March 5, 2018

Alexandria Town Gas Site

2

1930s

Oronoco St. today

Oronoco OutfallAt foot of Oronoco St.

Area Overview

3

Lee St. SquareFormer ATG site

Robinson Terminal

Oronoco Outfall

Voluntary Remediation Program

(VRP)

4

-Boom installed at the Oronoco St. storm sewer outfall.

-Free Product Recovery wells installed

-Oronoco St. Storm Sewer Pipe relined

-BioSparge Groundwater Treatment System installed

-Dredging and Capping project.

Dredge and Capping Project

5

▪ 3000 CY of contaminated sediment

dredged and removed.

Dredge and Capping Project

6

▪ Backfilling of clean sand in progress.

Dredge and Capping Project

7

▪ Reactive cap to be installed around the

Oronoco St. storm sewer outfall.

Storm Sewer Pipe Repair

8

Anticipated to be completed in March, 2018.

Project Schedule

9

Contacts:

Tafesse T. Gyes, P.E.

Department of Project Implementation

City of Alexandria, Virginia

703.746.4051

Lisa Goldberg

Office of Environmental Quality

City of Alexandria, Virginia

Telephone: 703. 746.4076

Questions

10