Operating Room Instrument Rapid Delivery
Systemsddec11-03
Group Members:Charles Ristau (Group Manager)
Yik Sen Tan (Web Master)
Tariq Azmy (Secretary)
Theron Worthington (Communication Liaison)
Advisor:Prof. Daji Qiao
Client:Iowa Health System Prof. Manimaran
Project GoalCreate a program to manage these
requests in a digital formatThis program will have nurses create
the requests, while Central Sterile Processing(CSP) can update the status of the instrument throughout its cleaning process.
This program will organize the requests as well for CSP staff, helping them increase their work efficiency.
Concept SketchOperating Room
Decontamination Room Clean
Core
Request Received
Request #: 31Status: Decontaminating
Request #: 31Status: Decontaminating
Request #: 31Status: Sterilizing
Ready for Sterilization
Instrument sent to Clean Core
Request #: 31Status: Complete
Request #: 31Status: Complete
Instrument sent to OR
Nurses receive pick up notification
Request #: 31Status: Ready for pick up
Request #: 31Status: Ready for pick up
Nurses pick up instruments and clear the request
System Design
Status Update
Requests Information
Operating Room Terminal
Decontamination Room Terminal
Coordinator Computer
Clean Core Terminals
Status Update
Server
Implementations Done• Done with the basic flow of the
system• Created JFrames for each window
and interface for nurse, decontamination and sterilization terminal
• Created database management server
Interface Design Nurse Terminal
Interface DesignDecontamination Terminal
Implementations To Be DoneMake the server program to do
synchronous updates to the terminal programs
Make each terminal program to be able to make a change to the database
Create another database for storing old requests
TestingUnit Testing (Junit)Functional TestingModular TestingManual Testing
Pending IssuesMutually exclusive database
accessMessaging between CSP
coordinator and each terminalProgram startup and
close(Pending requests)
Project Success CriteriaAble to implement our design as
we intended toProgram works well and fulfill our
client needs.Able to follow our project
schedule
Project Schedule – Fall 2011
Questions?