operating room instrument rapid delivery system

Post on 25-Jan-2016

22 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Operating Room Instrument Rapid Delivery System. sddec11-03 Group Members: Charles Ristau (Group Manager) Yik Sen Tan (Web Master) Tariq Azmy (Secretary) Theron Worthington (Communication Liaison) Advisor: Prof. Daji Qiao Client: Iowa Health System Prof. Manimaran. - PowerPoint PPT Presentation

TRANSCRIPT

Operating Room Instrument Rapid Delivery

Systemsddec11-03

Group Members:Charles Ristau (Group Manager)

Yik Sen Tan (Web Master)

Tariq Azmy (Secretary)

Theron Worthington (Communication Liaison)

Advisor:Prof. Daji Qiao

Client:Iowa Health System Prof. Manimaran

Project GoalCreate a program to manage these

requests in a digital formatThis program will have nurses create

the requests, while Central Sterile Processing(CSP) can update the status of the instrument throughout its cleaning process.

This program will organize the requests as well for CSP staff, helping them increase their work efficiency.

Concept SketchOperating Room

Decontamination Room Clean

Core

Request Received

Request #: 31Status: Decontaminating

Request #: 31Status: Decontaminating

Request #: 31Status: Sterilizing

Ready for Sterilization

Instrument sent to Clean Core

Request #: 31Status: Complete

Request #: 31Status: Complete

Instrument sent to OR

Nurses receive pick up notification

Request #: 31Status: Ready for pick up

Request #: 31Status: Ready for pick up

Nurses pick up instruments and clear the request

System Design

Status Update

Requests Information

Operating Room Terminal

Decontamination Room Terminal

Coordinator Computer

Clean Core Terminals

Status Update

Server

Implementations Done• Done with the basic flow of the

system• Created JFrames for each window

and interface for nurse, decontamination and sterilization terminal

• Created database management server

Interface Design Nurse Terminal

Interface DesignDecontamination Terminal

Implementations To Be DoneMake the server program to do

synchronous updates to the terminal programs

Make each terminal program to be able to make a change to the database

Create another database for storing old requests

TestingUnit Testing (Junit)Functional TestingModular TestingManual Testing

Pending IssuesMutually exclusive database

accessMessaging between CSP

coordinator and each terminalProgram startup and

close(Pending requests)

Project Success CriteriaAble to implement our design as

we intended toProgram works well and fulfill our

client needs.Able to follow our project

schedule

Project Schedule – Fall 2011

Questions?