANY INC
782 CHARLES ST
GALION, OH 44833-0148
Bidder 1
Bid $1,367,162.00
R & I CONSTRUCTION INC
2931 STATE ROUTE 67 SOUTH
TIFFIN, OH 44883
Seneca
Bidder 2
Bid $1,422,177.00
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 3
Bid $1,439,901.00
OHIO BRIDGE CORPORATION
P O BOX 757
CAMBRIDGE, OH 43725
Guernsey
Bidder 4
Bid $1,535,400.00
MOSSER CONSTRUCTION INC
122 S WILSON AVE
FREMONT, OH 43420
Sandusky
Bidder 5
Bid $1,639,800.00
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 6
Bid $1,887,150.00
163018 - Page 428
Ref #1 690E20240 SPECIAL - ROADWAY, (LUMP SUM)
Awd $54,750.00$54,750.00
2 $24,000.00$24,000.00
3 $50,000.00$50,000.00
4 $10,000.00$10,000.00
5 $32,000.00$32,000.00
6 $40,000.00$40,000.00
Section 1 - ROADWAY (PART 1) - Totals
Awd $54,750.00
2 $24,000.00
3 $50,000.00
4 $10,000.00
5 $32,000.00
6 $40,000.00
Ref #2 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $19,027.00$19,027.00
2 $9,000.00$9,000.00
3 $25,000.00$25,000.00
4 $1,000.00$1,000.00
5 $3,500.00$3,500.00
6 $4,000.00$4,000.00
Ref #3 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (1500 EACH)
Awd $1,500.00$1.00
2 $1,500.00$1.00
3 $1,500.00$1.00
4 $1,500.00$1.00
5 $1,500.00$1.00
6 $1,500.00$1.00
Section 2 - EROSION CONTROL (PART 1) - Totals
Awd $20,527.00
2 $10,500.00
3 $26,500.00
4 $2,500.00
5 $5,000.00
6 $5,500.00
Ref #4 611E97800 SPECIAL - DRAINAGE, (LUMP SUM)
Awd $1,168.00$1,168.00
2 $100.00$100.00
3 $5,000.00$5,000.00
4 $100.00$100.00
5 $500.00$500.00
6 $1,500.00$1,500.00
163018 - Page 429
Section 3 - DRAINAGE (PART 1) - Totals
Awd $1,168.00
2 $100.00
3 $5,000.00
4 $100.00
5 $500.00
6 $1,500.00
Ref #5 690E20250 SPECIAL - MISC. PAVEMENT:, (LUMP SUM)
Awd $72,025.00$72,025.00
2 $35,000.00$35,000.00
3 $38,000.00$38,000.00
4 $10,000.00$10,000.00
5 $16,100.00$16,100.00
6 $35,000.00$35,000.00
Section 4 - PAVEMENT (PART 1) - Totals
Awd $72,025.00
2 $35,000.00
3 $38,000.00
4 $10,000.00
5 $16,100.00
6 $35,000.00
Ref #6 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $500.00$500.00
2 $100.00$100.00
3 $1,000.00$1,000.00
4 $100.00$100.00
5 $500.00$500.00
6 $330.00$330.00
Section 5 - TRAFFIC CONTROL (PART 1) - Totals
Awd $500.00
2 $100.00
3 $1,000.00
4 $100.00
5 $500.00
6 $330.00
Ref #7 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $5,200.00$5,200.00
2 $4,000.00$4,000.00
3 $5,000.00$5,000.00
4 $1,000.00$1,000.00
5 $4,000.00$4,000.00
6 $6,000.00$6,000.00
163018 - Page 430
Section 6 - MAINTENANCE OF TRAFFIC (PART 1) - Totals
Awd $5,200.00
2 $4,000.00
3 $5,000.00
4 $1,000.00
5 $4,000.00
6 $6,000.00
Ref #8 530E99040 SPECIAL - STRUCTURES, (LUMP SUM)
Awd $272,154.00$272,154.00
2 $316,370.00$316,370.00
3 $258,000.00$258,000.00
4 $500,000.00$500,000.00
5 $375,000.00$375,000.00
6 $445,000.00$445,000.00
Section 7 - STRUCTURE 20 FOOT SPAN AND OVER (MRW-TR - Totals
Awd $272,154.00
2 $316,370.00
3 $258,000.00
4 $500,000.00
5 $375,000.00
6 $445,000.00
Ref #9 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $1,000.00$1,000.00
3 $1,100.00$1,100.00
4 $1,200.00$1,200.00
5 $1,100.00$1,100.00
6 $1,600.00$1,600.00
Ref #10 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $1,000.00$1,000.00
3 $100.00$100.00
4 $1,600.00$1,600.00
5 $1,800.00$1,800.00
6 $2,800.00$2,800.00
Ref #11 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $2,500.00$2,500.00
3 $2,500.00$2,500.00
4 $5,000.00$5,000.00
5 $4,700.00$4,700.00
6 $6,400.00$6,400.00
Ref #12 690E20200 SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $24,000.00$24,000.00
2 $20,000.00$20,000.00
3 $32,000.00$32,000.00
4 $30,000.00$30,000.00
5 $27,500.00$27,500.00
6 $20,200.00$20,200.00
163018 - Page 431
Ref #13 690E20210 SPECIAL - FINAL PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $11,000.00$11,000.00
2 $10,000.00$10,000.00
3 $10,000.00$10,000.00
4 $15,000.00$15,000.00
5 $12,600.00$12,600.00
6 $14,800.00$14,800.00
Ref #14 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $1,000.00$1,000.00
3 $10,000.00$10,000.00
4 $10,000.00$10,000.00
5 $4,200.00$4,200.00
6 $8,000.00$8,000.00
Section 8 - ENGINEERING AND SURVEYING SERVICES (PART - Totals
Awd $50,000.00
2 $35,500.00
3 $55,700.00
4 $62,800.00
5 $51,900.00
6 $53,800.00
Ref #15 690E20240 SPECIAL - ROADWAY, (LUMP SUM)
Awd $54,550.00$54,550.00
2 $23,000.00$23,000.00
3 $45,000.00$45,000.00
4 $10,000.00$10,000.00
5 $35,000.00$35,000.00
6 $35,000.00$35,000.00
Section 9 - ROADWAY (PART 2) - Totals
Awd $54,550.00
2 $23,000.00
3 $45,000.00
4 $10,000.00
5 $35,000.00
6 $35,000.00
Ref #16 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $16,310.00$16,310.00
2 $9,000.00$9,000.00
3 $25,000.00$25,000.00
4 $1,000.00$1,000.00
5 $3,500.00$3,500.00
6 $4,000.00$4,000.00
Ref #17 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (1500 EACH)
Awd $1,500.00$1.00
2 $1,500.00$1.00
3 $1,500.00$1.00
4 $1,500.00$1.00
5 $1,500.00$1.00
6 $1,500.00$1.00
163018 - Page 432
Section 10 - EROSION CONTROL (PART 2) - Totals
Awd $17,810.00
2 $10,500.00
3 $26,500.00
4 $2,500.00
5 $5,000.00
6 $5,500.00
Ref #18 611E97800 SPECIAL - DRAINAGE, (LUMP SUM)
Awd $1,088.00$1,088.00
2 $1,000.00$1,000.00
3 $5,000.00$5,000.00
4 $100.00$100.00
5 $500.00$500.00
6 $1,500.00$1,500.00
Section 11 - DRAINAGE (PART 2) - Totals
Awd $1,088.00
2 $1,000.00
3 $5,000.00
4 $100.00
5 $500.00
6 $1,500.00
Ref #19 690E20250 SPECIAL - MISC. PAVEMENT:, (LUMP SUM)
Awd $29,852.00$29,852.00
2 $35,000.00$35,000.00
3 $35,000.00$35,000.00
4 $10,000.00$10,000.00
5 $20,000.00$20,000.00
6 $30,000.00$30,000.00
Section 12 - PAVEMENT (PART 2) - Totals
Awd $29,852.00
2 $35,000.00
3 $35,000.00
4 $10,000.00
5 $20,000.00
6 $30,000.00
Ref #20 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $500.00$500.00
2 $100.00$100.00
3 $1,000.00$1,000.00
4 $100.00$100.00
5 $500.00$500.00
6 $185.00$185.00
163018 - Page 433
Section 13 - TRAFFIC CONTROL (PART 2) - Totals
Awd $500.00
2 $100.00
3 $1,000.00
4 $100.00
5 $500.00
6 $185.00
Ref #21 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $5,200.00$5,200.00
2 $4,000.00$4,000.00
3 $4,500.00$4,500.00
4 $1,000.00$1,000.00
5 $4,000.00$4,000.00
6 $6,000.00$6,000.00
Section 14 - MAINTENANCE OF TRAFFIC (PART 2) - Totals
Awd $5,200.00
2 $4,000.00
3 $4,500.00
4 $1,000.00
5 $4,000.00
6 $6,000.00
Ref #22 530E99040 SPECIAL - STRUCTURES, (LUMP SUM)
Awd $158,546.00$158,546.00
2 $322,685.00$322,685.00
3 $265,000.00$265,000.00
4 $400,000.00$400,000.00
5 $365,000.00$365,000.00
6 $400,000.00$400,000.00
Section 15 - STRUCTURE 20 FOOT SPAN AND OVER (MRW TR - Totals
Awd $158,546.00
2 $322,685.00
3 $265,000.00
4 $400,000.00
5 $365,000.00
6 $400,000.00
Ref #23 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $1,000.00$1,000.00
3 $1,100.00$1,100.00
4 $1,200.00$1,200.00
5 $1,100.00$1,100.00
6 $2,500.00$2,500.00
163018 - Page 434
Ref #24 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $1,000.00$1,000.00
3 $100.00$100.00
4 $1,600.00$1,600.00
5 $1,800.00$1,800.00
6 $3,200.00$3,200.00
Ref #25 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $2,500.00$2,500.00
3 $2,000.00$2,000.00
4 $5,000.00$5,000.00
5 $4,700.00$4,700.00
6 $6,400.00$6,400.00
Ref #26 690E20200 SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $24,000.00$24,000.00
2 $20,500.00$20,500.00
3 $31,000.00$31,000.00
4 $30,000.00$30,000.00
5 $27,500.00$27,500.00
6 $20,200.00$20,200.00
Ref #27 690E20210 SPECIAL - FINAL PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $11,000.00$11,000.00
2 $10,500.00$10,500.00
3 $10,000.00$10,000.00
4 $15,000.00$15,000.00
5 $12,600.00$12,600.00
6 $16,200.00$16,200.00
Ref #28 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $1,000.00$1,000.00
3 $1,100.00$1,100.00
4 $10,000.00$10,000.00
5 $4,200.00$4,200.00
6 $8,240.00$8,240.00
Section 16 - ENGINEERING AND SURVEYING SERVICES (PART - Totals
Awd $50,000.00
2 $36,500.00
3 $45,300.00
4 $62,800.00
5 $51,900.00
6 $56,740.00
Ref #29 690E20240 SPECIAL - ROADWAY, (LUMP SUM)
Awd $66,300.00$66,300.00
2 $25,000.00$25,000.00
3 $47,000.00$47,000.00
4 $10,000.00$10,000.00
5 $37,000.00$37,000.00
6 $39,000.00$39,000.00
163018 - Page 435
Section 17 - ROADWAY (PART 3) - Totals
Awd $66,300.00
2 $25,000.00
3 $47,000.00
4 $10,000.00
5 $37,000.00
6 $39,000.00
Ref #30 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $14,827.00$14,827.00
2 $9,000.00$9,000.00
3 $24,000.00$24,000.00
4 $1,000.00$1,000.00
5 $3,500.00$3,500.00
6 $4,000.00$4,000.00
Ref #31 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (1500 EACH)
Awd $1,500.00$1.00
2 $1,500.00$1.00
3 $1,500.00$1.00
4 $1,500.00$1.00
5 $1,500.00$1.00
6 $1,500.00$1.00
Section 18 - EROSION CONTROL (PART 3) - Totals
Awd $16,327.00
2 $10,500.00
3 $25,500.00
4 $2,500.00
5 $5,000.00
6 $5,500.00
Ref #32 611E97800 SPECIAL - DRAINAGE, (LUMP SUM)
Awd $1,256.00$1,256.00
2 $100.00$100.00
3 $4,100.00$4,100.00
4 $100.00$100.00
5 $500.00$500.00
6 $1,500.00$1,500.00
Section 19 - DRAINAGE (PART 3) - Totals
Awd $1,256.00
2 $100.00
3 $4,100.00
4 $100.00
5 $500.00
6 $1,500.00
163018 - Page 436
Ref #33 690E20250 SPECIAL - MISC. PAVEMENT:, (LUMP SUM)
Awd $27,912.00$27,912.00
2 $35,000.00$35,000.00
3 $37,000.00$37,000.00
4 $10,000.00$10,000.00
5 $26,000.00$26,000.00
6 $30,000.00$30,000.00
Section 20 - PAVEMENT (PART 3) - Totals
Awd $27,912.00
2 $35,000.00
3 $37,000.00
4 $10,000.00
5 $26,000.00
6 $30,000.00
Ref #34 630E99000 SPECIAL - SIGNS AND SUPPORTS, (LUMP SUM)
Awd $400.00$400.00
2 $100.00$100.00
3 $1,000.00$1,000.00
4 $100.00$100.00
5 $500.00$500.00
6 $495.00$495.00
Section 21 - TRAFFIC CONTROL (PART 3) - Totals
Awd $400.00
2 $100.00
3 $1,000.00
4 $100.00
5 $500.00
6 $495.00
Ref #35 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $5,200.00$5,200.00
2 $4,000.00$4,000.00
3 $5,000.00$5,000.00
4 $1,000.00$1,000.00
5 $4,000.00$4,000.00
6 $6,000.00$6,000.00
Section 22 - MAINTENANCE OF TRAFFIC (PART 3) - Totals
Awd $5,200.00
2 $4,000.00
3 $5,000.00
4 $1,000.00
5 $4,000.00
6 $6,000.00
163018 - Page 437
Ref #36 530E99040 SPECIAL - STRUCTURES, (LUMP SUM)
Awd $319,262.00$319,262.00
2 $347,121.00$347,121.00
3 $315,000.00$315,000.00
4 $276,500.00$276,500.00
5 $470,000.00$470,000.00
6 $530,000.00$530,000.00
Section 23 - STRUCTURE 20 FOOT SPAN AND OVER (MRW-CR - Totals
Awd $319,262.00
2 $347,121.00
3 $315,000.00
4 $276,500.00
5 $470,000.00
6 $530,000.00
Ref #37 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $1,000.00$1,000.00
3 $1,100.00$1,100.00
4 $1,200.00$1,200.00
5 $1,100.00$1,100.00
6 $1,600.00$1,600.00
Ref #38 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $1,000.00$1,000.00
3 $100.00$100.00
4 $5,000.00$5,000.00
5 $1,800.00$1,800.00
6 $4,400.00$4,400.00
Ref #39 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $2,500.00$2,500.00
3 $2,000.00$2,000.00
4 $5,000.00$5,000.00
5 $4,700.00$4,700.00
6 $6,400.00$6,400.00
Ref #40 690E20200 SPECIAL - PRELIMINARY PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $34,000.00$34,000.00
2 $23,000.00$23,000.00
3 $31,000.00$31,000.00
4 $30,000.00$30,000.00
5 $27,500.00$27,500.00
6 $26,400.00$26,400.00
Ref #41 690E20210 SPECIAL - FINAL PLANS FOR DESIGN-BUILD, (LUMP SUM)
Awd $11,000.00$11,000.00
2 $12,500.00$12,500.00
3 $10,000.00$10,000.00
4 $15,000.00$15,000.00
5 $12,600.00$12,600.00
6 $18,200.00$18,200.00
163018 - Page 438
Ref #42 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $1,000.00$1,000.00
3 $1,100.00$1,100.00
4 $10,000.00$10,000.00
5 $4,200.00$4,200.00
6 $8,600.00$8,600.00
Section 24 - ENGINEERING AND SURVEYING SERVICES (PART - Totals
Awd $60,000.00
2 $41,000.00
3 $45,300.00
4 $66,200.00
5 $51,900.00
6 $65,600.00
Ref #43 100E99010 SPECIAL - PROFESSIONAL LIABILITY INSURANCE(PART 1,, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $1.00$1.00
3 $1.00$1.00
4 $25,000.00$25,000.00
5 $1,000.00$1,000.00
6 $1,000.00$1,000.00
Ref #44 103E99010 SPECIAL - PREMIUM FOR CONTRACT PERFORMANCE BOND AN, (LUMP SUM)
Awd $9,895.00$9,895.00
2 $20,000.00$20,000.00
3 $9,500.00$9,500.00
4 $25,000.00$25,000.00
5 $12,000.00$12,000.00
6 $20,000.00$20,000.00
Ref #45 619E99000 SPECIAL - FIELD OFFICE(PART 1, 2 AND 3), (LUMP SUM)
Awd $15,500.00$15,500.00
2 $3,000.00$3,000.00
3 $19,000.00$19,000.00
4 $1,000.00$1,000.00
5 $10,000.00$10,000.00
6 $13,000.00$13,000.00
Ref #46 623E99000 SPECIAL - CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $6,240.00$6,240.00
2 $8,000.00$8,000.00
3 $25,000.00$25,000.00
4 $5,000.00$5,000.00
5 $15,000.00$15,000.00
6 $13,000.00$13,000.00
Ref #47 624E99000 SPECIAL - MOBILIZATION(PART 1, 2 AND 3), (LUMP SUM)
Awd $39,000.00$39,000.00
2 $70,000.00$70,000.00
3 $40,000.00$40,000.00
4 $40,000.00$40,000.00
5 $40,000.00$40,000.00
6 $40,000.00$40,000.00
163018 - Page 439
Section 25 - INCIDENTALS - Totals
Awd $76,635.00
2 $101,001.00
3 $93,501.00
4 $96,000.00
5 $78,000.00
6 $87,000.00
163018 - Page 440
Project No. 168005
PID 98733
D11-USBR 50-SIGN
Federal
Type: SIGNING
Completion Date: 9/30/2016
Award Amount: $92,980.00
Contract Awarded To: LAKE ERIE CONSTRUCTION COMPANY
Letting Date: 4/7/2016
Engineer's Estimate: $201,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jerry Wray, Director
LAKE ERIE CONSTRUCTION COMPANY
25 NORWALD ROAD
NORWALK, OH 44857
Huron
Bidder 1
Bid $92,980.00
M P DORY CO
2001 INTEGRITY DR SOUTH
COLUMBUS, OH 43209
Franklin
Bidder 2
Bid $121,840.00
PDK CONSTRUCTION INC
34070 CREW RD P O BOX 683
POMEROY, OH 45769
Meigs
Bidder 3
Bid $127,036.50
DBI SERVICES LLC
100 N CONAHAN DR
HAZELETON, PA 18201
Bidder 4
Bid $209,828.00
168005 - Page 441
Ref #1 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
Section 1 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
4 $1,000.00
Ref #2 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (5026 FT)
Awd $62,825.00$12.50
2 $75,390.00$15.00
3 $95,494.00$19.00
4 $125,650.00$25.00
Ref #3 630E80100 SIGN, FLAT SHEET, (1147.5 SF)
Awd $18,360.00$16.00
2 $22,950.00$20.00
3 $26,392.50$23.00
4 $45,900.00$40.00
Section 2 - TRAFFIC CONTROL - Totals
Awd $81,185.00
2 $98,340.00
3 $121,886.50
4 $171,550.00
Ref #4 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $695.00$695.00
2 $1,000.00$1,000.00
3 $950.00$950.00
4 $4,000.00$4,000.00
Ref #5 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $5,150.00$5,150.00
2 $1,500.00$1,500.00
3 $2,500.00$2,500.00
4 $500.00$500.00
Ref #6 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $450.00$450.00
2 $10,000.00$10,000.00
3 $200.00$200.00
4 $32,278.00$32,278.00
Ref #7 624E10000 MOBILIZATION, (LUMP SUM)
Awd $4,500.00$4,500.00
2 $10,000.00$10,000.00
3 $500.00$500.00
4 $500.00$500.00
168005 - Page 442
Section 3 - INCIDENTALS - Totals
Awd $10,795.00
2 $22,500.00
3 $4,150.00
4 $37,278.00
168005 - Page 443