Metrolinx and the TTC invite you to participate in an online consultation to learn about a number of new developments and improvements for the project and to share your input on preliminary plans for the Western Alignment and Vehicle Maintenance and Storage Facility for Keele Street to Jane Street. Have your say at thecrosstown.ca.

TRANSCRIPT

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

1

Welcome to the OnlineConsultationWestern Alignment & Vehicle Maintenance & Storage Facility Update

Please review the presentation and complete the survey by July 10, 2012.

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

1

Format for Feedback•Pleasecompletetheonlinesurveyatwww.thecrosstown.caby

July 10, 2012

•Aconsultationreporttoinformthedesignerswillbepostedonline at: www.thecrosstown.ca

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

2

Online Consultation Overview Part 1 •CrosstownBackground,KeyDevelopments&ConstructionUpdate

Part 2•NewKeeleStreettoWestonRoadRouting–PreliminaryPlanning

Part 3•VehicleFacility–PreliminaryPlanning

*MetrolinxisbeginningtheMountDennisMobilityHubStudyfortheareaaround the station.

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

3

The Purpose of this Online Consultation

•Provideabriefprojectupdate•Presentproposedchanges&improvementstothealignmentfromKeeleStreettoWestonRoad

•ProvideanoverviewoftheMaintenanceandStorageFacilitylayout&challenges

Most importantly: • Get your input on the Preliminary Planning early in this process. A second community consultation will be held in Fall, 2012

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

4

Presentation Part 1: CrosstownBackground,KeyDevelopments&Construction Update

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

5

What was determined in 2010 KeeletoJaneSectionAstreet-levelLRTalignmentonthefollowingpanelwasapprovedthroughastudy(TransitProjectAssessment)in2010.

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

6

2010Alignment(StreetLevel)

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

7

Whatweheardin2009–2010 Community Concerns were raised during the previous study. The new study will address these:

•TrafficconcernsatBlackCreekDrive

•PedestrianCrossingsatWestonRoad

•PropertyimpactsinthevicinityofWestonRoad

•PlanforCrosstownconnectiontoGOTransit

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

8

KeyProjectDevelopmentssince2010• Anoff-street(elevated) route is now proposed from a portal west ofKeeleStreettoBlackCreek

• UndergroundLRTisnowproposedfromBlackCreektoWestonRoad

• An underground“WestonRd/MtDennisStation”isnowproposed,justeastofWestonRoad

• Protecting for future GO Transit connection

•PreliminaryplansaredevelopingtoretainKodakBuilding

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

9

ProposedNewRouteAlignment–2012•ThisprojectincludesconstructiontoWestonRd/MtDennis

Station to be complete in 2020

•ThetimingandconstructionmethodforWestonRoadtoJaneStreetisTBDthroughfurtherstudy

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

10

PotentialBenefitsoftheNewLRTRouteProposal

•ImproveaccesstotheproposedVehicleMaintenanceandStorageFacility(MSF)• BuildanewundergroundLRTstationnearWestonRoad• Improve pedestrian connections at the newly proposed Station• ProvideanewbusterminalforconnectiontoproposedWestonRoad/MountDennisStation

• PreservetheformerKodakEmployeesBuildingforfuturere-development• ProtectforafutureGOTransittoCrosstownLRTconnection

A new study will now assess the pros and cons of the design changes and identify measurestomitigateanyimpactssuchasthoserelatedto“WestonRd/MtDennis”Station.

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

11

TheEglintonCrosstownPlan2012

•19kmRapidTransitLine(Jane/BlackCreekDrivetoKennedyStation)

•10kmUndergroundTunnel(KeeleAreatoLairdDrive*)

•SRTReplacement,Enhancement&ExtensionfromKennedyStationtoSheppardAvenueEast

•60% faster than bus service today

*ExactalignmentwestofKeeleStreetTBDthroughthisstudy

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

12

TheCrosstown–2012*FinalnumberandlocationofstationssubjecttoProvincialreview

•60%fasterthancurrent bus routes

•15minutesfromKeeleto Yonge

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

13

Implementation•TheKeeletoWestonRd/MtDennis

Station segment is part of the ProvinceofOntario’s$8.4Billioninvestment for Transit expansion in Toronto

• CrosstownPhase1(2011–2020)

– TunnelcontractforKeeletoYongeandKeelesdaleParkBridgearecurrently being tendered for bids

– 6LRTStationsarecurrentlyunderdesign(KeeletoChaplin)

Future Community CentreFutureBridge

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

14

Crosstown Construction Update

•TunnelpreparationworkatBlackCreekandEglintoninKeelesdalePark

•Pilingrigsarebuildingconcretesupport walls for the future west tunnel launch shaft

•Thewestlaunchshaftwillenabletunnelling works in late 2012 towardsAllenRoad

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

15

Presentation Part 2: RouteAlignmentUpdateKeeleStreettoJaneStreet

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

16

Guiding Principles The plans being presented today are conceptual, andwillberefinedoverthecomingmonthsto:

• Minimize impacts to the natural environment

• Reducepropertyimpactsifpossible

• Minimize costs

• Minimize impacts to buildings

• Enhanceaccesstovehiclefacility

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

17

Study Areas

* For future study

*

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

18

2012 – New Proposed Plan/Profile

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

19

Weston Rd / Mt Dennis Station

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

20

Presentation Part 3: Vehicle Maintenance & Storage Facility

Preliminary Planning

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

21

Maintenance and Storage FacilityRequirements

•17hectares(42acres)offlatproperty

•Vacantpropertypreferredorpropertywhichcausesminimaldisplacementofexistingcommercial/industrialactivities

•Ideallyzonedforindustrial/employmentortransportationuse

•ProximitytotheEglintonline–ideallylessthan1kilometre

•IdeallyclosetofutureintersectingLRTlines.

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

22

Maintenance and Storage Facility

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

23

Maintenance and Storage Facility Concept

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

24

BusTerminalTheWestonRd/MtDennisLRTStationwill be connected to anew15-baybusterminal.

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

26

BusTerminal:MSFSitewithKodakBuilding

EglintonAveW

ExistingBuilding

BlackCreekDr

PhotographyDr

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

27

Study ProcessesTransitProjectAssessment(TPAP)

•The alignment study focuses on the proposed changes to the approvedEglinton-CrosstownLRTplan,andwillassesstheimpacts of the changes using the same assessment factors as the previous study.

•The public will be provided opportunities to review and comment on the assessment of the impacts of the proposed design changes, and measures to mitigate those impacts.

•The impact assessment and results of the study will be documentedinareportfortheEglintonCrosstownLRTProject.

•The Vehicle Facility will also undergo study under the TPAP

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

28

EnvironmentalImpactAssessmentandMitigationoftheProject

•AspartoftheTransitProjectAssessmentProcess(TPAP),theprojectteamwill:

•Documenttheassessmentandevaluation of the impactsoftheprojectontheenvironment;

•Exploreandincorporatemeasures to mitigatenegativeimpactsoftheproject;and,

•Developmeanstomonitororverifytheeffectivenessofmitigationmeasures.

•Theprojectteamincludesnatural,socio-economicandculturalenvironmentspecialistssuchas:

•airquality •geotechnical •safety

•archaeological •healtheffects •naturalenvironment

•economic •heritage •traffic

•fisheries •noise

•Theresultsoftheimpactassessmentwillbedocumentedandreviewedbyvariousgovernmentagenciesand members of the public.

The following display provides a summary of the issues that will be explored.

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

29

EnvironmentalFactorAreas•NaturalEnvironment •CulturalEnvironment •Fisheriesandaquatichabitat •Culturalheritagefeatures •Terrestrialhabitatandspecies •Archaeologicalresources •Speciallydesignatedfeaturesandspecies •Constitutionallyprotectedaboriginalor •Groundwater treatyright •Contaminationproperties

•Socio-EconomicEnvironment •Directimpactsonresidentsandbusinessesincludingthingssuchas: •Displacementofresidences •Displacementofbusinesses •Displacementofcommunityfeatures •Indirectimpactsonresidentsandbusinessesincludingthingssuchas: •Changestonoiselevels–comparingfuture‘donothing’tofuturewiththeproject •Changesinlocalandregionalairqualityandtheimplicationsonhumanhealth •Changestoaestheticenvironment •Changestoaccess,travelpatternsandtraffic

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

30

Alignment & Facility - Consultation ProcessTimelinesOnline Consultation — June26–July10,2012

Consultation #2 — Fall, 2012

•UpdateonAlignment.Respondtoconsultation#1Input

•Update to layout of Vehicle Maintenance & Storage Facility

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

31

The Crosstown Team Please get in touch with usDevinHorne,FrancaDiGiovanni,DeniseJayawardene E-mail:eglintontransit@ttc.caOnline: www.thecrosstown.caTel: 416-338-6310Fax:416-397-8193TTY:416-481-2523Visit our West Community Officeat1848EglintonAvenueWest(atDufferin)

Community Office Hours — 2012Monday, Wednesday, Friday: 9:00a.m.–5:00p.m.Tuesday & Thursday: by appointment

Western Alignment & Future Vehicle Maintenance and Storage Facility Update

32

NextSteps•PleasesubmitcommentstotheprojectteambyJuly10th,2012•Refinethepreferredprojectoption•Assesstheprojectimpacts•Developmitigationmethods•Second Public Consultation in Fall, 2012 •Prepare a draft study summary report for public and agency review

THANKYOU!