Our EIA report is exceeding the threshold limit of 20MB. So, the copy of the same will be submitted in
hard.
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
National Highways Authority of India (Ministry of Road Transport & Highways) Government of India
G-5&6, Sector-10, Dwarka-New Delhi-110075
Consultancy Services for Preparation of Detailed Project Report for
development of Economic Corridors, Inter Corridors, Feeder Routes and
Border to improve the efficiency of freight movement in India under
Bharatmala Pariyojana (Package-5/Lot-7) from crossing of EPE -
Saharanpur bypass and spur to Dehradun
PROJECT REPORT
M/s MSV INTERNATIONAL INC.
in association with
MSV INTERNATIONAL TECH PVT. LTD. Unit no-514,515 and 516, 5th floor, Suncity Success Tower, Golf Course, Extension
Road, Sec-65, Gurgaon-12200
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
CONTENTS
1. PROJECT REPORT 6
1.1 Project Background 6
1.2 Project Corridor 6
1.3 PROJECT DESCRIPTION 7
1.4 Proposal for Alignment 7
1.5 Comparative Study of Alignments 8
1.6 RECOMMENDATIONS 14
1.7 Environment Features of Proposed Project Highway 14
1.8 Indicative Design Standards and Specifications 16
1.8.1 General 16
1.8.2 Classification of Design Standards for Geometrics of Highway 17
1.8.3 Coordination of Horizontal and Vertical alignment 19
1.8.4 Lateral and Vertical Clearance for Interchange/ FO/ROB/VUP/SVUP/LVUP 20
1.8.5 Interchange Design 21
1.8.6 Median Openings 22
1.8.7 Boundary Wall at ROW 22
1.8.8 Typical Cross Sections 22
1.8.9 Drainage 23
1.8.10 Capacity of Project Highway 23
1.8.11 Service Road 23
1.8.12 Embankment and Cut Sections 23
1.8.13 Highway Amenities 23
1.8.14 Traffic Control Devices, Road Safety Devices and Road Side Furniture 24
1.8.15 Traffic Management Systems 24
1.8.16 Toll booth 24
1.9 Design Criteria for Structures 25
1.9.1 Design Standards Structures 25
1.9.2 Special Design Requirements 26
1.9.3 Design Basis 27
1.9.4 Design Load and Stresses 32
1.10 HYDROLOGY, TRAINING WORKS AND ROAD DRAINAGE 39
1.9.5 Hydrological study 39
1.9.6 Road drainage 39
1.9.7 Side Slopes 40
1.9.8 Slope Protection Measure 40
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
1.9.9 River Training & Flood Protection Works 40
2 TRAFFIC SURVEYS 40
2.1 OBJECTIVES OF TRAFFIC STUDY 41
2.2 HOMOGENEOUS SECTIONS 41
3 MATERIAL INVESTIGATIONS 43
4 GEOMETRIC IMPROVEMENT 45
5 WAY SIDE AMENITIES / SERVICE AREA 47
6 TOLL BOOTHS 47
7 INTERSECTION PROPOSALS 47
8 PROPOSAL FOR STRUCTURES 48
9 TOE WALL AND RETAINING WALLS 58
10 HAZARDOUS LOCATIONS 58
11 Connecting Roads 59
12 Pavement Design 59
12.1 Type of Pavement 59
12.2 Design Methodology 59
12.3 Design Parameters 60
12.4 Recommended Pavement Design 60
12.5 Proposed Pavement Composition 60
12.6 PAVEMENT DESIGN FOR PROPOSED SERVICE/SLIP ROADS 64
13 MATERIALS 64
LIST OF FIGURES
Figure 1: Index Map of Section -1 (EPE Crossing to Saharanpur Bypass) 7
Figure 2: Various options of the alignment 8
Figure 3: Option 1 9
Figure 4: Option 2 10
Figure 5: Option 3 11
Figure 6: Traffic Survey Location 41
Figure 7: Homogeneous section of project road 42
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
LIST OF TABLES
Table 1: EROW/PROW Details 10
Table 2: EROW/PROW Details 11
Table 3: EROW/PROW Details 12
Table 4: Comparison Table of Section-I Alignment Options 12
Table 6: Summary of proposed project (Section-I) 13
Table 8: List of Districts and Talukas along the Project Highway Package V 15
Table 9: Affected Protected Forest Land 15
Table 10: Design Speed 17
Table 11: Recommended Minimum Right of Way 17
Table 12: Summary of Code of Standards & Technical Specifications 18
Table 13: Minimum Radii of horizontal Curves 18
Table 14: Safe sight Distance 19
Table 15: Gradients 19
Table 16: Minimum Length of Vertical curve 19
Table 17: Cross fall on different Surfaces 20
Table 18: Lateral Clearance and Vertical Clearance 21
Table 19: Minimum Acceleration Lengths for Entry (Grades of 2% or Less) 22
Table 20: Minimum Deceleration Lengths for Exit (Grades of 2% or Less) 22
Table 21: Recommended Design Speeds for Ramps 22
Table 22: Design service volume for Expressways in Plain and Rolling Terrain (in
PCUs/Day) for LOS B 23
Table 23: LIST OF IRC CODES 25
Table 24: Design Parameters for Structures 27
Table 25: Lane Reduction Factor for Live Load 34
Table 26: Relevant Codes & References 39
Table 2.1: Homogeneous Sections 41
Table 2.2: Schedule of Traffic Volume Count Survey 42
Table 2.3: Summary of ADT and AADT at Survey Locations 43
Table 2.4: Annual Average Daily Traffic at Survey Locations 43
Table 3.1: Summary of CBR Test Results of Borrow Area Soil Samples 44
Table 4.1: TCS Schedule 45
Table 4.2: Typical Cross Section 46
Table 5.1: Wayside Amenities Locations 47
Table 7.1: List of Interchanges 48
Table 8.1: Summary of Proposed Structures 48
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Table 10.1: Details of Realigned of nalla/drain and canal 58
Table 11.1:Connecting Roads 59
Table 27: Highway amenity coordinates 66
Table 28: Annexure 1 67
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
1. PROJECT REPORT
1.1 Project Background
I. The National Highways Development Program (NHDP) has reached a certain level of maturity. It is now important to re-define road development and have a macro approach while planning expansion of the national highways network. The focus has to be on recasting road development by bridging critical infrastructure gaps.
II. Hence Bharatmala has been launched as a new umbrella program whose primary focus is on optimizing the efficiency of the movement of goods and people across the country. This program envisages a corridor approach in place of the existing package-based approach which has, in many cases, resulted in skewed development. For instance, in areas of high traffic, even upto 30,000 Passenger Carrying Units (PCUs), there are NH stretches of single and even intermediate lane. These have naturally become an impediment to seamless freight and passenger movement.
III. A) The Delhi- Saharanpur corridor (Along existing 709B) is being developed in a phase manner. Union Minister for Road, Transport and Highways has laid the foundation stone for the Delhi-Saharanpur highway recently. The highway which will connect the national capital with Saharanpur in Uttar Pradesh is 154-km-long and will be developed in three phases. The Delhi-Saharanpur highway project will be executed by the National Highways Authority of India (NHAI). In the first phase of the project, a highway stretch of 61 km long from Baghpat to Shamli will be developed. For which the foundation stone is laid. Other than this, the foundation stone for the four-lane highway stretch of 62.772 km long, connecting Shamli to Saharanpur is also laid. And in the third phase of the project, the road between Baghpat and the national capital will be developed. once the development the Delhi-Saharanpur highway is complete, it will open the doors of development for districts like Saharanpur, Shamli, Baghpat, Muzaffarnagar in Uttar Pradesh.
III. B) The Delhi- Saharanpur corridor (Green field) is being developed in a phase manner under Bharat Mala Pariyojana (Phase-II) which has been identified under Bharatmala circular RW/NH-37011/37/2018-PPP (part)also.
1.2 Project Corridor The proposed economic corridor starts from Bilaspur and terminates at Delhi via Yamuna nagar - Saharanpur-Roorkee-Muzaffarnagar-Meerut (302 Km) with a feeder route to Dehradun (60 Km). It was decided that the proposed economic corridor from Delhi to Bilaspur shall have the alignment connecting Baghpat, Shamli, and Saharanpur with spur to Meerut and Muzaffarnagar. In addition, spur connectivity may be provided to Panipat and Sonipat from the proposed corridor to enable first and last mile connectivity. • Project Corridor as per RFP
The proposed corridor Sections- EPE Crossing to Saharanpur Bypass
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Figure 1 – Index Map of Section -2 (EPE Crossing to Saharanpur Bypass)
1.3 PROJECT DESCRIPTION
▪ A meeting of Hon’ble Minister (RT&H) was held on 19.11.2018, wherein the Project Stretch from NH-24 (near Akshardham) to EPE Junction of the newly declared NH-709B was proposed to be developed as 6 laning in two packages as mentioned below:
I. Package – I - From Chainage 0.000 Km to Chainage 14.750 Km (near Akshardham to Delhi UP Border) in the State of Delhi.
II. Package – II- From Chainage 14.750 Km to Chainage 31.200 Km (from Delhi UP Border to EPE Junction) in the State of Uttar Pradesh.
▪ It was thoughtfully decided that NH-709B to be developed within available ROW from EPE junction to Saharanpur Bypass under Phase-I without acquisition of additional ROW.
▪ An additional Greenfield route to be developed between EPE to Saharanpur bypass under Bharatmala Pariyojana Phase-II.
▪ With respect to 4-Lane connectivity to Dehradun, the work for 4-Laning from Saharanpur Bypass to Ganeshpur is under Progress.
▪ After Mohand Reserve Forest/ Rajaji National Park has to be negotiated to reach Dehradun & at present the carriageway is 2-Lane/Intermediate lane with narrow bridges.
The Delhi- Saharanpur corridor (Green field) is proposed to developed in a phase manner under Bharat Mala Pariyojana (Phase-II) which has been identified under Bharatmala circular RW/NH-37011/37/2018-PPP (part) also.
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
1.4 Proposal for Alignment
EPE Crossing to Saharanpur Bypass
There are three options in this section-
Option-I (Length-116Km)
Option-II (Length-124Km)
Option-III (Length-119.970Km)
1.5 Comparative Study of Alignments
Section-1 (EPE Crossing To Saharanpur Bypass)
Figure 2: Various options of the alignment
➢ OPTION-1: DELHI (EASTERN PERIPHERAL EXPRESSWAY) NEAR KHEKRA-
SAHARANPUR BYPASS (Length-116km)
The proposed project starts from Delhi (crossing of EPE) and it ends at Saharanpur Bypass. The length is 116km. This is a green field alignment which is passing through Baghpat, Shamli & Saharanpur districts rural area and parallel to NH-709B on RHS. Delhi traffic from NH-709B connects at Khekra. This is the shortest route between Delhi and Saharanpur. The proposed length through this alignment from Delhi to Dehradun is 222 Km.
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Start of Project from Crossing of EPE End of Project at Saharanpur Bypass
Figure 3: Option 1
Terrain
The entire project road traverses through plain terrain. Plain terrain road length is 116km. RIGHT OF WAY (ROW)
A green field highway with a ROW of 60mtr would cater to the traffic-flows and up-gradation of such Highway up to 8-lanes, along with service roads, wherever required (say, it gives a long-term perspective of about next 30 to 40 years)
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Table 1: EROW/PROW Details
Sl. No. Start
Chainage End
Chainage Total
Length Total
PROW Land Use
(Km) (Km) (Km) (m) LHS RHS
1 0+000 116+000 116.000 60 Agricultural
Land Agricultural Land
➢ OPTION-2: DELHI (EASTERN PERIPHERAL EXPRESSWAY) NEAR KHEKRA-
SAHARANPUR BYPASS (LENGTH-124km)
The proposed project starts from Delhi (crossing of EPE) and it ends at Saharanpur Bypass. The length is 124km. This is a green field alignment which is passing through Baghpat, Shamli & Saharanpur districts rural area and parallel to NH-709B on LHS. Delhi traffic from NH-709B connects at Khekra. This is the shortest route between Delhi and Dehradun. This alignment also provides easy connectivity to Sonipat, Panipat and Karnal. The proposed length through this alignment from Delhi to Dehradun is 244 Km.
Start Point (Intersection of EPE with NH 709B) End Point (Saharanpur Bypass)
Figure 4: Option 2 Terrain
Entire project road section passes through plain terrain.
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
RIGHT OF WAY (ROW)
A green field highway with a ROW of 60mtr would cater to the traffic-flows and up-gradation of such Highway up to 8-lanes, along with service roads, wherever required (say, it gives a long-term perspective of about next 30 to 40 years)
Table 2: EROW/PROW Details
Sl. No.
Start Chainage
End Chainage
Total Length
Total PROW Land Use
(Km) (Km) (Km) (m) LHS RHS
1 0+000 124+000 124.000 60 Agricultural
Land Agricultural Land
➢ OPTION-3: DELHI (EASTERN PERIPHERAL EXPRESSWAY) NEAR KHEKRA-
SAHARANPUR BYPASS (Length-119.790Km)
The proposed project starts from Delhi (crossing of EPE) and it ends at Saharanpur Bypass. The length is 119.790km. This is a green field alignment which is passing through Baghpat, Shamli & Saharanpur districts rural area and parallel to NH-709B on RHS. Delhi traffic from NH-709B connects at Khekra. This is the shortest route between Delhi and Saharanpur. The proposed length through this alignment from Delhi to Dehradun is 218 Km.
Start of Project from Crossing of EPE End of Project at Saharanpur Bypass
Figure 5: Option 3
Terrain
The entire project road traverses through plain terrain. Plain terrain road length is 119.970km.
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
RIGHT OF WAY (ROW)
A green field highway with a ROW of 70mtr would cater to the traffic-flows and up-gradation of such Highway up to 8-lanes, along with service roads, wherever required (say, it gives a long-term perspective of about next 30 to 40 years).
Table 3: EROW/PROW Details
Sl. No.
Start Chaina
ge
End Chainage
Total Length
Total PROW Land Use
(Km) (Km) (Km) (m) LHS RHS
1 0+000 119+970 119+970 70 Agricultural Land Agricultural Land
Comparison Table of Section-I Alignment Options
There are three alignment options in Section-1
Table 4
Sl. No. Factor Option I Option II Option III
1 Length (Km) 116.00 124.00 119.790
2 Lane Configuration 6 Lane 6 Lane 6 Lane
3 Provision of slip (Km)-Both side
0 0 0
4 Geometrics ➢ Good Design
speed 120 Kmph ➢ Good Design Speed
120 Kmph ➢ Good Design
speed 100 Kmph 5 PROW (m) 60 60 70
6 Land Acquisition (Hectare)
708 744 961.796
7 Bridges/ structures
➢ Bridge-4 ➢ ROB -1 ➢ Cloverleaf -5
VUP -67
➢ Bridge -1 ➢ ROB - 0
Cloverleaf - 5 VUP – 80
➢ Bridge-23 ➢ ROB -1 ➢ interchange-7
VUP -62
8 Junctions Approx. (No.)
➢ NH/SH - 5 ➢ MDR - 12 ➢ Vill. Roads- 55
➢ NH/SH – 5 ➢ MDR -15 ➢ Vill. Roads-65
➢ NH/SH - 5 ➢ MDR - 12 ➢ Vill. Roads- 55
9 Environmental Constraints
➢ Water bodies, ➢ Buildings, ➢ Temples ➢ Forest- Nil
➢ Water bodies, ➢ Buildings, ➢ Temples ➢ Forest-Nil
➢ Water bodies, ➢ Buildings, ➢ Temples ➢ Forest- Nil
10 Structures Impacted
Approx. - 12 (Building and Brick Kiln)
Approx. 35 (Building and Brick Kiln)
Approx. - 12 (Building and Brick Kiln)
11 Utility Relocation 10 HT Line 12 HT Line 10 HT Line
12 Social Impact ➢ Cultivation/
barren land acquisition
➢ Cultivation/ barren land acquisition
➢ Cultivation/ barren land acquisition
13 NH / Expressway connectivity
5 5 5
14 Civil Construction Cost (in Crore)
2900 Cr. 3100 Cr. 2884 Cr.
15 LA Cost (in Crore)
1735 1790 2182
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Sl. No. Factor Option I Option II Option III
16 Total Capital Cost 5070 5350 5524
Recommended
# Source-: Land Rate taken from Revenue Department office, UP.
Recommendation of Alignment Option (Section-I)
• As per above table Option-I has lesser length than option-II & III. It is also economical than option-II & III.
• But considering the destination point of project (i.e. Dehradun). The option-I & II has longer route by 26 & 4km respectively than option-III. Hence option-III is recommended as the suitable alignment. The cost of recommended alignment is 5524 Cr.
• Presentation of all the above three alignment has been made at Headquarter level with GM & CGM(HQ) and further explained at Chairman level.
• As per the presentation made at higher level in NHAI (HQ) option-III has been accepted principally and direction has been given to start the topographic survey & collect other details for the proposed option III. However formal approval of the alignment is yet to receive.
A brief summary of proposed data including ROW, Bypass length, Bypass cost, Total land required, Total project cost is presented in Table 6 Table 6: Summary of proposed project (Section-I)
Sl. No. Particular Unit Details
1 Existing Length of the Road km 2.35
2 Existing Traffic PCU 21645
4 Proposed Length km 119.790
12 Civil Cost per km Cr./km 24.075
13 Total Land required (ROW 70 m) Ha 961.39
14 Total Project Cost Cr. 5524
15 Project Cost per km (including LA) Cr./km 46.11
1.6 RECOMMENDATIONS
As per the above recommendation of alignment in Section-II. the recommended option are as follows :- Section-II EPE Crossing to Saharanpur Bypass (Length-119.790km)
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
1.7 Environment Features of Proposed Project Highway Land Use and Administrative Set-up The land use pattern of 10 Km either side of the project alignment is mainly agricultural and human habitation, besides some Protected Forest areas (Roadside and Canal Side plantations declared as Forest).
Details of various environmental clearances applicable for the project package are presented below Environment Clearance: Project Package is the part of Delhi-Amritsar-Katra Expressway in the state of Haryana and Punjab. Hence, ToR for Prior Environmental Clearance from MoEF&CChas been made and obtained for the entire Haryana Section (km 0.000 to km 135.056) and Punjab Section (km 135.056 to km 396.863) under Phase I of Delhi-Amritsar-Katra Expressway. Environmental Clearance from MoEF&CC shall be obtained once the EIA study as per the obtained ToR is completed. NHAI shall obtain the clearance before the start of the construction works. Wildlife Clearance: Bir Gurdialpura Wildlife Sanctuary falls within 10 km radius of the proposed alignment in the district of Patiala in Punjab State. Hence, recommendation from NBWL shall be required. Forest Clearance: Protected Forest (Roadside and Canal Side Plantation declared as Forest) shall be affected by the crossing of the proposed expressway. NHAI shall obtain the clearance before the start of the construction works. Details of protected forest located alongside the project highway under Package V are Tabulated below. Other than the above clearances obtained by NHAI, the contractor too shall have to procure and obtain a number of clearances, permissions and NOCs for the project, before the start of construction works. These are: Prior Environmental Clearance from MoEF&CC / SEIAA for mining of sand and
aggregate quarries, if new mines opened by the Contractor ▪ Conversion of land use, from the State revenue department for setting camps and plants ▪ Approval of Monitoring Consultant / Supervision Consultant / Authority Engineer for
location and layout of Camps & plants before start of Construction ▪ NOC and Consents under Air & Water Acts for establishing and operating the
construction plants including but not limited to hot mix plants, WMM, crushers etc. from State Pollution Control Board
▪ Prior permission for felling of trees from Forest dept. / District Authorities ▪ NOC under the Hazardous and Other Wastes (Management and Trans-boundary
Movement) Rules, 2016 from SPCB ▪ PUC certificate for use of vehicles for construction from Transport department ▪ NOC for water extraction for construction and allied works from Irrigation department ▪ Approval of Monitoring Consultant / Supervision Consultant / Authority Engineer for Traffic
Management Plan before start of Construction ▪ Approval of Monitoring Consultant / Supervision Consultant / Authority Engineer for the
Emergency Action Plan for accidents responding to involving fuel & lubricants before the construction starts.
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
1.8 Indicative Design Standards and Specifications 1.8.1 General
The postulates and considerations for designing the Greenfield Six lane Highway are as follows: The Highway will be designed as a fully access-controlled high-speed tolled facility. The Highway will be designed for six-lane divided configuration. The Highway will be provided with modern road furniture and traffic information systems for the safe, convenient and fast movement of vehicles. The road sides will be made aesthetically pleasing through suitable planting of trees, shrubs, etc. Wayside amenities to provide rest, food, fuel, repair facilities etc. at periodic intervals for the convenience of the traveling public and truck drivers will also be a part of the project. Traffic safety will be in-built in the design process itself, and all the accident prevention measures will be taken. The formulation of the design standards is required in order to avoid any inconsistency in design from one section to the other and provide desired level of service and safety. For this project it is proposed to follow Design Standards given in IRC codes, guidelines and special publications, and MORTH circulars as applicable to National Highways. The project corridor is eight lane Greenfield Highway and is to be designed as per standards and specifications of IRC SP 87-2013. Where the said standards are silent the following standards shall be referenced and the one considered the best and most relevant adopted: American Association of State Highway and Transport Officials (AASHTO) standards British Standards Any other National or International Standard as considered suitable 1.8.2 Classification of Design Standards for Geometrics of Highway
The project highway shall follow the design standards mentioned below
Design Speed
The design speeds given in table below are adopted for various terrain classifications.
Table 10: Design Speed
Nature of Terrain
Cross Slope of Ground Design Speed (KMPH) Ruling
Plain
Up to 25%
100
The project corridor passes through plain terrain. The adopted design speed is 100 KMPH throughout the stretch. Right of Way The recommended minimum Right of Way is given in table below
Table 11: Recommended Minimum Right of Way
Section Right of Way (ROW)
Rural Section 70m
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
At interchanges, toll booth, highway amenities, connecting roads additional land shall be required as mentioned in drawings volume. The co-ordinates for the LA shall be provided separately as Annexure 1. Lane Width of Carriageway
The standard lane width of the Project Corridor is 3.5 m. Project Corridor shall have three lane in each direction of traffic. Median The median shall be raised and recommended width of median including shyness is 5m. Other specifications for the median are mentioned below: ▪ The depressed median has suitably designed and provision of rainwater harvesting
system at suitable intervals for effective drainage of surface runoff from the median. ▪ An edge strip of 0.75m width of depressed median adjacent to carriageway in either
direction shall be paved with same specifications as of the adjacent carriageway. ▪ As far as possible, the median shall be of uniform width for the Project road. However,
where changes are unavoidable, a transition of 1 in 50 is to be provided. ▪ Median is to be well planted to cutoff the glare coming from the vehicle traveling in
opposite directions. ▪ In Median longitudinal gradient is designed in such a way that the water flow away from
SVUP, LVUP VUP median. Median drains shall be terminated well before these structures with effective drainage arrangement.
▪ At VUP, SVUP, LVUP and Bridge location, median wall is eliminated and slope of 1:6 is provided; in place of median wall pitching and toe wall is to be provided.
Shoulders
The shoulders on the outer side shall be 3.0 m earthen.
Barriers Thrie -beam crash barrier has been provided throughout the project corridor except at structure locations. At culverts parapet wall has been provided and at SVUP/LVUP /VUP/FO/ ROB concrete crash barrier has been provided. Design of Horizontal/Vertical alignment The general principles and design criteria laid down in relevant IRC & MORTH guidelines have been followed in conjunction with the relevant circulars. The following latest code of standards & technical specifications has been used for the alignment design;
Table 12: Summary of Code of Standards & Technical Specifications
Publication
Issued by IRC:38- – Guidelines for Design of Horizontal Curves Indian Road Congress (IRC) IRC:SP:23- Vertical Curves for Highway Indian Road Congress (IRC) IRC: 92- Guidelines for Design of Interchanges in Urban Areas
Indian Road Congress (IRC)
IRC:SP:87 - Manual of specifications and standards for Six lane Highway
Indian Road Congress (IRC)
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
The Project corridor is designed as per IRC SP 87 Guidelines. Few parameters have been considered based on MOM such as width of ROW, median width, rain water harvesting in medians and boundary wall on RoW edge at a spacing of 500m Horizontal Alignment Alignment is fluent and is blended with the topography. The horizontal curves have been designed as per IRC 38 requirement. Radii of horizontal Curves The desirable minimum radii of horizontal curves are given below
Table 13: Minimum Radii of horizontal Curves
Design Parameters Radii (m) Design Speed (Km/h) 100
Absolute Minimum Radius (m) 250
Desirable Minimum Radius (m) 400
Transition Curves Properly designed transition curves are provided at both ends of the circular curve. The minimum length of transition curves is designed for 100 Kmph as per IRC: 38 (latest).
Sight Distance The desirable minimum sight distance for 6 lane divided carriageway for 100 Kmph design speed is given in below table. An Intermediate sight distance has been provided throughout as per Section 2 clause 2.9.5 of IRC SP 87 (2019).
Table 14: Safe sight Distance
Design Speed (Kmph)
Safe Stopping Sight Distance (m)
Desirable Minimum Sight Distance (m) (Intermediate Sight distance)
100 180 360
Vertical Alignment The vertical alignment should provide for a smooth longitudinal profile. Grade changes are not too frequent to cause kinks and visual discontinuities in the profile. The vertical design, especially at grade change location, such as VUP/LVUP, ROB, bridge locations Intermediate sight distance (ISD) is adopted as per IRC SP 23. Length of approaches is also designed with ISD only. Gradients The ruling gradients for plain terrain has been adopted everywhere in the project highway as per section 2, clause 2.9.4.2 of IRC SP 87 latest revision.
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Table 15: Gradients
Terrain Ruling Gradient Plain
n 2.50%
In cut sections, minimum gradient for drainage considerations is 0.5 percent (1 in 200) if the side drains are lined; and 1.0 percent (1 in 100) if this are unlined. Ruling gradient is adopted to design vertical alignment. Vertical Curves The vertical alignment should provide for a smooth longitudinal profile; kinks and visual discontinuities in the profile should be avoided as far as possible. The vertical design at grade change location, such as VUP/LVUP, ROB, bridge locations Intermediate sight distance (ISD) is adopted. The minimum grade change requiring vertical curve and minimum length of vertical curve as per IRC SP 23 is as follows:
Table 16: Minimum Length of Vertical curve
Design speed (Km/h)
Minimum Grade change Requiring Vertical curve
Minimum Length of Vertical Curve (m)
K value for Hog Curve
(ISD)
K value for Sag Curve
100 0.5% 60 261 61
1.8.3 Coordination of Horizontal and Vertical alignment The overall appearance of project road is enhanced considerably by judicious combination of the horizontal and vertical alignments. Plan and profile of the road shall not be designed independently but in unison, so as to produce an appropriate three-dimensional effect. Proper co-ordination in this respect will ensure safety, avoid visual discontinuities and contribute to overall aesthetics. Vertical curvature superimposed upon horizontal curvature gives a pleasing effect. As such the vertical and horizontal curves shall coincide as far as possible and their length shall be somewhat longer than the vertical curve. Short vertical curve superimposed on long horizontal curves have been avoided at or near the apex. Cross fall and Super Elevation The cross fall on straight sections of project road carriageway shall be as given in table below. Each carriageway shall have unidirectional cross fall.
Table 17: Cross fall on different Surfaces
Cross-sectional Element Annual Rainfall 1000 mm or more Less than 1000 mm
Carriageway, Paved Shoulders, Edge Strip 2.5 Percent 2.0 Percent
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
The cross fall for earthen/granular shoulders on straight portions is at least 1.0 percent steeper than the values given in above table. On super elevated sections, the earthen portion of the shoulder on the outer side of the curve is provided with reverse cross fall so that the earth does not drain on the carriageway and the storm water drains out with minimum travel path. Super Elevation The super elevation is limited to 7% if radius of curve is less than desirable minimum radius. It shall be limited to 5% if radius of curve is more than desirable minimum radius. 1.8.4 Lateral and Vertical Clearance for Interchange/ FO/ROB/VUP/SVUP/LVUP The lateral and vertical clearance is as per table 18 Interchanges The details are given in Para 1.3.6 of this chapter. Flyover Flyovers are provided at crossing between the project road and the NH/SH depending upon the importance of road. All existing four lane road are considered for FO. Vehicular Under Pass (VUP) VUP’s are provided at crossing between the project road and MDR’s. The lane width of the cross road varies from 7.0m to 10.0m. The provision of future widening from 2 lane to 4 lanes is taken into consideration for these roads. These are provided perpendicular to the Project road. Light Vehicular under pass (LVUP) The location of LVUP has been provided for metal Roads/ODR’s. These are low configuration road compared to VUP’s. These are provided perpendicular to the Project road.
Small Vehicular Underpass (SVUP)
To ensure complete access control and make cost effective grade separation, a smaller dimension VUP (SVUP) has been provided for Village Road/Mud roads with width lesser than 5.50m. All cross roads are not provided with SVUP’s. At s few cross road Box of size 6mx4m Box is provided. Few, mud roads/ tracks which are at close interval and for which direct underpasses are not provided shall be connected by connecting roads with cross roads were Underpass is provided. Lateral and Vertical Clearance at Underpasses Lateral and Vertical clearance at underpasses shall not be less than the values given below
Table 18: Lateral Clearance and Vertical Clearance
Type of Underpass
Minimum Lateral Clearance (m)
Minimum Vertical Clearance (m)
Flyover 30 m for SH and 2x30 for NH 5.5 VUP 2
0 5.5
LVUP 12
4.0
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
1.8.5 Interchange Design Being fully access controlled, there will be no at grade junctions with Expressway. Entry/Exit will be only from interchanges. At grade intersections adversely influence the quality of highways in terms of speed, capacity and safety because of interruptions to the flow of traffic. Thus the basic requirement for the design of intersections is not only to cater for safe movements for the drivers, but also to provide them full traffic information by way of signs, pavement markings and traffic signals. Further, simplicity and uniformity should be the guiding principles for interchange design to ensure the safe passage of maneuvers and reduce conflict points, either by elimination of certain maneuvers or separated in space, horizontally or vertically. The interchanges are proposed on National highway/ State Highways. The interchanges are designed with proper ramps and loops as per IRC: 92 latest versions. Interchanges are designed considering following components
▪ Acceleration lane ▪ Deceleration lane ▪ Loops ▪ Ramps
Acceleration/Deceleration Lane Acceleration/Deceleration lane shall be provided as per IRC 92. Each entry and exit ramp shall have acceleration/deceleration lane for the Project Highway. The length of the acceleration/deceleration lanes shall be decided on the basis of speed differentials of the Project road traffic and the speed permitted on the ramps.
Table 21: Recommended Design Speeds for Ramps
Configuration
Type of Ramp
Range of Design Speed (Km/h) 100-120
Range of Ramp Design Speeds
Service Interchange
Semi-Direct 40-60 Loop 60-80 Direct 60-90
Access Control Access has been provided through interchanges only. Connecting Roads Connecting roads of service road standard are provided to maintain proper circulation of local traffic, continuity of travel and to facilitate crossing over to the other side of the Project road
SVUP 7 4.0
ROB Depending upon Railway ROW 6.550
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
through an underpass wherever required. These have been provided outside the ROW. These roads have been provided at locations where the distance between 2 cross roads is less than 200m. Width of connecting road is kept as 7 m. 1.8.6 Median Openings Median openings with detachable barrier have been provided at about 12 to 15km (between two interchanges) for traffic management for maintenance works and vehicles involved in accidents. 1.8.7 Boundary Wall at ROW Road boundary wall to be constructed as specified in Ministry Circular no. RW-NH 24036/27/2010-PPP/dated 04.02.2019 1.8.8 Typical Cross Sections The proposed TCS developed for the project corridor are for 3 x 3 lane divided carriageway. The details are provided in Chapter-6 of this report. 1.8.9 Drainage The IRC: SP 42 will generally be followed for design of highway drainage. The planning of highway and drainage is intricately linked with the terrain, alignment of the highway and the proposed cross drainage works. The planning and designing of adequate drainage system is a primary requirement for maintaining a structural soundness and functional efficiency of a road. Pavement structure including sub-grade must be protected from any ingress of water; otherwise over a period of time it may weaken the sub-grade by saturating it and cause distress in the pavement structure. Hence disposal of water from the pavement and sub-grade is a basic consideration in road design. Over and above quick drainage takes away the water from pavement surface and reduces chances of skidding of vehicles. In order to guard the pavement from the poorly drained conditions, planning, designing, construction and maintenance of longitudinal drains on either side of the roads is very much essential. The surface water from the pavement and shoulders will be made to flow into the drains by providing suitable cross Slopes / Camber. Earthen drains are provided through-out the project corridor to ensure the efficient drainage from carriageway to drain. All drains are connected to cross drainage structure. Median drains are provided with rain water harvesting structure. Proper drainage arrangements are provided for grade separated structures. If requires, CD work is also provided for loops and ramps.
1.8.10 Capacity of Project Highway For the purpose of design and future augmentation of the Project Expressway, the design service volume for level of service- B for plain/rolling terrain shall be 1300 PCU/hr/lane. The design service volume can be determined as per MORTH Guidelines for Expressways. The design service volume per day will depend on the peak hour flow and will be as specified in the below given table.
Table 22: Design service volume for Expressways in Plain and Rolling Terrain (in
PCUs/Day) for LOS B
Design Service Volume in PCUs per day for LOS B
4- Lane 6-Lane 8-Lane
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
86,000 for Peak hour flow (6%)
65,000 for Peak hour flow (8%)
1,30,000 for Peak hour flow (6%)
98,000 for Peak hour flow (8%)
1,73,000 for Peak hour flow (6%)
1 30,000 for Peak hour flow (8%)
1.8.11 Service Road Service road to be provided in this project. 1.8.12 Embankment and Cut Sections The design and construction of the road in embankment and in cutting shall be carried out in accordance with Section 300 of MORTH Specifications IRC: SP-87 latest version.
1.8.13 Highway Amenities Three types of amenities provided in the project highway are of size 6ha 18 ha and 30ha Bigger size amenities are connected with SVUP which enable the passengers to use other side amenity also. Wayside amenities generally provided at approximately 20 to 25Km interval. In the bigger wayside amenity having size of 300m x 600m, all facilities such as drinking water kiosk, toilet facilities, truck parking, bus parking, car parking, separate restaurants for truck driver, restaurants for other road users, children park, petrol station, garage, generator set/ solar system area, ATM’s, Ambulance area, medical room etc. to be provided. Other than this some portion of land is left for land monetization purpose. These facilities are generally in LOOPs of Interchanges.
In the smaller wayside amenity having size of 200m x 300m, facilities such as drinking water kiosk, toilet facilities, truck parking, bus parking, car parking, restaurants, petrol station, garage, generator set/ solar system area, ATM’s etc. to be provided. For way side amenity of 30 hec. and 45hec. Triangle area in between loops of interchange formed by highway and connecting roads as well as area in between loops of trumpets to be acquired as part of future land monetization plan, not to be developed currently. At present small way side amenity of size 6 hec. to be developed. 1.8.14 Traffic Control Devices, Road Safety Devices and Road Side Furniture Traffic Control Devices, Road Safety Devices and Road Side Furniture shall comprise of road signs, road markings, object markers, hazard markers, studs, delineators, attenuators, safety barriers, boundary fences, boundary stones, kilometer stones, etc. Relevant IRC Guidelines (IRC 2, IRC:8, IRC:35, IRC:67, IRC SP 87,etc), MORTH Guidelines, IRC:SP - 87 and Section 800 of MORTH Specifications shall be followed. 1.8.15 Traffic Management Systems
Advance Traffic Management Systems (ATMS) shall be provided as per Clause-816 of MORTH Specifications for road and bridge works. 1.8.16 Toll booth Toll booths shall be provided as per IRC: SP-87. Toll Plaza 1 3+520 Toll Plaza 2 116+900
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Toll booth are designed for peak hour traffic projected for minimum 25 years. The total number of toll booths and lanes are designed to ensure the service time of not more than 10 seconds per vehicle at peak flow. The width of each toll lane will be 3.5m for ETC/Manual/Smart card lanes proposed as per NHAI guidelines and one lane at the extreme outer side for over dimensional vehicles of 4.50m. Between each toll lane, traffic islands will be provided so as to accommodate toll booth. These islands will be of minimum 25 m length and 1.8m width. Protective barriers of reinforced concrete will be placed at the front of each island to prevent out of control approaching vehicles crashing into the toll booth. They would be painted with reflective chevron markings. The area of toll booth covering the flared portion shall be same as that of main carriageway. The fee collection system shall be electronic toll collection (ETC) system. The design of the Toll Booth(s) shall be aesthetically pleasing. The fee collection staff should be efficient, courteous and adequately trained before deployment. 1.9 Design Criteria for Structures Definition of Structures
Interchanges: Interchange is a system of interconnecting roads (ramps and
loops) in conjunction with one or more grade separations that provide for the uninterrupted movement of traffic between two or more roads.
Culverts: Cross drainage structures having length ≤ 6 m shall be
classified as culverts. Major and minor bridges: Bridges having length upto 60m shall be classified as minor
bridges and bridges having length greater than 60m shall be classified as major bridges.
Rail over Bridge (ROB): Structure provided over the railway lines to carry the Project
Highway. Rail under Bridge (RUB): Structure provided below the railway lines to carry the
Project Highway. Vehicular Underpass (VUP): Grade separated structure which is provided for crossing of
vehicles under the Project Highway. Vehicular Overpass (VOP): Grade separated structure which is provided for crossing of
vehicles over the Project Highway.
Viaducts: Structures carrying the project road over land and spanning across the valleys are termed as viaduct
1.9.1 Design Standards Structures
The design shall cover all aspects of preliminary design pertaining to various parts of Bridges
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
/ Grade separators / ROBs etc. The design shall generally be based on relevant IRC codes of practice, MoRTH circulars. However, where the IRC codes are not applicable or silent, appropriate BIS or other international Codes of Practice, such as, British / American / Australian Codes based on sound engineering practice shall be used. The section below outlines the standards to be adopted for the design of the structures which include Flyovers and Interchanges, Major Bridges, Minor Bridges, VUP, LVUP SVUPs and Culverts. The IRC codes/Standards/Act, MoRTH Publications, IS & BIS codes shall be followed in the project. Design of all proposed structures shall be done in accordance with the provisions of the following Latest IRC Codes:
Table 23: LIST OF IRC CODES
IRC: 5 - Section I- General Features of Design (Eighth Revision)
IRC: 6 - Section II- Loads and Stresses
IRC: 22
- Section IV-Composite construction for Road Bridges (Second Revision)
IRC: 24 - Section V-Steel Road Bridges (Second Revision)
IRC: 78 - Section VII- Foundations and Substructure (Second Revision)
IRC:83(Part-II) - Section IX- Bearings, Part II: Elastomeric Bearings
IRC: 83(Part-III)
- Section IX-Bearings, Part III: POT, POT- CUM-PTFE, Pin and Metallic Guide Bearings
IRC: 87
- Guidelines for the Design and Erection of False work for Road Bridges
IRC: 89
- Guidelines for Design and Construction of River Training and Control Works for Road Bridges (First Revision)
IRC:112 - Code of Practice for Concrete Road Bridges
IRC: SP13 - Guidelines for Design of Small Bridges and Culverts
IRC: SP:40 - Techniques for strengthening & rehabilitation of bridges.
IRC: SP:64
- Guidelines for the Analysis and Design of Cast-in-Place Voided Slab Superstructure
IRC: SP:66 - Guidelines for Design of Continuous Bridges
IRC: SP:69 - Guidelines & Specifications for Expansion Joints
IRC: SP:70 - Guidelines for the Use of High Performance Concrete in Bridges.
IS:14593
- Design and Construction of Bored cast in situ Piles founded on Rocks.
IS: 2062 - Hot rolled medium and high tensile structural steel specifications.
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
IS:14268
- Uncoated stress relieved low relaxation seven Ply strand for pre stressed concrete specifications
IS-2911 - For Pile foundations
IRC:SP:114
- Seismic design for Road Bridges
1.9.2 Special Design Requirements The complete structure shall be designed to be safe against collapse and to maintain at all times an acceptable serviceability level. These shall be also designed to be durable to withstand the deteriorating effects of climate and environment. All new bridges shall have independent superstructures for each direction of travel. Choice of single or independent structure for culverts shall be decided based site condition. Width of median in structural portion will be maintained same as that in the approaches. In cases where median is kept open to sky, suitable provision will be made for retaining the earth likely to spill from median portion of immediate embankment. All new bridges will be provided for carriageway width as per Manual IRC: SP 87. Bridge superstructure may be reinforced concrete, pre-stressed concrete or steel-concrete composite construction. Similarly, the substructure and foundations may also be concrete, steel or steel-concrete composite construction. Bearing of new bridges shall be easily accessible for inspection and maintenance.
Reinforced Earth/R.C.C Retaining wall type can be provided for high fill/embankment with aesthetically pleasing appearance. Design life of reinforcing elements for earth retaining structures shall be 100 years minimum. Structure with viaduct shall be provided for ensuring unhindered local cross movement of pedestrians and local vehicular traffic 1.9.3 Design Basis The design would be carried out using the limit state design philosophy satisfying the requirements of IRC-112. The structure would be designed to meet both the ultimate and serviceability requirements of the code. Ultimate limit state: This cover static equilibrium and failure of structural element or structure as a whole when acted upon by ultimate design load. Serviceability limit state: This deals with the condition of structure subjected to serviceability design loads. These conditions include level of internal stress, fatigue failure, deflection, cracking and discomfort by vibrations. Load Combination shall be adopted as per table B.1 to B.4 of Annex-B of IRC: 6 as given below: Table B.1 for Verification of Equilibrium. Table B.2 for Verification of Structural Strength Table B.3 for Verification of Serviceability Table B.4 for Base Pressure and Design of Foundation
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
At present the combination of loads shown in Table B.4 shall be used for structural design of foundation only. For checking the base pressure under foundation, load combination given in IRC: 78-2014 shall be used. Table B.4 shall be used for checking of base pressure under foundation only when relevant material safety factor and resistance factor are introduced in IRC: 78-2014.
Table 24: Design Parameters for Structures
S. No. Design Figure Standard
1
Service life (Years)
Foundations 100
Piers 100
Deck 100
Bearings i. for MJBR, VUPs and Rail road
structures ii. for other structures
50
25
Expansion Joints 10
Parapets (Concrete) 100
Parapets (Metals) 20
Exposure Condition:
As the general environment condition is Moderate
2 Minimum clear cover to reinforcement is given below. According to Exposure
condition clear cover is provided for structural components as per IRC: 112.
i. Superstructures 40mm
ii. Crash Barrier 50mm
iii. Substructures 50mm
iv. Pre-stressing cable duct 75/90mm
v. Pre-cast elements 45mm
vi. Foundations 75mm
vii. Earth Face of Abutment, return wall, retaining wall, box side wall
75mm
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
viii. NonEarth Face 50mm
3 Grade of Steel
i. HYSD bars
Fe500D (Section 1600 of Specifications: High yield strength deformed bars Fe500 conforming to IS: 1786)
ii Structural Steel Fe490(IS 2062)
S. No. Design Figure
Standard
4 Grade of Concrete
i
Prestressed Concrete
M45/M50
Girder and RCC Deck and Box Girder
ii Precast RCC Girder with RCC Deck M35
iii RCC Box type structure-MNB M35
iv Pier and Pier Cap M35
v Bearing Pedestal M40
vi RCC Abutment, Abutment cap, Return
Wall, Dirt wall.
M35
vii Open foundation, Pile and Pile cap M35
viii Crash Barrier M40
ix Approach slab M30
x Box Culverts M30
xi Leveling course M15
xii Head Wall M20
xiii Parapet wall M30
5 Dead load-(unit wt.)
i Pre-stressed Concrete 2.5 T/m³
ii Reinforced Concrete (RCC) 2.5 T/m³
iii Plain Cement Concrete (PCC) 2.5 T/m³
iv Steel 7.854 T/m³
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
v Wearing Coat 2.2 T/m³
6 Live Load
i
Footpath 400 Kg/m² (Rural area)
500 Kg/m²(Urban area)
ii
c/w 5.3m to 9.6m One lane of class 70R or Two lane of Class
A
iii
c/w 9.6m to 13.1 m
One lane of class 70R for every two lanes with one lane of class A on the remaining lane or 3 lanes of class A
** Live Load shall be considered at inner edge of the carriageway for stage 2 constructions and Girder shall be capable to take care the same.
7 Impact factor
Concrete Bridges
i for Class A 4.5/(6+L)
ii
for Class 70 RT and 70RW
Upto-9m
For Tracked -25% for span up to 5m and linear reducing to 10% for span up to 9m.
For Wheeled-25% for span up to 9m
More than 9 m-
For Tracked - 10% for span between 9m to 40m.As per curve for span more than 40m.
For wheeled-25% for span up to 12m and as per curve for span more than 12m
Steel Bridges
i for Class A 9/(13.5+L)
ii
for Class 70 RT & Class 70 R W
Up to -9m
For Tracked - 25% for span up to 5m and linear reducing to 10% for span up to 9m.
For wheeled-25% for span up to 9m
More than 9m-
For Tracked -10% for all spans. For wheeled-25% for span up to 23m and as per curve for span more than 23m.
8 Wind Load
i As per basic wind speed 47m/s as per IRC: 6, clause 209.
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
9 Horizontal Forces due to water current
i Case-I Parallel to pier
ii Case-II At inclination of (20±θ) to the pier
10 Longitudinal forces
i
Case-I
In case of single lane and two lane 20% of first train load plus 10% of load of succeeding train or part thereof
No. Design Figure
Standard
ii
Case-II
In case of bridges with more than two lane braking force for two lane plus 5 % of the loads on the lanes in excess of two
11 Buoyancy
i 100 % buoyancy for stability check
ii 15 % buoyancy for design
12 Temperature (as per IRC:6-2017 clause 215)
For bridge having difference between max and min air shade temperature-
>200 C Mean of Maximum and Minimum air shade temperature +,- 10˚C
whichever is critical
<200 C Mean of Maximum and Minimum air shade temperature +,- 5˚C
whichever is critical
The nonlinear temperature gradient for design of superstructure shall be considered as per clause 215.3 of IRC: 6.
13 Seismic force (as per IRC:6-2017, clause 219)
i
Zone IV
Bridges in Seismic Zone- IV to be designed for seismic forces and shall be considered as per Clause 219 of IRC 6
14 Expansion Joints
i
Filler type
For span up to 10m(Section 2600 of the specification)
ii
Strip Seal Type
For Span >10m and movement up to ±80 (Section 2600 of specification)
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
iii
Modular Type
movement more than ±80 (Section 2600 of specification)
15 Bearing
i Elastomeric As per design requirements
ii Pot cum PTFE As per design requirements
iii Pin and
Guided Bearing
As per design requirements
iv Spherical Bearing
As per design requirements
16 Wearing Coat 50 mm thick
17
Prestressing (IS: 14268, section 1800 of Specifications):
Uncoated stress relieved low relaxation steel
S. No. Design Figure Standard
Type of Strand-Stress relieved multiply strands of low relaxation Ultimate Stress in Cable -1861 Mpa
Maximum prestress jacking force-0.783(90% of 0.1% of proof load)
1) The maximum force applied to a tendon at active end during tensioning, shall not exceed 90% of 0.1% proof stress 2) The analysis of prestressed section would be as per the stress strain properties given in clause 6.3.5 of IRC-112. 3) Maximum prestressing force applied to structure immediately after transfer shall not be greater than 75% of characteristic tensile strength of prestressing steel or 0.85 of 0.1% of proof load whichever less is. 4)For serviceability limit state the section would be checked for 10% lower (Inferior) and 10% higher (Superior) values of prestressing force as per IRC -112
18 Sheathing HDPE
Time Dependent material properties
19 Shrinkage: Total shrinkage is auto-generous shrinkage and drying shrinkage
20 Creep: Creep to be calculated with time and stress as per IRC112
21 Coefficient of thermal Expansion-12x10-6/degree C
22
Modulus of Elasticity-Modulus of Elasticity to be calculated as per short term and long term creep and shrinkage
23 Minimum Bar Diameter 10 mm (refer Table 5.1,IRC112)
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Diameter if any reinforcing bar including transverse ties, stirrups etc. shall not be less than 10 mm. Diameter of any longitudinal reinforcement bars in columns/ vertical member shall not be less than 12 mm. However diameter of the reinforcing bars shall not exceed 25 mm in slabs and 32 mm in other member.
24 Margin in Material (FOS)
All critical sections shall be checked for stresses under various load combinations. A suitable margin (preferably 5%) shall be there between maximum stress and allowable stress in concrete as well as reinforcement in the final design.
1.9.4 Design Load and Stresses Design loads shall be as per IRC: 6, appropriate for the proposed carriageway width, type and properties of stream, location, altitude, etc. Dead Load (DL) The dead load i.e the self-weight of the superstructure, substructure and foundations, backfill will be considered as per the Cl. 203 of IRC: 6 and are summarized as below;
Wet concrete including reinforcement - 2.6 t/m3 (IRC: 87 – 2011)
Concrete (Cement Reinforced) - 2.5 t/m3
Concrete (Cement Prestressed) - 2.5 t/m3
Concrete (Asphalt) - 2.2 t/m3
Earth (Compacted) - 2.0 t/m3
Concrete (Cement - plain with plum) - 2.5 t/m3
Superimposed Dead Load (SIDL) SIDL comprises of the following items
Crash barrier without Hand Rail – 0.8 t/m Crash barrier with Hand Rail Wearing Course
– –
1.0 t/m 0.246 t/m2
Railing – 0.6 t/m Footpath Load
Crash barrier is adopted as per IRC: 5. Live Load Combinations Live load combinations mentioned in IRC: 6 Table-6 shall be followed as per relevant carriageway width. In general for Bridges and Flyovers following combinations shall be used:
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
i. Class A 3-Lane Loading ii. 1 Lane of 70R + 1 Lane of Class A Loading iii. 1 Lane of 70R + 1 Lane of 70R T Loading iv. IRC Class SV Loading special Multi Axle Hydraulic Trailer Vehicle (Prime Mover with 20 Axle Trailer – GVW =385Ton shall be considered to ply for single carriageway or Dual Carriageway Bridge with a maximum eccentricity of 300mm) Minimum clear distance between the two vehicles shall be 1.2m. The loads which are not mentioned in this clause shall be as per IRC: 6 Where ever footpath is provided in the bridge Footpath live load is taken and bridge is also designed for without footpath case. Live Load shall be considered at inner edge of the carriageway for stage 2 construction and Girder shall be capable to take care the same. Reduction in the longitudinal effect on bridges having more than two traffic lanes due to the low probability that all lanes will be subjected to the characteristic loads simultaneously shall be in accordance with the Table shown below:
Table 25: Lane Reduction Factor for Live Load
Number of lanes Reduction in longitudinal effect For two lanes No reduction For three lanes 10% reduction For SV Loading, during passage on bridge, no other vehicle shall be considered to ply on the bridge. No wind, seismic, braking forces and impact on the live load need to be considered as SV shall moves at a speed not exceeding 5kmph over the bridge.
Notes: a) However, it should be ensured that the reduced longitudinal effects are not less severe than the longitudinal effect, resulting from simultaneous loads on two adjacent lanes. Longitudinal effects mentioned above are bending moment, shear force and torsion in longitudinal direction. b) The above Table is applicable for individually supported superstructure of multi-laned carriageway. In the case of separate sub-structure and foundations, the number of lanes supported by each of them is to be considered while working out the reduction percentage. In the case of combined sub-structure and foundations, the total number of lanes for both Special vehicle loading Structure needs to be checked for special vehicle also. The total load 385T of special vehicle is the load considered to act at 300mm from center of carriageway. No other load is considered to moving on structure when special vehicle is moving.
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Congestion Factor For bridges, flyovers/grade separators close to areas such as ports, heavy industries and mines and any other areas where frequent congestion of heavy vehicles may occur, additional check for congestion of vehicular live load on the carriageway shall be considered. In the absence of any stipulated value, the congestion factor, as mentioned in Table 7 of IRC 6 shall be considered. This factor shall be used as a multiplying factor on the global effect of vehicular live load only. Under this condition, horizontal force due to braking/acceleration, centrifugal action and temperature gradient effect need not be included, but the effect of live load impact shall be included. Longitudinal forces In all road bridges, provision shall be made for longitudinal forces arising from anyone or more of the following causes: a) Tractive effort caused through acceleration of the driving wheels; b) Braking effect resulting from the application of the brakes to braked wheels. c) Frictional resistance offered to the movement of free bearings due to change of
temperature or any other cause. The braking effect on a simply supported span or a continuous unit of spans or on any other type of bridge unit shall be assumed to have the following value:
i. In the case of a single lane or a two lane bridge: twenty percent of the first train load plus
ten percent of the load of the succeeding trains or part thereof, the train loads in one lane only being considered. Where the entire first train is not on the full span, the braking force shall be taken as equal to twenty percent of the loads actually on the span or continuous unit of spans.
ii. In the case of bridges having more than two-lanes: as in (a) above for the first two lanes plus five per cent of the loads on the lanes in excess of two.
Construction Live Load
Construction load wherever applicable may be considered as 0.36 t/m2 of the form area to be considered as per IRC 87. This load include load due to mobile construction plant or equipment and temporary loads.
A minimum dynamic amplification of 50% of the loads during normal lifting operations is to be assumed. When Precast segmental construction is done consequence to stability to the structure to be determine due to sudden loss of segment. Dynamic amplification of 100% is to be considered.
Differential Settlement If the riding quality permits, clause 706.3.2.1 of IRC: 78-2014 specify that the calculated differential settlement between the foundations of simply supported span shall not exceed L / 400 of the distance between the foundations, where L is distance between two foundations. In case of structure sensitive to differential settlement such as continuous structures the value of differential settlement shall be taken as 10mm.
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Temperature Gradient Effective bridge temperature shall be estimated from the isotherms of shade air temperature given in fig 15 and fig 16 of IRC: 6. Difference in temperature between the top surface and other levels through the depth of the structure, where ever applicable shall be taken in accordance with clause :215.3 of IRC:6. Centrifugal Forces Centrifugal forces are considered for spans in curved portion as per IRC 6 Centrifugal forces shall be determined from following formula:
C= WV2/127R
Where,
C =Centrifugal force acting normal to the traffic. W = Live load (tons/m) V= Design speed of vehicles (Km/ hour) R = Radius of curvature (m)
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
It is considered to be acting at 1.2m above deck level. Earth Pressure 1. All earth retaining structures like Abutment and Other Earth Retaining Structures designed
to retain earth fills shall be proportioned to withstand pressure calculated in accordance with any rational theory. Coulomb's theory, subject to the modification that the center of pressure exerted by the backfill, when considered dry, is located at an elevation of 0.42 of the height of the wall above the base instead of 0.33 of that height.
2. For RCC Box Structure-Active Earth pressure / Earth pressure at rest will be considered to
be acting on the vertical walls of the RCC Box. The Co-efficient of such Earth pressure will be taken as 0.5.
3. Surcharge Pressure-All Earth retaining wall is designed for a live load surcharge pressure
equivalent to 1.2 m earth fill as per IRC 6. Wind forces 1. The superstructure shall be designed for wind induced horizontal forces (acting in the
transverse and longitudinal direction) and vertical loads acting simultaneously. The assumed wind direction shall be perpendicular to longitudinal axis for a straight structure or to an axis chosen to maximize the wind induced effects for a structure curved/skewed in plan.
2. The substructure shall be designed for wind induced loads transmitted to it from the Super
structure and wind loads acting directly on the substructure. Loads for wind with Live Load and without Live load shall be envisaged.
3. The longitudinal force on bridge superstructure (in N) shall be taken as 25% and 50% of
the transverse wind load as calculated as per Clause 209 for beam/box/plate girder bridges and truss girder bridges respectively.
Water Current Forces Any part of a road bridge which may be submerged in running water shall be designed to sustain safely the horizontal pressure due to the force of the current. On piers parallel to the direction of the water current, the intensity of pressure shall be calculated from the following equation: P = 52KV^2
Where, P = intensity of pressure due to water current, in kg/m^2 V = the velocity of the current at the point where the pressure intensity is being calculated, in meter per second, and K = a constant having the following values for different shapes of piers illustrated in Fig.11
i. Square ended piers (and for the superstructure)1.50 ii. Circular piers or piers with semi-circular ends 0.66 iii. Piers with triangular cut and ease waters, the angle included between the faces being 30° or less 0.50 iv. Piers with triangular cut and ease waters, the angle included between the faces being
more than 30° but less than 60° 0.50 to 0.70 v. do- 60 to 90° 0.70 to 0.90
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
vi. Piers with cut and ease waters of equilateral 0.45 arcs of circles vii. Piers with arcs of
the cut and ease waters 0.50 intersecting at 90° Buoyancy
1. In the design of abutments, especially those of submersible bridges, the effects of buoyancy shall also be considered assuming that the fill behind the abutments has been removed by scour.
2. To allow for full buoyancy, a reduction shall be made in the gross weight of the member affected by reducing its density by the density of the displaced water. The density of water may be taken as 1 .0 t/m2. For artesian condition, HFL or actual water head, whichever is higher, shall be considered for calculating the uplift.
3. In the design of submerged masonry or concrete structures, the buoyancy effect through pore pressure may be limited to 15% of full buoyancy. 213.4 In case of submersible bridges, the full buoyancy effect on the superstructure shall be taken into consideration.
Seismic Forces The project corridor falls under seismic zone- IV (High seismic zone). Seismic design is carried out as per zone and as per codal provisions along with provision of ductile detailing and seismic arrestor Block. All bridges supported on piers, pier bents and arches, directly or through bearings, and not exempted below in the category (a) and (b), are to be designed for horizontal and Vertical forces as given in the following clauses. The following types of bridges need not be checked for seismic effects: a) Culverts and minor bridges up to 10 m span in all seismic zones. The effect of Vertical component may be omitted for all elements in zone-IV for following cases as applicable for said project. a) Bearing and Linkage b) Horizontal cantilever structural element c) For stability Combination of component motion The seismic force assumed to be coming from any horizontal direction. For this purpose two separate analyses shall be performed for design seismic forces along two orthogonal directions. The design seismic forces resultants at any cross-section of a bridge component resulting from the analysis in three orthogonal horizontal directions shall be combined as below:
a) ±r1 ± 0.3r2± 0.3r3 b) ±0.3r1 ± r2±0.3r3 c) ±0.3r1 ± 0.3r2± r3
Where, r1 = Force resultant due to full design seismic force along x-direction
r2 = Force resultant due to full design seismic force along z-direction
r3 = Force resultant due to full design seismic force along y-direction
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
To improve the performance of the Bridge during earthquake, the bridges in seismic zone IV may be specifically detailed for ductility for which IRC: 112 shall be referred. Seismic Analysis The Seismic Analysis of the bridges shall be carried out using following method as per applicability defined in Table 5.3, of IRC :SP:114 – 2018,depending upon the complexity of the structure and the input ground motion.
a) Elastic seismic acceleration method (Static load) b) Elastic Response Spectrum Method c) Time history Method
Accidental Load Bridge piers of wall type, columns or the Frames built in median or in the vicinity of the carriageway supporting the superstructure shall be designed to withstand Vehicle collision loads as per clause 222.1 of IRC: 6. The effect of collision load shall not be considered on abutments or on the structures separated from the edge of the carriageway by a minimum distance of 4.5m and also not be combined with principal live loads on the carriageway supported by the structural members subjected to such collision loads as well as wind or seismic load as per cl 222.1.2 of IRC: 6. Where pedestrian/cycle track bridge ramps and stairs are structurally independent of the main highway spanning structure, their support need not be design for vehicle collision loads. Material factor of safety under collision load, reference shall be made to the provision in IRC: 112 for concrete and IRC: 24 for steel. For permissible overstressing in foundation, refer provision of IRC: 78. Collision Load The normal loads given in Table 22 of IRC: 6 shall be considered to act horizontally as Vehicle Collision loads. Supports shall be capable of resisting the main and residual components acting simultaneously. Load normal to the carriage way below and loads parallel to the carriageway below shall be considered to act separately and shall not be combined. The loads in Table 22 indicated in clause 222.3.1 are assumed for vehicles plying at velocity of about 60km/hours. In case of vehicles travelling in lesser velocity, the load may be reduced in proportion to the square of the velocity but not less than 50 percent. The bridge supports shall be designed for residual load component only, if protected with suitably designed fencing system taking in to account its flexibility, having a minimum height of 1.5m above the carriageway level.
Culverts As per Manual the culverts with vertical clearance 3 m can be used by cattle and pedestrians during dry season.
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
1.10 HYDROLOGY, TRAINING WORKS AND ROAD DRAINAGE 1.10.1 Hydrological study For performing the hydrological and hydraulic analysis which essentially need the design flood of a specific return period for fixing the waterway vis-à-vis the design HFL of bridges depending upon their size and importance to ensure safety as well as economy. As per IRC 5-Section I General Features of Design specify that the waterway of a bridge is to be designed for a maximum flood of 100 years return period and SP 13. The catchment area shall be marked on the topo-sheets of Survey of India for their assessment.
The following methods can be used to estimate the peak discharge for bridge sites on major
and minor streams up to the catchment area of 5000 m2;
▪ Empirical Formulae ▪ Rational Method ▪ Synthetic Unit Hydrograph Method
In case of catchment area is more than 5000 sq km, the discharge calculations shall be based on the area velocity method at local enquiry highest flood level/ water marks on nearest bridge or the basis of dam outflow data with reference to the catchment area at proposed bridge location. Highest of above shall be considered at design discharge. With the design discharge, calculations for the 100-year flood level shall be obtained using manning’s equation based on the 100-year flood discharge. Afflux calculation, span arrangement and scour levels for piers and abutment shall be estimated. Embankment crossing the submergence of dam shall be encroaching the minimum area. Height of structure shall be based on the dam top level & its maximum water level. 1.10.2 Road drainage Road drainage shall be designed to cater the rainwater into the side drain quickly in order to avoid stagnation of rainwater over road surface. The section of the drain shall be designed on the basis of IRC 42 and IRC 50. The relevant latest publications and Indian Standards are given below
Table 26: Relevant Codes & References
Designation Issued by Date of issue IRC:5 Standard specifications and code of practice for road bridges section-I
IRC
2015
SP13 : Guidelines for the design of small bridges and culverts
IRC
2004
IRC: SP-84-Manual of specifications and standards for four laning of highways through public private partnership
IRC
2014
IRC-78 -Standard specifications and code of practice for road bridges Section – VII
IRC
2014
IRC:89 - Guidelines for design and construction of River Training and control works for road bridges
IRC
1997
SP42 : Guidelines on road drainage IRC 2004
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Central Water Commission : flood estimation report Chambal subzone 1(b) & upper indo ganga plains 1(e)
CWC
1988 & 1984
1.10.3 Side Slopes IRC: 36-2010 recommends the following side slopes for highway embankments, purely from the safety point of view.
1V: 1.5 H up to 12m heights with slope protection 1V: 1.5 H with partial retaining wall above 12m embankment height.
1.10.4 Slope Protection Measure Side Slope of embankments affected by flood shall be protected with pitching or geo-fiber on over granular filter. The Pitching shall be extended up to 0.5m above the HFL. All other locations side slopes shall be protecting by seeding & mulching as per specification clause 308 of specification of road & bridge works (MoRT&H) in consultation with the NHAI/ Independent Engineer. 1.10.5 River Training & Flood Protection Works The proposed protective measures are to be designed in accordance with the requirement of IRC: 89-1998. It is proposed to provide stone pitching of suitable thickness all around the abutments and in the front portion of abutment with suitable thickness, which will be extended up to 1.5m above HFL. In order to prevent embankment erosion during high flood, bank protection works shall be provided as required. For River Training works, if required, for protection of Embankment, detailed hydrological investigation will be carried out and necessary protection works if required will be provided, based on study report.
Flood protection measures shall be provided as follows: a) Construction of guide bunds up to HFL, along both the banks of streams/rivers joining to
contain back flow during Flood.
b) Raising the invert of the vehicular and pedestrian underpasses above design HFL or providing an auxiliary bund downstream
2 TRAFFIC SURVEYS In order to capture traffic and travel characteristics, speed characteristics, users’ preference regarding toll imposition of traffic passing through the existing alternative routes from Delhi to Dehradun, following primary traffic surveys were conducted.
▪ Classified traffic volume count (CTVC) using ATCC method. ▪ Origin – destination survey (OD) ▪ Speed and Delay studies
The classified volume count surveys were carried out at five locations, considering the possibility of diversion of traffic from existing alternative routes to proposed expressway. These locations are characterized by centers of heavy economic activities, population and are away
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
from the influence of city areas in order to avoid the influence of local traffic. The surveys were conducted continuously for seven consecutive days for 24 hours through Automatic Traffic Counter and Classifier (ATCC) method. 2.1 OBJECTIVES OF TRAFFIC STUDY
The objective of traffic study is to provide basic input for the following part of the Study: ➢ Finding out the present level of traffic flow and its various characteristics (through
Classified Traffic Volume Count)
➢ Capacity assessment based on demand forecasting for next 15 years.
➢ Identifications of zone of influence of the project stretch as per O-D Survey and
Commodity Movement Characteristics survey.
➢ Intersection turning movement data defines the requirement of geometric improvement
of present intersection layout to improve the junction capacity or to provide underpass
or flyover.
➢ Pavement design.
➢ Signal design.
➢ Deriving Growth Factor for Traffic Demand Forecasting.
➢ Study of possible location & design of toll plaza.
➢ Development of wayside amenities.
2.2 HOMOGENEOUS SECTIONS The project stretch is divided into two homogenous sections based on existing traffic pattern or characteristics. The homogenous sections are mentioned in Table 2.1.
Table 2.1: Homogeneous Sections
Sl. No. Road Section
Chainage
Length (Km)
From (Km) To (Km)
1 Delhi-Saharanpur Bypass 0+000 119+790 118
Figure 6: Traffic Survey Location
Traffic Survey Location at start point
(near Baghpat) Traffic Survey Location at End Point
(Near Saharanpur Bypass)
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Fig. 7 –Homogeneous section of project road
Table 2.2: Schedule of Traffic Volume Count Survey
Location
Start Date
End Date Duration
(days)
BAGHPAT
11-08-2019 17-08-2019 7
RATTANGARH
11-08-2019 17-08-2019 7
GAGALHERI
11-08-2019 17-08-2019 7
GANESHPUR
11-08-2019 17-08-2019 7
The AADT value of base year (FY-2019) is used for the traffic volume projection up to horizon year and projected traffic volume is used in design of pavement and for projecting the tollable traffic.
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Table 2.3: Summary of ADT and AADT at Survey Locations
Sl. No.
Location
ADT AADT
Nos. PCUs Nos. PCUs
1 BAGHPAT
21270
23377
15250
16620
2 RATTANGARH
24965 35358
17705
24611
3 GAGALHERI
17984
24947
12862
17821
4 GANESHPUR
17462
20328
12467
14393
Table 2.4: Annual Average Daily Traffic at Survey Locations
Vehicle Type BAGHPAT RATTANGARH GAGALHERI GANESHPUR
2W 6183 5020 4028 3681
Auto Rick 371 267 302 43
Car/ Van/ Jeep 6217 7321 4754 6315
Mini Bus 226 252 260 501
Std. Bus 917 1083 714 813
LCV 403 631 508 388
2-Axle Truck 210 907 516 249
3-Axle Truck 263 1638 1185 302
Multi Axle Truck 230 378 118 47
Agr. Tractor Without Trailer 88 98 139 9
Agr. Tractor With Trailer 70 93 158 109
Animal Drawn 56 6 147 9
Cycle 16 12 28 1
Cycle Rick 0 0 4 0
Total Vehicle 15250
17705
12862
12467
Total PCU 16620
24611
17821
14393
3 MATERIAL INVESTIGATIONS
Borrow Area Soil Borrow area soil locations have been identified for the sub-grade and embankment and representative samples have been collected from potential locations for laboratory testing. Summary of observed CBR test results of borrow area soil samples are given in table below
Project Report
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Table 3.1: Summary of CBR Test Results of Borrow Area Soil Samples
Sl. N
o.
CHAINAGE
Grain size analysis
Atterberg Limits
SPE
CIF
IC
GR
AV
ITY
Heavy Compaction
C.B.R
Gra
vel (
%)
Sand
(%
)
Silt
(%
)
Cla
y (%
)
LIQ
UID
L
IMIT
(%
)
PL
AST
IC
LIM
IT (
%)
PL
AST
ICIT
Y
IND
EX
(%
)
OM
C (
%)
M.D
.D.
(gm
/cc
)
Soak
ed
Uns
oake
d
1
4+000
0
27
65
8
25.12
17.68
7.4
2.66
11.35
1.95
10.20
19.40
2
12+000
0
25
69
6
24.80
20.12
4.7
2.65
10.89
1.94
9.00
18.50
3
20+000
0
27
65
8
25.30
17.46
7.8
2.66
11.25
1.95
9.80
19.80
4
28+000
0
30
68
2
N
P
-
2.64
10.80
1.89
17.60
20.20
5
35+200
0
65
35
0
N
P
-
2.63
10.20
1.87
18.50
22.50
6
44+000
0
38
57
5
23.60
17.70
5.9
2.64
10.80
1.93
10.20
19.80
7
52+000
0
24
70
6
23.12
18.35
4.8
2.65
11.50
1.94
11.80
18.40
8
60+000
3
29
60
8
25.00
17.80
7.2
2.66
12.20
1.97
12.90
19.80
9
68+000
0
36
59
5
25.10
19.50
5.6
2.64
10.26
1.95
11.10
19.90
10
76+000
0
18
75
7
25.14
18.46
6.7
2.65
11.25
1.93
10.00
16.40
11
84+000
0
21
70
9
27.65
22.16
5.5
2.65
12.10
1.95
12.10
18.00
12
92+000
0
7
74
19
34.10
23.50
10.6
2.68
12.60
2.12
6.60
14.70
13
100+000
0
8
76
16
31.60
21.60
10.0
2.67
12.40
2.05
8.90
16.10
14
108+000
0
95
5
0
N
P
-
2.62
10.00
1.89
19.60
24.10
15
116+000
0
57
43
0
N
P
-
2.63
10.80
1.87
17.40
21.40
Project Report
38
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
4 GEOMETRIC IMPROVEMENT Project highway is a green-field alignment proposed to be developed with a design speed of 100kmph. All design parameters are as per IRC SP 87: 2019 are to be followed; the median width adopted is 5m. The geometric design of the Project Highway shall conform to the standards set out in the Manual for Six lane Highway(IRC: SP: 87-2019). The project highway is to be developed as Four lane divided carriageway with a provision of future widening towards the median. The various typical cross sections used for the project road sections are given in table below:
Table 4.1: TCS Schedule
Sl. No. Design Chainage Length
(km) TCS Type Name of Typical Cross-section
From (km) To (km)
1 0.000 0.918 0.918 TCS-1A Typical Cross section of 6-lane divided highway at Interchange-1 Approach with Existing NH-709 B
2 0.918 1.500 0.582 TCS-1B Typical Cross section of 6-lane divided highway at
Interchange-1 Approach with Ramp
3 1.500 7.500 6.000 TCS-2 Typical Cross section of 6-lane divided highway
without Paved Shoulder
4 7.500 8.600 1.100 TCS-3 Typical Cross section of 6-lane divided highway at
Interchange-2 Approach
5 8.600 27.000 18.400 TCS-2 Typical Cross section of 6-lane divided highway
without Paved Shoulder
6 -0.400 -0.000 400 TCS-1C Typical Cross section of 4-lane divided highway on
Existing NH-709B
7 27.000 27.400 0.400 TCS-2 TYPICAL CROSS SECTION OF 6-LANE DIVIDED
HIGHWAY WITHOUT PAVED SHOULDER
8 27.400 28.600 1.200 TCS-3 TYPICAL CROSS SECTION FOR 6-LANE
DIVIDED HIGHWAY AT INTERCHANGE-3 & 4 APPROACH
9 28.600 55.550 26.950 TCS-2 TYPICAL CROSS SECTION OF 6-LANE DIVIDED
HIGHWAY WITHOUT PAVED SHOULDER
10 55.550 56.500 0.950 TCS-3 TYPICAL CROSS SECTION FOR 6-LANE
DIVIDED HIGHWAY AT INTERCHANGE-3 & 4 APPROACH
11 56.500 68.000 11.500 TCS-2 Typical Cross section of 6-lane divided highway
without Paved Shoulder
12 68.000 69.900 1.900 TCS-3 Typical Cross section of 6-lane divided highway at
Interchange-5 Approach
13 69.900 82.000 12.100 TCS-2 Typical Cross section of 6-lane divided highway
without Paved Shoulder
14 82.000 82.300 0.300 TCS-2 Typical Cross section of 6-lane divided highway
without Paved Shoulder
15 82.300 83.500 1.200 TCS-3 Typical Cross section of 6-lane divided highway at
Interchange-6 Approach
16 83.400 118.620 35.220 TCS-2 Typical Cross section of 6-lane divided highway
without Paved Shoulder
17 118.700 119.790 1.090 TCS-9 Typical Cross section of 6-lane divided highway at
Interchange-7 Approach with Ramp
Project Report
38
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Table 4.2: Typical Cross Section
Project Report
44
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Project Report
45
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Project Report
46
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Project Report
47
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Project Report
48
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
5 WAY SIDE AMENITIES / SERVICE AREA The locations of the wayside amenities are given below.
Table 5.1: Wayside Amenities Locations
S. No. Start (Km) End (Km) Side Type of facility Area
1 5.750 5.950 Both side Road user facility 2 ha + 2 ha
2 29.950 30.150 Both side Road user facility 2 ha + 2 ha
3 52.800 53.000 Both side Road user facility 2 ha + 2 ha
4 75+014 75+450 Both side Road user facility 12 ha + 12 ha
5 96.243 96.443 Both side Road user facility 2 ha + 2 ha
6 TOLL BOOTHS Toll booths has been provided as per IRC: SP-99. Toll booth are designed for peak hour traffic projected for minimum 25 years. The total number of toll booths and lanes are designed to ensure the service time of not more than 10 seconds per vehicle at peak flow. The width of each toll lane will be 3.5m for ETC/Manual/Smart card lanes proposed as per NHAI guidelines and one lane at the extreme outer side for over dimensional vehicles of 4.50m. Between each toll lane, traffic islands will be provided so as to accommodate toll booth. These islands will be of minimum 25 m length and 1.8m width. Protective barriers of reinforced concrete will be placed at the front of each island to prevent out of control approaching vehicles crashing into the toll booth. They would be painted with reflective chevron markings. The area of toll booth covering the flared portion will be same as that of main carriageway. The fee collection system will be electronic toll collection (ETC) system. The Toll Booth(s) are aesthetically pleasing as per the design. The fee collection staff would be efficient, courteous and adequately trained before deployment.
Project Report
49
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
7 INTERSECTION PROPOSALS
Being fully access controlled, there will be no at grade junctions with the project Highway. Entry/Exit will be only from interchanges. At grade intersections adversely influence the quality of highways in terms of speed, capacity and safety because of interruptions to the flow of traffic. Thus the basic requirement for the design of intersections is not only to cater for safe movements for the drivers, but also to provide them full traffic information by way of signs, pavement markings and traffic signals. Further, simplicity and uniformity should be the guiding principles for interchange design to ensure the safe passage of maneuvers and reduce conflict points, either by elimination of certain maneuvers or separated in space, horizontally or vertically. Moreover, for a project highway carrying a high volume of traffic on the proposed six lane carriageway and where the design speed is 100 Kmph proposing an at grade intersection would be fatal and would also not pass the safety audit requirements. Keeping in view the safety hazard at high speed & volume of traffic on the project highway no at-grade intersection has been provided. Grade separation shall be provided at all intersection with National Highway and State Highway. In addition to this Grade Separators will be provided across other categories ofroads. It has been decided to give safe crossing to all roads. In case two crossings are at close interval then access will be given to one and other will be joined by service road. Grade separated interchange is proposed at the following location:
Table 7.1: List of Interchanges
S. No Design Chainage Type of Interchange Road crossing 1
1 0+000 INTERCHANGE-
1
2 7+895 INTERCHANGE-
2
3 27+900 INTERCHANGE-
3
1 0+000 INTERCHANGE-
1
2 7+895 INTERCHANGE-
2
3 27+900 INTERCHANGE-
3
0+000 Ramps EPE-BAGHPAT
2 8+043 Loops, Ramps MEERUT-BAGHPAT-NH334B
3 28+000 Rotary BARAUT-BUDAHA (MDR)
4 56+054 Loops , Ramps MEERUT-SHAMLI-709A
5 69+300 Loop , Ramps MZN-SHAMLI-PANIPAT
6 82+870 Rotary THANABHAWAN-MZN ROAD 7 119+068 Loop, Ramp SAHARANPUR BYPASS
8 PROPOSAL FOR STRUCTURES The summary of structures along the project highway is given in table below:
Table 8.1: Summary of Proposed Structures
Sl. No. Type of structures Numbers
1 ROB 1
2 Interchange 7
3 Flyover 0
4 Major Bridge 2
5 Major Bridge cum LVUP 0
6 Major Bridge cum SVUP 0
5 Major Bridge cum VUP 0
7 Minor Bridge 21
Project Report
50
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
8 Minor Bridge cum LVUP 5
9 Minor Bridge cum SVUP 0
10 Minor Bridge cum VUP 0
11 VUP 13
12 LVUP 49
13 SVUP 0
14 Viaduct 0
15 Culvert Box 184
16 Culvert Pipe 87
17 Structures on Loops of Interchange (VUP & VOP)
Total
Structure proposals Major Bridges:
Sl. No. Design Chainage
(km) Clear Span (No of SpanX C/C of
exp.Jt. (m) Total Width (m)
1 35.875 4x21 2x15.1
2 109.428 2x30 2x15.1 -
Major Bridge cum LVUP
S. No.
Design Chainage
(Km)
Span Arrangement
(m)
Total
width (m)
Remarks
Major Bridge cum SVUP
S. No. Design
Chainage (Km)
Span Arrangement
(m)
Total width (m)
Remarks
Major Bridges cum VUP:
S. No. Design
Chainage (Km)
Span Arrangement
(m)
Total width (m)
Remarks
Minor Bridges
Sl. No.
Design Chainage
(km)
Clear Span (No of SpanX Clear Span
Length (m) Total Width (m) Remarks
1 2.117 1x12 2x15.1 Canal Crossing
2 12.558 1x18 2x15.1 Canal Crossing
3 14.110 1x18 2x15.1 Canal Crossing
4 16.178 1x30 2x15.1 Canal Crossing
Project Report
51
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Sl. No.
Design Chainage
(km)
Clear Span (No of SpanX Clear Span
Length (m) Total Width (m) Remarks
5 17.300 1x16 2x15.1 Canal Crossing
6 17.698 1x6x4 2x15.1 Canal Crossing
7 18.081 10+20+10 2x15.1 Canal Crossing
8 18.478 1x30 2x15.1 Canal Crossing
9 23.691 1x20 2x15.1 Canal Crossing
10 26.057 1x20 2x15.1 Canal Crossing
11 31.675 1x18.27 2x15.1 Canal Crossing
12 32.203 1x21.06 2x15.1 Canal Crossing
13 43.676 1x16 2x15.1 Canal Crossing
14 50.780 1x30 2x15.1 Canal Crossing
15 70.000 1X10 2x15.1 Canal
16 77.062 1x16 2x15.1 Canal cum Road
17 83.149 1x20 2x15.1 -
18 93.668 1X25 2x15.1 -
19 98.355 1X20 2x15.1 -
20 112.318 1x40 2x15.1 -
Minor Bridge cum LVUP:
Minor Bridges cum SVUP
Minor Bridge cum VUP:
S.
No.
Design Chainage (Km)
Span Arrangement
(m)
Total
width (m)
Remarks
1 21.000 1X24.55 4.0 2x15.1
2 53.232 1X16 4.0 2x15.1 3 71.366 1x19.75 4.0 2x15.1 4 92.000 1x15+1x20+1x15 4 2x15.1 5 95.138 1x20+1x40 4 2x15.1
S. No.
Design
Chainage (Km)
Span Arrangement
(m)
Total Width (m)
Remarks
NILL
S. No.
Design
Chainage (Km)
Span Arrangement
(m)
Total Width (m)
Remarks
NILL
Project Report
52
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Road over-bridges
Viaduct:
Culverts :-
Sl. No
Design Chainage (km)
Type of Structures Vent Size No x Width
(m) or (Dia) x Height
(m)
Remark
2.209 RCC Box 1x3.5x2.5 Cross
Drainage
2.775 HPC 1x1.2 Irrigation
Gul
3.003 RCC Box 1x3.5x2.5 Cross
Drainage
3.062 HPC 1x1.2 Irrigation
Gul
3.947 RCC Box 1x3.5x2.5 Cross
Drainage
4.121 HPC 1x1.2 Irrigation
Gul
4.512 RCC Box 1x3.5x2.5 Cross
Drainage
4.595 HPC 1x1.2 Irrigation
Gul
4.729 HPC 1x1.2 Irrigation
Gul
4.955 RCC Box
1X6x3 Cart track
/drain
5.461 RCC Box
1X6x3 Cart track
/drain
5.583 HPC 1x1.2 Irrigation
Gul
6.046 RCC Box
1X6x3 Cart track
/drain
6.408 HPC 1x1.2 Irrigation
Gul
7.051 RCC Box 1x3.5x2.5 Cross
Drainage
7.118 RCC Box
1X6x3 Cart track
/drain
7.848 HPC 1x1.2 Irrigation
Gul
Sl. No.
Design Chainage (km)
Structure Type Span (No of
SpanX Span Length (m)
Total Width (m)
1 15.739 Composite Steel Girder
3x36+1x18 2x15.1
S. No. Design Chainage (In Km)
Span Arrangement (m)
Total width (m)
Remarks
Nil
Project Report
53
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
8.688 RCC Box 1x3.5x2.5 Cross Drainage
9.298 RCC Box
1X6x3 Cart track /drain
9.615 HPC 1x1.2 Irrigation Gul
9.855 RCC Box 1x3.5x2.5 Cross Drainage
10.733 RCC Box
1X6x3 Cart track /drain
10.948 RCC Box 1x3.5x2.5 Cross Drainage
11.663 HPC 1x1.2 Irrigation Gul
11.855 HPC 1x1.2 Irrigation Gul
11.983 RCC Box 1x3.5x3.5 Cross Drainage
12.748 RCC Box 1x3.5x2.5 Cross Drainage
13.038 RCC Box
1X6x3 Cart track /drain
14.300 HPC 1x1.2 Irrigation Gul
14.748 RCC Box 1x3.5x2.5 Cross Drainage
15.488 RCC Box 1x3.5x3.5 Cross Drainage
16.498 RCC Box 1x3.5x2.5 Cross Drainage
16.770 RCC Box 1x3.5x2.5 Cross Drainage
17.470 RCC Box 1x3.5x2.5 Cross Drainage
19.554 HPC 1x1.2 Irrigation Gul
19.600 RCC Box 1x3.5x2.5 Cross Drainage
20.120 RCC Box 1x3.5x2.5 Cross Drainage
20.361 RCC Box 1x3.5x2.5 Cross Drainage
20.756 HPC 1x1.2 Irrigation Gul
21.487 RCC Box 1x3.5x2.5 Cross Drainage
21.923 HPC 1x1.2 Irrigation Gul
22.023 RCC Box
1X6x3 Cart track /drain
Project Report
54
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
22.204 HPC 1x1.2 Irrigation Gul
22.441 HPC 1x1.2 Irrigation Gul
23.236 HPC 1x1.2 Irrigation Gul
23.865 RCC Box 1x3.5x2.5 Cross Drainage
24.000 HPC 1x1.2 Irrigation Gul
24.059 RCC Box
1X6x3 Cart track /drain
24.524 HPC 1x1.2 Irrigation Gul
25.148 RCC Box
1X6x3 Cart track /drain
25.848 RCC Box 1x3.5x2.5 Cross Drainage
26.460 RCC Box
1X6x3 Cart track /drain
26.960
RCC Box 1x3.5x2.5 Cross Drainage
28.900 Box Culvert 1X3.5X
2.5 Cross Drainage
28.954 Pipe Culvert 1X1.2 Irrigation gul
29.100 Pipe Culvert 1X1.2 Irrigation gul
29.154 Box Culvert 1X6x3 Cross Drainage
28.535 Box Culvert 1X3.5X
2.5 Cross Drainage
29.775 Box Culvert 1X6x3 Cross Drainage
29.932 Box Culvert 1X3.5X
3.5 Cross Drainage
30.228 Box Culvert 1X6x3 Cross Drainage
30.670 Box Culvert 1X3.5X
2.5 Cross Drainage
30.752 Pipe Culvert 1X1.2 Irrigation gul
30.995 Pipe Culvert 1X1.2 Irrigation gul
31.510 Pipe Culvert 1X1.2 Irrigation gul
32.011 Pipe Culvert 1X1.2 Irrigation gul
32.092 Pipe Culvert 1X1.2 Irrigation gul
Project Report
55
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
32.259 Pipe Culvert 1X1.2 Irrigation gul
32.427 Pipe Culvert 1X1.2 Irrigation gul
32.581 Box Culvert 1X6x3 Cross Drainage
32.703 Pipe Culvert 1X1.2 Irrigation gul
33.003 Box Culvert 1X6x3 Cross Drainage
33.429 Pipe Culvert 1X1.2 Irrigation gul
33.940 Box Culvert 1X3.5X3.5 Cross Drainage
34.240 Box Culvert 1X3.5X3.0 Cross Drainage
34.511 Pipe Culvert 1X1.2 Irrigation gul
34.776 Pipe Culvert 1X1.2 Irrigation gul
35.382 Box Culvert 1X6x3 Cross Drainage
35.599 Pipe Culvert 1X1.2 Irrigation gul
36.399 Box Culvert 1X3.5X2.5 Cross Drainage
36.513 Box Culvert 1X3.5X2.5 Cross Drainage
36.685 Box Culvert 1X6X3 Cross Drainage
36.905 Box Culvert 1X3.5x2.5 Cross Drainage
37.099 Pipe Culvert 1X1.2 Irrigation gul
37.313 Box Culvert 1X6x3 Cross Drainage
37.658 Pipe Culvert 1X1.2 Irrigation gul
37.940 Box Culvert 1X6x4 Cross Drainage
38.440 Box Culvert 1X6x3 Cross Drainage
38.742 Box Culvert 1X6x3 Cross Drainage
38.960 Box Culvert 1X6x3 Cross Drainage
39.548 Pipe Culvert 1X1.2 Irrigation gul
39.998 Pipe Culvert 1X1.2 Irrigation gul
Project Report
56
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
40.177 Box Culvert 1X6x3 Cross Drainage
40.346 Box Culvert 1X6x3 Cross Drainage
40.782 Box Culvert 1X6x3 Cross Drainage
41.843 Box Culvert 1X6x3 Cross Drainage
42.144 Box Culvert 1X6x3 Cross Drainage
42.886 Pipe Culvert 1X1.2 Irrigation gul
43.342 Pipe Culvert 1X1.2 Irrigation gul
44.350 Box Culvert 1X6x3 Cross Drainage
45.113 Pipe Culvert 1X1.2 Irrigation gul
45.486 Box Culvert 1X6x3 Cross Drainage
46.750 Box Culvert 1x5x3.0 Cross Drainage
47.066 Pipe Culvert 1X5x3.0 Irrigation gul
47.848 Pipe Culvert 1X1.2 Irrigation gul
47.922 Box Culvert 1X6x3.5 Cross Drainage
48.620 Box Culvert 1X6x3 Cross Drainage
49.548 Pipe Culvert 1X1.2 Irrigation gul
49.960 Box Culvert 1X6x3 Cross Drainage
50.249 Pipe Culvert 1X1.2 Irrigation gul
50.714 Box Culvert 1X6x4 Cross Drainage
50.960 Box Culvert 1X6x3 Cross Drainage
51.356 Box Culvert 1X6x3 Cross Drainage
51.613 Box Culvert 1X6x3 Cross Drainage
52.109 Box Culvert 1x5x3 Cross Drainage
52.548 Pipe Culvert 1X1.2 Irrigation gul
53.418 Pipe Culvert 1X1.2 Irrigation gul
Project Report
57
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
53.698 Pipe Culvert 1X1.2 Irrigation gul
53.838 Box Culvert 1X6x3 Cross Drainage
54.364 Pipe Culvert 1X1.2 Irrigation gul
54.624 Pipe Culvert 1X1.2 Irrigation gul
54.770 Box Culvert 1X6x3 Cross Drainage
54.849 Pipe Culvert 1X1.2 Irrigation gul
55.153 Pipe Culvert 1X1.2 Irrigation gul
56.448 Box Culvert 1X6x3 BT Road
57.318
Box Culvert 1x6x3.5
57.688
Pipe Culvert 1x1.2dia
57.988
Box Culvert 1x6x3
58.108
Pipe Culvert 1x1.2dia
58.362
Box Culvert 1x6x3
58.595
Pipe Culvert 1x1.2dia
59.530
Box Culvert 1x3.5x2.5
59.718
Pipe Culvert 1x1.2dia
60.040
Box Culvert 1x3.5x2.5
60.385
Box Culvert 1x6x3
60.758
Pipe Culvert 1x1.2dia
61.626
Box Culvert 1x6x3
61.953
Pipe Culvert 1x1.2dia
62.033
Pipe Culvert 1x1.2dia
62.341
Box Culvert 1x6x4
62.507
Pipe Culvert 1x1.2dia
63.071
Box Culvert 1x3.5x2.5
Project Report
58
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
63.495
Box Culvert 1x6x3
63.834
Box Culvert 1x3.5x2.5
63.971
Box Culvert 1x3.5x2.5
64.208
Box Culvert 1x3.5x2.5
65.060
Box Culvert 1x3.5x2.5
65.547
Box Culvert 1x6x3
66.328
Pipe Culvert 1x1.2dia
67.156
Box Culvert 1x3.5x2.5
67.964
Box Culvert 1x3.5x3
70.548
Box Culvert 1x3.5x2.5
71.032
Pipe Culvert 1x1.2dia
71.498
Pipe Culvert 1x1.2dia
71.732
Box Culvert 1x3.5x2.5
72.256
Box Culvert 1x3.5x3.5
72.559
Box Culvert 1x3.5x2.5
72.824
Box Culvert 1x3.5x2.5
73.156
Box Culvert 1x6x3
73.465
Pipe Culvert 1x1.2dia
73.622
Box Culvert 1x3.5x2.5
73.807
Box Culvert 1x6x4
74.145
Pipe Culvert 1x1.2dia
74.300
Box Culvert 1x6x3
74.492
Box Culvert 1x6x3
74.870
Box Culvert 1x6x3.5
75.082
Pipe Culvert 1x1.2dia
Project Report
59
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
75.330
Box Culvert 1x6x3
75.414
Box Culvert 1x4x3
76.107
Pipe Culvert 1x1.2dia
76.449
Pipe Culvert 1x1.2dia
76.797
Box Culvert 1x6x3
77.592
Box Culvert 1x3.5x2.5
77.994
Box Culvert 1x3.5x2.5
78.243
Pipe Culvert 1x1.2dia
79.108
Pipe Culvert 1x1.2dia
79.715
Pipe Culvert 1x1.2dia
80.050
Box Culvert 1x3.5x2.5
80.377
Pipe Culvert 1x1.2dia
80.912
Box Culvert 1x3.5x2.5
81.118
Box Culvert 1x3.5x2.5
81.500
Box Culvert 1x3.5x2.5
81.653
Pipe Culvert 1x1.2dia
81.824
Box Culvert 1x6x3
83.455 Box Culvert
1x3.5x2.5 Cross Drainage
83.996 Box Culvert
1X6x3 Cross Drainage
84.126 Box Culvert
1x3.5x2.5 Cross Drainage
84.346 Pipe Culvert
1x1.2 dia Irrigation gul
84.563 Pipe Culvert
1x1.2 dia Irrigation gul
85.376 Box Culvert
1x6x3 Cross Drainage
85.675 Pipe Culvert
1x1.2 dia Irrigation gul
85.934 Box Culvert
1x5x2.5 Cross Drainage
Project Report
60
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
86.084 Box Culvert
1x5x3 Cross Drainage
86.434 Box Culvert
1x3.5x2.5 Cross Drainage
86.615 Pipe Culvert
1x1.2 dia Irrigation gul
87.421 Pipe Culvert
1x1.2 dia Irrigation gul
87.920 Box Culvert
1x3.5x2.5 Cross Drainage
88.282 Box Culvert
1x6x3.5 Cross Drainage
88.680 Box Culvert
1x3.5x2.5 Cross Drainage
88.948 Box Culvert
1x6x3 Cross Drainage
89.541 Pipe Culvert
1x1.2 dia Irrigation gul
89.725 Pipe Culvert
1x1.2 dia Irrigation gul
89.993 Box Culvert
1x3.5x2.5 Cross Drainage
90.323 Box Culvert
1x3.5x2.5 Cross Drainage
90.555 Box Culvert
1x3.5x2.5 Cross Drainage
90.830 Box Culvert
1x3.5x2.5 Cross Drainage
91.103 Pipe Culvert
1x1.2 dia Irrigation gul
91.508 Box Culvert
1x3.5x3 Cross Drainage
92.238 Pipe Culvert
1x1.2 dia Irrigation gul
92.416 Box Culvert
1x3.5x3.5 Cross Drainage
92.551 Pipe Culvert
1x1.2 dia Irrigation gul
92.798 Box Culvert
1x3.5x2.5 Cross Drainage
93.068 Box Culvert
1x6x3 Cross Drainage
93.865 Pipe Culvert
1x1.2 dia Irrigation gul
94.025 Box Culvert
1x3.5x2.5 Cross Drainage
94.271 Box Culvert
1x3.5x3 Cross Drainage
94.490 Box Culvert
1x6x3 Cross Drainage
Project Report
61
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
94.673 Pipe Culvert
1x1.2 dia Irrigation gul
94.813 Box Culvert
1x3.5x2.5 Cross Drainage
95.475 Box Culvert
1x3.5x2.5 Cross Drainage
95.957 Box Culvert
1x3.5x2.5 Cross Drainage
96.234 Box Culvert
1x3.5x2.5 Cross Drainage
96.600 Box Culvert
1x3.5x2.5 Cross Drainage
96.959 Box Culvert
1x6x3 Cross Drainage
97.220 Pipe Culvert
1x1.2 dia Irrigation gul
97.445 Box Culvert
1x3.5x3 Cross Drainage
98.151 Box Culvert
1x6x3.75 Cross Drainage
99.500 Box Culvert
1x3.5x2.5 Cross Drainage
99.815 Box Culvert
1x3.5x2.5 Cross Drainage
100.294 Box Culvert
1x6x3 Cross Drainage
100.656 Box Culvert
1x3.5x2.5 Cross Drainage
100.872 Box Culvert
1x3.5x2.5 Cross Drainage
101.263 Pipe Culvert
1x1.2 dia Irrigation gul
101.569 Box Culvert
1x3.5x2.5 Cross Drainage
101.996 Box Culvert
1x6x3 Cross Drainage
102.563 Box Culvert
1x6x3 Cross Drainage
102.748 Box Culvert
1x3.5x2.5 Cross Drainage
103.303 Box Culvert
1x6x3 Cross Drainage
103.600 Box Culvert
1x3.5x2.5 Cross Drainage
104.210 Box Culvert
1x3.5x2.5 Cross Drainage
104.433 Box Culvert
1x3.5x2.5 Cross Drainage
105.093 Box Culvert
1x3.5x3 Cross Drainage
Project Report
62
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
105.651 Box Culvert
1x3.5x2.5 Cross Drainage
106.138 Box Culvert
1x6x3 Cross Drainage
106.480 Box Culvert
1x3.5x2.5 Cross Drainage
106.988 Box Culvert
1x6x3.5 Cross Drainage
107.485 Box Culvert
1x3.5x2.5 Cross Drainage
107.730 Box Culvert
1x6x3 Cross Drainage
108.132 Box Culvert
1x3.5x2.5 Cross Drainage
108.700 Box Culvert
1x3.5x2.5 Cross Drainage
109.121 Box Culvert
1x6x3 Cross Drainage
110.990 Box Culvert
1x3.5x2.5 Cross Drainage
112.613 Box Culvert
1x6x3 Cross Drainage
113.076 Box Culvert
1x6x3 Cross Drainage
113.500 Box Culvert
1x3.5x2.5 Cross Drainage
113.821 Box Culvert
1x3.5x2.5 Cross Drainage
113.981 Box Culvert
1x3.5x2.5 Cross Drainage
114.745 Box Culvert
1x3.5x2.5 Cross Drainage
115.108 Box Culvert
1x6x3 Cross Drainage
115.413 Box Culvert
1x3.5x2.5 Cross Drainage
115.588 Box Culvert
1x3.5x2.5 Cross Drainage
115.940 Box Culvert
1x3.5x2.5 Cross Drainage
116.530 Box Culvert
1x3.5x2.5 Cross Drainage
117.028 Box Culvert
1x6x3 Cross Drainage
117.578 Box Culvert
1x3.5x2.5 Cross Drainage
117.961 Box Culvert
1x3.5x2.5 Cross Drainage
118.340 Box Culvert
1x6x3 Cross Drainage
Project Report
63
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Vehicular Underpass (VUP):
Sl. No. Design
Chainage (km)
Proposal
Span Configuration (No. of Span X
clear Span Length (m))
Minimum Vertical
Clearance Total Width (m)
1 6.598 New Structure
1x20 5.5 2X15.1
2 24.388 New Structure
1x20 5.5 2X15.1
3 26.221 New Structure
1x20 5.5 2X15.1
4 49.224 New Structure
1x20 5.5 2X15.1
Project Report
64
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Sl. No.
Design Chainage
(km) Proposal
Span Configuration (No. of Span X Clear Span (m))
Minimum Vertical
Clearance
Total Width
(m) Remarks
1 49.224 New
Structure 1x20 5.5 2X15.1 As per TCS-4
Sl. No.
Design Chainage
(km) Proposal
Span Configuration (No. of Span X Clear Span (m))
Minimum Vertical
Clearance
Total Width
(m) Remarks
1 62.672 New
Structure 1x20 5.5 2X15.1 As per TCS-4
2 70.160 New
Structure 1x20 5.5 2X15.1 As per TCS-4
3 72.092 New
Structure 1x20 5.5 2X15.1 As per TCS-4
4 74.644 New
Structure 1x20 5.5 2X15.1 As per TCS-4
Sl. No.
Design Chainage
(km) Proposal
Span Configuration (No. of Span X
Clear Span (m))
Minimum Vertical Clearance
Total Width (m)
Remarks
1 97.796 New
Structure 1x20
5.5 2X15.1 As per TCS-4
2 98.703 New
Structure 1x20
5.5 2X15.1 As per TCS-4
3 104.690 New
Structure 1x20
5.5 2X15.1 As per TCS-4
4 110.405 New
Structure 1x20
5.5 2X15.1 As per TCS-4
5 111.428 New
Structure 1x20
5.5 2X15.1 As per TCS-4
Flyover:
S. No.
Design Chainage
(Km)
Span Arrangement
(m)
Skew Angle
Total width
(m)
Remarks
Nil
Vehicular Overpass (VOP):
S. No. Design Chainage
(In Km) Span Arrangement Total width
(m) Remarks
Nil
Project Report
65
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Animal Underpass (AUP)
S. No.
Design Chainage (In Km)
Type of structure
Span Arrangement (m)
Total width (m)
Remarks
Nil
Subway:
S. No. Design Chainage (In Km)
Opening Size
Remarks
Nil
Interchange:
S.
No.
Design Chainage
(Km)
Span Arrangement (m)
Total
width (m)
Remarks
1 0+400 8x30x5.5
2 x 15.1 Interchange-1
2 7+895 2X30X5.5 2 x 15.1 Interchange-2
3 27+900 2X30X5.5 2 x 15.1 Interchange-3
4 55+900 2x30x5.5 2 x 15.1 Interchange-4
5 69+150 2x30x5.5 2 x 15.1 Interchange-5
6 82+725 2x30x5.5 2 x 15.1 Interchange-6
7 118+920 2x30x5.5 2 x 15.1 Interchange-7
LVUP:
Sl. No.
Design Chainage
(km) Proposal
Span Configuration (No. of Span X
Clear Span (m))
Minimum Vertical
Clearance
Total Width
(m) Remarks
1 1.954 New Structure 1x12 4 2X15.1 As per TCS-4
2 2.720 New Structure 1x12 4 2X15.1 As per TCS-4
3 8.900 New Structure 1x12 4 2X15.1 As per TCS-4
4 10.288 New Structure 1x12 4 2X15.1 As per TCS-4
5 11.133 New Structure 1x12 4 2X15.1 As per TCS-4
6 12.177 New Structure 1x12 4 2X15.1 As per TCS-4
7 13.937 New Structure 1x12 4 2X15.1 As per TCS-4
8 15.078 New Structure 1x12 4 2X15.1 As per TCS-4
9 16.338 New Structure 1x12 4 2X15.1 As per TCS-4
10 16.990 New Structure 1x12 4 2X15.1 As per TCS-4
Project Report
66
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
11 17.838 New Structure 1x12 4 2X15.1 As per TCS-4
12 19.038 New Structure 1x12 4 2X15.1 As per TCS-4
13 20.503 New Structure 1x12 4 2X15.1 As per TCS-4
14 22.718 New Structure 1x12 4 2X15.1 As per TCS-4
15 30.420 New Structure 1x12 4 2X15.1 As per TCS-4
16 31.236 New Structure 1x12 4 2X15.1 As per TCS-4
17 33.228 New Structure 1x12 4 2X15.1 As per TCS-4
18 33.652 New Structure 1x12 4 2X15.1 As per TCS-4
19 36.036 New Structure 1x12 4 2X15.1 As per TCS-4
20 38.080 New Structure 1x12 4 2X15.1 As per TCS-4
21 39.256 New Structure 1x12 4 2X15.1 As per TCS-4
22 39.710 New Structure 1x12 4 2X15.1 As per TCS-4
23 42.474 New Structure 1x12 4 2X15.1 As per TCS-4
24 44.049 New Structure 1x12 4 2X15.1 As per TCS-4
25 46.348 New Structure 1x12 4 2X15.1 As per TCS-4
26 47.310 New Structure 1x12 4 2X15.1 As per TCS-4
27 48.139 New Structure 1x12 4 2X15.1 As per TCS-4
28 51.860 New Structure 1x12 4 2X15.1 As per TCS-4
29 54.034 New Structure 1x12 4 2X15.1 As per TCS-4
30 54.440 New Structure 1x12 4 2X15.1 As per TCS-4
31 59.180 New Structure 1x12 4 2X15.1 As per TCS-4
32 60.553 New Structure 1x12 4 2X15.1 As per TCS-4
33 60.932 New Structure 1x12 4 2X15.1 As per TCS-4
34 61.159 New Structure 1x12 4 2X15.1 As per TCS-4
35 64.700 New Structure 1x12 4 2X15.1 As per TCS-4
36 65.948 New Structure 1x12 4 2X15.1 As per TCS-4
37 66.663 New Structure 1x12 4 2X15.1 As per TCS-4
38 67.511 New Structure 1x12 4 2X15.1 As per TCS-4
39 77.381 New Structure 1x12 4 2X15.1 As per TCS-4
40 78.700 New Structure 1x12 4 2X15.1 As per TCS-4
41 79.315 New Structure 1x12 4 2X15.1 As per TCS-4
42 80.600 New Structure 1x12 4 2X15.1 As per TCS-4
43 84.763 New Structure 1x12 4 2X15.1 As per TCS-4
44 86.917 New Structure 1x12 4 2X15.1 As per TCS-4
45 104.004 New Structure 1x12 4 2X15.1 As per TCS-4
46 105.450 New Structure 1x12 4 2X15.1 As per TCS-4
47 108.345 New Structure 1x12 4 2X15.1 As per TCS-4
48 111.719 New Structure 1x12 4 2X15.1 As per TCS-4
49 116.131 New Structure 1x12 4 2X15.1 As per TCS-4
Project Report
67
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
9 TOE WALL AND RETAINING WALLS Retaining wall / Toe Wall shall be provided as per TCS and site requirement. 10 HAZARDOUS LOCATIONS Safety barriers shall be provided at the hazardous location. The realignment of nalla/drain and canal is indicated above are minimum specified. The realignment of existing nalla/drain and canal to the Culverts/underpasses outside the PROW and realignement between consecutive culverts/underpasses wherever required as per plan & profile. Length of realigned nalla/drain and canal given in above table excludes length across the project Expressway. For proper drainage and field irrigation on either side of project expressway which shall be deemed to be included in the scope of work. 11 Connecting Roads Connecting Road at the locations and for the lengths indicated below
Table 11.1: Connecting Roads
Sl. No.
Design Chainage (Km) Side Length (m)
From To
1 2.720 2.850 RHS 0.130
2 4.900 5.200 LHS 0.300
3 5.200 5.461 RHS 0.261
4 6.046 6.200 RHS 0.154
5 12.135 12.177 LHS 0.042
6 13.038 13.535 RHS 0.497
7 12.535 13.937 LHS 1.402
8 14.675 14.748 LHS 0.073
9 18.800 19.038 BHS 0.238
10 19.038 19.240 RHS 0.202
11 20.460 20.600 LHS 0.140
12 20.600 20.690 RHS 0.090
13 29.154 29.460 LHS 0.306
14 35.800 35.840 RHS 0.040
15 36.036 36.243 RHS 0.207
16 36.800 36.905 LHS 0.105
17 37.773 37.940 RHS 0.167
18 38.080 38.274 RHS 0.194
19 39.710 39.840 RHS 0.130
20 41.843 42.030 RHS 0.187
21 42.474 42.600 RHS 0.126
22 44.275 44.351 LHS 0.076
Project Report
68
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
23 45.385 45.486 RHS 0.101
24 47.310 47.800 BHS 0.490
25 48.973 49.224 BHS 0.251
26 50.410 50.714 BHS 0.304
27 51.227 51.356 Right 0.129
28 57.982 58.255 LHS 0.273
29 58.278 58.360 RHS 0.082
30 60.047 60.386 LHS 0.339
31 63.071 63.300 RHS 0.229
32 63.973 64.075 LHS 0.102
33 66.635 66.822 LHS 0.187
34 66.945 67.155 LHS 0.210
35 67.900 68.000 RHS 0.100
36 69.000 70.000 LHS 1.000
37 69.859 70.000 RHS 0.141
38 70.548 70.800 LHS 0.252
39 70.548 70.798 RHS 0.250
40 72.200 72.256 LHS 0.056
41 72.230 72.276 RHS 0.046
42 72.598 72.751 LHS 0.153
43 72.730 72.822 RHS 0.092
44 72.822 73.000 LHS 0.178
45 73.000 73.157 RHS 0.157
46 74.155 74.300 LHS 0.145
47 74.155 74.300 RHS 0.145
48 75.700 75.910 canal 0.210
49 77.385 77.480 LHS 0.095
50 77.385 77.598 RHS 0.213
51 78.700 78.875 LHS 0.175
52 78.700 78.875 RHS 0.175
53 79.100 79.300 LHS 0.200
54 79.100 79.300 RHS 0.200
55 81.110 81.280 LHS 0.170
56 81.110 81.265 RHS 0.155
57 83.825 84.000 LHS 0.175
58 83.964 84.000 RHS 0.036
59 84.125 84.350 LHS 0.225
60 86.350 86.435 RHS 0.085
61 88.848 88.950 LHS 0.102
62 88.900 88.950 RHS 0.050
63 90.725 90.830 LHS 0.105
64 90.830 90.910 RHS 0.080
65 91.500 91.800 RHS 0.300
66 95.000 95.100 LHS 0.100
Project Report
69
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
67 95.000 95.100 RHS 0.100
68 95.475 95.584 RHS 0.109
69 95.774 95.959 LHS 0.185
70 99.000 99.200 RHS 0.200
71 99.500 99.631 LHS 0.131
72 100.300 100.388 LHS 0.088
73 100.570 101.763 RHS 1.193
74 101.830 102.000 LHS 0.170
75 104.166 104.200 RHS 0.034
76 104.363 104.433 RHS 0.070
77 105.093 105.200 RHS 0.107
78 106.113 106.138 LHS 0.025
79 106.138 106.200 RHS 0.062
80 106.364 106.480 RHS 0.116
81 107.070 107.200 LHS 0.130
82 107.305 107.484 RHS 0.179
83 108.146 108.346 RHS 0.200
84 108.663 108.700 LHS 0.037
85 108.700 108.748 RHS 0.048
86 109.000 109.100 LHS 0.100
87 109.100 109.125 RHS 0.025
88 109.455 109.689 LHS 0.234
89 109.974 110.400 RHS 0.426
90 111.740 112.200 LHS 0.460
91 111.750 111.940 RHS 0.190
92 113.074 113.110 RHS 0.036
93 115.000 115.100 LHS 0.100
94 115.020 115.100 RHS 0.080
95 115.100 115.170 LHS 0.070
96 115.810 115.938 LHS 0.128
97 115.938 116.048 RHS 0.110
98 116.360 116.520 RHS 0.160
99 116.480 116.520 LHS 0.040
The connecting roads is indicated above are minimum specified. The realignment of existing track to the SVUP outside the PROW and connecting roads between consecutive underpasses wherever required as per plan & profile. Length of connecting roads given in above table excludes length across the project Expressway. For proper connectivity of crossroads on either side of project expressway which shall be deemed to be included in the scope of work. 12 Pavement Design The pavement design has been carried out as per IRC: 37-2018, IRC: SP-87 and MoRTH specifications, Vth Revision. 12.1 Type of Pavement Flexible pavement type is recommended for main carriageway of the project highway
Project Report
70
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
except connecting roads & way side amenities where Flexible pavement shall be provided. 12.2 Design Methodology
The proposed project highway is a Greenfield Highway and hence, the design methodology for new pavement is as given below:
Identification of traffic homogeneous sections Assessment of vehicle damaging factors (VDFs) for commercial vehicles. Assessment of number of cumulative commercial vehicles as per the traffic
(ADT/AADT) Assessment of Traffic Growth Rates for the future projections Traffic Loading on the proposed pavement (MSA) Strength of the sub-grade soil (borrow material)
12.3 Design Parameters The best pavement alternative for a project shall be decided by, pavement type selection process called pavement option study has been undertaken. This process helps to determine the most cost-effective pavement type capable of supporting anticipated traffic under existing environmental conditions and providing safety and driving comfort to the travelling public. The following options have been considered for new pavement design.
Option-I : Flexible pavement with granular base and sub-base, Option-II : Flexible pavement with Cement Treated Sub-base (CTSB) Option-III : Flexible Pavement with Cement Treated Base (CTB) & Cement Treated Sub-base Layers (CTSB) Option-IV : Perpetual Pavement with Cement Treated Sub-base (CTSB) Option-V : Perpetual Pavement with granular base and sub-bases Option-VI : Rigid Pavement
The following IRC codes are considered for the pavement design:
IRC: 37 – 2018, “Tentative Guidelines for the Design of Flexible Pavements” IRC: 58 – 2015, “Guidelines for the Design of Plain Jointed Rigid Pavements for
Highways”. 12.4 Recommended Pavement Design As per clause 4.3.1 of IRC: 37-2018, a design life of 20 years has been considered for flexible pavement design options (option I, II & III). Design life for perpetual pavement (Option-IV & V) considered is minimum 50 years and similarly, design life for rigid pavement design (Option-VI) considered as 30 years. The base year of traffic estimation considered is 2020 and the proposed Highway shall be opened to traffic in the year of 2024.
12.5 Proposed Pavement Composition The summary of proposed flexible pavement design details with granular base and granular sub-base is given in table below:
Project Report
71
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Main Carriageway Flexible Pavement Design for Granular Base & Sub-base (Option-I)
Homogeneous Sections Details
Section (Ch.) From 0.000
To 119.790
Length (Km) 119.790
Adopted MSA 130
Grade of Bitumen VG40
Proposed Crust Composition (mm)
SMA/BC 50 DBM 125
WMM 250 GSB 200
Total 625 Allowable Tensile Strain below the Bituminous Layers (εt) 1.49E-04 Actual Tensile Strain below the Bituminous Layers (εt) 1.47E-04 Allowable Vertical Strain in the top of Sub-grade (εv) 3.19E-04 Actual Vertical Strain in the top of Sub-grade (εv) 2.39E-04
Sub-grade shall be used of 500 mm thickness with effective design CBR not less than 10% and sub-base material of CBR not less than 30%. The pavement composition for paved shoulders has been kept same with same specifications as those of the main carriageway.
Flexible Pavement with Cement Treated Sub-Base (CTSB)-(Option-II)
Homogeneous Sections Details
Section (Ch.) From 0.000
To 119.790
Length (Km) 119.790
Adopted MSA 130
Grade of Bitumen VG40
Proposed Crust Composition (mm)
SMA/BC 50
DBM 100
WMM 150
CTSB 200
Total 500
Allowable Tensile Strain below the Bituminous Layers (εt) 1.49E-04
Actual Tensile Strain below the Bituminous Layers (εt) 1.49E-04
Allowable Vertical Strain in the top of Sub-grade (εv) 3.19E-04
Actual Vertical Strain in the top of Sub-grade (εv) 3.04E-04
Project Report
72
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Sub-grade shall be used of 500 mm thickness with effective design CBR not less than 10% and sub-base material of CBR not less than 30%. The pavement composition for paved shoulders has been kept same with same specifications as those of the main carriageway. Flexible Pavement with Cement Treated Base (CTB) & Cement Treated Sub-Base (CTSB)-
(Option-III)
Homogeneous Sections Details
Section (Ch.) From 0.000
To 119.790 Length (Km) 119.790 Adopted MSA 130 Grade of Bitumen VG40
Proposed Crust Composition (mm)
SMA/BC 50 DBM 65 AIL 100 CTB 160
CTSB 200 Total 575
Allowable Tensile Strain below the Bituminous Layers (εt) 1.49E-04
Actual Tensile Strain below the Bituminous Layers (εt) 1.18E-04
Allowable Tensile Strain below CTB (εt) 6.70E-05 Actual Tensile Strain below CTB (εt) 4.52E-05
Allowable Vertical Strain in the top of Sub-grade (εv) 3.19E-04
Actual Vertical Strain in the top of Sub-grade (εv) 1.78E-04
Sub-grade shall be used of 500 mm thickness with effective design CBR not less than 10% and sub-base material of CBR not less than 30%. The pavement composition for paved shoulders has been kept same with same specifications as those of the main carriageway.
Perpetual Pavement Design with CTSB (Option-IV)
Homogeneous Sections Details
Section (Ch.) From 0.000
119.790
Length (Km) 119.790
Adopted MSA 130
Grade of Bitumen VG40
Proposed Crust Composition (mm)
SMA/BC 50
DBM 210
WMM 150
CTSB 200
Total 560
Actual Tensile Strain below the Bituminous Layers (εt) 7.85E-05
Project Report
73
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Actual Vertical Strain in the top of Sub-grade (εv) 1.72E-04
Sub-grade shall be used of 500 mm thickness with effective design CBR not less than 10% and sub-base material of CBR not less than 30%. The pavement composition for paved shoulders has been kept same with same specifications as those of the main carriageway.
Perpetual Pavement with conventional (WMM+GSB) (Option-V) Decreasing natural resources and increasing construction and maintenance cost of highway projects, the time has come to think beyond the conventional method of designs. Therefore, the full depth bituminous pavement is considered as sustainable perpetual pavement for heavy traffic and interest of socio-economic perspective.
Perpetual pavement is having thick bituminous layers, which do not undergo structural damage for high traffic flows over the longer periods. Perpetual pavements are made up with multiple layers of durable bitumen. The main aspect is to provide rut resistant, impermeable, wear resistant and durable intermediate layers and fatigue resistant and durable base layers. The bottom layer is designed to be strong but flexible to resist strains that could cause cracks to form from the bottom up. Generally, this pavement type shall be designed for high traffic volume and for longer design period i.e., greater than 50 years.
With this perpetual pavement, the traditional fatigue cracking is reduced, and pavement distress is typically confined to the upper layer of the pavement structure. Therefore, whenever surface distress reaches a critical level, an economical rehabilitation is required to remove the distressed surface and resurfacing with an asphalt overlay or milling and relaying of existing surface course. The pavement structural layers proposed are Granular Subbase (GSB), Wet Mix Macadam (WMM) and Bituminous Surfacing comprising Dense Bituminous Macadam (DBM) &Stone Matrix Asphalt (SMA).
IITPAVE software is used for strain calculations for pavement design. The allowable strains in the pavement layers have been calculated in terms of two primary pavement failure modes: fatigue cracking and rutting. The actual strains arising in the pavement layers due to traffic loading have been calculated, assuming suitable thickness values for different pavement layers. The assumed pavement crust is deemed to be safe for the design loads, if obtained strains are lesser than the allowable strains.
Perpetual Pavement Design (Option-VI)
Homogeneous Sections Details
Section (Ch.) From 0.000
To 119.790
Length (Km) 119.790
Adopted MSA 130
Grade of Bitumen VG40
Proposed Crust Composition (mm)
SMA 50
DBM 255
WMM 150
Project Report
74
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
GSB 200
Total 655
Actual Tensile Strain below the Bituminous Layers (εt) 7.96E-05
Actual Vertical Strain in the top of Sub-grade (εv) 1.62E-04
Sub-grade shall be used of 500 mm thickness with effective design CBR not less than 10% and sub-base material of CBR not less than 30%. The pavement composition for paved shoulders has been kept same with same specifications as those of the main carriageway. Proposed Rigid Pavement Design – The proposed rigid pavement crust composition is given in table below :-
Pavement Crust
Composition Calculated Thickness
(mm) Recommended Thickness (mm)
PQC 280 300
DLC 150 150
GSB 150 150
Total 580 600
Plain Dowel Bar Details 32mm Dia at 300 mm c/c, 500 mm long
Deformed Tie Bar Details 12 mm Dia at 600mm c/c, 650 mm long
12.6 PAVEMENT DESIGN FOR PROPOSED SERVICE/SLIP ROADS Flexible pavement with granular base and granular sub-base is considered for the service and slip road sections along the project highway. 10 MSA has been considered for service road/slip roads and connecting roads pavement design. The effective sub-grade design CBR considered for the pavement design is 10%. The type and pavement structural layers proposed are Granular Subbase (GSB), Wet Mix Macadam (WMM), Bituminous Surfacing comprising Dense Bituminous Macadam (DBM) and Bituminous Concrete (BC).
IITPAVE software is used for strain calculations of pavement design. The allowable strains in the pavement layers have been calculated in terms of two primary pavement failure modes: fatigue cracking and rutting. The actual strains arising in the pavement layers due to traffic loading have been calculated, assuming suitable thickness values for different pavement layers. The assumed pavement crust is deemed to be safe for the design loads, if obtained strains are lesser than the allowable strains.
Homogeneous Sections Details
Adopted MSA 10 Grade of Bitumen VG30
Proposed Crust Composition (mm)
BC 30 DBM 50 WMM 150 GSB 200 Total 430
Allowable Tensile Strain below the Bituminous Layers (εt) 3.61E-04
Actual Tensile Strain below the Bituminous Layers (εt) 3.44E-04
Project Report
75
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Allowable Vertical Strain in the top of Sub-grade (εv) 6.73E-04
Actual Vertical Strain in the top of Sub-grade (εv) 5.70E-04
13 MATERIALS All materials to be used in works shall be in conformity with the requirements laid down for
relevant item in MORTH Specifications, Vth Revision. If any material, which is not covered in MORTH Specifications, is used, shall conform to IRC or relevant Indian or International Standards provision
Table 28: Annexure 1
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
0 719191.159 3196913.97
1 719225.571 3196907.58
3
719156.747 3196920.36
50 719200.285 3196963.13
2 719234.697 3196956.74
3
719165.873 3196969.52
100 719209.411 3197012.29
2 719243.823 3197005.90
3
719174.999 3197018.68
150 719218.537 3197061.45
2 719252.949 3197055.06
3
719184.125 3197067.84
200 719227.664 3197110.61
2 719262.076 3197104.22
3
719193.252 3197117
250 719236.79 3197159.77
2 719271.202 3197153.38
3
719202.378 3197166.16
300 719245.916 3197208.93
2 719280.328 3197202.54
3
719211.504 3197215.32
350 719255.042 3197258.09
2 719289.455 3197251.70
4
719220.63 3197264.48
400 719264.169 3197307.25
2 719298.581 3197300.86
4
719229.757 3197313.64
450 719273.295 3197356.41
2 719307.707 3197350.02
4
719238.883 3197362.8
500 719282.421 3197405.57
2 719316.833 3197399.18
4
719248.009 3197411.96
550 719291.548 3197454.73
2 719325.96 3197448.34
4
719257.135 3197461.121
600 719300.674 3197503.89
2 719335.086 3197497.50
4
719266.262 3197510.281
650 719309.8 3197553.05
2 719344.212 3197546.66
4
719275.388 3197559.441
700 719318.926 3197602.21
2 719353.338 3197595.82
4
719284.514 3197608.601
750 719328.053 3197651.37
2 719362.465 3197644.98
4
719293.641 3197657.761
Project Report
76
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
800 719337.179 3197700.53
2 719371.591 3197694.14
4
719302.767 3197706.921
850 719346.305 3197749.69
2 719380.717 3197743.30
4
719311.893 3197756.081
900 719355.431 3197798.85
3 719389.843 3197792.46
4
719321.019 3197805.241
950 719364.558 3197848.01
3 719398.97 3197841.62
4
719330.146 3197854.401
1000 719373.684 3197897.17
3 719408.096 3197890.78
4
719339.272 3197903.561
1050 719382.81 3197946.33
3 719417.222 3197939.94
4
719348.398 3197952.721
1100 719391.936 3197995.49
3 719426.348 3197989.10
4
719357.524 3198001.881
1150 719401.063 3198044.65
3 719435.475 3198038.26
4
719366.651 3198051.041
1200 719410.189 3198093.81
3 719444.601 3198087.42
5
719375.777 3198100.201
1250 719419.315 3198142.97
3 719453.727 3198136.58
5
719384.903 3198149.361
1300 719428.441 3198192.13
3 719462.854 3198185.74
5
719394.029 3198198.521
1350 719437.568 3198241.29
3 719471.98 3198234.90
5
719403.156 3198247.681
1400 719446.694 3198290.45
3 719481.106 3198284.06
5
719412.282 3198296.842
1450 719455.82 3198339.61
3 719490.232 3198333.22
5
719421.408 3198346.002
1500 719464.947 3198388.77
3 719499.359 3198382.38
5
719430.534 3198395.162
1550 719474.073 3198437.93
3 719508.485 3198431.54
5
719439.661 3198444.322
1600 719483.199 3198487.09
3 719517.611 3198480.70
5
719448.787 3198493.482
1650 719492.325 3198536.25
3 719526.737 3198529.86
5
719457.913 3198542.642
1700 719501.452 3198585.41
3 719535.864 3198579.02
5
719467.04 3198591.802
1750 719510.578 3198634.57
4 719544.99 3198628.18
5
719476.166 3198640.962
1800 719519.704 3198683.73
4 719554.116 3198677.34
5
719485.292 3198690.122
1850 719528.83 3198732.89
4 719563.242 3198726.50
5
719494.418 3198739.282
1900 719537.957 3198782.05
4 719572.369 3198775.66
5
719503.545 3198788.442
Project Report
77
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
1950 719547.083 3198831.21
4 719581.495 3198824.82
5
719512.671 3198837.602
2000 719556.209 3198880.37
4 719590.621 3198873.98
5
719521.797 3198886.762
2050 719565.335 3198929.53
4 719599.747 3198923.14
5
719530.923 3198935.922
2100 719574.462 3198978.69
4 719608.874 3198972.30
6
719540.05 3198985.082
2150 719583.588 3199027.85
4 719618 3199021.46
6
719549.176 3199034.242
2200 719592.714 3199077.01
4 719627.126 3199070.62
6
719558.302 3199083.402
2250 719601.805 3199126.18
1 719636.244 3199119.93
8
719567.367 3199132.424
2300 719610.416 3199175.43
3 719644.93 3199169.62
1
719575.902 3199181.245
2350 719618.411 3199224.79 719652.995 3199219.41 719583.827 3199230.17
2400 719625.787 3199274.24
2 719660.436 3199269.29
5
719591.139 3199279.19
2450 719632.546 3199323.78
3 719667.253 3199319.26
9
719597.838 3199328.297
2500 719638.684 3199373.40
4 719673.445 3199369.32
5
719603.923 3199377.484
2550 719644.202 3199423.09
9 719679.011 3199419.45
4
719609.392 3199426.744
2600 719649.098 3199472.85
8 719683.95 3199469.64
9
719614.245 3199476.068
2650 719653.371 3199522.67
5 719688.261 3199519.90
1
719618.482 3199525.448
2700 719657.022 3199572.54
1 719691.944 3199570.20
4
719622.1 3199574.878
2750 719660.049 3199622.44
9 719694.998 3199620.54
8
719625.101 3199624.35
2800 719662.452 3199672.39
1 719697.422 3199670.92
7
719627.483 3199673.854
2850 719664.237 3199722.35
9 719699.22 3199721.27
3
719629.254 3199723.445
2900 719665.788 3199772.33
5 719700.771 3199771.24
8
719630.805 3199773.421
2950 719667.34 3199822.31
1 719702.323 3199821.22
4
719632.357 3199823.397
3000 719668.891 3199872.28
6 719703.875 3199871.2
719633.908 3199873.373
3050 719670.443 3199922.26
2 719705.426 3199921.17
6
719635.46 3199923.349
3100 719671.995 3199972.23
8 719706.978 3199971.15
2
719637.012 3199973.324
Project Report
78
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
3150 719673.546 3200022.21
4 719708.529 3200021.12
8
719638.563 3200023.3
3200 719675.098 3200072.19 719710.081 3200071.10
4
719640.115 3200073.276
3250 719676.65 3200122.16
6 719711.633 3200121.08
719641.666 3200123.252
3300 719678.201 3200172.14
2 719713.184 3200171.05
6
719643.218 3200173.228
3350 719679.753 3200222.11
8 719714.736 3200221.03
2
719644.77 3200223.204
3400 719681.304 3200272.09
4 719716.287 3200271.00
8
719646.321 3200273.18
3450 719682.856 3200322.07 719717.839 3200320.98
4
719647.873 3200323.156
3500 719684.408 3200372.04
6 719719.391 3200370.96
719649.424 3200373.132
3550 719685.959 3200422.02
2 719720.942 3200420.93
5
719650.976 3200423.108
3600 719687.511 3200471.99
7 719722.494 3200470.91
1
719652.528 3200473.084
3650 719689.062 3200521.97
3 719724.046 3200520.88
7
719654.079 3200523.06
3700 719690.614 3200571.94
9 719725.597 3200570.86
3
719655.631 3200573.035
3750 719692.166 3200621.92
5 719727.149 3200620.83
9
719657.182 3200623.011
3800 719693.717 3200671.90
1 719728.7 3200670.81
5
719658.734 3200672.987
3850 719695.269 3200721.87
7 719730.252 3200720.79
1
719660.286 3200722.963
3900 719696.82 3200771.85
3 719731.804 3200770.76
7
719661.837 3200772.939
3950 719698.372 3200821.82
9 719733.355 3200820.74
3
719663.389 3200822.915
4000 719699.924 3200871.80
5 719734.907 3200870.71
9
719664.94 3200872.891
4050 719701.475 3200921.78
1 719736.458 3200920.69
5
719666.492 3200922.867
4100 719703.027 3200971.75
7 719738.01 3200970.67
1
719668.044 3200972.843
4150 719704.578 3201021.73
3 719739.562 3201020.64
6
719669.595 3201022.819
4200 719706.13 3201071.70
9 719741.113 3201070.62
2
719671.147 3201072.795
4250 719707.682 3201121.68
4 719742.665 3201120.59
8
719672.698 3201122.771
Project Report
79
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
4300 719709.233 3201171.66 719744.216 3201170.57
4
719674.25 3201172.746
4350 719710.785 3201221.63
6 719745.768 3201220.55
719675.802 3201222.722
4400 719712.336 3201271.61
2 719747.32 3201270.52
6
719677.353 3201272.698
4450 719714.056 3201321.58
2 719749.026 3201320.12
6
719679.087 3201323.039
4500 719716.554 3201371.51
9 719751.494 3201369.48
719681.613 3201373.559
4550 719719.85 3201421.41 719754.763 3201418.95
3
719684.936 3201423.868
4600 719723.36 3201471.28
7 719758.274 3201468.82
9
719688.447 3201473.744
4650 719726.871 3201521.16
3 719761.784 3201518.70
6
719691.957 3201523.621
4700 719730.381 3201571.04 719765.295 3201568.58
3
719695.468 3201573.497
4750 719733.892 3201620.91
7 719768.806 3201618.45
9
719698.978 3201623.374
4800 719737.403 3201670.79
3 719772.316 3201668.33
6
719702.489 3201673.251
4850 719740.913 3201720.67 719775.827 3201718.21
2
719706 3201723.127
4900 719744.424 3201770.54
6 719779.337 3201768.08
9
719709.51 3201773.004
4950 719747.934 3201820.42
3 719782.848 3201817.96
6
719713.021 3201822.88
5000 719751.445 3201870.3 719786.359 3201867.84
2
719716.531 3201872.757
5050 719754.956 3201920.17
6 719789.869 3201917.71
9
719720.042 3201922.634
5100 719758.466 3201970.05
3 719793.38 3201967.59
5
719723.553 3201972.51
5150 719761.977 3202019.92
9 719796.891 3202017.47
2
719727.063 3202022.387
5200 719765.488 3202069.80
6 719800.401 3202067.34
9
719730.574 3202072.263
5250 719768.998 3202119.68
3 719803.912 3202117.22
5
719734.084 3202122.14
5300 719772.509 3202169.55
9 719807.422 3202167.10
2
719737.595 3202172.017
5350 719776.019 3202219.43
6 719810.933 3202216.97
8
719741.106 3202221.893
5400 719779.53 3202269.31
2 719814.444 3202266.85
5
719744.616 3202271.77
Project Report
80
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
5450 719783.041 3202319.18
9 719817.954 3202316.73
2
719748.127 3202321.646
5500 719786.551 3202369.06
6 719821.465 3202366.60
8
719751.638 3202371.523
5550 719790.062 3202418.94
2 719824.975 3202416.48
5
719755.148 3202421.4
5600 719793.572 3202468.81
9 719828.486 3202466.36
1
719758.659 3202471.276
5650 719797.083 3202518.69
5 719831.997 3202516.23
8
719762.169 3202521.153
5700 719800.594 3202568.57
2 719835.507 3202566.11
5
719765.68 3202571.029
5750 719804.104 3202618.44
9 719839.018 3202615.99
1
719769.191 3202620.906
5800 719807.615 3202668.32
5 719842.528 3202665.86
8
719772.701 3202670.783
5850 719811.125 3202718.20
2 719846.039 3202715.74
4
719776.212 3202720.659
5900 719814.636 3202768.07
8 719849.55 3202765.62
1
719779.722 3202770.536
5950 719818.147 3202817.95
5 719853.06 3202815.49
8
719783.233 3202820.413
6000 719821.657 3202867.83
2 719856.571 3202865.37
4
719786.744 3202870.289
6050 719825.168 3202917.70
8 719860.081 3202915.25
1
719790.254 3202920.166
6100 719828.678 3202967.58
5 719863.592 3202965.12
7
719793.765 3202970.042
6150 719832.189 3203017.46
2 719867.103 3203015.00
4
719797.275 3203019.919
6200 719835.7 3203067.33
8 719870.613 3203064.88
1
719800.786 3203069.796
6250 719839.21 3203117.21
5 719874.124 3203114.75
7
719804.297 3203119.672
6300 719842.721 3203167.09
1 719877.634 3203164.63
4
719807.807 3203169.549
6350 719846.231 3203216.96
8 719881.145 3203214.51
719811.318 3203219.425
6400 719849.743 3203266.84
4 719884.656 3203264.37
719814.831 3203269.319
6450 719853.291 3203316.71
8 719888.203 3203314.23
5
719818.379 3203319.202
6500 719856.839 3203366.59
2 719891.751 3203364.10
9
719821.927 3203369.076
6550 719860.387 3203416.46
6 719895.299 3203413.98
3
719825.475 3203418.95
Project Report
81
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
6600 719863.935 3203466.34 719898.847 3203463.85
7
719829.023 3203468.824
6650 719867.483 3203516.21
4 719902.395 3203513.73
1
719832.571 3203518.698
6700 719871.031 3203566.08
8 719905.943 3203563.60
5
719836.119 3203568.572
6750 719874.579 3203615.96
2 719909.491 3203613.47
9
719839.667 3203618.446
6800 719878.127 3203665.83
6 719913.039 3203663.35
2
719843.215 3203668.32
6850 719881.675 3203715.71 719916.587 3203713.22
6
719846.763 3203718.194
6900 719885.223 3203765.58
4 719920.135 3203763.1
719850.311 3203768.068
6950 719888.771 3203815.45
8 719923.683 3203812.97
4
719853.859 3203817.942
7000 719892.319 3203865.33
2 719927.231 3203862.84
8
719857.407 3203867.816
7050 719895.867 3203915.20
6 719930.779 3203912.72
2
719860.955 3203917.69
7100 719899.415 3203965.08 719934.327 3203962.59
6
719864.503 3203967.563
7150 719902.963 3204014.95
4 719937.875 3204012.47
719868.052 3204017.437
7200 719906.511 3204064.82
8 719941.423 3204062.34
4
719871.6 3204067.311
7250 719910.059 3204114.70
2 719944.971 3204112.21
8
719875.148 3204117.185
7300 719913.607 3204164.57
6 719948.519 3204162.09
2
719878.696 3204167.059
7350 719917.155 3204214.45 719952.067 3204211.96
6
719882.244 3204216.933
7400 719920.703 3204264.32
4 719955.615 3204261.84
719885.792 3204266.807
7450 719924.251 3204314.19
8 719959.163 3204311.71
4
719889.34 3204316.681
7500 719927.799 3204364.07
2 719962.711 3204361.58
8
719892.888 3204366.555
7550 719931.399 3204413.94
2 719966.296 3204411.25
2
719896.503 3204416.631
7600 719935.656 3204463.76 719970.503 3204460.48
9
719900.809 3204467.03
7650 719940.743 3204513.5 719975.531 3204509.64
9
719905.955 3204517.35
7700 719946.658 3204563.14
8 719981.376 3204558.71
8
719911.939 3204567.578
Project Report
82
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
7750 719953.399 3204612.69
1 719988.039 3204607.68
3
719918.76 3204617.699
7800 719960.966 3204662.11
4 719995.517 3204656.53
719926.414 3204667.699
7850 719969.355 3204711.40
5 720003.808 3204705.24
5
719934.901 3204717.565
7900 719978.21 3204760.61
4 720012.657 3204754.41
4
719943.764 3204766.815
7950 719987.068 3204809.82
4 720021.515 3204803.62
3
719952.622 3204816.024
8000 719995.926 3204859.03
3 720030.372 3204852.83
2
719961.479 3204865.233
8050 720004.784 3204908.24
2 720039.23 3204902.04
1
719970.337 3204914.442
8100 720013.641 3204957.45
1 720048.088 3204951.25
1
719979.195 3204963.652
8150 720022.499 3205006.66 720056.946 3205000.46 719988.053 3205012.861
8200 720031.357 3205055.86
9 720065.803 3205049.66
9
719996.911 3205062.07
8250 720040.215 3205105.07
8 720074.661 3205098.87
8
720005.768 3205111.279
8300 720048.673 3205154.35
7 720083.217 3205148.72
4
720014.129 3205159.991
8350 720056.309 3205203.77 720090.942 3205198.71
3
720021.676 3205208.827
8400 720063.12 3205253.30
3 720097.833 3205248.82
5
720028.408 3205257.782
8450 720069.105 3205302.94
3 720103.887 3205299.04
4
720034.323 3205306.843
8500 720074.262 3205352.67
6 720109.104 3205349.35
7
720039.42 3205355.996
8550 720078.589 3205402.48
8 720113.482 3205399.75
720043.696 3205405.226
8600 720082.102 3205452.36
4 720117.028 3205450.09
1
720047.176 3205454.637
8650 720085.349 3205502.25
8 720120.276 3205499.98
5
720050.423 3205504.532
8700 720088.597 3205552.15
3 720123.523 3205549.88
720053.671 3205554.426
8750 720091.844 3205602.04
7 720126.77 3205599.77
4
720056.918 3205604.32
8800 720095.091 3205651.94
2 720130.017 3205649.66
9
720060.165 3205654.215
8850 720098.339 3205701.83
6 720133.265 3205699.56
3
720063.413 3205704.109
8900 720101.586 3205751.73
1 720136.512 3205749.45
8
720066.66 3205754.004
Project Report
83
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
8950 720104.833 3205801.62
5 720139.759 3205799.35
2
720069.907 3205803.898
9000 720108.08 3205851.52 720143.007 3205849.24
6
720073.154 3205853.793
9050 720111.328 3205901.41
4 720146.254 3205899.14
1
720076.402 3205903.687
9100 720114.575 3205951.30
8 720149.501 3205949.03
5
720079.649 3205953.581
9150 720117.822 3206001.20
3 720152.748 3205998.93
720082.896 3206003.476
9200 720121.07 3206051.09
7 720155.996 3206048.82
4
720086.144 3206053.37
9250 720124.317 3206100.99
2 720159.243 3206098.71
9
720089.391 3206103.265
9300 720127.564 3206150.88
6 720162.49 3206148.61
3
720092.638 3206153.159
9350 720130.811 3206200.78
1 720165.738 3206198.50
7
720095.885 3206203.054
9400 720134.059 3206250.67
5 720168.985 3206248.40
2
720099.133 3206252.948
9450 720137.306 3206300.56
9 720172.232 3206298.29
6
720102.38 3206302.843
9500 720140.553 3206350.46
4 720175.479 3206348.19
1
720105.627 3206352.737
9550 720143.801 3206400.35
8 720178.727 3206398.08
5
720108.875 3206402.631
9600 720147.048 3206450.25
3 720181.974 3206447.98
720112.122 3206452.526
9650 720150.295 3206500.14
7 720185.221 3206497.87
4
720115.369 3206502.42
9700 720153.542 3206550.04
2 720188.469 3206547.76
9
720118.616 3206552.315
9750 720156.79 3206599.93
6 720191.716 3206597.66
3
720121.864 3206602.209
9800 720160.037 3206649.83
1 720194.963 3206647.55
7
720125.111 3206652.104
9850 720163.284 3206699.72
5 720198.21 3206697.45
2
720128.358 3206701.998
9900 720166.532 3206749.61
9 720201.458 3206747.34
6
720131.606 3206751.893
9950 720169.779 3206799.51
4 720204.705 3206797.24
1
720134.853 3206801.787
10000 720173.026 3206849.40
8 720207.952 3206847.13
5
720138.1 3206851.681
10050 720176.273 3206899.30
3 720211.2 3206897.03
720141.347 3206901.576
Project Report
84
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
10100 720179.521 3206949.19
7 720214.447 3206946.92
4
720144.595 3206951.47
10150 720182.768 3206999.09
2 720217.694 3206996.81
9
720147.842 3207001.365
10200 720186.015 3207048.98
6 720220.941 3207046.71
3
720151.089 3207051.259
10250 720189.263 3207098.88
1 720224.189 3207096.60
7
720154.337 3207101.154
10300 720192.51 3207148.77
5 720227.436 3207146.50
2
720157.584 3207151.048
10350 720195.757 3207198.66
9 720230.683 3207196.39
6
720160.831 3207200.942
10400 720199.005 3207248.56
4 720233.931 3207246.29
1
720164.078 3207250.837
10450 720202.252 3207298.45
8 720237.178 3207296.18
5
720167.326 3207300.731
10500 720205.499 3207348.35
3 720240.425 3207346.08
720170.573 3207350.626
10550 720208.746 3207398.24
7 720243.672 3207395.97
4
720173.82 3207400.52
10600 720211.994 3207448.14
2 720246.92 3207445.86
8
720177.068 3207450.415
10650 720215.241 3207498.03
6 720250.167 3207495.76
3
720180.315 3207500.309
10700 720218.488 3207547.93 720253.414 3207545.65
7
720183.562 3207550.204
10750 720221.736 3207597.82
5 720256.662 3207595.55
2
720186.809 3207600.098
10800 720224.983 3207647.71
9 720259.909 3207645.44
6
720190.057 3207649.992
10850 720228.23 3207697.61
4 720263.156 3207695.34
1
720193.304 3207699.887
10900 720231.477 3207747.50
8 720266.403 3207745.23
5
720196.551 3207749.781
10950 720234.725 3207797.40
3 720269.651 3207795.13
720199.799 3207799.676
11000 720237.972 3207847.29
7 720272.898 3207845.02
4
720203.046 3207849.57
11050 720241.219 3207897.19
2 720276.145 3207894.91
8
720206.293 3207899.465
11100 720244.467 3207947.08
6 720279.393 3207944.81
3
720209.54 3207949.359
11150 720247.711 3207996.98
1 720282.64 3207994.75
9
720212.781 3207999.202
11200 720250.468 3208046.90
4 720285.43 3208045.26
5
720215.507 3208048.543
Project Report
85
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
11250 720252.394 3208096.86
6 720287.378 3208095.81
720217.41 3208097.923
11300 720253.486 3208146.85
4 720288.483 3208146.38
1
720218.489 3208147.327
11350 720253.745 3208196.85
3 720288.745 3208196.96
3
720218.746 3208196.742
11400 720253.171 3208246.84
9 720288.164 3208247.54
2
720218.178 3208246.155
11450 720251.764 3208296.82
8 720286.741 3208298.10
5
720216.787 3208295.552
11500 720249.524 3208346.77
7 720284.475 3208348.63
7
720214.573 3208344.918
11550 720246.452 3208396.68
2 720281.367 3208399.12
4
720211.537 3208394.241
11600 720242.548 3208446.52
9 720277.418 3208449.55
2
720207.679 3208443.506
11650 720237.815 3208496.30
4 720272.629 3208499.90
8
720203.001 3208492.7
11700 720232.252 3208545.99
3 720267.001 3208550.17
7
720197.503 3208541.81
11750 720225.862 3208595.58
3 720260.537 3208600.34
5
720191.188 3208590.82
11800 720218.647 3208645.05
9 720253.237 3208650.39
8
720184.057 3208639.719
11850 720210.608 3208694.40
8 720245.105 3208700.32
3
720176.111 3208688.493
11900 720201.748 3208743.61
6 720236.141 3208750.10
5
720167.355 3208737.127
11950 720192.069 3208792.66
9 720226.349 3208799.73
1
720157.788 3208785.608
12000 720181.573 3208841.55
5 720215.731 3208849.18
6
720147.415 3208833.923
12050 720170.265 3208890.25
8 720204.29 3208898.45
8
720136.239 3208882.059
12100 720158.146 3208938.76
7 720192.03 3208947.53
3
720124.261 3208930.001
12150 720145.22 3208987.06
7 720178.954 3208996.39
6
720111.487 3208977.737
12200 720131.492 3209035.14
5 720165.065 3209045.03
5
720097.918 3209025.254
12250 720116.964 3209082.98
7 720150.368 3209093.43
5
720083.56 3209072.538
12300 720101.64 3209130.58 720134.866 3209141.58
4
720068.415 3209119.577
12350 720085.526 3209177.91
2 720118.563 3209189.46
8
720052.489 3209166.356
Project Report
86
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
12400 720068.73 3209225.00
6 720101.673 3209236.82
8
720035.787 3209213.184
12450 720051.842 3209272.06
8 720084.785 3209283.88
9
720018.898 3209260.246
12500 720034.953 3209319.12
9 720067.897 3209330.95
1
720002.01 3209307.307
12550 720018.065 3209366.19
1 720051.008 3209378.01
2
719985.122 3209354.369
12600 720001.177 3209413.25
2 720034.12 3209425.07
4
719968.234 3209401.431
12650 719984.289 3209460.31
4 720017.232 3209472.13
6
719951.346 3209448.492
12700 719967.401 3209507.37
5 720000.344 3209519.19
7
719934.458 3209495.554
12750 719950.513 3209554.43
7 719983.456 3209566.25
9
719917.57 3209542.615
12800 719933.625 3209601.49
9 719966.568 3209613.32
719900.682 3209589.677
12850 719916.737 3209648.56 719949.68 3209660.38
2
719883.794 3209636.739
12900 719899.849 3209695.62
2 719932.792 3209707.44
3
719866.906 3209683.8
12950 719882.961 3209742.68
3 719915.904 3209754.50
5
719850.018 3209730.862
13000 719866.073 3209789.74
5 719899.016 3209801.56
7
719833.129 3209777.923
13050 719849.185 3209836.80
7 719882.128 3209848.62
8
719816.241 3209824.985
13100 719832.296 3209883.86
8 719865.24 3209895.69
719799.353 3209872.046
13150 719815.408 3209930.93 719848.351 3209942.75
1
719782.465 3209919.108
13200 719798.52 3209977.99
1 719831.463 3209989.81
3
719765.577 3209966.17
13250 719781.632 3210025.05
3 719814.575 3210036.87
5
719748.689 3210013.231
13300 719764.744 3210072.11
4 719797.687 3210083.93
6
719731.801 3210060.293
13350 719747.856 3210119.17
6 719780.799 3210130.99
8
719714.913 3210107.354
13400 719730.968 3210166.23
8 719763.911 3210178.05
9
719698.025 3210154.416
13450 719714.08 3210213.29
9 719747.023 3210225.12
1
719681.137 3210201.478
13500 719697.192 3210260.36
1 719730.135 3210272.18
2
719664.249 3210248.539
Project Report
87
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
13550 719680.305 3210307.42
3 719713.254 3210319.22
9
719647.356 3210295.617
13600 719663.728 3210354.59
4 719696.861 3210365.87
1
719630.594 3210343.317
13650 719648.447 3210402.19
9 719681.987 3210412.2
719614.906 3210392.197
13700 719635.253 3210450.42
2 719669.213 3210458.88
9
719601.293 3210441.955
13750 719624.264 3210499.19
5 719658.574 3210506.11
719589.954 3210492.28
13800 719615.503 3210548.41
7 719650.092 3210553.76
6
719580.914 3210543.068
13850 719608.987 3210597.98
6 719643.783 3210601.75
8
719574.191 3210594.215
13900 719604.731 3210647.80
1 719639.662 3210649.98
7
719569.799 3210645.614
13950 719602.742 3210697.75
7 719637.737 3210698.35
4
719567.747 3210697.16
14000 719603.025 3210747.75
2 719638.011 3210746.75
8
719568.039 3210748.745
14050 719605.58 3210797.68
2 719640.485 3210795.1
719570.675 3210800.264
14100 719610.401 3210847.44
5 719645.152 3210843.27
9
719575.65 3210851.61
14150 719617.478 3210896.93
7 719652.004 3210891.19
7
719582.952 3210902.677
14200 719626.797 3210946.05
7 719661.026 3210938.75
3
719592.567 3210953.36
14250 719638.338 3210994.70
2 719672.2 3210985.85
1
719604.475 3211003.553
14300 719652.077 3211042.77
3 719685.502 3211032.39
2
719618.652 3211053.153
14350 719667.987 3211090.17 719700.905 3211078.28
1
719635.068 3211102.058
14400 719686.033 3211136.79
4 719718.378 3211123.42
2
719653.689 3211150.167
14450 719706.18 3211182.55
1 719737.884 3211167.72
3
719674.476 3211197.379
14500 719728.385 3211227.34
5 719759.382 3211211.09
2
719697.388 3211243.599
14550 719752.602 3211271.08
4 719782.829 3211253.43
9
719722.376 3211288.729
14600 719778.782 3211313.67
7 719808.176 3211294.67
7
719749.389 3211332.678
14650 719806.871 3211355.03
7 719835.37 3211334.72
1
719778.371 3211375.353
Project Report
88
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
14700 719836.809 3211395.07
8 719864.356 3211373.48
7
719809.262 3211416.668
14750 719868.536 3211433.71
6 719895.074 3211410.89
7
719841.998 3211456.536
14800 719901.986 3211470.87
4 719927.46 3211446.87
2
719876.513 3211494.876
14850 719937.09 3211506.47
3 719961.447 3211481.33
8
719912.733 3211531.608
14900 719973.775 3211540.44 719996.964 3211514.22
4
719950.586 3211566.656
14950 720011.954 3211572.72 720033.995 3211545.53
2
719989.913 3211599.908
15000 720051.22 3211603.67
2 720072.615 3211575.97
3
720029.825 3211631.372
15050 720090.873 3211634.13 720112.177 3211606.36
1
720069.569 3211661.899
15100 720130.543 3211664.56
4 720151.847 3211636.79
5
720109.239 3211692.334
15150 720170.214 3211694.99
9 720191.518 3211667.23
720148.909 3211722.768
15200 720209.884 3211725.43
3 720231.188 3211697.66
4
720188.58 3211753.203
15250 720249.554 3211755.86
8 720270.858 3211728.09
9
720228.25 3211783.637
15300 720289.225 3211786.30
2 720310.529 3211758.53
3
720267.921 3211814.072
15350 720328.895 3211816.73
7 720350.199 3211788.96
8
720307.591 3211844.506
15400 720368.566 3211847.17
1 720389.87 3211819.40
2
720347.261 3211874.941
15450 720408.236 3211877.60
6 720429.54 3211849.83
7
720386.932 3211905.375
15500 720447.906 3211908.04 720469.211 3211880.27
1
720426.602 3211935.81
15550 720487.577 3211938.47
5 720508.881 3211910.70
6
720466.273 3211966.244
15600 720527.247 3211968.90
9 720548.551 3211941.14
720505.943 3211996.679
15650 720566.918 3211999.34
4 720588.222 3211971.57
5
720545.613 3212027.113
15700 720606.588 3212029.77
8 720627.892 3212002.00
9
720585.284 3212057.548
15750 720646.258 3212060.21
3 720667.563 3212032.44
4
720624.954 3212087.982
15800 720685.929 3212090.64
7 720707.233 3212062.87
8
720664.625 3212118.417
Project Report
89
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
15850 720725.599 3212121.08
2 720746.903 3212093.31
3
720704.295 3212148.851
15900 720765.27 3212151.51
6 720786.574 3212123.74
7
720743.965 3212179.286
15950 720804.94 3212181.95
1 720826.244 3212154.18
2
720783.636 3212209.72
16000 720844.61 3212212.38
5 720865.915 3212184.61
6
720823.306 3212240.155
16050 720884.281 3212242.82 720905.585 3212215.05
1
720862.977 3212270.589
16100 720923.945 3212273.26
3 720945.296 3212245.53
720902.594 3212300.996
16150 720963.313 3212304.08
6 720985.217 3212276.78
8
720941.408 3212331.385
16200 721001.696 3212336.12
3 721024.705 3212309.75
720978.686 3212362.497
16250 721038.613 3212369.83
9 721062.796 3212344.53
8
721014.429 3212395.14
16300 721073.959 3212405.19
6 721099.268 3212381.02
721048.651 3212429.372
16350 721107.663 3212442.12
4 721134.044 3212419.12
3
721081.282 3212465.125
16400 721139.654 3212480.54
5 721167.053 3212458.76
6
721112.255 3212502.323
16450 721169.866 3212520.37
9 721198.226 3212499.86
8
721141.506 3212540.89
16500 721198.237 3212561.54
6 721227.5 3212542.34
4
721168.974 3212580.747
16550 721224.708 3212603.95
8 721254.813 3212586.10
7
721194.603 3212621.81
16600 721249.224 3212647.53 721280.109 3212631.06
5
721218.339 3212663.996
16650 721271.735 3212692.17
1 721303.337 3212677.12
6
721240.134 3212707.216
16700 721292.195 3212737.78
9 721324.447 3212724.19
6
721259.943 3212751.383
16750 721310.561 3212784.28
9 721343.397 3212772.17
5
721277.724 3212796.403
16800 721326.794 3212831.57
6 721360.148 3212820.96
7
721293.441 3212842.185
16850 721340.863 3212879.55
2 721374.663 3212870.46
9
721307.062 3212888.634
16900 721352.736 3212928.11
7 721386.915 3212920.57
9
721318.558 3212935.654
16950 721362.391 3212977.17
1 721396.877 3212971.19
5
721327.905 3212983.148
Project Report
90
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
17000 721369.807 3213026.61
4 721404.529 3213022.21
1
721335.085 3213031.018
17050 721374.968 3213076.34
3 721409.855 3213073.52
1
721340.082 3213079.164
17100 721377.865 3213126.25
4 721412.843 3213125.02
1
721342.887 3213127.488
17150 721378.491 3213176.24
6 721413.489 3213176.60
4
721343.493 3213175.889
17200 721376.868 3213226.21
6 721411.819 3213228.06
4
721341.917 3213224.367
17250 721373.565 3213276.10
6 721408.465 3213278.74
9
721338.665 3213273.463
17300 721369.671 3213325.95
4 721404.563 3213328.69
6
721334.779 3213323.211
17350 721365.753 3213375.8 721400.646 3213378.54
2
721330.861 3213373.058
17400 721361.835 3213425.64
6 721396.728 3213428.38
9
721326.943 3213422.904
17450 721357.918 3213475.49
3 721392.81 3213478.23
5
721323.025 3213472.75
17500 721354 3213525.33
9 721388.892 3213528.08
1
721319.107 3213522.596
17550 721350.082 3213575.18
5 721384.974 3213577.92
8
721315.19 3213572.443
17600 721346.164 3213625.03
1 721381.057 3213627.77
4
721311.272 3213622.289
17650 721342.246 3213674.87
8 721377.139 3213677.62
721307.354 3213672.135
17700 721338.329 3213724.72
4 721373.221 3213727.46
6
721303.436 3213721.981
17750 721334.411 3213774.57 721369.303 3213777.31
3
721299.519 3213771.828
17800 721330.493 3213824.41
6 721365.386 3213827.15
9
721295.601 3213821.674
17850 721326.575 3213874.26
3 721361.468 3213877.00
5
721291.683 3213871.52
17900 721322.658 3213924.10
9 721357.55 3213926.85
1
721287.765 3213921.367
17950 721318.74 3213973.95
5 721353.632 3213976.69
8
721283.847 3213971.213
18000 721314.822 3214023.80
2 721349.714 3214026.54
4
721279.93 3214021.059
18050 721310.904 3214073.64
8 721345.797 3214076.39
721276.012 3214070.905
18100 721306.986 3214123.49
4 721341.879 3214126.23
7
721272.094 3214120.752
Project Report
91
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
18150 721303.069 3214173.34 721337.961 3214176.08
3
721268.176 3214170.598
18200 721299.151 3214223.18
7 721334.043 3214225.92
9
721264.258 3214220.444
18250 721295.259 3214273.03
5 721330.163 3214275.63
2
721260.355 3214270.438
18300 721291.964 3214322.92
6 721326.906 3214324.94
1
721257.023 3214320.911
18350 721289.502 3214372.86
4 721324.473 3214374.29
7
721254.531 3214371.432
18400 721287.872 3214422.83
7 721322.862 3214423.68
7
721252.882 3214421.988
18450 721287.075 3214472.83 721322.074 3214473.09
7
721252.076 3214472.564
18500 721287.111 3214522.83 721322.11 3214522.51
3
721252.113 3214523.147
18550 721287.981 3214572.82
2 721322.969 3214571.92
1
721252.993 3214573.722
18600 721289.684 3214622.79
2 721324.652 3214621.30
9
721254.715 3214624.275
18650 721292.219 3214672.72
7 721327.158 3214670.66
1
721257.28 3214674.793
18700 721295.586 3214722.61
3 721330.486 3214719.96
5
721260.686 3214725.261
18750 721299.784 3214772.43
6 721334.635 3214769.20
7
721264.934 3214775.665
18800 721304.812 3214822.18
2 721339.604 3214818.37
2
721270.02 3214825.991
18850 721310.668 3214871.83
7 721345.392 3214867.44
8
721275.944 3214876.226
18900 721317.351 3214921.38
8 721351.997 3214916.42
1
721282.705 3214926.355
18950 721324.859 3214970.82 721359.417 3214965.27
7
721290.301 3214976.364
19000 721333.19 3215020.12
1 721367.651 3215014.00
2
721298.729 3215026.24
19050 721342.341 3215069.27
6 721376.695 3215062.58
4
721307.986 3215075.968
19100 721352.31 3215118.27
1 721386.548 3215111.00
7
721318.072 3215125.535
19150 721363.094 3215167.09
4 721397.206 3215159.26
721328.982 3215174.928
19200 721374.69 3215215.73 721408.667 3215207.32
9
721340.713 3215224.131
19250 721387.095 3215264.16
6 721420.928 3215255.2
721353.263 3215273.132
Project Report
92
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
19300 721400.306 3215312.38
9 721433.984 3215302.86
721366.628 3215321.917
19350 721414.319 3215360.38
4 721447.833 3215350.29
6
721380.804 3215370.473
19400 721428.997 3215408.18
1 721462.44 3215397.85
6
721395.555 3215418.506
19450 721443.747 3215455.95
6 721477.189 3215445.63
1
721410.304 3215466.281
19500 721458.496 3215503.73
1 721491.939 3215493.40
6
721425.054 3215514.056
19550 721473.246 3215551.50
6 721506.689 3215541.18
1
721439.804 3215561.831
19600 721487.996 3215599.28
1 721521.438 3215588.95
6
721454.553 3215609.606
19650 721502.745 3215647.05
6 721536.188 3215636.73
1
721469.303 3215657.381
19700 721517.495 3215694.83
1 721550.937 3215684.50
6
721484.052 3215705.156
19750 721532.244 3215742.60
6 721565.687 3215732.28
1
721498.802 3215752.931
19800 721546.994 3215790.38
1 721580.437 3215780.05
6
721513.552 3215800.706
19850 721561.744 3215838.15
6 721595.186 3215827.83
1
721528.301 3215848.481
19900 721576.493 3215885.93
1 721609.936 3215875.60
6
721543.051 3215896.256
19950 721591.243 3215933.70
6 721624.685 3215923.38
1
721557.8 3215944.031
20000 721605.993 3215981.48
1 721639.435 3215971.15
6
721572.55 3215991.806
20050 721620.742 3216029.25
6 721654.185 3216018.93
1
721587.3 3216039.581
20100 721635.492 3216077.03
1 721668.934 3216066.70
6
721602.049 3216087.356
20150 721650.241 3216124.80
6 721683.684 3216114.48
1
721616.799 3216135.131
20200 721664.991 3216172.58
1 721698.433 3216162.25
6
721631.549 3216182.906
20250 721679.741 3216220.35
6 721713.183 3216210.03
1
721646.298 3216230.681
20300 721694.49 3216268.13
1 721727.933 3216257.80
6
721661.048 3216278.456
20350 721709.24 3216315.90
6 721742.682 3216305.58
1
721675.797 3216326.231
20400 721723.989 3216363.68
1 721757.432 3216353.35
6
721690.547 3216374.006
Project Report
93
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
20450 721738.739 3216411.45
6 721772.182 3216401.13
1
721705.297 3216421.781
20500 721753.489 3216459.23
1 721786.931 3216448.90
6
721720.046 3216469.556
20550 721768.238 3216507.00
6 721801.681 3216496.68
1
721734.796 3216517.331
20600 721782.988 3216554.78
1 721816.43 3216544.45
6
721749.545 3216565.105
20650 721797.738 3216602.55
6 721831.18 3216592.23
1
721764.295 3216612.88
20700 721812.487 3216650.33
1 721845.93 3216640.00
6
721779.045 3216660.655
20750 721827.237 3216698.10
6 721860.679 3216687.78
1
721793.794 3216708.43
20800 721841.986 3216745.88
1 721875.429 3216735.55
6
721808.544 3216756.205
20850 721856.736 3216793.65
6 721890.178 3216783.33
1
721823.294 3216803.98
20900 721871.486 3216841.43
1 721904.928 3216831.10
6
721838.043 3216851.755
20950 721886.235 3216889.20
6 721919.678 3216878.88
1
721852.793 3216899.53
21000 721900.985 3216936.98
1 721934.427 3216926.65
6
721867.542 3216947.305
21050 721915.734 3216984.75
6 721949.177 3216974.43
1
721882.292 3216995.08
21100 721930.484 3217032.53
1 721963.927 3217022.20
6
721897.042 3217042.855
21150 721945.234 3217080.30
6 721978.676 3217069.98
1
721911.791 3217090.63
21200 721959.983 3217128.08
1 721993.426 3217117.75
6
721926.541 3217138.405
21250 721974.733 3217175.85
6 722008.175 3217165.53
1
721941.29 3217186.18
21300 721989.483 3217223.63
1 722022.925 3217213.30
6
721956.04 3217233.955
21350 722004.232 3217271.40
5 722037.675 3217261.08
1
721970.79 3217281.73
21400 722018.982 3217319.18 722052.424 3217308.85
6
721985.539 3217329.505
21450 722033.731 3217366.95
5 722067.174 3217356.63
1
722000.289 3217377.28
21500 722048.481 3217414.73 722081.923 3217404.40
6
722015.038 3217425.055
21550 722063.231 3217462.50
5 722096.673 3217452.18
1
722029.788 3217472.83
Project Report
94
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
21600 722077.98 3217510.28 722111.423 3217499.95
6
722044.538 3217520.605
21650 722092.73 3217558.05
5 722126.172 3217547.73
1
722059.287 3217568.38
21700 722107.479 3217605.83 722140.922 3217595.50
6
722074.037 3217616.155
21750 722122.229 3217653.60
5 722155.672 3217643.28
1
722088.787 3217663.93
21800 722136.979 3217701.38 722170.421 3217691.05
6
722103.536 3217711.705
21850 722151.728 3217749.15
5 722185.171 3217738.83
1
722118.286 3217759.48
21900 722166.478 3217796.93 722199.92 3217786.60
6
722133.035 3217807.255
21950 722181.228 3217844.70
5 722214.67 3217834.38
1
722147.785 3217855.03
22000 722195.977 3217892.48 722229.42 3217882.15
6
722162.535 3217902.805
22050 722210.727 3217940.25
5 722244.169 3217929.93
722177.284 3217950.58
22100 722225.465 3217988.03
4 722258.926 3217977.77
722192.004 3217998.297
22150 722239.778 3218035.94
1 722273.395 3218026.19
7
722206.162 3218045.685
22200 722253.298 3218084.07
8 722287.072 3218074.89
5
722219.524 3218093.26
22250 722266.013 3218132.43
3 722299.935 3218123.81
5
722232.09 3218141.052
22300 722277.92 3218180.99
4 722311.981 3218172.94
2
722243.859 3218189.046
22350 722289.017 3218229.74
7 722323.207 3218222.26
4
722254.826 3218237.23
22400 722299.299 3218278.67
7 722333.61 3218271.76
5
722264.988 3218285.589
22450 722308.771 3218327.77
1 722343.184 3218321.39
722274.358 3218334.153
22500 722317.812 3218376.94
7 722352.236 3218370.62
7
722283.387 3218383.268
22550 722326.841 3218426.12
5 722361.266 3218419.80
5
722292.417 3218432.446
22600 722335.87 3218475.30
3 722370.295 3218468.98
3
722301.446 3218481.624
22650 722344.9 3218524.48
1 722379.324 3218518.16
1
722310.475 3218530.802
22700 722353.929 3218573.65
9 722388.354 3218567.33
9
722319.505 3218579.98
Project Report
95
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
22750 722362.958 3218622.83
7 722397.383 3218616.51
7
722328.534 3218629.158
22800 722371.988 3218672.01
5 722406.412 3218665.69
4
722337.563 3218678.336
22850 722381.017 3218721.19
3 722415.442 3218714.87
2
722346.593 3218727.514
22900 722390.046 3218770.37
1 722424.471 3218764.05
722355.622 3218776.691
22950 722399.076 3218819.54
9 722433.5 3218813.22
8
722364.651 3218825.869
23000 722408.212 3218868.70
7 722442.585 3218862.11
4
722373.838 3218875.3
23050 722418.21 3218917.69
6 722452.414 3218910.27
722384.007 3218925.121
23100 722429.428 3218966.42 722463.435 3218958.14
2
722395.421 3218974.698
23150 722441.857 3219014.84
9 722475.652 3219005.74
5
722408.062 3219023.953
23200 722455.146 3219063.05
1 722488.866 3219053.67
2
722421.426 3219072.429
23250 722468.544 3219111.22
2 722502.264 3219101.84
3
722434.824 3219120.601
23300 722481.942 3219159.39
4 722515.662 3219150.01
5
722448.222 3219168.772
23350 722495.34 3219207.56
5 722529.06 3219198.18
6
722461.62 3219216.944
23400 722508.738 3219255.73
7 722542.458 3219246.35
8
722475.018 3219265.115
23450 722522.136 3219303.90
8 722555.856 3219294.52
9
722488.416 3219313.287
23500 722535.534 3219352.08 722569.254 3219342.70
1
722501.814 3219361.458
23550 722548.932 3219400.25
1 722582.652 3219390.87
2
722515.212 3219409.63
23600 722562.33 3219448.42
3 722596.05 3219439.04
4
722528.61 3219457.801
23650 722575.728 3219496.59
4 722609.448 3219487.21
5
722542.008 3219505.973
23700 722589.192 3219544.74
7 722622.848 3219535.14
2
722555.535 3219554.352
23750 722603.313 3219592.71
1 722636.804 3219582.54
7
722569.821 3219602.876
23800 722618.232 3219640.43
3 722651.549 3219629.71
2
722584.914 3219651.154
23850 722633.944 3219687.89
9 722667.078 3219676.62
4
722600.81 3219699.175
Project Report
96
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
23900 722650.445 3219735.09
8 722683.386 3219723.27
2
722617.503 3219746.923
23950 722667.73 3219782.01
4 722700.47 3219769.64
1
722634.99 3219794.387
24000 722685.795 3219828.63
6 722718.324 3219815.71
9
722653.265 3219841.553
24050 722704.488 3219875.01 722736.934 3219861.88
4
722672.043 3219888.136
24100 722723.239 3219921.36
1 722755.685 3219908.23
5
722690.794 3219934.487
24150 722741.991 3219967.71
2 722774.436 3219954.58
6
722709.545 3219980.837
24200 722760.742 3220014.06
2 722793.187 3220000.93
7
722728.296 3220027.188
24250 722779.493 3220060.41
3 722811.938 3220047.28
7
722747.047 3220073.539
24300 722798.244 3220106.76
4 722830.69 3220093.63
8
722765.798 3220119.89
24350 722816.995 3220153.11
5 722849.441 3220139.98
9
722784.55 3220166.24
24400 722835.746 3220199.46
5 722868.192 3220186.34
722803.301 3220212.591
24450 722854.497 3220245.81
6 722886.943 3220232.69
722822.052 3220258.942
24500 722873.249 3220292.16
7 722905.694 3220279.04
1
722840.803 3220305.293
24550 722892 3220338.51
8 722924.445 3220325.39
2
722859.554 3220351.644
24600 722910.751 3220384.86
8 722943.196 3220371.74
3
722878.305 3220397.994
24650 722929.502 3220431.21
9 722961.948 3220418.09
3
722897.057 3220444.345
24700 722948.253 3220477.57 722980.699 3220464.44
4
722915.808 3220490.696
24750 722967.004 3220523.92
1 722999.45 3220510.79
5
722934.559 3220537.047
24800 722985.756 3220570.27
2 723018.201 3220557.14
6
722953.31 3220583.397
24850 723004.507 3220616.62
2 723036.952 3220603.49
7
722972.061 3220629.748
24900 723023.258 3220662.97
3 723055.703 3220649.84
7
722990.812 3220676.099
24950 723042.009 3220709.32
4 723074.455 3220696.19
8
723009.563 3220722.45
25000 723060.76 3220755.67
5 723093.206 3220742.54
9
723028.315 3220768.8
Project Report
97
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
25050 723079.511 3220802.02
5 723111.957 3220788.9
723047.066 3220815.151
25100 723098.262 3220848.37
6 723130.708 3220835.25
723065.817 3220861.502
25150 723117.014 3220894.72
7 723149.459 3220881.60
1
723084.568 3220907.853
25200 723135.765 3220941.07
8 723168.21 3220927.95
2
723103.319 3220954.204
25250 723154.516 3220987.42
9 723186.962 3220974.30
3
723122.07 3221000.554
25300 723173.267 3221033.77
9 723205.713 3221020.65
4
723140.822 3221046.905
25350 723192.018 3221080.13 723224.464 3221067.00
4
723159.573 3221093.256
25400 723210.769 3221126.48
1 723243.215 3221113.35
5
723178.324 3221139.607
25450 723229.47 3221172.85
2 723261.994 3221159.92
3
723196.946 3221185.782
25500 723247.552 3221219.46
7 723280.288 3221207.08
1
723214.817 3221231.853
25550 723264.856 3221266.37
7 723297.793 3221254.53
9
723231.919 3221278.215
25600 723281.375 3221313.56
9 723314.505 3221302.28
1
723248.245 3221324.857
25650 723297.105 3221361.02
9 723330.419 3221350.29
5
723263.792 3221371.763
25700 723312.042 3221408.74
5 723345.53 3221398.56
8
723278.555 3221418.923
25750 723326.182 3221456.70
4 723359.835 3221447.08
6
723292.53 3221466.322
25800 723339.521 3221504.89
1 723373.329 3221495.83
5
723305.713 3221513.947
25850 723352.055 3221553.29
4 723386.009 3221544.80
3
723318.1 3221561.785
25900 723363.78 3221601.89
9 723397.871 3221593.97
5
723329.689 3221609.823
25950 723374.693 3221650.69
3 723408.912 3221643.33
8
723340.475 3221658.048
26000 723384.792 3221699.66
2 723419.129 3221692.87
8
723350.456 3221706.445
26050 723394.074 3221748.79
2 723428.518 3221742.58
2
723359.629 3221755.003
26100 723402.535 3221798.07
1 723437.078 3221792.43
5
723367.992 3221803.706
26150 723410.174 3221847.48
3 723444.806 3221842.42
4
723375.541 3221852.542
Project Report
98
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
26200 723416.988 3221897.01
6 723451.7 3221892.53
5
723382.276 3221901.497
26250 723422.976 3221946.65
5 723457.758 3221942.75
4
723388.194 3221950.557
26300 723428.136 3221996.38
8 723462.978 3221993.06
6
723393.294 3221999.71
26350 723432.466 3222046.2 723467.358 3222043.45
9
723397.573 3222048.94
26400 723435.965 3222096.07
6 723470.899 3222093.91
8
723401.032 3222098.235
26450 723438.633 3222146.00
5 723473.597 3222144.42
8
723403.668 3222147.581
26500 723440.468 3222195.97 723475.454 3222194.97
7
723405.482 3222196.963
26550 723441.47 3222245.96 723476.468 3222245.55 723406.473 3222246.37
26600 723441.685 3222295.95
9 723476.685 3222295.94
723406.685 3222295.978
26650 723441.712 3222345.95
9 723476.712 3222345.94
723406.712 3222345.978
26700 723441.748 3222395.95
9 723476.748 3222395.85
6
723406.749 3222396.062
26750 723442.312 3222445.95
5 723477.306 3222445.26
9
723407.319 3222446.641
26800 723443.709 3222495.93
5 723478.686 3222494.66
5
723408.732 3222497.204
26850 723445.939 3222545.88
5 723480.89 3222544.03
2
723410.988 3222547.737
26900 723449.001 3222595.79 723483.917 3222593.35
6
723414.086 3222598.225
26950 723452.895 3222645.63
8 723487.764 3222642.62
2
723418.025 3222648.654
27000 723457.618 3222695.41
4 723492.433 3222691.81
7
723422.804 3222699.01
27050 723463.171 3222745.10
4 723497.921 3222740.92
7
723428.421 3222749.28
27100 723469.55 3222794.69
5 723504.226 3222789.93
9
723434.875 3222799.45
27150 723476.756 3222844.17
2 723511.347 3222838.84
723442.164 3222849.504
27200 723484.785 3222893.52
3 723519.283 3222887.61
5
723450.287 3222899.431
27250 723493.635 3222942.73
2 723528.03 3222936.25
723459.241 3222949.215
27300 723503.304 3222991.78
8 723537.586 3222984.73
4
723469.023 3222998.843
27350 723513.79 3223040.67
6 723547.949 3223033.05
1
723479.63 3223048.3
Project Report
99
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
27400 723525.089 3223089.38
2 723559.116 3223081.18
9
723491.061 3223097.575
27450 723537.197 3223137.89
3 723571.084 3223129.13
4
723503.311 3223146.652
27500 723550.113 3223186.19
5 723583.849 3223176.87
3
723516.378 3223195.518
27550 723563.832 3223234.27
6 723597.408 3223224.39
2
723530.257 3223244.159
27600 723578.35 3223282.12
1 723611.757 3223271.67
9
723544.944 3223292.563
27650 723593.664 3223329.71
7 723626.892 3223318.72
723560.437 3223340.714
27700 723609.769 3223377.05
2 723642.808 3223365.50
3
723576.729 3223388.601
27750 723626.66 3223424.11
2 723659.503 3223412.01
4
723593.818 3223436.21
27800 723644.334 3223470.88
4 723676.97 3223458.24
723611.697 3223483.528
27850 723662.784 3223517.35
4 723695.205 3223504.16
8
723630.363 3223530.54
27900 723682.006 3223563.51
1 723714.203 3223549.78
6
723649.81 3223577.236
27950 723701.973 3223609.35
1 723733.994 3223595.22
1
723669.952 3223623.481
28000 723722.158 3223655.09
6 723754.179 3223640.96
6
723690.137 3223669.225
28050 723742.343 3223700.84 723774.364 3223686.71
1
723710.322 3223714.97
28100 723762.528 3223746.58
5 723794.549 3223732.45
5
723730.507 3223760.714
28150 723782.713 3223792.32
9 723814.734 3223778.2
723750.692 3223806.459
28200 723802.898 3223838.07
4 723834.919 3223823.94
4
723770.877 3223852.203
28250 723823.083 3223883.81
8 723855.104 3223869.68
9
723791.062 3223897.948
28300 723843.268 3223929.56
3 723875.289 3223915.43
3
723811.247 3223943.692
28350 723863.453 3223975.30
7 723895.474 3223961.17
8
723831.432 3223989.437
28400 723883.638 3224021.05
2 723915.659 3224006.92
2
723851.617 3224035.181
28450 723903.823 3224066.79
6 723935.845 3224052.66
7
723871.802 3224080.926
28500 723924.008 3224112.54
1 723956.03 3224098.41
1
723891.987 3224126.671
Project Report
100
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
28550 723944.194 3224158.28
6 723976.215 3224144.15
6
723912.172 3224172.415
28600 723964.379 3224204.03 723996.4 3224189.90
1
723932.357 3224218.16
28650 723984.564 3224249.77
5 724016.585 3224235.64
5
723952.542 3224263.904
28700 724004.749 3224295.51
9 724036.77 3224281.39
723972.728 3224309.649
28750 724024.934 3224341.26
4 724056.955 3224327.13
4
723992.913 3224355.393
28800 724045.119 3224387.00
8 724077.14 3224372.87
9
724013.098 3224401.138
28850 724065.304 3224432.75
3 724097.325 3224418.62
3
724033.283 3224446.882
28900 724085.489 3224478.49
7 724117.51 3224464.36
8
724053.468 3224492.627
28950 724105.674 3224524.24
2 724137.695 3224510.11
2
724073.653 3224538.371
29000 724125.807 3224570.00
9 724157.915 3224556.07
8
724093.699 3224583.941
29050 724145.326 3224616.04
1 724177.661 3224602.64
7
724112.99 3224629.436
29100 724164.075 3224662.39
2 724196.63 3224649.53
8
724131.521 3224675.246
29150 724182.05 3224709.04
9 724214.813 3224696.74
724149.286 3224721.359
29200 724199.244 3224755.99
9 724232.208 3224744.23
7
724166.279 3224767.761
29250 724215.675 3224803.22
2 724248.787 3224791.87
9
724182.564 3224814.564
29300 724231.879 3224850.52
3 724264.99 3224839.18
1
724198.767 3224861.866
29350 724248.082 3224897.82
5 724281.193 3224886.48
3
724214.971 3224909.167
29400 724264.285 3224945.12
7 724297.396 3224933.78
5
724231.174 3224956.469
29450 724280.488 3224992.42
9 724313.6 3224981.08
6
724247.377 3225003.771
29500 724296.692 3225039.73 724329.803 3225028.38
8
724263.58 3225051.073
29550 724312.895 3225087.03
2 724346.006 3225075.69
724279.784 3225098.374
29600 724329.098 3225134.33
4 724362.209 3225122.99
1
724295.987 3225145.676
29650 724345.301 3225181.63
6 724378.413 3225170.29
3
724312.19 3225192.978
Project Report
101
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
29700 724361.505 3225228.93
7 724394.616 3225217.59
5
724328.393 3225240.28
29750 724377.708 3225276.23
9 724410.819 3225264.89
7
724344.597 3225287.581
29800 724393.911 3225323.54
1 724427.022 3225312.19
8
724360.8 3225334.883
29850 724410.114 3225370.84
2 724443.226 3225359.5
724377.003 3225382.185
29900 724426.318 3225418.14
4 724459.429 3225406.80
2
724393.206 3225429.486
29950 724442.521 3225465.44
6 724475.632 3225454.10
4
724409.41 3225476.788
30000 724458.724 3225512.74
8 724491.835 3225501.40
5
724425.613 3225524.09
30000 724458.724 3225512.74
8 724491.835 3225501.40
5
724425.613 3225524.09
30050 724474.927 3225560.04
9 724508.039 3225548.70
7
724441.816 3225571.392
30100 724491.131 3225607.35
1 724524.242 3225596.00
9
724458.019 3225618.693
30150 724507.334 3225654.65
3 724540.445 3225643.31
1
724474.223 3225665.995
30200 724523.537 3225701.95
5 724556.648 3225690.61
2
724490.426 3225713.297
30250 724539.74 3225749.25
6 724572.851 3225737.91
4
724506.629 3225760.599
30300 724555.944 3225796.55
8 724589.055 3225785.21
6
724522.832 3225807.9
30350 724572.147 3225843.86 724605.258 3225832.51
8
724539.036 3225855.202
30400 724588.35 3225891.16
2 724621.461 3225879.81
9
724555.239 3225902.504
30450 724604.553 3225938.46
3 724637.664 3225927.12
1
724571.442 3225949.806
30500 724620.757 3225985.76
5 724653.868 3225974.42
3
724587.645 3225997.107
30550 724636.96 3226033.06
7 724670.071 3226021.72
5
724603.849 3226044.409
30600 724653.163 3226080.36
9 724686.274 3226069.02
6
724620.052 3226091.711
30650 724669.366 3226127.67 724702.477 3226116.32
8
724636.255 3226139.013
30700 724685.569 3226174.97
2 724718.681 3226163.63
724652.458 3226186.314
30750 724701.773 3226222.27
4 724734.884 3226210.93
2
724668.662 3226233.616
Project Report
102
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
30800 724717.976 3226269.57
6 724751.087 3226258.23
3
724684.865 3226280.918
30850 724734.179 3226316.87
7 724767.29 3226305.53
5
724701.068 3226328.22
30900 724750.382 3226364.17
9 724783.494 3226352.83
7
724717.271 3226375.521
30950 724766.586 3226411.48
1 724799.697 3226400.13
9
724733.474 3226422.823
31000 724782.789 3226458.78
3 724815.9 3226447.44
724749.678 3226470.125
31050 724798.992 3226506.08
4 724832.103 3226494.74
2
724765.881 3226517.427
31100 724815.195 3226553.38
6 724848.307 3226542.04
4
724782.084 3226564.728
31150 724831.399 3226600.68
8 724864.51 3226589.34
6
724798.287 3226612.03
31200 724847.602 3226647.99 724880.713 3226636.64
7
724814.491 3226659.332
31250 724863.805 3226695.29
1 724896.916 3226683.94
9
724830.694 3226706.634
31300 724880.008 3226742.59
3 724913.12 3226731.25
1
724846.897 3226753.935
31350 724896.212 3226789.89
5 724929.323 3226778.55
2
724863.1 3226801.237
31400 724912.415 3226837.19
6 724945.526 3226825.85
4
724879.304 3226848.539
31450 724928.618 3226884.49
8 724961.729 3226873.15
6
724895.507 3226895.841
31500 724944.821 3226931.8 724977.933 3226920.45
8
724911.71 3226943.142
31550 724961.025 3226979.10
2 724994.136 3226967.75
9
724927.913 3226990.444
31600 724977.228 3227026.40
3 725010.339 3227015.06
1
724944.117 3227037.746
31650 724993.431 3227073.70
5 725026.542 3227062.36
3
724960.32 3227085.047
31700 725009.634 3227121.00
7 725042.746 3227109.66
5
724976.523 3227132.349
31750 725025.838 3227168.30
9 725058.949 3227156.96
6
724992.726 3227179.651
31800 725042.041 3227215.61 725075.152 3227204.26
8
725008.93 3227226.953
31850 725058.244 3227262.91
2 725091.355 3227251.57
725025.133 3227274.254
31900 725074.447 3227310.21
4 725107.559 3227298.87
2
725041.336 3227321.556
Project Report
103
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
31950 725090.651 3227357.51
6 725123.762 3227346.17
3
725057.539 3227368.858
32000 725106.854 3227404.81
7 725139.965 3227393.47
5
725073.743 3227416.16
32050 725123.057 3227452.11
9 725156.168 3227440.77
7
725089.946 3227463.461
32100 725139.26 3227499.42
1 725172.372 3227488.07
9
725106.149 3227510.763
32150 725155.464 3227546.72
3 725188.575 3227535.38
725122.352 3227558.065
32200 725171.667 3227594.02
4 725204.778 3227582.68
2
725138.556 3227605.367
32250 725187.87 3227641.32
6 725220.981 3227629.98
4
725154.759 3227652.668
32300 725204.073 3227688.62
8 725237.185 3227677.28
6
725170.962 3227699.97
32350 725220.277 3227735.93 725253.388 3227724.58
7
725187.165 3227747.272
32400 725236.48 3227783.23
1 725269.591 3227771.88
9
725203.369 3227794.574
32450 725252.683 3227830.53
3 725285.794 3227819.19
1
725219.572 3227841.875
32500 725268.886 3227877.83
5 725301.998 3227866.49
3
725235.775 3227889.177
32550 725285.09 3227925.13
7 725318.201 3227913.79
4
725251.978 3227936.479
32600 725301.293 3227972.43
8 725334.404 3227961.09
6
725268.182 3227983.781
32650 725317.496 3228019.74 725350.607 3228008.39
8
725284.385 3228031.082
32700 725333.699 3228067.04
2 725366.811 3228055.7
725300.588 3228078.384
32750 725349.903 3228114.34
4 725383.014 3228103.00
1
725316.791 3228125.686
32800 725366.106 3228161.64
5 725399.217 3228150.30
3
725332.995 3228172.988
32850 725382.309 3228208.94
7 725415.42 3228197.60
5
725349.198 3228220.289
32900 725398.512 3228256.24
9 725431.624 3228244.90
6
725365.401 3228267.591
32950 725414.716 3228303.55
1 725447.827 3228292.20
8
725381.604 3228314.893
33000 725430.919 3228350.85
2 725464.03 3228339.51
725397.808 3228362.195
33050 725447.122 3228398.15
4 725480.233 3228386.81
2
725414.011 3228409.496
Project Report
104
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
33100 725463.325 3228445.45
6 725496.437 3228434.11
3
725430.214 3228456.798
33150 725479.529 3228492.75
7 725512.64 3228481.41
5
725446.417 3228504.1
33200 725495.732 3228540.05
9 725528.843 3228528.71
7
725462.621 3228551.401
33250 725511.935 3228587.36
1 725545.046 3228576.01
9
725478.824 3228598.703
33300 725528.138 3228634.66
3 725561.249 3228623.32
725495.027 3228646.005
33350 725544.342 3228681.96
4 725577.453 3228670.62
2
725511.23 3228693.307
33400 725560.545 3228729.26
6 725593.656 3228717.92
4
725527.434 3228740.608
33450 725576.748 3228776.56
8 725609.859 3228765.22
6
725543.637 3228787.91
33500 725592.951 3228823.87 725626.062 3228812.52
7
725559.84 3228835.212
33550 725609.154 3228871.17
1 725642.266 3228859.82
9
725576.043 3228882.514
33600 725625.358 3228918.47
3 725658.469 3228907.13
1
725592.247 3228929.815
33650 725641.561 3228965.77
5 725674.672 3228954.43
3
725608.45 3228977.117
33700 725657.764 3229013.07
7 725690.875 3229001.73
4
725624.653 3229024.419
33750 725673.967 3229060.37
8 725707.079 3229049.03
6
725640.856 3229071.721
33800 725690.171 3229107.68 725723.282 3229096.33
8
725657.06 3229119.022
33850 725706.374 3229154.98
2 725739.485 3229143.64
725673.263 3229166.324
33900 725722.266 3229202.38
8 725755.542 3229191.53
7
725688.991 3229213.24
33950 725737.371 3229250.05
2 725770.823 3229239.75
6
725703.92 3229260.347
34000 725751.68 3229297.96 725785.299 3229288.22
3
725718.062 3229307.696
34050 725765.188 3229346.1 725798.964 3229336.92
5
725731.412 3229355.275
34100 725777.892 3229394.45
8 725811.817 3229385.84
8
725743.968 3229403.069
34150 725789.882 3229442.99
9 725823.88 3229434.68
3
725755.885 3229451.316
34200 725801.763 3229491.56
7 725835.761 3229483.25
1
725767.765 3229499.884
Project Report
105
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
34250 725813.644 3229540.13
5 725847.641 3229531.81
9
725779.646 3229548.452
34300 725825.524 3229588.70
3 725859.522 3229580.38
7
725791.527 3229597.02
34350 725837.405 3229637.27
1 725871.403 3229628.95
5
725803.407 3229645.588
34400 725849.286 3229685.83
9 725883.283 3229677.52
3
725815.288 3229694.156
34450 725861.166 3229734.40
7 725895.164 3229726.09
1
725827.169 3229742.724
34500 725873.047 3229782.97
5 725907.045 3229774.65
9
725839.049 3229791.292
34550 725884.928 3229831.54
3 725918.925 3229823.22
7
725850.93 3229839.86
34600 725896.934 3229880.08 725930.847 3229871.42
3
725863.022 3229888.737
34650 725910.07 3229928.32
2 725943.683 3229918.56
7
725876.456 3229938.076
34700 725924.802 3229976.09
9 725958.072 3229965.23
725891.533 3229986.969
34750 725941.119 3230023.36 725974.008 3230011.38
7
725908.23 3230035.332
34800 725959.002 3230070.05 725991.473 3230056.98
8
725926.53 3230083.111
34850 725978.431 3230116.11
8 726010.449 3230101.98
2
725946.413 3230130.255
34900 725999.384 3230161.51
3 726030.914 3230146.31
8
725967.855 3230176.709
34950 726021.839 3230206.18
5 726052.844 3230189.94
7
725990.834 3230222.423
35000 726045.77 3230250.08
3 726076.217 3230232.82
1
726015.323 3230267.346
35050 726071.151 3230293.16 726101.005 3230274.89
2
726041.296 3230311.427
35100 726097.953 3230335.36
7 726127.182 3230316.11
4
726068.724 3230354.619
35150 726126.147 3230376.65
7 726154.719 3230356.44
1
726097.576 3230396.872
35200 726155.702 3230416.98
4 726183.583 3230395.82
7
726127.82 3230438.141
35250 726186.584 3230456.30
4 726213.745 3230434.23
726159.422 3230478.378
35300 726218.637 3230494.67
7 726245.311 3230472.01
6
726191.964 3230517.338
35350 726251.027 3230532.76
7 726277.69 3230510.09
4
726224.364 3230555.441
Project Report
106
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
35400 726283.418 3230570.85
7 726310.081 3230548.18
4
726256.755 3230593.531
35450 726315.809 3230608.94
7 726342.472 3230586.27
3
726289.146 3230631.621
35500 726348.2 3230647.03
7 726374.862 3230624.36
3
726321.537 3230669.71
35550 726380.163 3230685.48
4 726407.354 3230663.44
6
726352.972 3230707.522
35600 726411.157 3230724.71
8 726438.89 3230703.36
6
726383.424 3230746.069
35650 726441.16 3230764.71
3 726469.418 3230744.06
2
726412.902 3230785.365
35700 726470.155 3230805.44
7 726498.92 3230785.50
8
726441.389 3230825.385
35750 726498.122 3230846.89
2 726527.377 3230827.67
9
726468.867 3230866.105
35800 726525.044 3230889.02
3 726554.77 3230870.54
7
726495.318 3230907.499
35850 726550.905 3230931.81
5 726581.083 3230914.08
8
726520.726 3230949.542
35900 726575.687 3230975.23
9 726606.3 3230958.27
2
726545.075 3230992.206
35950 726599.377 3231019.26
9 726630.404 3231003.07
3
726568.35 3231035.466
36000 726621.959 3231063.87
8 726653.381 3231048.46
2
726590.537 3231079.294
36050 726643.418 3231109.03
7 726675.216 3231094.41
2
726611.621 3231123.663
36100 726663.742 3231154.71
9 726695.895 3231140.89
3
726631.589 3231168.545
36150 726682.918 3231200.89
4 726715.407 3231187.87
6
726650.429 3231213.913
36200 726700.933 3231247.53
5 726733.737 3231235.33
3
726668.129 3231259.737
36250 726717.777 3231294.61
1 726750.876 3231283.23
3
726684.678 3231305.989
36300 726733.439 3231342.09
3 726766.812 3231331.54
6
726700.066 3231352.64
36350 726747.909 3231389.95
2 726781.535 3231380.24
3
726714.282 3231399.662
36400 726761.178 3231438.15
8 726795.036 3231429.29
2
726727.319 3231447.024
36450 726773.238 3231486.68
1 726807.307 3231478.66
4
726739.168 3231494.697
36500 726784.081 3231535.48
9 726818.34 3231528.32
7
726749.822 3231542.652
Project Report
107
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
36550 726793.701 3231584.55
4 726828.128 3231578.25
726759.273 3231590.858
36600 726802.283 3231633.81
2 726836.778 3231627.88
9
726767.787 3231639.734
36650 726810.744 3231683.09 726845.239 3231677.16
7
726776.249 3231689.013
36700 726819.205 3231732.36
9 726853.7 3231726.44
6
726784.71 3231738.292
36750 726827.667 3231781.64
8 726862.162 3231775.72
5
726793.171 3231787.571
36800 726836.128 3231830.92
7 726870.623 3231825.00
4
726801.633 3231836.85
36850 726844.589 3231880.20
6 726879.084 3231874.28
3
726810.094 3231886.129
36900 726853.05 3231929.48
5 726887.546 3231923.56
2
726818.555 3231935.408
36950 726861.512 3231978.76
4 726896.007 3231972.84
1
726827.017 3231984.686
37000 726869.973 3232028.04
2 726904.468 3232022.12
726835.478 3232033.965
37050 726878.434 3232077.32
1 726912.93 3232071.39
8
726843.939 3232083.244
37100 726886.896 3232126.6 726921.391 3232120.67
7
726852.4 3232132.523
37150 726895.357 3232175.87
9 726929.852 3232169.95
6
726860.862 3232181.802
37200 726903.818 3232225.15
8 726938.314 3232219.23
5
726869.323 3232231.081
37250 726912.28 3232274.43
7 726946.775 3232268.51
4
726877.784 3232280.36
37300 726920.741 3232323.71
6 726955.236 3232317.79
3
726886.246 3232329.639
37350 726929.202 3232372.99
4 726963.697 3232367.07
2
726894.707 3232378.917
37400 726937.664 3232422.27
3 726972.159 3232416.35
726903.168 3232428.196
37450 726946.125 3232471.55
2 726980.62 3232465.62
9
726911.63 3232477.475
37500 726954.586 3232520.83
1 726989.081 3232514.90
8
726920.091 3232526.754
37550 726963.048 3232570.11 726997.543 3232564.18
7
726928.552 3232576.033
37600 726971.509 3232619.38
9 727006.004 3232613.46
6
726937.014 3232625.312
37650 726979.97 3232668.66
8 727014.465 3232662.74
5
726945.475 3232674.591
Project Report
108
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
37700 726988.431 3232717.94
6 727022.927 3232712.02
4
726953.936 3232723.869
37750 726996.893 3232767.22
5 727031.388 3232761.30
2
726962.398 3232773.148
37800 727005.354 3232816.50
4 727039.849 3232810.58
1
726970.859 3232822.427
37850 727013.815 3232865.78
3 727048.311 3232859.86
726979.32 3232871.706
37900 727022.277 3232915.06
2 727056.772 3232909.13
9
726987.781 3232920.985
37950 727030.738 3232964.34
1 727065.233 3232958.41
8
726996.243 3232970.264
38000 727039.199 3233013.62 727073.695 3233007.69
7
727004.704 3233019.543
38050 727047.661 3233062.89
9 727082.156 3233056.97
6
727013.165 3233068.821
38100 727056.231 3233112.15
8 727090.686 3233106.00
6
727021.777 3233118.311
38150 727065.267 3233161.33
5 727099.659 3233154.83
8
727030.875 3233167.832
38200 727074.794 3233210.41
9 727109.119 3233203.57
8
727040.469 3233217.259
38250 727084.811 3233259.40
5 727119.066 3233252.22
1
727050.557 3233266.588
38300 727095.318 3233308.28
8 727129.499 3233300.76
2
727061.137 3233315.814
38350 727106.313 3233357.06
4 727140.417 3233349.19
7
727072.209 3233364.931
38400 727117.699 3233405.75 727151.774 3233397.75
7
727083.624 3233413.744
38450 727129.119 3233454.42
9 727163.194 3233446.43
5
727095.044 3233462.422
38500 727140.538 3233503.10
7 727174.613 3233495.11
4
727106.463 3233511.101
38550 727151.958 3233551.78
6 727186.032 3233543.79
2
727117.883 3233559.779
38600 727163.377 3233600.46
4 727197.452 3233592.47
1
727129.302 3233608.458
38650 727174.797 3233649.14
3 727208.871 3233641.14
9
727140.722 3233657.136
38700 727186.216 3233697.82
1 727220.291 3233689.82
8
727152.141 3233705.815
38750 727197.635 3233746.5 727231.71 3233738.50
6
727163.561 3233754.493
38800 727209.055 3233795.17
8 727243.13 3233787.18
5
727174.98 3233803.172
Project Report
109
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
38850 727220.474 3233843.85
7 727254.549 3233835.86
3
727186.4 3233851.85
38900 727231.894 3233892.53
5 727265.969 3233884.54
2
727197.819 3233900.529
38950 727243.313 3233941.21
4 727277.388 3233933.22
727209.239 3233949.207
39000 727254.733 3233989.89
2 727288.808 3233981.89
9
727220.658 3233997.886
39050 727266.152 3234038.57
1 727300.227 3234030.57
7
727232.077 3234046.564
39100 727277.572 3234087.24
9 727311.647 3234079.25
6
727243.497 3234095.243
39150 727288.991 3234135.92
8 727323.066 3234127.93
4
727254.916 3234143.921
39200 727300.411 3234184.60
6 727334.486 3234176.61
3
727266.336 3234192.6
39250 727311.83 3234233.28
5 727345.905 3234225.29
1
727277.755 3234241.278
39300 727323.25 3234281.96
3 727357.325 3234273.97
727289.175 3234289.957
39350 727334.669 3234330.64
2 727368.744 3234322.64
8
727300.594 3234338.635
39400 727346.089 3234379.32 727380.164 3234371.32
6
727312.014 3234387.314
39450 727357.508 3234427.99
9 727391.583 3234420.00
5
727323.433 3234435.992
39500 727368.928 3234476.67
7 727403.003 3234468.68
3
727334.853 3234484.671
39550 727380.347 3234525.35
6 727414.422 3234517.36
2
727346.272 3234533.349
39600 727391.767 3234574.03
4 727425.842 3234566.04
727357.692 3234582.028
39650 727403.186 3234622.71
3 727437.261 3234614.71
9
727369.111 3234630.706
39700 727414.606 3234671.39
1 727448.681 3234663.39
7
727380.531 3234679.385
39750 727426.025 3234720.07 727460.1 3234712.07
6
727391.95 3234728.063
39800 727437.445 3234768.74
8 727471.52 3234760.75
4
727403.37 3234776.742
39850 727448.864 3234817.42
7 727482.939 3234809.43
3
727414.789 3234825.42
39900 727460.284 3234866.10
5 727494.359 3234858.11
1
727426.209 3234874.099
39950 727471.703 3234914.78
4 727505.778 3234906.79
727437.628 3234922.777
Project Report
110
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
40000 727483.123 3234963.46
2 727517.198 3234955.46
8
727449.048 3234971.456
40050 727494.542 3235012.14 727528.617 3235004.14
7
727460.467 3235020.134
40100 727505.962 3235060.81
9 727540.037 3235052.82
5
727471.887 3235068.813
40150 727517.381 3235109.49
7 727551.456 3235101.50
4
727483.306 3235117.491
40200 727528.801 3235158.17
6 727562.876 3235150.18
2
727494.726 3235166.17
40250 727540.22 3235206.85
4 727574.295 3235198.86
1
727506.145 3235214.848
40300 727551.64 3235255.53
3 727585.715 3235247.53
9
727517.565 3235263.527
40350 727563.059 3235304.21
1 727597.134 3235296.21
8
727528.984 3235312.205
40400 727574.479 3235352.89 727608.554 3235344.89
6
727540.404 3235360.884
40450 727585.898 3235401.56
8 727619.973 3235393.57
5
727551.823 3235409.562
40500 727597.318 3235450.24
7 727631.393 3235442.25
3
727563.243 3235458.241
40550 727608.737 3235498.92
5 727642.812 3235490.93
2
727574.662 3235506.919
40600 727620.157 3235547.60
4 727654.232 3235539.61
727586.082 3235555.598
40650 727631.576 3235596.28
2 727665.651 3235588.28
9
727597.501 3235604.276
40700 727642.996 3235644.96
1 727677.07 3235636.96
7
727608.921 3235652.954
40750 727654.415 3235693.63
9 727688.49 3235685.64
6
727620.34 3235701.633
40800 727665.835 3235742.31
8 727699.909 3235734.32
4
727631.76 3235750.311
40850 727677.254 3235790.99
6 727711.329 3235783.00
3
727643.179 3235798.99
40900 727688.321 3235839.75
6 727722.516 3235832.29
2
727654.126 3235847.219
40950 727698.575 3235888.69
2 727732.89 3235881.8
727664.26 3235895.585
41000 727708.012 3235937.79
3 727742.437 3235931.47
3
727673.588 3235944.113
41050 727716.63 3235987.04
4 727751.156 3235981.29
9
727682.105 3235992.789
41100 727724.426 3236036.43
2 727759.042 3236031.26
3
727689.81 3236041.601
Project Report
111
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
41150 727731.7 3236085.9 727766.329 3236080.81
4
727697.072 3236090.986
41200 727738.966 3236135.36
9 727773.595 3236130.28
3
727704.338 3236140.455
41250 727746.232 3236184.83
9 727780.861 3236179.75
2
727711.604 3236189.925
41300 727753.498 3236234.30
8 727788.127 3236229.22
2
727718.87 3236239.394
41350 727760.764 3236283.77
7 727795.393 3236278.69
1
727726.136 3236288.863
41400 727768.03 3236333.24
6 727802.659 3236328.16
727733.402 3236338.332
41450 727775.296 3236382.71
5 727809.924 3236377.62
9
727740.667 3236387.802
41500 727782.562 3236432.18
5 727817.19 3236427.09
9
727747.933 3236437.271
41550 727789.828 3236481.65
4 727824.456 3236476.56
8
727755.199 3236486.74
41600 727797.094 3236531.12
3 727831.722 3236526.03
7
727762.465 3236536.209
41650 727804.36 3236580.59
2 727838.988 3236575.50
6
727769.731 3236585.679
41700 727811.626 3236630.06
2 727846.254 3236624.97
6
727776.997 3236635.148
41750 727818.892 3236679.53
1 727853.52 3236674.44
5
727784.263 3236684.617
41800 727826.157 3236729 727860.786 3236723.91
4
727791.529 3236734.086
41850 727833.423 3236778.46
9 727868.052 3236773.38
3
727798.795 3236783.556
41900 727840.689 3236827.93
9 727875.318 3236822.85
3
727806.061 3236833.025
41950 727847.955 3236877.40
8 727882.584 3236872.32
2
727813.327 3236882.494
42000 727855.221 3236926.87
7 727889.85 3236921.79
1
727820.593 3236931.963
42050 727862.487 3236976.34
6 727897.116 3236971.26
727827.859 3236981.433
42100 727869.753 3237025.81
6 727904.381 3237020.73
727835.125 3237030.902
42150 727877.019 3237075.28
5 727911.647 3237070.19
9
727842.39 3237080.371
42200 727884.285 3237124.75
4 727918.913 3237119.66
8
727849.656 3237129.84
42250 727891.551 3237174.22
3 727926.179 3237169.13
7
727856.922 3237179.31
Project Report
112
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
42300 727898.817 3237223.69
3 727933.445 3237218.60
7
727864.188 3237228.779
42350 727906.083 3237273.16
2 727940.711 3237268.07
6
727871.454 3237278.248
42400 727913.349 3237322.63
1 727947.977 3237317.54
5
727878.72 3237327.717
42450 727920.614 3237372.1 727955.243 3237367.01
4
727885.986 3237377.187
42500 727927.88 3237421.57 727962.509 3237416.48
4
727893.252 3237426.656
42550 727935.146 3237471.03
9 727969.775 3237465.95
3
727900.518 3237476.125
42600 727942.412 3237520.50
8 727977.041 3237515.42
2
727907.784 3237525.594
42650 727949.678 3237569.97
7 727984.307 3237564.89
1
727915.05 3237575.064
42700 727956.944 3237619.44
7 727991.573 3237614.36
727922.316 3237624.533
42750 727964.21 3237668.91
6 727998.838 3237663.83
727929.582 3237674.002
42800 727971.476 3237718.38
5 728006.104 3237713.29
9
727936.847 3237723.471
42850 727978.742 3237767.85
4 728013.37 3237762.76
8
727944.113 3237772.941
42900 727986.008 3237817.32
4 728020.636 3237812.23
7
727951.379 3237822.41
42950 727993.274 3237866.79
3 728027.902 3237861.70
7
727958.645 3237871.879
43000 728000.54 3237916.26
2 728035.168 3237911.17
6
727965.911 3237921.348
43050 728007.806 3237965.73
1 728042.434 3237960.64
5
727973.177 3237970.818
43100 728015.071 3238015.20
1 728049.7 3238010.11
4
727980.443 3238020.287
43150 728022.337 3238064.67 728056.966 3238059.58
4
727987.709 3238069.756
43200 728029.637 3238114.13
4 728064.241 3238108.88
3
727995.033 3238119.385
43250 728037.55 3238163.50
3 728072.062 3238157.67
6
728003.039 3238169.331
43300 728046.286 3238212.73
4 728080.695 3238206.33
2
728011.876 3238219.135
43350 728055.84 3238261.81
2 728090.138 3238254.83
8
728021.542 3238268.786
43400 728066.211 3238310.72
4 728100.388 3238303.17
9
728032.034 3238318.269
Project Report
113
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
43450 728077.395 3238359.45
6 728111.442 3238351.34
3
728043.349 3238367.57
43500 728089.391 3238407.99
6 728123.297 3238399.31
6
728055.484 3238416.675
43550 728102.193 3238456.32
8 728135.951 3238447.08
5
728068.436 3238465.572
43600 728115.799 3238504.44
1 728149.398 3238494.63
6
728082.201 3238514.245
43650 728130.194 3238552.32
3 728163.654 3238542.05
7
728096.733 3238562.59
43700 728144.86 3238600.12
4 728178.32 3238589.85
8
728111.4 3238610.39
43750 728159.526 3238647.92
5 728192.987 3238637.65
8
728126.066 3238658.191
43800 728174.193 3238695.72
5 728207.653 3238685.45
9
728140.732 3238705.992
43850 728188.859 3238743.52
6 728222.319 3238733.25
9
728155.399 3238753.792
43900 728203.525 3238791.32
6 728236.986 3238781.06
728170.065 3238801.593
43950 728218.192 3238839.12
7 728251.652 3238828.86
1
728184.731 3238849.393
44000 728232.858 3238886.92
8 728266.318 3238876.66
1
728199.397 3238897.194
44050 728247.524 3238934.72
8 728280.985 3238924.46
2
728214.064 3238944.995
44100 728262.191 3238982.52
9 728295.651 3238972.26
2
728228.73 3238992.795
44150 728276.857 3239030.32
9 728310.317 3239020.06
3
728243.396 3239040.596
44200 728291.523 3239078.13 728324.984 3239067.86
4
728258.063 3239088.397
44250 728306.19 3239125.93
1 728339.65 3239115.66
4
728272.729 3239136.197
44300 728320.856 3239173.73
1 728354.316 3239163.46
5
728287.395 3239183.998
44350 728335.522 3239221.53
2 728368.983 3239211.26
6
728302.062 3239231.798
44400 728350.189 3239269.33
3 728383.649 3239259.06
6
728316.728 3239279.599
44450 728364.855 3239317.13
3 728398.315 3239306.86
7
728331.394 3239327.4
44500 728379.521 3239364.93
4 728412.982 3239354.66
7
728346.061 3239375.2
44550 728394.188 3239412.73
4 728427.648 3239402.46
8
728360.727 3239423.001
Project Report
114
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
44600 728408.854 3239460.53
5 728442.314 3239450.26
9
728375.393 3239470.801
44650 728423.52 3239508.33
6 728456.981 3239498.06
9
728390.06 3239518.602
44700 728438.186 3239556.13
6 728471.647 3239545.87
728404.726 3239566.403
44750 728452.853 3239603.93
7 728486.313 3239593.67
728419.392 3239614.203
44800 728467.519 3239651.73
7 728500.98 3239641.47
1
728434.059 3239662.004
44850 728482.185 3239699.53
8 728515.646 3239689.27
2
728448.725 3239709.805
44900 728496.852 3239747.33
9 728530.312 3239737.07
2
728463.391 3239757.605
44950 728511.518 3239795.13
9 728544.979 3239784.87
3
728478.058 3239805.406
45000 728526.184 3239842.94 728559.645 3239832.67
4
728492.724 3239853.206
45050 728540.851 3239890.74
1 728574.311 3239880.47
4
728507.39 3239901.007
45100 728555.517 3239938.54
1 728588.978 3239928.27
5
728522.057 3239948.808
45150 728570.183 3239986.34
2 728603.644 3239976.07
5
728536.723 3239996.608
45200 728584.85 3240034.14
2 728618.31 3240023.87
6
728551.389 3240044.409
45250 728599.516 3240081.94
3 728632.977 3240071.67
7
728566.056 3240092.209
45300 728614.182 3240129.74
4 728647.643 3240119.47
7
728580.722 3240140.01
45350 728628.849 3240177.54
4 728662.309 3240167.27
8
728595.388 3240187.811
45400 728643.515 3240225.34
5 728676.975 3240215.07
8
728610.055 3240235.611
45450 728658.181 3240273.14
6 728691.642 3240262.87
9
728624.721 3240283.412
45500 728672.848 3240320.94
6 728706.308 3240310.68
728639.387 3240331.213
45550 728687.514 3240368.74
7 728720.974 3240358.48
728654.054 3240379.013
45600 728702.18 3240416.54
7 728735.641 3240406.28
1
728668.72 3240426.814
45650 728716.847 3240464.34
8 728750.307 3240454.08
2
728683.386 3240474.614
45700 728731.513 3240512.14
9 728764.973 3240501.88
2
728698.053 3240522.415
Project Report
115
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
45750 728746.179 3240559.94
9 728779.64 3240549.68
3
728712.719 3240570.216
45800 728760.846 3240607.75 728794.306 3240597.48
3
728727.385 3240618.016
45850 728775.512 3240655.55 728808.972 3240645.28
4
728742.052 3240665.817
45900 728790.178 3240703.35
1 728823.639 3240693.08
5
728756.718 3240713.617
45950 728804.845 3240751.15
2 728838.305 3240740.88
5
728771.384 3240761.418
46000 728819.511 3240798.95
2 728852.971 3240788.68
6
728786.051 3240809.219
46050 728834.177 3240846.75
3 728867.638 3240836.48
6
728800.717 3240857.019
46100 728848.844 3240894.55
4 728882.304 3240884.28
7
728815.383 3240904.82
46150 728863.51 3240942.35
4 728896.97 3240932.08
8
728830.05 3240952.621
46200 728878.176 3240990.15
5 728911.637 3240979.88
8
728844.716 3241000.421
46250 728892.843 3241037.95
5 728926.303 3241027.68
9
728859.382 3241048.222
46300 728907.509 3241085.75
6 728940.969 3241075.49
728874.048 3241096.022
46350 728922.175 3241133.55
7 728955.636 3241123.29
728888.715 3241143.823
46400 728936.842 3241181.35
7 728970.302 3241171.09
1
728903.381 3241191.624
46450 728951.508 3241229.15
8 728984.968 3241218.89
1
728918.047 3241239.424
46500 728966.174 3241276.95
8 728999.635 3241266.69
2
728932.714 3241287.225
46550 728980.841 3241324.75
9 729014.301 3241314.49
3
728947.38 3241335.025
46600 728995.507 3241372.56 729028.967 3241362.29
3
728962.046 3241382.826
46650 729010.173 3241420.36 729043.634 3241410.09
4
728976.713 3241430.627
46700 729024.84 3241468.16
1 729058.3 3241457.89
4
728991.379 3241478.427
46750 729039.506 3241515.96
2 729072.966 3241505.69
5
729006.045 3241526.228
46800 729054.172 3241563.76
2 729087.633 3241553.49
6
729020.712 3241574.029
46850 729068.839 3241611.56
3 729102.299 3241601.29
6
729035.378 3241621.829
Project Report
116
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
46900 729083.505 3241659.36
3 729116.965 3241649.09
7
729050.044 3241669.63
46950 729098.171 3241707.16
4 729131.632 3241696.89
8
729064.711 3241717.43
47000 729112.837 3241754.96
5 729146.298 3241744.69
8
729079.377 3241765.231
47050 729127.504 3241802.76
5 729160.964 3241792.49
9
729094.043 3241813.032
47100 729142.17 3241850.56
6 729175.631 3241840.29
9
729108.71 3241860.832
47150 729156.836 3241898.36
6 729190.297 3241888.1
729123.376 3241908.633
47200 729171.503 3241946.16
7 729204.963 3241935.90
1
729138.042 3241956.433
47250 729186.169 3241993.96
8 729219.63 3241983.70
1
729152.709 3242004.234
47300 729200.835 3242041.76
8 729234.296 3242031.50
2
729167.375 3242052.035
47350 729215.502 3242089.56
9 729248.962 3242079.30
2
729182.041 3242099.835
47400 729230.168 3242137.37 729263.629 3242127.10
3
729196.708 3242147.636
47450 729244.834 3242185.17 729278.295 3242174.90
4
729211.374 3242195.437
47500 729259.501 3242232.97
1 729292.961 3242222.70
4
729226.04 3242243.237
47550 729274.167 3242280.77
1 729307.627 3242270.50
5
729240.707 3242291.038
47600 729288.833 3242328.57
2 729322.294 3242318.30
6
729255.373 3242338.838
47650 729303.5 3242376.37
3 729336.96 3242366.10
6
729270.039 3242386.639
47700 729318.166 3242424.17
3 729351.626 3242413.90
7
729284.706 3242434.44
47750 729332.832 3242471.97
4 729366.293 3242461.70
7
729299.372 3242482.24
47800 729347.499 3242519.77
4 729380.959 3242509.50
8
729314.038 3242530.041
47850 729362.165 3242567.57
5 729395.625 3242557.30
9
729328.705 3242577.841
47900 729376.831 3242615.37
6 729410.292 3242605.10
9
729343.371 3242625.642
47950 729391.498 3242663.17
6 729424.958 3242652.91
729358.037 3242673.443
48000 729406.164 3242710.97
7 729439.624 3242700.71
729372.704 3242721.243
Project Report
117
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
48050 729420.83 3242758.77
8 729454.291 3242748.51
1
729387.37 3242769.044
48100 729435.497 3242806.57
8 729468.957 3242796.31
2
729402.036 3242816.845
48150 729450.163 3242854.37
9 729483.623 3242844.11
2
729416.703 3242864.645
48200 729464.829 3242902.17
9 729498.29 3242891.91
3
729431.369 3242912.446
48250 729479.496 3242949.98 729512.956 3242939.71
4
729446.035 3242960.246
48300 729494.162 3242997.78
1 729527.622 3242987.51
4
729460.702 3243008.047
48350 729508.828 3243045.58
1 729542.289 3243035.31
5
729475.368 3243055.848
48400 729523.495 3243093.38
2 729556.955 3243083.11
5
729490.034 3243103.648
48450 729538.161 3243141.18
2 729571.621 3243130.91
6
729504.701 3243151.449
48500 729552.827 3243188.98
3 729586.288 3243178.71
7
729519.367 3243199.249
48550 729567.494 3243236.78
4 729600.954 3243226.51
7
729534.033 3243247.05
48600 729582.16 3243284.58
4 729615.62 3243274.31
8
729548.699 3243294.851
48650 729596.826 3243332.38
5 729630.287 3243322.11
8
729563.366 3243342.651
48700 729611.493 3243380.18
6 729644.953 3243369.91
9
729578.032 3243390.452
48750 729626.159 3243427.98
6 729659.619 3243417.72
729592.698 3243438.253
48800 729640.825 3243475.78
7 729674.286 3243465.52
729607.365 3243486.053
48850 729655.492 3243523.58
7 729688.952 3243513.32
1
729622.031 3243533.854
48900 729670.158 3243571.38
8 729703.618 3243561.12
2
729636.697 3243581.654
48950 729684.824 3243619.18
9 729718.285 3243608.92
2
729651.364 3243629.455
49000 729699.491 3243666.98
9 729732.951 3243656.72
3
729666.03 3243677.256
49050 729714.157 3243714.79 729747.617 3243704.52
3
729680.696 3243725.056
49100 729728.823 3243762.59 729762.284 3243752.32
4
729695.363 3243772.857
49150 729743.49 3243810.39
1 729776.95 3243800.12
5
729710.029 3243820.658
Project Report
118
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
49200 729758.156 3243858.19
2 729791.616 3243847.92
5
729724.695 3243868.458
49250 729772.822 3243905.99
2 729806.283 3243895.72
6
729739.362 3243916.259
49300 729787.488 3243953.79
3 729820.949 3243943.52
6
729754.028 3243964.059
49350 729802.155 3244001.59
4 729835.615 3243991.32
7
729768.694 3244011.86
49400 729816.568 3244049.47
1 729850.161 3244039.65
729782.974 3244059.292
49450 729830.197 3244097.57
7 729863.95 3244088.31
7
729796.444 3244106.836
49500 729843.023 3244145.90
3 729876.925 3244137.20
7
729809.12 3244154.599
49550 729855.041 3244194.43
7 729889.084 3244186.30
7
729820.998 3244202.566
49600 729866.249 3244243.16
4 729900.423 3244235.60
2
729832.076 3244250.725
49650 729876.643 3244292.07
1 729910.938 3244285.08
729842.349 3244299.061
49700 729886.345 3244341.12 729920.691 3244334.38
7
729851.999 3244347.854
49750 729895.965 3244390.18
6 729930.311 3244383.45
3
729861.619 3244396.92
49800 729905.584 3244439.25
2 729939.93 3244432.51
9
729871.238 3244445.986
49850 729915.204 3244488.31
8 729949.55 3244481.58
4
729880.857 3244495.052
49900 729924.823 3244537.38
4 729959.169 3244530.65
729890.477 3244544.118
49950 729934.442 3244586.45 729968.789 3244579.71
6
729900.096 3244593.184
50000 729944.062 3244635.51
6 729978.408 3244628.78
2
729909.716 3244642.249
50050 729953.681 3244684.58
2 729988.027 3244677.84
8
729919.335 3244691.315
50100 729963.301 3244733.64
8 729997.647 3244726.91
4
729928.955 3244740.381
50150 729972.92 3244782.71
4 730007.266 3244775.98
729938.574 3244789.447
50200 729982.54 3244831.78 730016.886 3244825.04
6
729948.193 3244838.513
50250 729992.159 3244880.84
6 730026.505 3244874.11
2
729957.813 3244887.579
50300 730001.779 3244929.91
2 730036.125 3244923.17
8
729967.432 3244936.645
Project Report
119
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
50350 730011.398 3244978.97
7 730045.744 3244972.24
4
729977.052 3244985.711
50400 730021.017 3245028.04
3 730055.364 3245021.31
729986.671 3245034.777
50450 730030.637 3245077.10
9 730064.983 3245070.37
6
729996.291 3245083.843
50500 730040.256 3245126.17
5 730074.602 3245119.44
2
730005.91 3245132.909
50550 730049.876 3245175.24
1 730084.222 3245168.50
8
730015.53 3245181.975
50600 730059.495 3245224.30
7 730093.841 3245217.57
4
730025.149 3245231.041
50650 730069.115 3245273.37
3 730103.461 3245266.63
9
730034.768 3245280.107
50700 730078.734 3245322.43
9 730113.08 3245315.70
5
730044.388 3245329.173
50750 730088.353 3245371.50
5 730122.7 3245364.77
1
730054.007 3245378.239
50800 730097.973 3245420.57
1 730132.319 3245413.83
7
730063.627 3245427.305
50850 730107.592 3245469.63
7 730141.938 3245462.90
3
730073.246 3245476.37
50900 730117.212 3245518.70
3 730151.558 3245511.96
9
730082.866 3245525.436
50950 730126.831 3245567.76
9 730161.177 3245561.03
5
730092.485 3245574.502
51000 730136.451 3245616.83
5 730170.797 3245610.10
1
730102.104 3245623.568
51050 730146.07 3245665.90
1 730180.416 3245659.16
7
730111.724 3245672.634
51100 730155.69 3245714.96
7 730190.036 3245708.23
3
730121.343 3245721.7
51150 730165.309 3245764.03
2 730199.655 3245757.29
9
730130.963 3245770.766
51200 730174.928 3245813.09
8 730209.275 3245806.36
5
730140.582 3245819.832
51250 730184.548 3245862.16
4 730218.894 3245855.43
1
730150.202 3245868.898
51300 730194.167 3245911.23 730228.513 3245904.49
7
730159.821 3245917.964
51350 730203.787 3245960.29
6 730238.133 3245953.56
3
730169.441 3245967.03
51400 730213.406 3246009.36
2 730247.752 3246002.62
9
730179.06 3246016.096
51450 730223.026 3246058.42
8 730257.372 3246051.69
5
730188.679 3246065.162
Project Report
120
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
51500 730232.645 3246107.49
4 730266.991 3246100.76
730198.299 3246114.228
51550 730242.264 3246156.56 730276.611 3246149.82
6
730207.918 3246163.294
51600 730251.884 3246205.62
6 730286.23 3246198.89
2
730217.538 3246212.36
51650 730261.503 3246254.69
2 730295.849 3246247.95
8
730227.157 3246261.425
51700 730271.123 3246303.75
8 730305.469 3246297.02
4
730236.777 3246310.491
51750 730280.742 3246352.82
4 730315.088 3246346.09
730246.396 3246359.557
51800 730290.362 3246401.89 730324.708 3246395.15
6
730256.015 3246408.623
51850 730299.981 3246450.95
6 730334.327 3246444.22
2
730265.635 3246457.689
51900 730309.601 3246500.02
2 730343.947 3246493.28
8
730275.254 3246506.755
51950 730319.22 3246549.08
8 730353.566 3246542.35
4
730284.874 3246555.821
52000 730328.839 3246598.15
3 730363.186 3246591.42
730294.493 3246604.887
52050 730338.459 3246647.21
9 730372.805 3246640.48
6
730304.113 3246653.953
52100 730348.078 3246696.28
5 730382.424 3246689.55
2
730313.732 3246703.019
52150 730357.698 3246745.35
1 730392.044 3246738.61
8
730323.352 3246752.085
52200 730367.317 3246794.41
7 730401.663 3246787.68
4
730332.971 3246801.151
52250 730376.937 3246843.48
3 730411.283 3246836.75
730342.59 3246850.217
52300 730386.556 3246892.54
9 730420.902 3246885.81
5
730352.21 3246899.283
52350 730396.175 3246941.61
5 730430.522 3246934.88
1
730361.829 3246948.349
52400 730405.795 3246990.68
1 730440.141 3246983.94
7
730371.449 3246997.415
52450 730415.414 3247039.74
7 730449.761 3247033.01
3
730381.068 3247046.481
52500 730425.034 3247088.81
3 730459.38 3247082.07
9
730390.688 3247095.546
52550 730434.653 3247137.87
9 730468.999 3247131.14
5
730400.307 3247144.612
52600 730444.273 3247186.94
5 730478.619 3247180.21
1
730409.927 3247193.678
Project Report
121
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
52650 730453.892 3247236.01
1 730488.238 3247229.27
7
730419.546 3247242.744
52700 730463.512 3247285.07
7 730497.858 3247278.34
3
730429.165 3247291.81
52750 730473.131 3247334.14
3 730507.477 3247327.40
9
730438.785 3247340.876
52800 730482.75 3247383.20
8 730517.097 3247376.47
5
730448.404 3247389.942
52850 730492.37 3247432.27
4 730526.716 3247425.54
1
730458.024 3247439.008
52900 730501.989 3247481.34 730536.335 3247474.60
7
730467.643 3247488.074
52950 730511.609 3247530.40
6 730545.955 3247523.67
3
730477.263 3247537.14
53000 730521.228 3247579.47
2 730555.574 3247572.73
9
730486.882 3247586.206
53050 730530.848 3247628.53
8 730565.194 3247621.80
5
730496.501 3247635.272
53100 730540.467 3247677.60
4 730574.813 3247670.87
1
730506.121 3247684.338
53150 730550.086 3247726.67 730584.433 3247719.93
6
730515.74 3247733.404
53200 730559.706 3247775.73
6 730594.052 3247769.00
2
730525.36 3247782.47
53250 730569.325 3247824.80
2 730603.672 3247818.06
8
730534.979 3247831.536
53300 730578.945 3247873.86
8 730613.291 3247867.13
4
730544.599 3247880.601
53350 730588.564 3247922.93
4 730622.91 3247916.2
730554.218 3247929.667
53400 730598.184 3247972 730632.53 3247965.26
6
730563.838 3247978.733
53450 730607.803 3248021.06
6 730642.149 3248014.33
2
730573.457 3248027.799
53500 730617.423 3248070.13
2 730651.769 3248063.39
8
730583.076 3248076.865
53550 730627.042 3248119.19
8 730661.388 3248112.46
4
730592.696 3248125.931
53600 730636.661 3248168.26
4 730671.008 3248161.53
730602.315 3248174.997
53650 730646.281 3248217.32
9 730680.627 3248210.59
6
730611.935 3248224.063
53700 730655.9 3248266.39
5 730690.246 3248259.66
2
730621.554 3248273.129
53750 730665.52 3248315.46
1 730699.866 3248308.72
8
730631.174 3248322.195
Project Report
122
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
53800 730675.139 3248364.52
7 730709.485 3248357.79
4
730640.793 3248371.261
53850 730684.759 3248413.59
3 730719.105 3248406.86
730650.412 3248420.327
53900 730694.378 3248462.65
9 730728.724 3248455.92
6
730660.032 3248469.393
53950 730703.997 3248511.72
5 730738.344 3248504.99
1
730669.651 3248518.459
54000 730713.617 3248560.79
1 730747.963 3248554.05
7
730679.271 3248567.525
54050 730723.236 3248609.85
7 730757.583 3248603.12
3
730688.89 3248616.591
54100 730732.856 3248658.92
3 730767.202 3248652.18
9
730698.51 3248665.657
54150 730742.475 3248707.98
9 730776.821 3248701.25
5
730708.129 3248714.722
54200 730752.095 3248757.05
5 730786.441 3248750.32
1
730717.749 3248763.788
54250 730761.714 3248806.12
1 730796.06 3248799.38
7
730727.368 3248812.854
54300 730771.334 3248855.18
7 730805.68 3248848.45
3
730736.987 3248861.92
54350 730780.953 3248904.25
3 730815.299 3248897.51
9
730746.607 3248910.986
54400 730790.572 3248953.31
9 730824.919 3248946.58
5
730756.226 3248960.052
54450 730800.192 3249002.38
4 730834.538 3248995.65
1
730765.846 3249009.118
54500 730809.969 3249051.41
9 730844.265 3249044.43
5
730775.673 3249058.404
54550 730820.151 3249100.37
1 730854.387 3249093.10
1
730785.914 3249107.641
54600 730830.74 3249149.23
7 730864.915 3249141.68
2
730796.565 3249156.792
54650 730841.737 3249198.01
3 730875.847 3249190.17
3
730807.626 3249205.852
54700 730853.139 3249246.69
5 730887.183 3249238.57
1
730819.095 3249254.819
54750 730864.947 3249295.28 730898.922 3249286.87
3
730830.972 3249303.688
54800 730877.159 3249343.76
6 730911.063 3249335.07
6
730843.255 3249352.456
54850 730889.775 3249392.14
8 730923.606 3249383.17
6
730855.945 3249401.12
54900 730902.794 3249440.42
3 730936.548 3249431.17
730869.039 3249449.677
Project Report
123
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
54950 730916.214 3249488.58
8 730949.89 3249479.05
4
730882.538 3249498.123
55000 730930.036 3249536.64 730963.631 3249526.82
5
730896.44 3249546.455
55050 730944.257 3249584.57
5 730977.77 3249574.48
730910.744 3249594.669
55100 730958.877 3249632.38
9 730992.305 3249622.01
6
730925.45 3249642.763
55150 730973.895 3249680.08 731007.235 3249669.42
9
730940.556 3249690.732
55200 730989.31 3249727.64
5 731022.56 3249716.71
5
730956.061 3249738.574
55250 731005.121 3249775.07
9 731038.279 3249763.87
3
730971.964 3249786.285
55300 731021.327 3249822.38 731054.39 3249810.89
8
730988.264 3249833.862
55350 731037.926 3249869.54
4 731070.893 3249857.78
7
731004.96 3249881.301
55400 731054.918 3249916.56
8 731087.785 3249904.53
7
731022.051 3249928.599
55450 731072.301 3249963.44
9 731105.067 3249951.14
4
731039.535 3249975.753
55500 731090.074 3250010.18
3 731122.736 3249997.60
6
731057.412 3250022.76
55550 731108.236 3250056.76
8 731140.792 3250043.91
9
731075.68 3250069.617
55600 731126.785 3250103.19
9 731159.233 3250090.07
9
731094.338 3250116.319
55650 731145.721 3250149.47
5 731178.059 3250136.08
5
731113.384 3250162.865
55700 731165.042 3250195.59
1 731197.267 3250181.93
2
731132.817 3250209.25
55750 731184.746 3250241.54
5 731216.856 3250227.61
8
731152.636 3250255.472
55800 731204.833 3250287.33
2 731236.826 3250273.13
8
731172.84 3250301.526
55850 731225.3 3250332.95
1 731257.174 3250318.49
1
731193.427 3250347.411
55900 731246.147 3250378.39
8 731277.899 3250363.67
2
731214.396 3250393.123
55950 731267.372 3250423.66
9 731299 3250408.68
731235.744 3250438.658
56000 731288.923 3250468.78
6 731320.49 3250453.67
731257.355 3250483.902
56050 731310.517 3250513.88
3 731342.084 3250498.76
7
731278.949 3250528.998
Project Report
124
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
56100 731332.111 3250558.97
9 731363.678 3250543.86
4
731300.543 3250574.095
56150 731353.705 3250604.07
6 731385.272 3250588.96
731322.137 3250619.192
56200 731375.299 3250649.17
2 731406.866 3250634.05
7
731343.731 3250664.288
56250 731396.892 3250694.26
9 731428.46 3250679.15
3
731365.325 3250709.385
56300 731418.486 3250739.36
6 731450.054 3250724.25
731386.919 3250754.481
56350 731440.08 3250784.46
2 731471.648 3250769.34
6
731408.513 3250799.578
56400 731461.674 3250829.55
9 731493.242 3250814.44
3
731430.107 3250844.675
56450 731483.268 3250874.65
5 731514.836 3250859.54
731451.701 3250889.771
56500 731504.862 3250919.75
2 731536.43 3250904.63
6
731473.295 3250934.868
56550 731526.456 3250964.84
9 731558.024 3250949.73
3
731494.889 3250979.964
56600 731548.05 3251009.94
5 731579.618 3250994.82
9
731516.482 3251025.061
56650 731569.644 3251055.04
2 731601.212 3251039.92
6
731538.076 3251070.157
56700 731591.238 3251100.13
8 731622.806 3251085.02
3
731559.67 3251115.254
56750 731612.832 3251145.23
5 731644.4 3251130.11
9
731581.264 3251160.351
56800 731634.426 3251190.33
1 731665.993 3251175.21
6
731602.858 3251205.447
56850 731656.02 3251235.42
8 731687.587 3251220.31
2
731624.452 3251250.544
56900 731677.614 3251280.52
5 731709.181 3251265.40
9
731646.046 3251295.64
56950 731699.208 3251325.62
1 731730.775 3251310.50
5
731667.64 3251340.737
57000 731720.802 3251370.71
8 731752.369 3251355.60
2
731689.234 3251385.834
57050 731742.396 3251415.81
4 731773.963 3251400.69
9
731710.828 3251430.93
57100 731763.989 3251460.91
1 731795.557 3251445.79
5
731732.422 3251476.027
57150 731785.583 3251506.00
8 731817.151 3251490.89
2
731754.016 3251521.123
57200 731807.177 3251551.10
4 731838.745 3251535.98
8
731775.61 3251566.22
Project Report
125
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
57250 731828.771 3251596.20
1 731860.339 3251581.08
5
731797.204 3251611.316
57300 731850.365 3251641.29
7 731881.933 3251626.18
2
731818.798 3251656.413
57350 731871.959 3251686.39
4 731903.527 3251671.27
8
731840.392 3251701.51
57400 731893.553 3251731.49 731925.121 3251716.37
5
731861.986 3251746.606
57450 731915.147 3251776.58
7 731946.715 3251761.47
1
731883.579 3251791.703
57500 731936.741 3251821.68
4 731968.309 3251806.56
8
731905.173 3251836.799
57550 731958.335 3251866.78 731989.903 3251851.66
4
731926.767 3251881.896
57600 731979.929 3251911.87
7 732011.497 3251896.76
1
731948.361 3251926.993
57650 732001.564 3251956.95
4 732033.067 3251941.70
3
731970.061 3251972.204
57700 732023.575 3252001.84
8 732054.924 3251986.28
3
731992.226 3252017.413
57750 732045.998 3252046.53
8 732077.253 3252030.78
6
732014.743 3252062.29
57800 732068.501 3252091.18
8 732099.756 3252075.43
6
732037.246 3252106.94
57850 732091.004 3252135.83
8 732122.259 3252120.08
5
732059.749 3252151.59
57900 732113.507 3252180.48
7 732144.762 3252164.73
5
732082.252 3252196.24
57950 732136.01 3252225.13
7 732167.265 3252209.38
5
732104.755 3252240.889
58000 732158.513 3252269.78
7 732189.768 3252254.03
5
732127.259 3252285.539
58050 732181.017 3252314.43
7 732212.271 3252298.68
5
732149.762 3252330.189
58100 732203.52 3252359.08
7 732234.775 3252343.33
5
732172.265 3252374.839
58150 732226.023 3252403.73
7 732257.278 3252387.98
5
732194.768 3252419.489
58200 732248.526 3252448.38
7 732279.781 3252432.63
5
732217.271 3252464.139
58250 732271.029 3252493.03
7 732302.284 3252477.28
4
732239.774 3252508.789
58300 732293.532 3252537.68
7 732324.787 3252521.93
4
732262.277 3252553.439
58350 732316.035 3252582.33
6 732347.29 3252566.58
4
732284.78 3252598.089
Project Report
126
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
58400 732338.538 3252626.98
6 732369.793 3252611.23
4
732307.283 3252642.738
58450 732361.041 3252671.63
6 732392.296 3252655.88
4
732329.786 3252687.388
58500 732383.544 3252716.28
6 732414.799 3252700.53
4
732352.289 3252732.038
58550 732406.047 3252760.93
6 732437.302 3252745.18
4
732374.792 3252776.688
58600 732428.55 3252805.58
6 732459.805 3252789.83
4
732397.295 3252821.338
58650 732451.053 3252850.23
6 732482.308 3252834.48
4
732419.798 3252865.988
58700 732473.556 3252894.88
6 732504.811 3252879.13
3
732442.301 3252910.638
58750 732496.059 3252939.53
5 732527.314 3252923.78
3
732464.805 3252955.288
58800 732518.563 3252984.18
5 732549.817 3252968.43
3
732487.308 3252999.937
58850 732541.066 3253028.83
5 732572.321 3253013.08
3
732509.811 3253044.587
58900 732563.569 3253073.48
5 732594.824 3253057.73
3
732532.314 3253089.237
58950 732586.072 3253118.13
5 732617.327 3253102.38
3
732554.817 3253133.887
59000 732608.575 3253162.78
5 732639.83 3253147.03
3
732577.32 3253178.537
59050 732631.078 3253207.43
5 732662.333 3253191.68
3
732599.823 3253223.187
59100 732653.581 3253252.08
5 732684.836 3253236.33
2
732622.326 3253267.837
59150 732676.084 3253296.73
5 732707.339 3253280.98
2
732644.829 3253312.487
59200 732698.587 3253341.38
4 732729.842 3253325.63
2
732667.332 3253357.137
59250 732721.09 3253386.03
4 732752.345 3253370.28
2
732689.835 3253401.786
59300 732743.593 3253430.68
4 732774.848 3253414.93
2
732712.338 3253446.436
59350 732766.096 3253475.33
4 732797.351 3253459.58
2
732734.841 3253491.086
59400 732788.599 3253519.98
4 732819.854 3253504.23
2
732757.344 3253535.736
59450 732811.102 3253564.63
4 732842.357 3253548.88
2
732779.847 3253580.386
59500 732833.605 3253609.28
4 732864.86 3253593.53
2
732802.351 3253625.036
Project Report
127
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
59550 732856.084 3253653.94
6 732887.394 3253638.30
2
732824.775 3253669.589
59600 732878.184 3253698.79
7 732909.665 3253683.50
2
732846.703 3253714.091
59650 732899.783 3253743.89 732931.433 3253728.94
6
732868.134 3253758.834
59700 732920.881 3253789.22
1 732952.694 3253774.62
9
732889.067 3253803.813
59750 732941.473 3253834.78
3 732973.446 3253820.54
6
732909.499 3253849.021
59800 732961.558 3253880.57
2 732993.687 3253866.69
1
732929.428 3253894.453
59850 732981.132 3253926.58 733013.414 3253913.05
7
732948.85 3253940.104
59900 733000.195 3253972.80
4 733032.625 3253959.64
732967.765 3253985.968
59950 733018.742 3254019.23
6 733051.317 3254006.43
3
732986.168 3254032.039
60000 733036.773 3254065.87
2 733069.488 3254053.43
2
733004.058 3254078.312
60050 733054.284 3254112.70
5 733087.135 3254100.62
9
733021.433 3254124.78
60100 733071.274 3254159.72
9 733104.257 3254148.01
9
733038.291 3254171.439
60150 733087.74 3254206.94 733120.851 3254195.59
7
733054.629 3254218.283
60200 733103.681 3254254.33 733136.916 3254243.35
6
733070.446 3254265.305
60250 733119.094 3254301.89
5 733152.449 3254291.29
1
733085.739 3254312.499
60300 733133.978 3254349.62
8 733167.449 3254339.39
5
733100.507 3254359.861
60350 733148.331 3254397.52
4 733181.913 3254387.66
3
733114.748 3254407.384
60400 733162.15 3254445.57
6 733195.84 3254436.08
9
733128.46 3254455.062
60450 733175.435 3254493.77
8 733209.228 3254484.66
7
733141.642 3254502.89
60500 733188.183 3254542.12
6 733222.075 3254533.39
733154.291 3254550.861
60550 733200.393 3254590.61
2 733234.381 3254582.25
3
733166.406 3254598.97
60600 733212.064 3254639.23 733246.142 3254631.25 733177.986 3254647.211
60650 733223.207 3254687.97
2 733257.353 3254680.28
9
733189.061 3254695.656
60700 733234.161 3254736.65
2 733268.307 3254728.96
8
733200.015 3254744.335
Project Report
128
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
60750 733245.138 3254785.43
2 733279.284 3254777.74
8
733210.991 3254793.115
60800 733256.114 3254834.21
2 733290.26 3254826.52
8
733221.968 3254841.896
60850 733267.091 3254882.99
2 733301.237 3254875.30
9
733232.945 3254890.676
60900 733278.068 3254931.77
3 733312.214 3254924.08
9
733243.921 3254939.456
60950 733289.044 3254980.55
3 733323.19 3254972.86
9
733254.898 3254988.236
61000 733300.021 3255029.33
3 733334.167 3255021.64
9
733265.875 3255037.017
61050 733310.998 3255078.11
3 733345.144 3255070.43
733276.852 3255085.797
61100 733321.974 3255126.89
3 733356.121 3255119.21
733287.828 3255134.577
61150 733332.951 3255175.67
4 733367.097 3255167.99
733298.805 3255183.357
61200 733343.928 3255224.45
4 733378.074 3255216.77
733309.782 3255232.138
61250 733354.904 3255273.23
4 733389.051 3255265.55
1
733320.758 3255280.918
61300 733365.881 3255322.01
4 733400.027 3255314.33
1
733331.735 3255329.698
61350 733376.858 3255370.79
5 733411.004 3255363.11
1
733342.712 3255378.478
61400 733387.835 3255419.57
5 733421.981 3255411.89
1
733353.688 3255427.259
61450 733398.811 3255468.35
5 733432.957 3255460.67
2
733364.665 3255476.039
61500 733409.788 3255517.13
5 733443.934 3255509.45
2
733375.642 3255524.819
61550 733420.765 3255565.91
6 733454.911 3255558.23
2
733386.619 3255573.599
61600 733431.741 3255614.69
6 733465.888 3255607.01
2
733397.595 3255622.38
61650 733442.718 3255663.47
6 733476.864 3255655.79
2
733408.572 3255671.16
61700 733453.695 3255712.25
6 733487.841 3255704.57
3
733419.549 3255719.94
61750 733464.671 3255761.03
7 733498.818 3255753.35
3
733430.525 3255768.72
61800 733475.648 3255809.81
7 733509.794 3255802.13
3
733441.502 3255817.501
61850 733486.625 3255858.59
7 733520.771 3255850.91
3
733452.479 3255866.281
Project Report
129
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
61900 733497.602 3255907.37
7 733531.748 3255899.69
4
733463.455 3255915.061
61950 733508.578 3255956.15
8 733542.724 3255948.47
4
733474.432 3255963.841
62000 733519.555 3256004.93
8 733553.701 3255997.25
4
733485.409 3256012.622
62050 733530.532 3256053.71
8 733564.678 3256046.03
4
733496.385 3256061.402
62100 733541.508 3256102.49
8 733575.655 3256094.81
5
733507.362 3256110.182
62150 733552.485 3256151.27
9 733586.631 3256143.59
5
733518.339 3256158.962
62200 733563.462 3256200.05
9 733597.608 3256192.37
5
733529.316 3256207.743
62250 733574.438 3256248.83
9 733608.585 3256241.15
5
733540.292 3256256.523
62300 733585.415 3256297.61
9 733619.561 3256289.93
6
733551.269 3256305.303
62350 733596.392 3256346.4 733630.538 3256338.71
6
733562.246 3256354.083
62400 733607.369 3256395.18 733641.515 3256387.49
6
733573.222 3256402.864
62450 733618.345 3256443.96 733652.491 3256436.27
6
733584.199 3256451.644
62500 733629.322 3256492.74 733663.468 3256485.05
7
733595.176 3256500.424
62550 733640.299 3256541.52
1 733674.445 3256533.83
7
733606.152 3256549.204
62600 733651.275 3256590.30
1 733685.421 3256582.61
7
733617.129 3256597.984
62650 733661.889 3256639.16
1 733696.152 3256632.01
5
733627.626 3256646.306
62700 733671.689 3256688.19 733706.066 3256681.61
7
733637.311 3256694.764
62750 733680.669 3256737.37
7 733715.151 3256731.37
7
733646.187 3256743.376
62800 733688.829 3256786.70
6 733723.407 3256781.28
2
733654.252 3256792.13
62850 733696.166 3256836.16
4 733730.829 3256831.31
7
733661.503 3256841.011
62900 733702.677 3256885.73
8 733737.416 3256881.46
9
733667.939 3256890.006
62950 733708.362 3256935.41
3 733743.167 3256931.72
4
733673.557 3256939.102
63000 733713.235 3256985.17
4 733748.086 3256981.94
7
733678.384 3256988.402
Project Report
130
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
63050 733717.846 3257034.96
1 733752.697 3257031.73
4
733682.995 3257038.189
63100 733722.457 3257084.74
8 733757.308 3257081.52
733687.606 3257087.976
63150 733727.068 3257134.53
5 733761.919 3257131.30
7
733692.217 3257137.763
63200 733731.679 3257184.32
2 733766.53 3257181.09
4
733696.828 3257187.55
63250 733736.29 3257234.10
9 733771.14 3257230.88
1
733701.439 3257237.337
63300 733740.901 3257283.89
6 733775.751 3257280.66
8
733706.05 3257287.124
63350 733745.512 3257333.68
3 733780.362 3257330.45
5
733710.661 3257336.911
63400 733750.123 3257383.47 733784.973 3257380.24
2
733715.272 3257386.697
63450 733754.734 3257433.25
7 733789.584 3257430.02
9
733719.883 3257436.484
63500 733759.345 3257483.04
4 733794.195 3257479.81
6
733724.494 3257486.271
63550 733763.956 3257532.83
1 733798.806 3257529.60
3
733729.105 3257536.058
63600 733768.566 3257582.61
8 733803.417 3257579.39
733733.716 3257585.845
63650 733773.177 3257632.40
4 733808.028 3257629.17
7
733738.327 3257635.632
63700 733777.788 3257682.19
1 733812.639 3257678.96
4
733742.938 3257685.419
63750 733782.399 3257731.97
8 733817.25 3257728.75
1
733747.549 3257735.206
63800 733787.01 3257781.76
5 733821.861 3257778.53
8
733752.16 3257784.993
63850 733791.621 3257831.55
2 733826.472 3257828.32
5
733756.771 3257834.78
63900 733796.232 3257881.33
9 733831.083 3257878.11
1
733761.382 3257884.567
63950 733800.843 3257931.12
6 733835.694 3257927.89
8
733765.992 3257934.354
64000 733805.454 3257980.91
3 733840.305 3257977.68
5
733770.603 3257984.141
64050 733810.065 3258030.7 733844.916 3258027.47
2
733775.214 3258033.928
64100 733814.676 3258080.48
7 733849.527 3258077.25
9
733779.825 3258083.715
64150 733819.287 3258130.27
4 733854.138 3258127.04
6
733784.436 3258133.501
Project Report
131
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
64200 733823.898 3258180.06
1 733858.749 3258176.83
3
733789.047 3258183.288
64250 733828.509 3258229.84
8 733863.36 3258226.62
733793.658 3258233.075
64300 733833.12 3258279.63
5 733867.971 3258276.40
7
733798.269 3258282.862
64350 733837.731 3258329.42
2 733872.582 3258326.19
4
733802.88 3258332.649
64400 733842.342 3258379.20
8 733877.193 3258375.98
1
733807.491 3258382.436
64450 733846.953 3258428.99
5 733881.804 3258425.76
8
733812.102 3258432.223
64500 733851.564 3258478.78
2 733886.415 3258475.55
5
733816.713 3258482.01
64550 733856.175 3258528.56
9 733891.026 3258525.34
2
733821.324 3258531.797
64600 733860.786 3258578.35
6 733895.637 3258575.12
9
733825.935 3258581.584
64650 733865.397 3258628.14
3 733900.248 3258624.91
5
733830.546 3258631.371
64700 733870.008 3258677.93 733904.859 3258674.70
2
733835.157 3258681.158
64750 733874.619 3258727.71
7 733909.47 3258724.48
9
733839.768 3258730.945
64800 733879.23 3258777.50
4 733914.081 3258774.27
6
733844.379 3258780.732
64850 733883.841 3258827.29
1 733918.692 3258824.06
3
733848.99 3258830.519
64900 733888.452 3258877.07
8 733923.303 3258873.85
733853.601 3258880.306
64950 733893.063 3258926.86
5 733927.914 3258923.63
7
733858.212 3258930.092
65000 733897.674 3258976.65
2 733932.525 3258973.42
4
733862.823 3258979.879
65050 733902.285 3259026.43
9 733937.136 3259023.21
1
733867.434 3259029.666
65100 733906.896 3259076.22
6 733941.747 3259072.99
8
733872.045 3259079.453
65150 733911.507 3259126.01
3 733946.358 3259122.78
5
733876.656 3259129.24
65200 733916.118 3259175.79
9 733950.969 3259172.57
2
733881.267 3259179.027
65250 733920.729 3259225.58
6 733955.58 3259222.35
9
733885.878 3259228.814
65300 733925.34 3259275.37
3 733960.191 3259272.14
6
733890.489 3259278.601
Project Report
132
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
65350 733929.951 3259325.16 733964.802 3259321.93
3
733895.1 3259328.388
65400 733934.562 3259374.94
7 733969.413 3259371.72
733899.711 3259378.175
65450 733939.173 3259424.73
4 733974.024 3259421.50
6
733904.322 3259427.962
65500 733943.784 3259474.52
1 733978.635 3259471.29
3
733908.933 3259477.749
65550 733948.395 3259524.30
8 733983.245 3259521.08
733913.544 3259527.536
65600 733953.006 3259574.09
5 733987.856 3259570.86
7
733918.155 3259577.323
65650 733957.617 3259623.88
2 733992.467 3259620.65
4
733922.766 3259627.11
65700 733962.228 3259673.66
9 733997.078 3259670.44
1
733927.377 3259676.896
65750 733966.839 3259723.45
6 734001.689 3259720.22
8
733931.988 3259726.683
65800 733971.45 3259773.24
3 734006.3 3259770.01
5
733936.599 3259776.47
65850 733976.061 3259823.03 734010.911 3259819.80
2
733941.21 3259826.257
65900 733980.671 3259872.81
7 734015.522 3259869.58
9
733945.821 3259876.044
65950 733985.282 3259922.60
3 734020.133 3259919.37
6
733950.432 3259925.831
66000 733989.893 3259972.39 734024.744 3259969.16
3
733955.043 3259975.618
66050 733994.504 3260022.17
7 734029.355 3260018.95
733959.654 3260025.405
66100 733999.115 3260071.96
4 734033.966 3260068.73
7
733964.265 3260075.192
66150 734003.726 3260121.75
1 734038.577 3260118.52
4
733968.876 3260124.979
66200 734008.337 3260171.53
8 734043.188 3260168.31
733973.486 3260174.766
66250 734012.948 3260221.32
5 734047.799 3260218.09
7
733978.097 3260224.553
66300 734017.559 3260271.11
2 734052.41 3260267.88
4
733982.708 3260274.34
66350 734022.17 3260320.89
9 734057.021 3260317.67
1
733987.319 3260324.127
66400 734026.781 3260370.68
6 734061.632 3260367.45
8
733991.93 3260373.914
66450 734031.392 3260420.47
3 734066.243 3260417.24
5
733996.541 3260423.701
Project Report
133
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
66500 734036.003 3260470.26 734070.854 3260467.03
2
734001.152 3260473.487
66550 734040.614 3260520.04
7 734075.465 3260516.81
9
734005.763 3260523.274
66600 734045.225 3260569.83
4 734080.076 3260566.60
6
734010.374 3260573.061
66650 734049.836 3260619.62
1 734084.687 3260616.39
3
734014.985 3260622.848
66700 734054.447 3260669.40
7 734089.298 3260666.18
734019.596 3260672.635
66750 734059.058 3260719.19
4 734093.909 3260715.96
7
734024.207 3260722.422
66800 734063.669 3260768.98
1 734098.52 3260765.75
4
734028.818 3260772.209
66850 734068.28 3260818.76
8 734103.131 3260815.54
1
734033.429 3260821.996
66900 734072.891 3260868.55
5 734107.742 3260865.32
8
734038.04 3260871.783
66950 734077.502 3260918.34
2 734112.353 3260915.11
4
734042.651 3260921.57
67000 734082.113 3260968.12
9 734116.964 3260964.90
1
734047.262 3260971.357
67050 734086.724 3261017.91
6 734121.575 3261014.68
8
734051.873 3261021.144
67100 734091.335 3261067.70
3 734126.186 3261064.47
5
734056.484 3261070.931
67150 734095.946 3261117.49 734130.797 3261114.26
2
734061.095 3261120.718
67200 734100.557 3261167.27
7 734135.408 3261164.04
9
734065.706 3261170.505
67250 734105.168 3261217.06
4 734140.019 3261213.83
6
734070.317 3261220.291
67300 734109.779 3261266.85
1 734144.63 3261263.62
3
734074.928 3261270.078
67350 734114.39 3261316.63
8 734149.241 3261313.41
734079.539 3261319.865
67400 734119.001 3261366.42
5 734153.852 3261363.19
7
734084.15 3261369.652
67450 734123.612 3261416.21
2 734158.463 3261412.98
4
734088.761 3261419.439
67500 734128.223 3261465.99
8 734163.074 3261462.77
1
734093.372 3261469.226
67550 734132.834 3261515.78
5 734167.685 3261512.55
8
734097.983 3261519.013
67600 734137.445 3261565.57
2 734172.296 3261562.34
5
734102.594 3261568.8
Project Report
134
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
67650 734142.056 3261615.35
9 734176.907 3261612.13
2
734107.205 3261618.587
67700 734146.667 3261665.14
6 734181.518 3261661.91
9
734111.816 3261668.374
67750 734151.278 3261714.93
3 734186.129 3261711.70
5
734116.427 3261718.161
67800 734155.889 3261764.72 734190.74 3261761.49
2
734121.038 3261767.948
67850 734160.5 3261814.50
7 734195.35 3261811.27
9
734125.649 3261817.735
67900 734165.111 3261864.29
4 734199.961 3261861.06
6
734130.26 3261867.522
67950 734169.722 3261914.08
1 734204.572 3261910.85
3
734134.871 3261917.309
68000 734174.333 3261963.86
8 734209.183 3261960.64
734139.482 3261967.095
68050 734178.944 3262013.65
5 734213.794 3262010.42
7
734144.093 3262016.882
68100 734183.555 3262063.44
2 734218.405 3262060.21
4
734148.704 3262066.669
68150 734188.165 3262113.22
9 734223.016 3262110.00
1
734153.315 3262116.456
68200 734192.776 3262163.01
6 734227.627 3262159.78
8
734157.926 3262166.243
68250 734197.387 3262212.80
2 734232.238 3262209.57
5
734162.537 3262216.03
68300 734201.998 3262262.58
9 734236.849 3262259.36
2
734167.148 3262265.817
68350 734206.609 3262312.37
6 734241.46 3262309.14
9
734171.759 3262315.604
68400 734211.22 3262362.16
3 734246.071 3262358.93
6
734176.37 3262365.391
68450 734215.831 3262411.95 734250.682 3262408.72
3
734180.981 3262415.178
68500 734220.442 3262461.73
7 734255.293 3262458.50
9
734185.591 3262464.965
68550 734225.053 3262511.52
4 734259.904 3262508.29
6
734190.202 3262514.752
68600 734229.664 3262561.31
1 734264.515 3262558.08
3
734194.813 3262564.539
68650 734234.275 3262611.09
8 734269.126 3262607.87
734199.424 3262614.326
68700 734239.507 3262660.82
2 734274.266 3262656.72
5
734204.747 3262664.919
68750 734245.807 3262710.42
3 734280.515 3262705.91
7
734211.098 3262714.93
Project Report
135
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
68800 734252.245 3262760.00
7 734286.953 3262755.5
734217.536 3262764.514
68850 734258.683 3262809.59
1 734293.392 3262805.08
4
734223.974 3262814.098
68900 734265.121 3262859.17
5 734299.83 3262854.66
8
734230.413 3262863.681
68950 734271.559 3262908.75
8 734306.268 3262904.25
2
734236.851 3262913.265
69000 734277.998 3262958.34
2 734312.706 3262953.83
5
734243.289 3262962.849
69050 734284.436 3263007.92
6 734319.144 3263003.41
9
734249.727 3263012.433
69100 734290.874 3263057.51 734325.583 3263053.00
3
734256.165 3263062.016
69150 734297.312 3263107.09
3 734332.021 3263102.58
7
734262.603 3263111.6
69200 734303.75 3263156.67
7 734338.459 3263152.17
1
734269.042 3263161.184
69250 734310.188 3263206.26
1 734344.897 3263201.75
4
734275.48 3263210.768
69300 734316.627 3263255.84
5 734351.335 3263251.33
8
734281.918 3263260.352
69350 734323.065 3263305.42
9 734357.773 3263300.92
2
734288.356 3263309.935
69400 734329.503 3263355.01
2 734364.212 3263350.50
6
734294.794 3263359.519
69450 734335.941 3263404.59
6 734370.65 3263400.08
9
734301.233 3263409.103
69500 734342.379 3263454.18 734377.088 3263449.67
3
734307.671 3263458.687
69550 734348.818 3263503.76
4 734383.526 3263499.25
7
734314.109 3263508.27
69600 734355.256 3263553.34
7 734389.964 3263548.84
1
734320.547 3263557.854
69650 734361.694 3263602.93
1 734396.403 3263598.42
4
734326.985 3263607.438
69700 734368.132 3263652.51
5 734402.841 3263648.00
8
734333.423 3263657.022
69750 734374.57 3263702.09
9 734409.279 3263697.59
2
734339.862 3263706.605
69800 734381.008 3263751.68
2 734415.717 3263747.17
6
734346.3 3263756.189
69850 734387.447 3263801.26
6 734422.155 3263796.75
9
734352.738 3263805.773
69900 734393.885 3263850.85 734428.593 3263846.34
3
734359.176 3263855.357
Project Report
136
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
69950 734400.323 3263900.43
4 734435.032 3263895.92
7
734365.614 3263904.94
70000 734406.761 3263950.01
8 734441.47 3263945.51
1
734372.053 3263954.524
70050 734413.199 3263999.60
1 734447.908 3263995.09
5
734378.491 3264004.108
70100 734419.638 3264049.18
5 734454.346 3264044.67
8
734384.929 3264053.692
70150 734426.076 3264098.76
9 734460.784 3264094.26
2
734391.367 3264103.276
70200 734432.514 3264148.35
3 734467.223 3264143.84
6
734397.805 3264152.859
70250 734438.952 3264197.93
6 734473.661 3264193.43
734404.243 3264202.443
70300 734445.39 3264247.52 734480.099 3264243.01
3
734410.682 3264252.027
70350 734451.828 3264297.10
4 734486.537 3264292.59
7
734417.12 3264301.611
70400 734458.267 3264346.68
8 734492.975 3264342.18
1
734423.558 3264351.194
70450 734464.705 3264396.27
1 734499.413 3264391.76
5
734429.996 3264400.778
70500 734471.143 3264445.85
5 734505.852 3264441.34
8
734436.434 3264450.362
70550 734477.581 3264495.43
9 734512.29 3264490.93
2
734442.873 3264499.946
70600 734484.019 3264545.02
3 734518.728 3264540.51
6
734449.311 3264549.529
70650 734490.458 3264594.60
6 734525.166 3264590.1
734455.749 3264599.113
70700 734496.896 3264644.19 734531.604 3264639.68
4
734462.187 3264648.697
70750 734503.334 3264693.77
4 734538.043 3264689.26
7
734468.625 3264698.281
70800 734509.772 3264743.35
8 734544.481 3264738.85
1
734475.063 3264747.864
70850 734516.21 3264792.94
2 734550.919 3264788.43
5
734481.502 3264797.448
70900 734522.648 3264842.52
5 734557.357 3264838.01
9
734487.94 3264847.032
70950 734529.087 3264892.10
9 734563.795 3264887.60
2
734494.378 3264896.616
71000 734535.525 3264941.69
3 734570.233 3264937.18
6
734500.816 3264946.2
71050 734541.963 3264991.27
7 734576.672 3264986.77
734507.254 3264995.783
Project Report
137
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
71100 734548.401 3265040.86 734583.11 3265036.35
4
734513.692 3265045.367
71150 734554.839 3265090.44
4 734589.548 3265085.93
7
734520.131 3265094.951
71200 734561.277 3265140.02
8 734595.986 3265135.52
1
734526.569 3265144.535
71250 734567.716 3265189.61
2 734602.424 3265185.10
5
734533.007 3265194.118
71300 734574.154 3265239.19
5 734608.862 3265234.68
9
734539.445 3265243.702
71350 734580.592 3265288.77
9 734615.301 3265284.27
2
734545.883 3265293.286
71400 734587.03 3265338.36
3 734621.739 3265333.85
6
734552.322 3265342.87
71450 734593.468 3265387.94
7 734628.177 3265383.44
734558.76 3265392.453
71500 734599.907 3265437.53 734634.615 3265433.02
4
734565.198 3265442.037
71550 734606.345 3265487.11
4 734641.053 3265482.60
8
734571.636 3265491.621
71600 734612.783 3265536.69
8 734647.492 3265532.19
1
734578.074 3265541.205
71650 734619.221 3265586.28
2 734653.93 3265581.77
5
734584.512 3265590.789
71700 734625.659 3265635.86
6 734660.368 3265631.35
9
734590.951 3265640.372
71750 734632.097 3265685.44
9 734666.806 3265680.94
3
734597.389 3265689.956
71800 734638.536 3265735.03
3 734673.244 3265730.52
6
734603.827 3265739.54
71850 734644.974 3265784.61
7 734679.682 3265780.11
734610.265 3265789.124
71900 734651.412 3265834.20
1 734686.121 3265829.69
4
734616.703 3265838.707
71950 734657.85 3265883.78
4 734692.559 3265879.27
8
734623.142 3265888.291
72000 734664.288 3265933.36
8 734698.997 3265928.86
1
734629.58 3265937.875
72050 734670.784 3265982.94
4 734705.464 3265978.22
3
734636.104 3265987.666
72100 734677.941 3266032.42
9 734712.538 3266027.13
734643.345 3266037.728
72150 734685.923 3266081.78
7 734720.426 3266075.91
2
734651.419 3266087.662
72200 734694.681 3266131.01
4 734729.116 3266124.75
4
734660.245 3266137.274
Project Report
138
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
72250 734703.623 3266180.20
8 734738.059 3266173.94
8
734669.188 3266186.467
72300 734712.566 3266229.40
1 734747.002 3266223.14
1
734678.131 3266235.661
72350 734721.509 3266278.59
5 734755.945 3266272.33
5
734687.073 3266284.855
72400 734730.452 3266327.78
9 734764.887 3266321.52
9
734696.016 3266334.049
72450 734739.426 3266376.97
7 734773.832 3266370.55
6
734705.02 3266383.397
72500 734749.008 3266426.04
9 734783.302 3266419.05
6
734714.714 3266433.043
72550 734759.406 3266474.95
6 734793.579 3266467.39
2
734725.233 3266482.52
72600 734770.618 3266523.68
2 734804.66 3266515.55
734736.576 3266531.814
72650 734782.64 3266572.21
4 734816.542 3266563.51
6
734748.738 3266580.913
72700 734795.469 3266620.54 734829.222 3266611.27
8
734761.717 3266629.802
72750 734809.094 3266668.64
7 734842.711 3266658.90
6
734775.477 3266678.389
72800 734823.01 3266716.67
2 734856.627 3266706.93
734789.393 3266726.413
72850 734836.927 3266764.69
6 734870.544 3266754.95
4
734803.31 3266774.437
72900 734850.843 3266812.72 734884.46 3266802.97
9
734817.226 3266822.462
72950 734864.76 3266860.74
4 734898.377 3266851.00
3
734831.143 3266870.486
73000 734878.676 3266908.76
9 734912.293 3266899.02
7
734845.059 3266918.51
73050 734892.593 3266956.79
3 734926.21 3266947.05
1
734858.976 3266966.535
73100 734906.509 3267004.81
7 734940.126 3266995.07
6
734872.892 3267014.559
73150 734920.426 3267052.84
2 734954.043 3267043.1
734886.809 3267062.583
73200 734934.342 3267100.86
6 734967.959 3267091.12
4
734900.725 3267110.607
73250 734948.259 3267148.89 734981.876 3267139.14
9
734914.642 3267158.632
73300 734962.175 3267196.91
4 734995.792 3267187.17
3
734928.558 3267206.656
73350 734976.092 3267244.93
9 735009.709 3267235.19
7
734942.475 3267254.68
Project Report
139
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
73400 734990.008 3267292.96
3 735023.625 3267283.22
1
734956.391 3267302.704
73450 735003.925 3267340.98
7 735037.542 3267331.24
6
734970.308 3267350.729
73500 735017.841 3267389.01
2 735051.458 3267379.27
734984.224 3267398.753
73550 735031.758 3267437.03
6 735065.375 3267427.29
4
734998.141 3267446.777
73600 735045.674 3267485.06 735079.291 3267475.31
9
735012.057 3267494.802
73650 735059.591 3267533.08
4 735093.208 3267523.34
3
735025.974 3267542.826
73700 735073.507 3267581.10
9 735107.124 3267571.36
7
735039.89 3267590.85
73750 735087.424 3267629.13
3 735121.041 3267619.39
1
735053.807 3267638.874
73800 735101.35 3267677.15
4 735134.947 3267667.34
4
735067.753 3267686.965
73850 735115.605 3267725.07
9 735149.102 3267714.93
3
735082.108 3267735.225
73900 735130.339 3267772.85
9 735163.733 3267762.37
8
735096.945 3267783.339
73950 735145.549 3267820.48
9 735178.837 3267809.67
5
735112.262 3267831.303
74000 735161.235 3267867.96
4 735194.413 3267856.81
8
735128.057 3267879.111
74050 735177.395 3267915.28
1 735210.46 3267903.80
3
735144.331 3267926.758
74100 735194.027 3267962.43
3 735226.976 3267950.62
5
735161.079 3267974.241
74150 735211.131 3268009.41
7 735243.959 3267997.28
735178.302 3268021.553
74200 735228.703 3268056.22
7 735261.408 3268043.76
3
735195.997 3268068.691
74250 735246.742 3268102.85
9 735279.321 3268090.06
9
735214.163 3268115.65
74300 735265.246 3268149.30
9 735297.696 3268136.19
3
735232.797 3268162.424
74350 735284.073 3268195.62
9 735316.494 3268182.44
3
735251.652 3268208.815
74400 735302.91 3268241.94
5 735335.331 3268228.75
9
735270.489 3268255.131
74450 735321.747 3268288.26
1 735354.168 3268275.07
5
735289.326 3268301.447
74500 735340.584 3268334.57
7 735373.005 3268321.39
1
735308.163 3268347.763
Project Report
140
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
74550 735359.421 3268380.89
2 735391.843 3268367.70
6
735327 3268394.078
74600 735378.259 3268427.20
8 735410.68 3268414.02
2
735345.838 3268440.394
74650 735397.096 3268473.52
4 735429.517 3268460.33
8
735364.675 3268486.71
74700 735415.933 3268519.84 735448.354 3268506.65
4
735383.512 3268533.026
74750 735434.77 3268566.15
6 735467.191 3268552.97
735402.349 3268579.342
74800 735453.607 3268612.47
2 735486.029 3268599.28
6
735421.186 3268625.658
74850 735472.445 3268658.78
8 735504.866 3268645.60
2
735440.024 3268671.974
74900 735491.282 3268705.10
4 735523.703 3268691.91
8
735458.861 3268718.29
74950 735510.119 3268751.41
9 735542.54 3268738.23
3
735477.698 3268764.605
75000 735528.892 3268797.76
1 735561.382 3268784.74
5
735496.403 3268810.777
75050 735547.304 3268844.24
8 735579.863 3268831.40
7
735514.745 3268857.089
75100 735565.648 3268890.76
1 735598.208 3268877.92
735533.089 3268903.602
75150 735583.993 3268937.27
4 735616.552 3268924.43
3
735551.433 3268950.115
75200 735602.337 3268983.78
8 735634.896 3268970.94
7
735569.778 3268996.629
75250 735620.681 3269030.30
1 735653.241 3269017.46
735588.122 3269043.142
75300 735639.026 3269076.81
4 735671.585 3269063.97
3
735606.466 3269089.655
75350 735657.37 3269123.32
7 735689.929 3269110.48
6
735624.811 3269136.168
75400 735675.715 3269169.84
1 735708.274 3269157
735643.155 3269182.682
75450 735694.059 3269216.35
4 735726.618 3269203.51
3
735661.5 3269229.195
75500 735712.403 3269262.86
7 735744.963 3269250.02
6
735679.844 3269275.708
75550 735730.748 3269309.38 735763.307 3269296.53
9
735698.188 3269322.222
75600 735749.092 3269355.89
4 735781.651 3269343.05
3
735716.533 3269368.735
75650 735767.436 3269402.40
7 735799.996 3269389.56
6
735734.877 3269415.248
Project Report
141
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
75700 735786.07 3269448.80
5 735818.441 3269435.49
6
735753.699 3269462.113
75750 735805.467 3269494.88
8 735837.617 3269481.05
4
735773.317 3269508.722
75800 735825.23 3269540.81
7 735857.38 3269526.98
3
735793.08 3269554.651
75850 735844.993 3269586.74
5 735877.143 3269572.91
1
735812.843 3269600.579
75900 735864.756 3269632.67
4 735896.906 3269618.84
735832.606 3269646.508
75950 735884.519 3269678.60
2 735916.669 3269664.76
8
735852.369 3269692.436
76000 735904.282 3269724.53
1 735936.432 3269710.69
7
735872.132 3269738.365
76050 735924.045 3269770.45
9 735956.195 3269756.62
5
735891.895 3269784.293
76100 735943.808 3269816.38
8 735975.958 3269802.55
4
735911.658 3269830.222
76150 735963.571 3269862.31
6 735995.72 3269848.48
2
735931.421 3269876.15
76200 735983.334 3269908.24
5 736015.483 3269894.41
735951.184 3269922.079
76250 736003.096 3269954.17
3 736035.246 3269940.33
9
735970.947 3269968.007
76300 736022.859 3270000.10
2 736055.009 3269986.26
7
735990.71 3270013.936
76350 736042.622 3270046.03 736074.772 3270032.19
6
736010.472 3270059.864
76400 736062.385 3270091.95
8 736094.535 3270078.12
4
736030.235 3270105.793
76450 736082.148 3270137.88
7 736114.298 3270124.05
3
736049.998 3270151.721
76500 736101.911 3270183.81
5 736134.061 3270169.98
1
736069.761 3270197.649
76550 736121.674 3270229.74
4 736153.824 3270215.91
736089.524 3270243.578
76600 736141.437 3270275.67
2 736173.587 3270261.83
8
736109.287 3270289.506
76650 736161.2 3270321.60
1 736193.35 3270307.76
7
736129.05 3270335.435
76700 736180.963 3270367.52
9 736213.113 3270353.69
5
736148.813 3270381.363
76750 736200.726 3270413.45
8 736232.876 3270399.62
4
736168.576 3270427.292
76800 736220.489 3270459.38
6 736252.639 3270445.55
2
736188.339 3270473.22
Project Report
142
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
76850 736240.252 3270505.31
5 736272.402 3270491.48
1
736208.102 3270519.149
76900 736260.026 3270551.23
8 736292.142 3270537.32
4
736227.911 3270565.152
76950 736280.19 3270596.99
2 736312.129 3270582.67
8
736248.251 3270611.306
77000 736300.923 3270642.49 736332.681 3270627.77
8
736269.166 3270657.203
77050 736322.224 3270687.72
6 736353.795 3270672.61
8
736290.653 3270702.834
77100 736344.089 3270732.69
1 736375.468 3270717.19
736312.709 3270748.193
77150 736366.513 3270777.38 736397.697 3270761.48
8
736335.33 3270793.273
77200 736389.495 3270821.78
5 736420.478 3270805.50
4
736358.512 3270838.067
77250 736413.03 3270865.9 736443.807 3270849.23
2
736382.253 3270882.567
77300 736437.115 3270909.71
6 736467.68 3270892.66
6
736406.549 3270926.767
77350 736461.745 3270953.22
9 736492.095 3270935.79
7
736431.394 3270970.66
77400 736486.917 3270996.43 736517.047 3270978.62 736456.787 3271014.239
77450 736512.584 3271039.33
9 736542.58 3271021.30
5
736482.588 3271057.373
77500 736538.347 3271082.19 736568.343 3271064.15
6
736508.351 3271100.224
77550 736564.11 3271125.04
2 736594.106 3271107.00
8
736534.114 3271143.076
77600 736589.873 3271167.89
4 736619.869 3271149.86
736559.876 3271185.928
77650 736615.636 3271210.74
6 736645.632 3271192.71
2
736585.639 3271228.78
77700 736641.398 3271253.59
8 736671.395 3271235.56
4
736611.402 3271271.632
77750 736667.161 3271296.44
9 736697.158 3271278.41
5
736637.165 3271314.483
77800 736692.924 3271339.30
1 736722.92 3271321.26
7
736662.928 3271357.335
77850 736718.687 3271382.15
3 736748.683 3271364.11
9
736688.691 3271400.187
77900 736744.45 3271425.00
5 736774.446 3271406.97
1
736714.454 3271443.039
77950 736770.213 3271467.85
7 736800.209 3271449.82
3
736740.216 3271485.891
78000 736795.976 3271510.70
8 736825.972 3271492.67
4
736765.979 3271528.742
Project Report
143
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
78050 736821.738 3271553.56 736851.735 3271535.52
6
736791.742 3271571.594
78100 736847.501 3271596.41
2 736877.497 3271578.37
8
736817.505 3271614.446
78150 736873.264 3271639.26
4 736903.26 3271621.23
736843.268 3271657.298
78200 736899.027 3271682.11
5 736929.023 3271664.08
1
736869.031 3271700.149
78250 736924.79 3271724.96
7 736954.786 3271706.93
3
736894.794 3271743.001
78300 736950.553 3271767.81
9 736980.549 3271749.78
5
736920.556 3271785.853
78350 736976.316 3271810.67
1 737006.312 3271792.63
7
736946.319 3271828.705
78400 737002.078 3271853.52
3 737032.075 3271835.48
9
736972.082 3271871.557
78450 737027.841 3271896.37
4 737057.837 3271878.34
736997.845 3271914.408
78500 737053.604 3271939.22
6 737083.6 3271921.19
2
737023.608 3271957.26
78550 737079.367 3271982.07
8 737109.363 3271964.04
4
737049.371 3272000.112
78600 737105.13 3272024.93 737135.126 3272006.89
6
737075.134 3272042.964
78650 737130.893 3272067.78
2 737160.889 3272049.74
8
737100.896 3272085.816
78700 737156.655 3272110.63
3 737186.652 3272092.59
9
737126.659 3272128.667
78750 737182.418 3272153.48
5 737212.415 3272135.45
1
737152.422 3272171.519
78800 737208.181 3272196.33
7 737238.177 3272178.30
3
737178.185 3272214.371
78850 737233.944 3272239.18
9 737263.94 3272221.15
5
737203.948 3272257.223
78900 737259.707 3272282.04 737289.703 3272264.00
6
737229.711 3272300.074
78950 737285.47 3272324.89
2 737315.466 3272306.85
8
737255.473 3272342.926
79000 737311.233 3272367.74
4 737341.229 3272349.71
737281.236 3272385.778
79050 737336.995 3272410.59
6 737366.992 3272392.56
2
737306.999 3272428.63
79100 737362.758 3272453.44
8 737392.755 3272435.41
4
737332.762 3272471.482
79150 737388.521 3272496.29
9 737418.517 3272478.26
5
737358.525 3272514.333
Project Report
144
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
79200 737414.284 3272539.15
1 737444.28 3272521.11
7
737384.288 3272557.185
79250 737440.047 3272582.00
3 737470.043 3272563.96
9
737410.051 3272600.037
79300 737465.81 3272624.85
5 737495.806 3272606.82
1
737435.813 3272642.889
79350 737491.573 3272667.70
7 737521.569 3272649.67
3
737461.576 3272685.741
79400 737517.335 3272710.55
8 737547.332 3272692.52
4
737487.339 3272728.592
79450 737543.098 3272753.41 737573.094 3272735.37
6
737513.102 3272771.444
79500 737568.861 3272796.26
2 737598.857 3272778.22
8
737538.865 3272814.296
79550 737594.624 3272839.11
4 737624.62 3272821.08
737564.628 3272857.148
79600 737620.387 3272881.96
5 737650.383 3272863.93
1
737590.391 3272899.999
79650 737646.15 3272924.81
7 737676.146 3272906.78
3
737616.153 3272942.851
79700 737671.912 3272967.66
9 737701.909 3272949.63
5
737641.916 3272985.703
79750 737697.675 3273010.52
1 737727.672 3272992.48
7
737667.679 3273028.555
79800 737723.438 3273053.37
3 737753.434 3273035.33
9
737693.442 3273071.407
79850 737749.201 3273096.22
4 737779.197 3273078.19
737719.205 3273114.258
79900 737774.964 3273139.07
6 737804.96 3273121.04
2
737744.968 3273157.11
79950 737800.727 3273181.92
8 737830.723 3273163.89
4
737770.73 3273199.962
80000 737826.49 3273224.78 737856.486 3273206.74
6
737796.493 3273242.814
80050 737852.252 3273267.63
2 737882.249 3273249.59
8
737822.256 3273285.665
80100 737878.015 3273310.48
3 737908.012 3273292.44
9
737848.019 3273328.517
80150 737903.778 3273353.33
5 737933.774 3273335.30
1
737873.782 3273371.369
80200 737929.541 3273396.18
7 737959.537 3273378.15
3
737899.545 3273414.221
80250 737955.304 3273439.03
9 737985.3 3273421.00
5
737925.308 3273457.073
80300 737981.067 3273481.89 738011.063 3273463.85
6
737951.07 3273499.924
Project Report
145
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
80350 738006.83 3273524.74
2 738036.826 3273506.70
8
737976.833 3273542.776
80400 738032.592 3273567.59
4 738062.589 3273549.56
738002.596 3273585.628
80450 738058.355 3273610.44
6 738088.351 3273592.41
2
738028.359 3273628.48
80500 738084.118 3273653.29
8 738114.114 3273635.26
4
738054.122 3273671.332
80550 738109.881 3273696.14
9 738139.877 3273678.11
5
738079.885 3273714.183
80600 738135.644 3273739.00
1 738165.64 3273720.96
7
738105.648 3273757.035
80650 738161.407 3273781.85
3 738191.403 3273763.81
9
738131.41 3273799.887
80700 738187.169 3273824.70
5 738217.166 3273806.67
1
738157.173 3273842.739
80750 738212.932 3273867.55
7 738242.929 3273849.52
3
738182.936 3273885.59
80800 738238.695 3273910.40
8 738268.691 3273892.37
4
738208.699 3273928.442
80850 738264.458 3273953.26 738294.454 3273935.22
6
738234.462 3273971.294
80900 738290.221 3273996.11
2 738320.217 3273978.07
8
738260.225 3274014.146
80950 738315.984 3274038.96
4 738345.98 3274020.93
738285.987 3274056.998
81000 738341.747 3274081.81
5 738371.743 3274063.78
1
738311.75 3274099.849
81050 738367.509 3274124.66
7 738397.506 3274106.63
3
738337.513 3274142.701
81100 738393.272 3274167.51
9 738423.269 3274149.48
5
738363.276 3274185.553
81150 738418.935 3274210.43
1 738449.089 3274192.66
2
738388.781 3274228.199
81200 738443.959 3274253.71
7 738474.405 3274236.45
3
738413.513 3274270.981
81250 738468.258 3274297.41
5 738498.988 3274280.66
1
738437.529 3274314.169
81300 738491.826 3274341.51
1 738522.83 3274325.27
2
738460.822 3274357.751
81350 738514.655 3274385.99
5 738545.926 3274370.27
4
738483.385 3274401.715
81400 738536.74 3274430.85
2 738568.269 3274415.65
5
738505.212 3274446.05
81450 738558.075 3274476.07
2 738589.852 3274461.40
2
738526.297 3274490.742
Project Report
146
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
81500 738578.652 3274521.64 738610.67 3274507.50
2
738546.635 3274535.779
81550 738598.468 3274567.54
6 738630.716 3274553.94
3
738566.219 3274581.148
81600 738617.515 3274613.77
5 738649.986 3274600.71
1
738585.044 3274626.838
81650 738635.79 3274660.31
5 738668.474 3274647.79
5
738603.106 3274672.835
81700 738653.286 3274707.15
3 738686.174 3274695.17
9
738620.398 3274719.127
81750 738669.999 3274754.27
7 738703.082 3274742.85
2
738636.916 3274765.701
81800 738685.925 3274801.67
2 738719.193 3274790.80
1
738652.656 3274812.543
81850 738701.058 3274849.32
6 738734.504 3274839.01
1
738667.613 3274859.641
81900 738715.395 3274897.22
6 738749.008 3274887.46
9
738681.783 3274906.982
81950 738728.947 3274945.35
4 738762.688 3274936.04
9
738695.207 3274954.658
82000 738742.24 3274993.55
4 738775.98 3274984.25
738708.499 3275002.859
82050 738755.532 3275041.75
5 738789.272 3275032.45
1
738721.791 3275051.06
82100 738768.824 3275089.95
6 738802.565 3275080.65
1
738735.084 3275099.261
82150 738782.116 3275138.15
7 738815.857 3275128.85
2
738748.376 3275147.461
82200 738795.409 3275186.35
8 738829.149 3275177.05
3
738761.668 3275195.662
82250 738808.701 3275234.55
8 738842.441 3275225.25
4
738774.96 3275243.863
82300 738821.993 3275282.75
9 738855.734 3275273.45
5
738788.253 3275292.064
82350 738835.285 3275330.96 738869.026 3275321.65
5
738801.545 3275340.265
82400 738848.578 3275379.16
1 738882.318 3275369.85
6
738814.837 3275388.465
82450 738861.87 3275427.36
2 738895.61 3275418.05
7
738828.129 3275436.666
82500 738875.162 3275475.56
2 738908.903 3275466.25
8
738841.422 3275484.867
82550 738888.454 3275523.76
3 738922.195 3275514.45
9
738854.714 3275533.068
82600 738901.747 3275571.96
4 738935.487 3275562.65
9
738868.006 3275581.269
Project Report
147
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
82650 738915.039 3275620.16
5 738948.779 3275610.86
738881.298 3275629.469
82700 738928.331 3275668.36
6 738962.072 3275659.06
1
738894.591 3275677.67
82750 738941.621 3275716.56
7 738975.372 3275707.3
738907.87 3275725.834
82800 738954.558 3275764.86
4 738988.422 3275756.01
9
738920.694 3275773.709
82850 738966.891 3275813.31
9 739000.863 3275804.89
8
738932.919 3275821.739
82900 738978.617 3275861.92
4 739012.691 3275853.92
9
738944.542 3275869.919
82950 738989.734 3275910.67
2 739023.906 3275903.10
3
738955.562 3275918.241
83000 739000.241 3275959.55
5 739034.505 3275952.41
4
738965.978 3275966.696
83050 739010.137 3276008.56
6 739044.487 3276001.85
4
738975.786 3276015.278
83100 739019.419 3276057.69
7 739053.85 3276051.41
4
738984.987 3276063.979
83150 739028.086 3276106.93
9 739062.593 3276101.08
8
738993.579 3276112.791
83200 739036.16 3276156.28
3 739070.719 3276150.74
5
739001.601 3276161.821
83250 739044.071 3276205.65
3 739078.63 3276200.11
5
739009.512 3276211.191
83300 739051.982 3276255.02
3 739086.541 3276249.48
5
739017.423 3276260.561
83350 739059.893 3276304.39
3 739094.452 3276298.85
6
739025.334 3276309.931
83400 739067.804 3276353.76
4 739102.364 3276348.22
6
739033.245 3276359.301
83450 739075.716 3276403.13
4 739110.275 3276397.59
6
739041.156 3276408.672
83500 739083.627 3276452.50
4 739118.186 3276446.96
6
739049.068 3276458.042
83550 739091.538 3276501.87
4 739126.097 3276496.33
6
739056.979 3276507.412
83600 739099.449 3276551.24
4 739134.008 3276545.70
6
739064.89 3276556.782
83650 739107.36 3276600.61
4 739141.919 3276595.07
7
739072.801 3276606.152
83700 739115.341 3276649.97
3 739149.874 3276644.28
1
739080.807 3276655.666
83750 739123.649 3276699.27
8 739158.141 3276693.33
9
739089.156 3276705.217
Project Report
148
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
83800 739132.309 3276748.52
2 739166.758 3276742.33
7
739097.86 3276754.708
83850 739141.321 3276797.70
3 739175.725 3276791.27
2
739106.917 3276804.135
83900 739150.684 3276846.81
9 739185.041 3276840.14
2
739116.326 3276853.496
83950 739160.397 3276895.86
6 739194.706 3276888.94
4
739126.088 3276902.788
84000 739170.461 3276944.84
3 739204.719 3276937.67
6
739136.202 3276952.01
84050 739180.874 3276993.74
6 739215.08 3276986.33
5
739146.667 3277001.158
84100 739191.636 3277042.57
4 739225.788 3277034.91
9
739157.483 3277050.23
84150 739202.746 3277091.32
4 739236.843 3277083.42
5
739168.649 3277099.223
84200 739214.205 3277139.99
3 739248.245 3277131.85
1
739180.165 3277148.136
84250 739226.011 3277188.57
9 739259.991 3277180.19
4
739192.03 3277196.965
84300 739238.163 3277237.08 739272.083 3277228.45
2
739204.243 3277245.708
84350 739250.662 3277285.49
3 739284.519 3277276.62
2
739216.805 3277294.363
84400 739263.506 3277333.81
5 739297.299 3277324.70
3
739229.713 3277342.926
84450 739276.695 3277382.04
4 739310.423 3277372.69
1
739242.968 3277391.396
84500 739290.229 3277430.17
7 739323.888 3277420.58
4
739256.569 3277439.771
84550 739304.105 3277478.21
3 739337.695 3277468.37
9
739270.515 3277488.047
84600 739318.325 3277526.14
8 739351.844 3277516.07
5
739284.806 3277536.222
84650 739332.886 3277573.98
1 739366.332 3277563.66
8
739299.44 3277584.293
84700 739347.789 3277621.70
8 739381.16 3277611.15
7
739314.417 3277632.259
84750 739363.032 3277669.32
8 739396.328 3277658.53
8
739329.736 3277680.117
84800 739378.615 3277716.83
7 739411.833 3277705.81
739345.397 3277727.864
84850 739394.537 3277764.23
4 739427.675 3277752.97
1
739361.399 3277775.498
84900 739410.797 3277811.51
6 739443.854 3277800.01
6
739377.74 3277823.017
Project Report
149
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
84950 739427.394 3277858.68
1 739460.368 3277846.94
5
739394.421 3277870.417
85000 739444.328 3277905.72
6 739477.217 3277893.75
5
739411.439 3277917.698
85050 739461.598 3277952.64
9 739494.401 3277940.44
3
739428.795 3277964.855
85100 739479.202 3277999.44
7 739511.917 3277987.00
8
739446.487 3278011.887
85150 739497.14 3278046.11
9 739529.765 3278033.44
6
739464.515 3278058.792
85200 739515.411 3278092.66
1 739547.945 3278079.75
5
739482.877 3278105.567
85250 739534.014 3278139.07
1 739566.454 3278125.93
3
739501.573 3278152.209
85300 739552.948 3278185.34
7 739585.294 3278171.97
8
739520.602 3278198.717
85350 739572.212 3278231.48
7 739604.461 3278217.88
7
739539.962 3278245.087
85400 739591.805 3278277.48
8 739623.956 3278263.65
8
739559.653 3278291.319
85450 739611.726 3278323.34
8 739643.778 3278309.28
9
739579.674 3278337.408
85500 739631.94 3278369.08 739663.937 3278354.89
7
739599.943 3278383.264
85550 739652.202 3278414.79
1 739684.199 3278400.60
7
739620.205 3278428.974
85600 739672.464 3278460.50
1 739704.461 3278446.31
8
739640.467 3278474.685
85650 739692.726 3278506.21
2 739724.723 3278492.02
8
739660.728 3278520.395
85700 739712.988 3278551.92
2 739744.985 3278537.73
9
739680.99 3278566.106
85750 739733.25 3278597.63
3 739765.247 3278583.44
9
739701.252 3278611.816
85800 739753.512 3278643.34
3 739785.509 3278629.16
739721.514 3278657.527
85850 739773.774 3278689.05
4 739805.771 3278674.87
1
739741.776 3278703.237
85900 739794.065 3278734.75
1 739826.019 3278720.47
1
739762.111 3278749.032
85950 739814.629 3278780.32
7 739846.48 3278765.81
8
739782.778 3278794.835
86000 739835.518 3278825.75
4 739867.265 3278811.01
8
739803.771 3278840.49
86050 739856.731 3278871.03
1 739888.372 3278856.06
9
739825.09 3278885.993
Project Report
150
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
86100 739878.267 3278916.15
5 739909.8 3278900.96
8
739846.733 3278931.343
86150 739900.124 3278961.12
5 739931.548 3278945.71
2
739868.7 3278976.537
86200 739922.302 3279005.93
7 739953.615 3278990.3
739890.989 3279021.573
86250 739944.8 3279050.58
9 739976 3279034.72
9
739913.599 3279066.449
86300 739967.616 3279095.08 739998.702 3279078.99
8
739936.529 3279111.162
86350 739990.749 3279139.40
7 740021.719 3279123.10
3
739959.778 3279155.71
86400 740014.198 3279183.56
7 740045.051 3279167.04
2
739983.345 3279200.092
86450 740037.962 3279227.55
8 740068.697 3279210.81
4
740007.227 3279244.303
86500 740062.03 3279271.38
5 740092.674 3279254.47
6
740031.385 3279288.293
86550 740086.185 3279315.16
3 740116.829 3279298.25
4
740055.54 3279332.071
86600 740110.34 3279358.94
1 740140.984 3279342.03
3
740079.695 3279375.85
86650 740134.421 3279402.76 740165.191 3279386.08
1
740103.651 3279419.439
86700 740157.881 3279446.91
4 740188.925 3279430.75
740126.837 3279463.078
86750 740180.601 3279491.45
3 740211.91 3279475.80
9
740149.292 3279507.097
86800 740202.576 3279536.36
4 740234.142 3279521.24
4
740171.011 3279551.484
86850 740223.8 3279581.63
6 740255.613 3279567.04
4
740191.987 3279596.228
86900 740244.287 3279627.24
5 740276.284 3279613.06
2
740212.289 3279641.429
86950 740264.548 3279672.95
6 740296.552 3279658.78
7
740232.545 3279687.126
87000 740284.332 3279718.87
5 740316.612 3279705.34
8
740252.051 3279732.401
87050 740303.193 3279765.18 740335.738 3279752.30
2
740270.649 3279778.058
87100 740321.125 3279811.85
3 740353.92 3279799.62
8
740288.329 3279824.078
87150 740338.119 3279858.87
5 740371.153 3279847.30
9
740305.086 3279870.442
87200 740354.17 3279906.22
8 740387.428 3279895.32
4
740320.912 3279917.132
Project Report
151
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
87250 740369.271 3279953.89
3 740402.74 3279943.65
6
740335.801 3279964.129
87300 740383.415 3280001.84
9 740417.083 3279992.28
4
740349.747 3280011.414
87350 740396.597 3280050.07
9 740430.45 3280041.19
740362.745 3280058.969
87400 740408.813 3280098.56
3 740442.836 3280090.35
2
740374.79 3280106.774
87450 740420.056 3280147.28
2 740454.237 3280139.75
3
740385.875 3280154.811
87500 740430.323 3280196.21
6 740464.647 3280189.37
2
740395.998 3280203.06
87550 740439.609 3280245.34
5 740474.063 3280239.18
9
740405.154 3280251.501
87600 740447.91 3280294.65 740482.481 3280289.18
5
740413.34 3280300.116
87650 740455.251 3280344.10
8 740489.901 3280339.17
2
740420.601 3280349.043
87700 740462.302 3280393.60
8 740496.952 3280388.67
3
740427.652 3280398.544
87750 740469.352 3280443.10
9 740504.003 3280438.17
3
740434.702 3280448.044
87800 740476.403 3280492.60
9 740511.053 3280487.67
4
740441.753 3280497.544
87850 740483.454 3280542.10
9 740518.104 3280537.17
4
740448.804 3280547.045
87900 740490.505 3280591.61 740525.155 3280586.67
4
740455.854 3280596.545
87950 740497.555 3280641.11 740532.205 3280636.17
5
740462.905 3280646.046
88000 740504.606 3280690.61
1 740539.256 3280685.67
5
740469.956 3280695.546
88050 740511.657 3280740.11
1 740546.307 3280735.17
5
740477.006 3280745.046
88100 740518.707 3280789.61
1 740553.358 3280784.67
6
740484.057 3280794.547
88150 740525.758 3280839.11
2 740560.408 3280834.17
6
740491.108 3280844.047
88200 740532.809 3280888.61
2 740567.459 3280883.67
7
740498.158 3280893.548
88250 740539.859 3280938.11
2 740574.51 3280933.17
7
740505.209 3280943.048
88300 740546.91 3280987.61
3 740581.56 3280982.67
7
740512.26 3280992.548
88350 740553.961 3281037.11
3 740588.611 3281032.17
8
740519.31 3281042.049
Project Report
152
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
88400 740561.011 3281086.61
4 740595.662 3281081.67
8
740526.361 3281091.549
88450 740568.062 3281136.11
4 740602.712 3281131.17
9
740533.412 3281141.049
88500 740575.113 3281185.61
4 740609.763 3281180.67
9
740540.462 3281190.55
88550 740582.163 3281235.11
5 740616.814 3281230.17
9
740547.513 3281240.05
88600 740589.214 3281284.61
5 740623.864 3281279.68
740554.564 3281289.551
88650 740596.265 3281334.11
6 740630.915 3281329.18
740561.614 3281339.051
88700 740603.315 3281383.61
6 740637.966 3281378.68
740568.665 3281388.551
88750 740610.366 3281433.11
6 740645.016 3281428.18
1
740575.716 3281438.052
88800 740617.417 3281482.61
7 740652.067 3281477.68
1
740582.767 3281487.552
88850 740624.467 3281532.11
7 740659.118 3281527.18
2
740589.817 3281537.053
88900 740631.518 3281581.61
7 740666.168 3281576.68
2
740596.868 3281586.553
88950 740638.569 3281631.11
8 740673.219 3281626.18
2
740603.919 3281636.053
89000 740645.62 3281680.61
8 740680.27 3281675.68
3
740610.969 3281685.554
89050 740652.67 3281730.11
9 740687.32 3281725.18
3
740618.02 3281735.054
89100 740659.839 3281779.60
2 740694.45 3281774.39
9
740625.227 3281784.804
89150 740667.58 3281828.99
9 740702.123 3281823.36
4
740633.036 3281834.633
89200 740675.937 3281878.29
5 740710.408 3281872.22
9
740641.467 3281884.361
89250 740684.911 3281927.48
3 740719.303 3281920.98
6
740650.519 3281933.979
89300 740694.498 3281976.55
5 740728.806 3281969.62
9
740660.19 3281983.48
89350 740704.698 3282025.50
3 740738.917 3282018.14
9
740670.48 3282032.857
89400 740715.51 3282074.32 740749.634 3282066.53
8
740681.386 3282082.101
89450 740726.93 3282122.99
8 740760.954 3282114.79
740692.906 3282131.205
89500 740738.958 3282171.52
9 740772.877 3282162.89
7
740705.039 3282180.161
Project Report
153
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
89550 740751.592 3282219.90
6 740785.4 3282210.85
1
740717.784 3282228.961
89600 740764.829 3282268.12
2 740798.526 3282258.65
9
740731.133 3282277.584
89650 740778.347 3282316.26 740812.044 3282306.79
7
740744.651 3282325.722
89700 740791.866 3282364.39
8 740825.562 3282354.93
5
740758.169 3282373.86
89750 740805.384 3282412.53
5 740839.08 3282403.07
3
740771.687 3282421.998
89800 740818.902 3282460.67
3 740852.598 3282451.21
1
740785.205 3282470.136
89850 740832.42 3282508.81
1 740866.117 3282499.34
9
740798.723 3282518.274
89900 740845.938 3282556.94
9 740879.635 3282547.48
7
740812.242 3282566.412
89950 740859.456 3282605.08
7 740893.153 3282595.62
4
740825.76 3282614.55
90000 740872.974 3282653.22
5 740906.671 3282643.76
2
740839.278 3282662.688
90000 740872.974 3282653.22
5 740906.671 3282643.76
2
740839.278 3282662.688
90050 740886.493 3282701.36
3 740920.189 3282691.9
740852.796 3282710.826
90100 740900.011 3282749.50
1 740933.707 3282740.03
8
740866.314 3282758.964
90150 740913.529 3282797.63
9 740947.226 3282788.17
6
740879.832 3282807.102
90200 740927.047 3282845.77
7 740960.744 3282836.31
4
740893.351 3282855.239
90250 740940.565 3282893.91
5 740974.262 3282884.45
2
740906.869 3282903.377
90300 740954.083 3282942.05
3 740987.78 3282932.59
740920.387 3282951.515
90350 740967.602 3282990.19
1 741001.298 3282980.72
8
740933.905 3282999.653
90400 740981.12 3283038.32
8 741014.816 3283028.86
6
740947.423 3283047.791
90450 740994.638 3283086.46
6 741028.334 3283077.00
4
740960.941 3283095.929
90500 741008.156 3283134.60
4 741041.853 3283125.14
2
740974.46 3283144.067
90550 741021.674 3283182.74
2 741055.371 3283173.27
9
740987.978 3283192.205
90600 741035.192 3283230.88 741068.889 3283221.41
7
741001.496 3283240.343
Project Report
154
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
90650 741048.711 3283279.01
8 741082.407 3283269.55
5
741015.014 3283288.481
90700 741062.229 3283327.15
6 741095.925 3283317.69
3
741028.532 3283336.619
90750 741075.747 3283375.29
4 741109.443 3283365.83
1
741042.05 3283384.757
90800 741089.265 3283423.43
2 741122.962 3283413.96
9
741055.569 3283432.895
90850 741102.783 3283471.57 741136.48 3283462.10
7
741069.087 3283481.032
90900 741116.301 3283519.70
8 741149.998 3283510.24
5
741082.605 3283529.17
90950 741129.82 3283567.84
6 741163.516 3283558.38
3
741096.123 3283577.308
91000 741143.338 3283615.98
3 741177.034 3283606.52
1
741109.641 3283625.446
91050 741156.856 3283664.12
1 741190.552 3283654.65
9
741123.159 3283673.584
91100 741170.374 3283712.25
9 741204.071 3283702.79
7
741136.677 3283721.722
91150 741183.892 3283760.39
7 741217.589 3283750.93
5
741150.196 3283769.86
91200 741197.41 3283808.53
5 741231.107 3283799.07
2
741163.714 3283817.998
91250 741210.928 3283856.67
3 741244.625 3283847.21
741177.232 3283866.136
91300 741224.447 3283904.81
1 741258.143 3283895.34
8
741190.75 3283914.274
91350 741237.965 3283952.94
9 741271.661 3283943.48
6
741204.268 3283962.412
91400 741251.483 3284001.08
7 741285.18 3283991.62
4
741217.786 3284010.55
91450 741265.001 3284049.22
5 741298.698 3284039.76
2
741231.305 3284058.687
91500 741278.519 3284097.36
3 741312.216 3284087.9
741244.823 3284106.825
91550 741292.037 3284145.50
1 741325.734 3284136.03
8
741258.341 3284154.963
91600 741305.556 3284193.63
9 741339.252 3284184.17
6
741271.859 3284203.101
91650 741319.074 3284241.77
6 741352.77 3284232.31
4
741285.377 3284251.239
91700 741332.592 3284289.91
4 741366.288 3284280.45
2
741298.895 3284299.377
91750 741346.11 3284338.05
2 741379.807 3284328.59
741312.414 3284347.515
Project Report
155
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
91800 741359.652 3284386.18
3 741393.319 3284376.61
4
741325.986 3284395.752
91850 741373.562 3284434.20
9 741407.132 3284424.30
4
741339.993 3284444.114
91900 741387.952 3284482.09
4 741421.421 3284471.85
3
741354.484 3284492.334
91950 741402.82 3284529.83
2 741436.184 3284519.25
7
741369.456 3284540.406
92000 741418.165 3284577.41
9 741451.422 3284566.51
1
741384.908 3284588.326
92050 741433.984 3284624.85 741467.13 3284613.61 741400.838 3284636.09
92100 741450.277 3284672.12
1 741483.31 3284660.55
741417.245 3284683.691
92150 741467.042 3284719.22
6 741499.957 3284707.32
6
741434.128 3284731.126
92200 741484.278 3284766.16
1 741517.072 3284753.93
2
741451.484 3284778.39
92250 741501.981 3284812.92
2 741534.652 3284800.36
6
741469.311 3284825.478
92300 741520.152 3284859.50
3 741552.695 3284846.62
1
741487.609 3284872.385
92350 741538.787 3284905.9 741571.2 3284892.69
3
741506.375 3284919.107
92400 741557.687 3284952.19
1 741590.09 3284938.96
741525.284 3284965.421
92450 741576.588 3284998.48
1 741608.991 3284985.25
741544.185 3285011.711
92500 741595.489 3285044.77
1 741627.892 3285031.54
741563.086 3285058.001
92550 741614.389 3285091.06
1 741646.792 3285077.83
741581.987 3285104.291
92600 741633.29 3285137.35
1 741665.693 3285124.12
741600.887 3285150.581
92650 741652.191 3285183.64 741684.594 3285170.41 741619.788 3285196.871
92700 741671.092 3285229.93 741703.495 3285216.7 741638.689 3285243.161
92750 741689.993 3285276.22 741722.396 3285262.99 741657.59 3285289.451
92800 741708.894 3285322.51 741741.297 3285309.28 741676.491 3285335.741
92850 741727.795 3285368.8 741760.198 3285355.57 741695.392 3285382.031
92900 741746.696 3285415.09 741779.099 3285401.85
9
741714.293 3285428.321
92950 741765.596 3285461.38 741797.999 3285448.14
9
741733.194 3285474.611
93000 741784.497 3285507.67 741816.9 3285494.43
9
741752.094 3285520.901
93050 741803.398 3285553.96 741835.801 3285540.72
9
741770.995 3285567.19
Project Report
156
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
93100 741822.299 3285600.25 741854.702 3285587.01
9
741789.896 3285613.48
93150 741841.2 3285646.54 741873.603 3285633.30
9
741808.797 3285659.77
93200 741860.101 3285692.83 741892.504 3285679.59
9
741827.698 3285706.06
93250 741879.002 3285739.12 741911.405 3285725.88
9
741846.599 3285752.35
93300 741897.903 3285785.40
9 741930.306 3285772.17
9
741865.5 3285798.64
93350 741916.803 3285831.69
9 741949.206 3285818.46
9
741884.401 3285844.93
93400 741935.704 3285877.98
9 741968.107 3285864.75
9
741903.301 3285891.22
93450 741954.605 3285924.27
9 741987.008 3285911.04
9
741922.202 3285937.51
93500 741973.506 3285970.56
9 742005.909 3285957.33
9
741941.103 3285983.8
93550 741992.407 3286016.85
9 742024.81 3286003.62
8
741960.004 3286030.09
93600 742011.308 3286063.14
9 742043.711 3286049.91
8
741978.905 3286076.38
93650 742030.209 3286109.43
9 742062.612 3286096.20
8
741997.806 3286122.67
93700 742049.11 3286155.72
9 742081.513 3286142.49
8
742016.707 3286168.959
93750 742068.01 3286202.01
9 742100.413 3286188.78
8
742035.608 3286215.249
93800 742086.911 3286248.30
9 742119.314 3286235.07
8
742054.508 3286261.539
93850 742105.812 3286294.59
9 742138.215 3286281.36
8
742073.409 3286307.829
93900 742124.713 3286340.88
9 742157.116 3286327.65
8
742092.31 3286354.119
93950 742143.614 3286387.17
8 742176.017 3286373.94
8
742111.211 3286400.409
94000 742162.515 3286433.46
8 742194.918 3286420.23
8
742130.112 3286446.699
94050 742181.416 3286479.75
8 742213.819 3286466.52
8
742149.013 3286492.989
94100 742200.317 3286526.04
8 742232.72 3286512.81
8
742167.914 3286539.279
94150 742219.217 3286572.33
8 742251.62 3286559.10
8
742186.815 3286585.569
94200 742238.118 3286618.62
8 742270.521 3286605.39
7
742205.715 3286631.859
Project Report
157
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
94250 742257.019 3286664.91
8 742289.422 3286651.68
7
742224.616 3286678.149
94300 742275.92 3286711.20
8 742308.323 3286697.97
7
742243.517 3286724.439
94350 742294.821 3286757.49
8 742327.224 3286744.26
7
742262.418 3286770.728
94400 742313.722 3286803.78
8 742346.125 3286790.55
7
742281.319 3286817.018
94450 742332.623 3286850.07
8 742365.026 3286836.84
7
742300.22 3286863.308
94500 742351.524 3286896.36
8 742383.927 3286883.13
7
742319.121 3286909.598
94550 742370.425 3286942.65
8 742402.827 3286929.42
7
742338.022 3286955.888
94600 742389.325 3286988.94
7 742421.728 3286975.71
7
742356.922 3287002.178
94650 742408.255 3287035.22
5 742440.597 3287021.84
7
742375.913 3287048.604
94700 742427.752 3287081.26
7 742459.867 3287067.35
1
742395.637 3287095.183
94750 742448.013 3287126.97
7 742479.892 3287112.52
8
742416.135 3287141.426
94800 742469.034 3287172.34
3 742500.667 3287157.36
5
742437.401 3287187.322
94850 742490.807 3287217.35
3 742522.186 3287201.84
9
742459.428 3287232.856
94900 742513.328 3287261.99
3 742544.444 3287245.96
9
742482.212 3287278.018
94950 742536.589 3287306.25
2 742567.434 3287289.71
1
742505.744 3287322.793
95000 742560.585 3287350.11
7 742591.15 3287333.06
5
742530.02 3287367.17
95050 742585.308 3287393.57
6 742615.585 3287376.01
7
742555.032 3287411.136
95100 742610.495 3287436.76
9 742640.727 3287419.13
2
742580.264 3287454.406
95150 742635.691 3287479.95
7 742665.922 3287462.32
742605.459 3287497.594
95200 742660.886 3287523.14
5 742691.118 3287505.50
8
742630.654 3287540.782
95250 742686.081 3287566.33
3 742716.313 3287548.69
6
742655.85 3287583.97
95300 742711.277 3287609.52
1 742741.508 3287591.88
4
742681.045 3287627.157
95350 742736.472 3287652.70
9 742766.703 3287635.07
2
742706.24 3287670.345
Project Report
158
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
95400 742761.667 3287695.89
7 742791.899 3287678.26
742731.436 3287713.533
95450 742786.862 3287739.08
5 742817.094 3287721.44
8
742756.631 3287756.721
95500 742812.058 3287782.27
2 742842.289 3287764.63
6
742781.826 3287799.909
95550 742837.253 3287825.46 742867.485 3287807.82
4
742807.022 3287843.097
95600 742862.448 3287868.64
8 742892.68 3287851.01
2
742832.217 3287886.285
95650 742887.644 3287911.83
6 742917.875 3287894.2
742857.412 3287929.473
95700 742912.839 3287955.02
4 742943.071 3287937.38
7
742882.607 3287972.661
95750 742938.034 3287998.21
2 742968.266 3287980.57
5
742907.803 3288015.849
95800 742963.23 3288041.4 742993.461 3288023.76
3
742932.998 3288059.037
95850 742988.425 3288084.58
8 743018.656 3288066.95
1
742958.193 3288102.225
95900 743013.62 3288127.77
6 743043.852 3288110.13
9
742983.389 3288145.413
95950 743038.816 3288170.96
4 743069.047 3288153.32
7
743008.584 3288188.6
96000 743064.011 3288214.15
2 743094.242 3288196.51
5
743033.779 3288231.788
96050 743089.206 3288257.34 743119.438 3288239.70
3
743058.975 3288274.976
96100 743114.401 3288300.52
8 743144.633 3288282.89
1
743084.17 3288318.164
96150 743139.597 3288343.71
5 743169.828 3288326.07
9
743109.365 3288361.352
96200 743164.792 3288386.90
3 743195.024 3288369.26
7
743134.56 3288404.54
96250 743189.987 3288430.09
1 743220.219 3288412.45
5
743159.756 3288447.728
96300 743215.183 3288473.27
9 743245.414 3288455.64
3
743184.951 3288490.916
96350 743240.494 3288516.39
9 743270.607 3288498.56
743210.381 3288534.238
96400 743266.157 3288559.31
1 743296.12 3288541.22
1
743236.194 3288577.4
96450 743292.177 3288602.00
7 743321.988 3288583.66
9
743262.365 3288620.345
96500 743318.551 3288644.48
5 743348.209 3288625.89
9
743288.894 3288663.071
Project Report
159
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
96550 743345.255 3288686.75
6 743374.814 3288668.01
4
743315.697 3288705.499
96600 743372.03 3288728.98
3 743401.589 3288710.24
743342.472 3288747.725
96650 743398.806 3288771.20
9 743428.364 3288752.46
7
743369.247 3288789.952
96700 743425.581 3288813.43
6 743455.139 3288794.69
4
743396.022 3288832.179
96750 743452.356 3288855.66
3 743481.915 3288836.92
743422.797 3288874.405
96800 743479.131 3288897.88
9 743508.69 3288879.14
7
743449.572 3288916.632
96850 743505.906 3288940.11
6 743535.465 3288921.37
4
743476.347 3288958.859
96900 743532.681 3288982.34
3 743562.24 3288963.6
743503.123 3289001.085
96950 743559.456 3289024.57 743589.015 3289005.82
7
743529.898 3289043.312
97000 743586.232 3289066.79
6 743615.79 3289048.05
4
743556.673 3289085.539
97050 743613.007 3289109.02
3 743642.565 3289090.28
743583.448 3289127.765
97100 743639.604 3289151.36
1 743669.382 3289132.97
743609.825 3289169.753
97150 743665.521 3289194.11
9 743695.602 3289176.22
7
743635.44 3289212.012
97200 743690.723 3289237.30
3 743721.098 3289219.91
4
743660.348 3289254.692
97250 743715.201 3289280.90
1 743745.861 3289264.02
1
743684.54 3289297.781
97300 743738.949 3289324.9 743769.886 3289308.53
4
743708.011 3289341.267
97350 743761.96 3289369.29 743793.166 3289353.44
1
743730.754 3289385.138
97400 743784.229 3289414.05
6 743815.695 3289398.73
743752.763 3289429.383
97450 743805.748 3289459.18
8 743837.465 3289444.38
8
743774.031 3289473.988
97500 743826.663 3289504.60
3 743858.471 3289489.99
9
743794.856 3289519.207
97550 743847.526 3289550.04
3 743879.334 3289535.43
9
743815.719 3289564.647
97600 743868.389 3289595.48
2 743900.197 3289580.87
8
743836.582 3289610.086
97650 743889.252 3289640.92
1 743921.06 3289626.31
7
743857.445 3289655.525
Project Report
160
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
97700 743910.115 3289686.36
1 743941.923 3289671.75
7
743878.308 3289700.965
97750 743930.978 3289731.8 743962.786 3289717.19
6
743899.171 3289746.404
97800 743951.841 3289777.23
9 743983.649 3289762.63
5
743920.034 3289791.843
97850 743972.704 3289822.67
9 744004.512 3289808.07
5
743940.897 3289837.283
97900 743993.567 3289868.11
8 744025.375 3289853.51
4
743961.76 3289882.722
97950 744014.431 3289913.55
7 744046.238 3289898.95
3
743982.623 3289928.162
98000 744035.294 3289958.99
7 744067.101 3289944.39
3
744003.486 3289973.601
98050 744056.157 3290004.43
6 744087.964 3289989.83
2
744024.349 3290019.04
98100 744077.02 3290049.87
5 744108.827 3290035.27
1
744045.212 3290064.48
98150 744097.713 3290095.39
2 744129.635 3290081.03
9
744065.791 3290109.745
98200 744118.027 3290141.08 744150.067 3290126.99
3
744085.986 3290155.166
98250 744137.984 3290186.92
4 744170.099 3290173.00
9
744105.869 3290200.839
98300 744157.863 3290232.80
2 744189.978 3290218.88
7
744125.748 3290246.718
98350 744177.742 3290278.68
1 744209.857 3290264.76
5
744145.627 3290292.596
98400 744197.621 3290324.55
9 744229.736 3290310.64
4
744165.506 3290338.474
98450 744217.5 3290370.43
7 744249.615 3290356.52
2
744185.385 3290384.353
98500 744237.379 3290416.31
6 744269.494 3290402.4
744205.264 3290430.231
98550 744257.258 3290462.19
4 744289.373 3290448.27
9
744225.143 3290476.109
98600 744277.137 3290508.07
2 744309.252 3290494.15
7
744245.023 3290521.988
98650 744297.016 3290553.95
1 744329.131 3290540.03
5
744264.902 3290567.866
98700 744316.896 3290599.82
9 744349.01 3290585.91
4
744284.781 3290613.744
98750 744336.775 3290645.70
7 744368.89 3290631.79
2
744304.66 3290659.623
98800 744356.654 3290691.58
6 744388.769 3290677.67
744324.539 3290705.501
Project Report
161
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
98850 744376.533 3290737.46
4 744408.648 3290723.54
9
744344.418 3290751.379
98900 744396.412 3290783.34
2 744428.527 3290769.42
7
744364.297 3290797.258
98950 744416.291 3290829.22
1 744448.406 3290815.30
5
744384.176 3290843.136
99000 744436.17 3290875.09
9 744468.285 3290861.18
4
744404.055 3290889.014
99050 744456.049 3290920.97
7 744488.164 3290907.06
2
744423.934 3290934.893
99100 744475.928 3290966.85
6 744508.043 3290952.94
744443.813 3290980.771
99150 744495.807 3291012.73
4 744527.922 3290998.81
9
744463.693 3291026.649
99200 744515.686 3291058.61
2 744547.801 3291044.69
7
744483.572 3291072.528
99250 744535.566 3291104.49
1 744567.68 3291090.57
5
744503.451 3291118.406
99300 744555.445 3291150.36
9 744587.56 3291136.45
4
744523.33 3291164.284
99350 744575.324 3291196.24
7 744607.439 3291182.33
2
744543.209 3291210.163
99400 744595.203 3291242.12
6 744627.318 3291228.21
744563.088 3291256.041
99450 744615.082 3291288.00
4 744647.197 3291274.08
9
744582.967 3291301.919
99500 744634.961 3291333.88
2 744667.076 3291319.96
7
744602.846 3291347.798
99550 744654.84 3291379.76
1 744686.955 3291365.84
5
744622.725 3291393.676
99600 744674.799 3291425.60
4 744706.844 3291411.52
9
744642.754 3291439.68
99650 744695.07 3291471.31 744727.014 3291457.00
6
744663.127 3291485.615
99700 744715.667 3291516.87
1 744747.508 3291502.33
9
744683.827 3291531.403
99750 744736.45 3291562.34
7 744768.336 3291547.91
6
744704.563 3291576.779
99800 744756.685 3291608.06
9 744788.808 3291594.17
1
744724.563 3291621.967
99850 744776.157 3291654.12
1 744808.506 3291640.76
744743.807 3291667.482
99900 744795.168 3291700.36
6 744827.54 3291687.06
1
744762.796 3291713.671
99950 744814.175 3291746.61
2 744846.548 3291733.30
7
744781.803 3291759.917
Project Report
162
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
100000 744833.183 3291792.85
8 744865.555 3291779.55
3
744800.81 3291806.163
100050 744852.19 3291839.10
5 744884.562 3291825.8
744819.817 3291852.41
100100 744871.197 3291885.35
1 744903.569 3291872.04
6
744838.825 3291898.656
100150 744890.204 3291931.59
7 744922.577 3291918.29
2
744857.832 3291944.902
100200 744909.212 3291977.84
4 744941.584 3291964.53
9
744876.839 3291991.149
100250 744928.219 3292024.09 744960.591 3292010.78
5
744895.846 3292037.395
100300 744947.226 3292070.33
6 744979.599 3292057.03
1
744914.854 3292083.641
100350 744966.233 3292116.58
3 744998.606 3292103.27
8
744933.861 3292129.888
100400 744985.241 3292162.82
9 745017.613 3292149.52
4
744952.868 3292176.134
100450 745004.248 3292209.07
5 745036.62 3292195.77
744971.875 3292222.38
100500 745023.255 3292255.32
2 745055.628 3292242.01
7
744990.883 3292268.627
100550 745042.262 3292301.56
8 745074.635 3292288.26
3
745009.89 3292314.873
100600 745061.27 3292347.81
4 745093.642 3292334.50
9
745028.897 3292361.12
100650 745080.277 3292394.06
1 745112.649 3292380.75
6
745047.905 3292407.366
100700 745099.284 3292440.30
7 745131.657 3292427.00
2
745066.912 3292453.612
100750 745118.292 3292486.55
3 745150.664 3292473.24
8
745085.919 3292499.859
100800 745137.299 3292532.8 745169.671 3292519.49
5
745104.926 3292546.105
100850 745156.306 3292579.04
6 745188.678 3292565.74
1
745123.934 3292592.351
100900 745175.313 3292625.29
2 745207.686 3292611.98
7
745142.941 3292638.598
100950 745194.321 3292671.53
9 745226.693 3292658.23
4
745161.948 3292684.844
101000 745213.328 3292717.78
5 745245.7 3292704.48
745180.955 3292731.09
101050 745232.335 3292764.03
1 745264.708 3292750.72
6
745199.963 3292777.337
101100 745251.342 3292810.27
8 745283.715 3292796.97
3
745218.97 3292823.583
Project Report
163
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
101150 745270.35 3292856.52
4 745302.722 3292843.21
9
745237.977 3292869.829
101200 745289.357 3292902.77 745321.729 3292889.46
5
745256.984 3292916.076
101250 745308.364 3292949.01
7 745340.737 3292935.71
2
745275.992 3292962.322
101300 745327.371 3292995.26
3 745359.744 3292981.95
8
745294.999 3293008.568
101350 745346.379 3293041.50
9 745378.751 3293028.20
4
745314.006 3293054.815
101400 745365.386 3293087.75
6 745397.758 3293074.45
1
745333.014 3293101.061
101450 745384.393 3293134.00
2 745416.766 3293120.69
7
745352.021 3293147.307
101500 745403.401 3293180.24
9 745435.773 3293166.94
3
745371.028 3293193.554
101550 745422.408 3293226.49
5 745454.78 3293213.19
745390.035 3293239.8
101600 745441.415 3293272.74
1 745473.787 3293259.43
6
745409.043 3293286.046
101650 745460.422 3293318.98
8 745492.795 3293305.68
2
745428.05 3293332.293
101700 745479.43 3293365.23
4 745511.802 3293351.92
9
745447.057 3293378.539
101750 745498.437 3293411.48 745530.809 3293398.17
5
745466.064 3293424.785
101800 745517.444 3293457.72
7 745549.817 3293444.42
1
745485.072 3293471.032
101850 745536.451 3293503.97
3 745568.824 3293490.66
8
745504.079 3293517.278
101900 745555.459 3293550.21
9 745587.831 3293536.91
4
745523.086 3293563.524
101950 745574.466 3293596.46
6 745606.838 3293583.16
745542.093 3293609.771
102000 745593.473 3293642.71
2 745625.846 3293629.40
7
745561.101 3293656.017
102050 745612.48 3293688.95
8 745644.853 3293675.65
3
745580.108 3293702.263
102100 745631.488 3293735.20
5 745663.86 3293721.89
9
745599.115 3293748.51
102150 745650.495 3293781.45
1 745682.867 3293768.14
6
745618.123 3293794.756
102200 745669.502 3293827.69
7 745701.875 3293814.39
2
745637.13 3293841.002
102250 745688.51 3293873.94
4 745720.882 3293860.63
9
745656.137 3293887.249
Project Report
164
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
102300 745707.517 3293920.19 745739.889 3293906.88
5
745675.144 3293933.495
102350 745726.524 3293966.43
6 745758.896 3293953.13
1
745694.152 3293979.741
102400 745745.531 3294012.68
3 745777.904 3293999.37
8
745713.159 3294025.988
102450 745764.539 3294058.92
9 745796.911 3294045.62
4
745732.166 3294072.234
102500 745783.546 3294105.17
5 745815.918 3294091.87
745751.173 3294118.48
102550 745802.553 3294151.42
2 745834.926 3294138.11
7
745770.181 3294164.727
102600 745821.56 3294197.66
8 745853.933 3294184.36
3
745789.188 3294210.973
102650 745840.568 3294243.91
4 745872.94 3294230.60
9
745808.195 3294257.219
102700 745859.575 3294290.16
1 745891.947 3294276.85
6
745827.202 3294303.466
102750 745878.582 3294336.40
7 745910.955 3294323.10
2
745846.21 3294349.712
102800 745897.589 3294382.65
3 745929.962 3294369.34
8
745865.217 3294395.958
102850 745916.597 3294428.9 745948.969 3294415.59
5
745884.224 3294442.205
102900 745935.604 3294475.14
6 745967.976 3294461.84
1
745903.232 3294488.451
102950 745954.611 3294521.39
2 745986.984 3294508.08
7
745922.239 3294534.697
103000 745973.618 3294567.63
9 746005.991 3294554.33
4
745941.246 3294580.944
103050 745992.626 3294613.88
5 746024.998 3294600.58
745960.253 3294627.19
103100 746011.633 3294660.13
1 746044.005 3294646.82
6
745979.261 3294673.436
103150 746030.64 3294706.37
8 746063.013 3294693.07
3
745998.268 3294719.683
103200 746049.648 3294752.62
4 746082.02 3294739.31
9
746017.275 3294765.929
103250 746068.655 3294798.87 746101.027 3294785.56
5
746036.282 3294812.175
103300 746087.662 3294845.11
7 746120.035 3294831.81
2
746055.29 3294858.422
103350 746106.666 3294891.36
5 746139.051 3294878.09
2
746074.28 3294904.637
103400 746125.482 3294937.68
9 746157.95 3294924.61
8
746093.014 3294950.759
Project Report
165
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
103450 746144.009 3294984.13 746176.558 3294971.26
2
746111.46 3294996.997
103500 746162.245 3295030.68
5 746194.874 3295018.02
2
746129.616 3295043.349
103550 746180.19 3295077.35
4 746212.897 3295064.89
5
746147.483 3295089.813
103600 746197.843 3295124.13
4 746230.627 3295111.87
9
746165.058 3295136.389
103650 746215.203 3295171.02
3 746248.063 3295158.97
4
746182.342 3295183.073
103700 746232.27 3295218.02
1 746265.205 3295206.17
7
746199.334 3295229.864
103750 746249.042 3295265.12
3 746282.051 3295253.48
6
746216.034 3295276.761
103800 746265.52 3295312.33 746298.601 3295300.89
9
746232.439 3295323.761
103850 746281.727 3295359.63 746314.85 3295348.32
2
746248.604 3295370.939
103900 746297.882 3295406.94
9 746331.005 3295395.64
746264.76 3295418.257
103950 746314.038 3295454.26
7 746347.16 3295442.95
8
746280.915 3295465.575
104000 746330.193 3295501.58
5 746363.315 3295490.27
6
746297.07 3295512.894
104050 746346.348 3295548.90
3 746379.471 3295537.59
4
746313.225 3295560.212
104100 746362.503 3295596.22
1 746395.626 3295584.91
3
746329.38 3295607.53
104150 746378.658 3295643.53
9 746411.781 3295632.23
1
746345.535 3295654.848
104200 746394.813 3295690.85
8 746427.936 3295679.54
9
746361.691 3295702.166
104250 746410.968 3295738.17
6 746444.091 3295726.86
7
746377.846 3295749.484
104300 746427.124 3295785.49
4 746460.246 3295774.18
5
746394.001 3295796.803
104350 746443.279 3295832.81
2 746476.402 3295821.50
4
746410.156 3295844.121
104400 746459.434 3295880.13 746492.557 3295868.82
2
746426.311 3295891.439
104450 746475.589 3295927.44
9 746508.712 3295916.14
746442.466 3295938.757
104500 746491.744 3295974.76
7 746524.867 3295963.45
8
746458.622 3295986.075
104550 746507.899 3296022.08
5 746541.022 3296010.77
6
746474.777 3296033.394
Project Report
166
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
104600 746524.055 3296069.40
3 746557.177 3296058.09
5
746490.932 3296080.712
104650 746540.21 3296116.72
1 746573.333 3296105.41
3
746507.087 3296128.03
104700 746556.365 3296164.04 746589.488 3296152.73
1
746523.242 3296175.348
104750 746572.52 3296211.35
8 746605.643 3296200.04
9
746539.397 3296222.666
104800 746588.675 3296258.67
6 746621.798 3296247.36
7
746555.553 3296269.985
104850 746604.83 3296305.99
4 746637.953 3296294.68
5
746571.708 3296317.303
104900 746620.986 3296353.31
2 746654.108 3296342.00
4
746587.863 3296364.621
104950 746637.329 3296400.56
6 746670.337 3296388.92
7
746604.321 3296412.204
105000 746654.249 3296447.61
5 746687.11 3296435.56
5
746621.389 3296459.665
105050 746671.757 3296494.44
9 746704.464 3296481.99
746639.05 3296506.909
105100 746689.848 3296541.06
1 746722.397 3296528.19
4
746657.299 3296553.929
105150 746708.521 3296587.44
3 746740.906 3296574.17
746676.135 3296600.717
105200 746727.768 3296633.59 746760.005 3296619.96 746695.531 3296647.221
105250 746747.24 3296679.64
3 746779.477 3296666.01
2
746715.003 3296693.273
105300 746766.712 3296725.69
5 746798.949 3296712.06
5
746734.475 3296739.326
105350 746786.184 3296771.74
8 746818.421 3296758.11
7
746753.947 3296785.378
105400 746805.656 3296817.8 746837.893 3296804.17 746773.419 3296831.431
105450 746825.128 3296863.85
3 746857.365 3296850.22
3
746792.891 3296877.483
105500 746844.6 3296909.90
6 746876.837 3296896.27
5
746812.364 3296923.536
105550 746864.072 3296955.95
8 746896.309 3296942.32
8
746831.836 3296969.589
105600 746883.544 3297002.01
1 746915.781 3296988.38
746851.308 3297015.641
105650 746903.017 3297048.06
3 746935.253 3297034.43
3
746870.78 3297061.694
105700 746922.489 3297094.11
6 746954.725 3297080.48
5
746890.252 3297107.746
105750 746941.961 3297140.16
8 746974.197 3297126.53
8
746909.724 3297153.799
Project Report
167
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
105800 746961.433 3297186.22
1 746993.67 3297172.59
746929.196 3297199.851
105850 746980.905 3297232.27
4 747013.142 3297218.64
3
746948.668 3297245.904
105900 747000.377 3297278.32
6 747032.614 3297264.69
6
746968.14 3297291.957
105950 747019.849 3297324.37
9 747052.086 3297310.74
8
746987.612 3297338.009
106000 747039.321 3297370.43
1 747071.558 3297356.80
1
747007.084 3297384.062
106050 747058.793 3297416.48
4 747091.03 3297402.85
3
747026.556 3297430.114
106100 747078.188 3297462.56
9 747110.526 3297449.18
747045.85 3297475.958
106150 747096.929 3297508.92
3 747129.485 3297496.07
5
747064.372 3297521.771
106200 747114.895 3297555.58
3 747147.661 3297543.28
747082.128 3297567.887
106250 747132.08 3297602.53
6 747165.047 3297590.78
1
747099.114 3297614.292
106300 747148.481 3297649.76
9 747181.639 3297638.56
5
747115.323 3297660.974
106350 747164.092 3297697.26
9 747197.433 3297686.61
8
747130.752 3297707.92
106400 747179.264 3297744.91
2 747212.614 3297734.29
2
747145.914 3297755.531
106450 747194.434 3297792.55
5 747227.785 3297781.93
6
747161.084 3297803.174
106500 747209.605 3297840.19
8 747242.955 3297829.57
9
747176.255 3297850.817
106550 747224.775 3297887.84
1 747258.125 3297877.22
2
747191.425 3297898.46
106600 747239.946 3297935.48
4 747273.296 3297924.86
5
747206.595 3297946.103
106650 747255.116 3297983.12
7 747288.466 3297972.50
8
747221.766 3297993.746
106700 747270.286 3298030.77 747303.636 3298020.15
1
747236.936 3298041.389
106750 747285.457 3298078.41
3 747318.807 3298067.79
4
747252.107 3298089.032
106800 747300.627 3298126.05
6 747333.977 3298115.43
7
747267.277 3298136.675
106850 747315.797 3298173.69
9 747349.148 3298163.08
747282.447 3298184.318
106900 747330.916 3298221.35
9 747364.321 3298210.91
4
747297.51 3298231.803
Project Report
168
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
106950 747345.538 3298269.17
3 747379.071 3298259.14
6
747312.004 3298279.199
107000 747359.561 3298317.16
5 747393.217 3298307.55
9
747325.905 3298326.772
107050 747372.983 3298365.33 747406.757 3298356.14
5
747339.21 3298374.515
107100 747385.802 3298413.65
8 747419.688 3298404.89
6
747351.917 3298422.42
107150 747398.017 3298462.14
3 747432.009 3298453.80
5
747364.024 3298470.481
107200 747409.624 3298510.77
7 747443.718 3298502.86
5
747375.53 3298518.689
107250 747420.622 3298559.55
2 747454.812 3298552.06
7
747386.432 3298567.037
107300 747431.01 3298608.46
1 747465.291 3298601.40
3
747396.729 3298615.518
107350 747441.021 3298657.44
8 747475.313 3298650.44
3
747406.729 3298664.453
107400 747451.028 3298706.43
7 747485.32 3298699.43
2
747416.736 3298713.441
107450 747461.034 3298755.42
5 747495.326 3298748.42
747426.743 3298762.43
107500 747471.041 3298804.41
3 747505.333 3298797.40
9
747436.749 3298811.418
107550 747481.048 3298853.40
2 747515.34 3298846.39
7
747446.756 3298860.406
107600 747491.055 3298902.39 747525.346 3298895.38
6
747456.763 3298909.395
107650 747501.061 3298951.37
9 747535.353 3298944.37
4
747466.769 3298958.383
107700 747511.068 3299000.36
7 747545.36 3298993.36
2
747476.776 3299007.372
107750 747521.075 3299049.35
6 747555.366 3299042.35
1
747486.783 3299056.36
107800 747531.081 3299098.34
4 747565.373 3299091.33
9
747496.789 3299105.349
107850 747541.088 3299147.33
2 747575.38 3299140.32
8
747506.796 3299154.337
107900 747551.095 3299196.32
1 747585.386 3299189.31
6
747516.803 3299203.326
107950 747561.076 3299245.31
4 747595.396 3299238.45
3
747526.755 3299252.176
108000 747570.469 3299294.42
4 747604.899 3299288.13
5
747536.039 3299300.712
108050 747579.042 3299343.68
2 747613.573 3299337.96
8
747544.512 3299349.396
Project Report
169
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
108100 747586.794 3299393.07
7 747621.415 3299387.94
747552.173 3299398.215
108150 747593.721 3299442.59
5 747628.423 3299438.03
5
747559.019 3299447.155
108200 747600.026 3299492.19
6 747634.749 3299487.80
8
747565.302 3299496.583
108250 747606.293 3299541.80
1 747641.017 3299537.41
4
747571.569 3299546.189
108300 747612.561 3299591.40
7 747647.285 3299587.01
9
747577.837 3299595.794
108350 747618.829 3299641.01
2 747653.553 3299636.62
5
747584.105 3299645.4
108400 747625.097 3299690.61
8 747659.821 3299686.23
747590.373 3299695.005
108450 747631.365 3299740.22
3 747666.088 3299735.83
6
747596.641 3299744.611
108500 747637.632 3299789.82
9 747672.356 3299785.44
2
747602.908 3299794.217
108550 747643.9 3299839.43
5 747678.624 3299835.04
7
747609.176 3299843.822
108600 747650.168 3299889.04 747684.892 3299884.65
3
747615.444 3299893.428
108650 747656.436 3299938.64
6 747691.16 3299934.25
8
747621.712 3299943.033
108700 747662.703 3299988.25
1 747697.427 3299983.86
4
747627.98 3299992.639
108750 747668.971 3300037.85
7 747703.695 3300033.47
747634.247 3300042.245
108800 747675.239 3300087.46
3 747709.963 3300083.07
5
747640.515 3300091.85
108850 747681.507 3300137.06
8 747716.231 3300132.68
1
747646.783 3300141.456
108900 747687.775 3300186.67
4 747722.499 3300182.28
6
747653.051 3300191.061
108950 747693.928 3300236.29
4 747728.677 3300232.10
6
747659.179 3300240.482
109000 747699.734 3300285.95
5 747734.511 3300282.01
6
747664.956 3300289.895
109050 747705.184 3300335.65
7 747739.989 3300331.96
6
747670.38 3300339.349
109100 747710.28 3300385.39
7 747745.11 3300381.95
4
747675.45 3300388.839
109150 747715.02 3300435.17
2 747749.874 3300431.97
8
747680.166 3300438.365
109200 747719.405 3300484.97
9 747754.281 3300482.03
4
747684.529 3300487.923
Project Report
170
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
109250 747723.433 3300534.81
6 747758.329 3300532.12
1
747688.537 3300537.512
109300 747727.106 3300584.68
1 747762.02 3300582.23
5
747692.192 3300587.127
109350 747730.422 3300634.57
1 747765.353 3300632.37
4
747695.491 3300636.767
109400 747733.382 3300684.48
3 747768.328 3300682.53
6
747698.436 3300686.43
109450 747735.985 3300734.41
5 747770.944 3300732.71
8
747701.027 3300736.112
109500 747738.232 3300784.36
4 747773.202 3300782.91
7
747703.262 3300785.812
109550 747740.122 3300834.32
9 747775.101 3300833.13
1
747705.142 3300835.526
109600 747741.655 3300884.30
5 747776.642 3300883.35
7
747706.667 3300885.253
109650 747742.83 3300934.29
1 747777.823 3300933.59
3
747707.837 3300934.989
109700 747743.649 3300984.28
4 747778.646 3300983.83
6
747708.652 3300984.732
109750 747744.111 3301034.28
2 747779.11 3301034.08
4
747709.111 3301034.48
109800 747744.215 3301084.28
2 747779.215 3301084.33
4
747709.215 3301084.23
109850 747743.962 3301134.28
1 747778.961 3301134.58
3
747708.964 3301133.979
109900 747743.353 3301184.27
7 747778.348 3301184.82
9
747708.357 3301183.725
109950 747742.386 3301234.26
8 747777.377 3301235.07
747707.395 3301233.466
110000 747741.155 3301284.25
3 747776.144 3301285.12
4
747706.166 3301283.382
110050 747739.911 3301334.23
7 747774.9 3301335.10
8
747704.922 3301333.366
110100 747738.667 3301384.22
2 747773.656 3301385.09
3
747703.678 3301383.351
110150 747737.423 3301434.20
6 747772.412 3301435.07
7
747702.433 3301433.335
110200 747736.178 3301484.19
1 747771.168 3301485.06
2
747701.189 3301483.32
110250 747734.934 3301534.17
5 747769.923 3301535.04
6
747699.945 3301533.304
110300 747733.69 3301584.16 747768.679 3301585.03
1
747698.701 3301583.289
110350 747732.446 3301634.14
4 747767.435 3301635.01
5
747697.457 3301633.273
Project Report
171
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
110400 747731.201 3301684.12
9 747766.191 3301685
747696.212 3301683.258
110450 747729.957 3301734.11
3 747764.946 3301734.98
4
747694.968 3301733.242
110500 747728.713 3301784.09
8 747763.702 3301784.96
9
747693.724 3301783.227
110550 747727.469 3301834.08
2 747762.458 3301834.95
3
747692.48 3301833.211
110600 747726.225 3301884.06
7 747761.214 3301884.93
8
747691.235 3301883.196
110650 747724.98 3301934.05
1 747759.969 3301934.92
2
747689.991 3301933.18
110700 747723.736 3301984.03
6 747758.725 3301984.90
7
747688.747 3301983.165
110750 747722.492 3302034.02 747757.481 3302034.89
1
747687.503 3302033.149
110800 747721.248 3302084.00
5 747756.237 3302084.87
6
747686.259 3302083.134
110850 747720.003 3302133.98
9 747754.993 3302134.86
747685.014 3302133.118
110900 747718.759 3302183.97
4 747753.748 3302184.84
5
747683.77 3302183.103
110950 747717.515 3302233.95
8 747752.504 3302234.82
9
747682.526 3302233.087
111000 747716.271 3302283.94
3 747751.26 3302284.81
4
747681.282 3302283.072
111050 747715.027 3302333.92
7 747750.016 3302334.79
8
747680.037 3302333.057
111100 747714.19 3302383.92 747749.189 3302384.21
4
747679.191 3302383.626
111150 747714.187 3302433.91
9 747749.186 3302433.63
747679.188 3302434.209
111200 747715.017 3302483.91
2 747750.006 3302483.03
9
747680.028 3302484.785
111250 747716.681 3302533.88
4 747751.65 3302532.42
8
747681.711 3302535.339
111300 747719.176 3302583.82
1 747754.117 3302581.78
2
747684.236 3302585.859
111350 747722.504 3302633.70
9 747757.406 3302631.08
9
747687.602 3302636.33
111400 747726.663 3302683.53
5 747761.516 3302680.33
4
747691.81 3302686.737
111450 747731.651 3302733.28
5 747766.446 3302729.50
3
747696.856 3302737.067
111500 747737.468 3302782.94
5 747772.196 3302778.58
4
747702.741 3302787.307
Project Report
172
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
111550 747744.112 3302832.50
1 747778.762 3302827.56
2
747709.463 3302837.441
111600 747751.581 3302881.94 747786.144 3302876.42
3
747717.018 3302887.456
111650 747759.873 3302931.24
7 747794.338 3302925.15
5
747725.407 3302937.338
111700 747768.985 3302980.40
9 747803.344 3302973.74
4
747734.625 3302987.074
111750 747778.915 3303029.41
2 747813.159 3303022.17
5
747744.672 3303036.649
111800 747789.661 3303078.24
3 747823.779 3303070.43
7
747755.543 3303086.05
111850 747801.219 3303126.88
9 747835.202 3303118.51
4
747767.235 3303135.263
111900 747813.586 3303175.33
4 747847.425 3303166.39
5
747779.747 3303184.274
111950 747826.716 3303223.57
9 747860.453 3303214.25
9
747792.98 3303232.899
112000 747840.03 3303271.77
4 747873.766 3303262.45
4
747806.294 3303281.094
112050 747853.344 3303319.96
9 747887.08 3303310.64
9
747819.607 3303329.288
112100 747866.658 3303368.16
4 747900.394 3303358.84
4
747832.921 3303377.483
112150 747879.971 3303416.35
9 747913.708 3303407.03
9
747846.235 3303425.678
112200 747893.285 3303464.55
3 747927.022 3303455.23
4
747859.549 3303473.873
112250 747906.599 3303512.74
8 747940.335 3303503.42
9
747872.863 3303522.068
112300 747919.913 3303560.94
3 747953.649 3303551.62
3
747886.176 3303570.263
112350 747933.227 3303609.13
8 747966.963 3303599.81
8
747899.49 3303618.458
112400 747946.54 3303657.33
3 747980.277 3303648.01
3
747912.804 3303666.652
112450 747959.854 3303705.52
8 747993.59 3303696.20
8
747926.118 3303714.847
112500 747973.168 3303753.72
2 748006.904 3303744.40
3
747939.431 3303763.042
112550 747986.482 3303801.91
7 748020.218 3303792.59
8
747952.745 3303811.237
112600 747999.795 3303850.11
2 748033.532 3303840.79
2
747966.059 3303859.432
112650 748013.109 3303898.30
7 748046.846 3303888.98
7
747979.373 3303907.627
Project Report
173
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
112700 748026.423 3303946.50
2 748060.159 3303937.18
2
747992.687 3303955.821
112750 748039.737 3303994.69
7 748073.473 3303985.37
7
748006 3304004.016
112800 748053.051 3304042.89
2 748086.787 3304033.57
2
748019.314 3304052.211
112850 748066.364 3304091.08
6 748100.101 3304081.76
7
748032.628 3304100.406
112900 748079.678 3304139.28
1 748113.414 3304129.96
2
748045.942 3304148.601
112950 748092.992 3304187.47
6 748126.728 3304178.15
6
748059.255 3304196.796
113000 748106.306 3304235.67
1 748140.042 3304226.35
1
748072.569 3304244.991
113050 748119.619 3304283.86
6 748153.356 3304274.54
6
748085.883 3304293.185
113100 748132.933 3304332.06
1 748166.67 3304322.74
1
748099.197 3304341.38
113150 748146.247 3304380.25
5 748179.983 3304370.93
6
748112.511 3304389.575
113200 748159.561 3304428.45 748193.297 3304419.13
1
748125.824 3304437.77
113250 748172.875 3304476.64
5 748206.611 3304467.32
6
748139.138 3304485.965
113300 748186.188 3304524.84 748219.925 3304515.52 748152.452 3304534.16
113350 748199.502 3304573.03
5 748233.238 3304563.71
5
748165.766 3304582.354
113400 748212.816 3304621.23 748246.552 3304611.91 748179.079 3304630.549
113450 748226.13 3304669.42
5 748259.866 3304660.10
5
748192.393 3304678.744
113500 748239.474 3304717.61
1 748273.167 3304708.13
5
748205.781 3304727.086
113550 748253.394 3304765.63
4 748286.959 3304755.71
5
748219.828 3304775.552
113600 748267.563 3304813.58
4 748301.128 3304803.66
6
748233.997 3304823.502
113650 748281.732 3304861.53
5 748315.297 3304851.61
6
748248.166 3304871.453
113700 748295.901 3304909.48
5 748329.466 3304899.56
7
748262.336 3304919.403
113750 748310.07 3304957.43
5 748343.635 3304947.51
7
748276.505 3304967.354
113800 748324.239 3305005.38
6 748357.804 3304995.46
7
748290.674 3305015.304
113850 748338.408 3305053.33
6 748371.973 3305043.41
8
748304.843 3305063.254
Project Report
174
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
113900 748352.577 3305101.28
6 748386.142 3305091.36
8
748319.012 3305111.205
113950 748366.746 3305149.23
7 748400.311 3305139.31
8
748333.181 3305159.155
114000 748380.915 3305197.18
7 748414.48 3305187.26
9
748347.35 3305207.105
114050 748395.084 3305245.13
8 748428.649 3305235.21
9
748361.519 3305255.056
114100 748409.253 3305293.08
8 748442.818 3305283.17
748375.688 3305303.006
114150 748423.422 3305341.03
8 748456.987 3305331.12
748389.857 3305350.957
114200 748437.591 3305388.98
9 748471.156 3305379.07
748404.026 3305398.907
114250 748451.76 3305436.93
9 748485.325 3305427.02
1
748418.195 3305446.857
114300 748465.929 3305484.88
9 748499.494 3305474.97
1
748432.364 3305494.808
114350 748480.098 3305532.84 748513.663 3305522.92
2
748446.533 3305542.758
114400 748494.267 3305580.79 748527.832 3305570.87
2
748460.702 3305590.709
114450 748508.436 3305628.74
1 748542.001 3305618.82
2
748474.871 3305638.659
114500 748522.605 3305676.69
1 748556.17 3305666.77
3
748489.04 3305686.609
114550 748536.819 3305724.62
8 748570.328 3305714.52
3
748503.309 3305734.733
114600 748551.653 3305772.37
6 748584.989 3305761.71
4
748518.317 3305783.038
114650 748567.281 3305819.87
1 748600.435 3305808.65
4
748534.127 3305831.087
114700 748583.698 3305867.09
8 748616.661 3305855.33
1
748550.735 3305878.865
114750 748600.658 3305914.13
4 748633.578 3305902.24
9
748567.737 3305926.018
114800 748617.635 3305961.16
3 748650.556 3305949.27
9
748584.715 3305973.047
114850 748634.613 3306008.19
2 748667.534 3305996.30
8
748601.692 3306020.077
114900 748651.591 3306055.22
2 748684.511 3306043.33
7
748618.67 3306067.106
114950 748668.568 3306102.25
1 748701.489 3306090.36
7
748635.648 3306114.135
115000 748685.546 3306149.28
1 748718.466 3306137.39
6
748652.625 3306161.165
Project Report
175
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
115050 748702.523 3306196.31 748735.444 3306184.42
6
748669.603 3306208.194
115100 748719.501 3306243.33
9 748752.421 3306231.45
5
748686.58 3306255.224
115150 748736.478 3306290.36
9 748769.399 3306278.48
4
748703.558 3306302.253
115200 748753.456 3306337.39
8 748786.377 3306325.51
4
748720.535 3306349.282
115250 748770.434 3306384.42
7 748803.354 3306372.54
3
748737.513 3306396.312
115300 748787.411 3306431.45
7 748820.332 3306419.57
2
748754.491 3306443.341
115350 748804.389 3306478.48
6 748837.309 3306466.60
2
748771.468 3306490.37
115400 748821.366 3306525.51
6 748854.287 3306513.63
1
748788.446 3306537.4
115450 748838.344 3306572.54
5 748871.264 3306560.66
1
748805.423 3306584.429
115500 748855.321 3306619.57
4 748888.242 3306607.69
748822.401 3306631.459
115550 748872.299 3306666.60
4 748905.22 3306654.71
9
748839.378 3306678.488
115600 748889.277 3306713.63
3 748922.197 3306701.74
9
748856.356 3306725.517
115650 748906.254 3306760.66
2 748939.175 3306748.77
8
748873.334 3306772.547
115700 748923.232 3306807.69
2 748956.152 3306795.80
7
748890.311 3306819.576
115750 748940.209 3306854.72
1 748973.13 3306842.83
7
748907.289 3306866.605
115800 748957.187 3306901.75 748990.107 3306889.86
6
748924.266 3306913.635
115850 748974.164 3306948.78 749007.085 3306936.89
6
748941.244 3306960.664
115900 748991.142 3306995.80
9 749024.063 3306983.92
5
748958.221 3307007.694
115950 749008.12 3307042.83
9 749041.04 3307030.95
4
748975.199 3307054.723
116000 749025.097 3307089.86
8 749058.018 3307077.98
4
748992.177 3307101.752
116050 749042.075 3307136.89
7 749074.995 3307125.01
3
749009.154 3307148.782
116100 749059.052 3307183.92
7 749091.973 3307172.04
2
749026.132 3307195.811
116150 749076.03 3307230.95
6 749108.95 3307219.07
2
749043.109 3307242.84
Project Report
176
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
116200 749093.007 3307277.98
5 749125.928 3307266.10
1
749060.087 3307289.87
116250 749109.985 3307325.01
5 749142.906 3307313.13
1
749077.064 3307336.899
116300 749126.963 3307372.04
4 749159.883 3307360.16
749094.042 3307383.929
116350 749144.28 3307418.94
9 749177.012 3307406.55
4
749111.549 3307431.343
116400 749162.376 3307465.55
9 749194.897 3307452.62
749129.855 3307478.497
116450 749181.245 3307511.86
1 749213.546 3307498.38
2
749148.945 3307525.339
116500 749200.591 3307557.96
7 749232.864 3307544.42
749168.319 3307571.513
116550 749219.943 3307604.07 749252.215 3307590.52
4
749187.671 3307617.616
116600 749239.295 3307650.17
3 749271.567 3307636.62
7
749207.023 3307663.719
116650 749258.647 3307696.27
6 749290.919 3307682.73
749226.375 3307709.823
116700 749277.999 3307742.37
9 749310.271 3307728.83
3
749245.727 3307755.926
116750 749297.351 3307788.48
3 749329.623 3307774.93
6
749265.078 3307802.029
116800 749316.703 3307834.58
6 749348.975 3307821.03
9
749284.43 3307848.132
116850 749336.054 3307880.68
9 749368.327 3307867.14
3
749303.782 3307894.235
116900 749355.406 3307926.79
2 749387.679 3307913.24
6
749323.134 3307940.339
116950 749374.758 3307972.89
5 749407.03 3307959.34
9
749342.486 3307986.442
117000 749394.11 3308018.99
9 749426.382 3308005.45
2
749361.838 3308032.545
117050 749413.462 3308065.10
2 749445.734 3308051.55
5
749381.19 3308078.648
117100 749432.814 3308111.20
5 749465.086 3308097.65
9
749400.542 3308124.751
117150 749452.166 3308157.30
8 749484.438 3308143.76
2
749419.893 3308170.855
117200 749471.518 3308203.41
1 749503.79 3308189.86
5
749439.245 3308216.958
117250 749490.869 3308249.51
5 749523.142 3308235.96
8
749458.597 3308263.061
117300 749510.221 3308295.61
8 749542.494 3308282.07
1
749477.949 3308309.164
Project Report
177
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
117350 749529.573 3308341.72
1 749561.845 3308328.17
5
749497.301 3308355.267
117400 749548.925 3308387.82
4 749581.197 3308374.27
8
749516.653 3308401.37
117450 749568.277 3308433.92
7 749600.549 3308420.38
1
749536.005 3308447.474
117500 749587.629 3308480.03
1 749619.901 3308466.48
4
749555.357 3308493.577
117550 749606.981 3308526.13
4 749639.253 3308512.58
7
749574.709 3308539.68
117600 749626.333 3308572.23
7 749658.605 3308558.69
1
749594.06 3308585.783
117650 749645.685 3308618.34 749677.957 3308604.79
4
749613.412 3308631.886
117700 749665.036 3308664.44
3 749697.309 3308650.89
7
749632.764 3308677.99
117750 749684.388 3308710.54
7 749716.661 3308697
749652.116 3308724.093
117800 749703.74 3308756.65 749736.012 3308743.10
3
749671.468 3308770.196
117850 749723.092 3308802.75
3 749755.364 3308789.20
7
749690.82 3308816.299
117900 749742.444 3308848.85
6 749774.716 3308835.31
749710.172 3308862.402
117950 749761.796 3308894.95
9 749794.068 3308881.41
3
749729.524 3308908.506
118000 749781.148 3308941.06
3 749813.42 3308927.51
6
749748.875 3308954.609
118050 749800.5 3308987.16
6 749832.772 3308973.61
9
749768.227 3309000.712
118100 749819.851 3309033.26
9 749852.124 3309019.72
3
749787.579 3309046.815
118150 749839.203 3309079.37
2 749871.476 3309065.82
6
749806.931 3309092.918
118200 749858.555 3309125.47
5 749890.827 3309111.92
9
749826.283 3309139.022
118250 749877.907 3309171.57
9 749910.179 3309158.03
2
749845.635 3309185.125
118300 749897.259 3309217.68
2 749929.531 3309204.13
5
749864.987 3309231.228
118350 749916.611 3309263.78
5 749948.883 3309250.23
9
749884.339 3309277.331
118400 749935.963 3309309.88
8 749968.235 3309296.34
2
749903.69 3309323.434
118450 749955.315 3309355.99
1 749987.587 3309342.44
5
749923.042 3309369.538
Project Report
178
Preparation of Detailed Project Report for development of Economic Corridors, Inter Corridors, Feeder Routes and Border to improve the efficiency of freight movement in Delhi (from crossing of EPE)-Saharanpur bypass and spur to Dehradun under Bharatmala Pariyojana (Package-5/Lot-7)
Design Chainag
e
Design CL Co-odrinate RHS @35 Co-ordinate LHS @35 Co-ordinate
X Y X Y
X Y
118500 749974.666 3309402.09
4 750006.939 3309388.54
8
749942.394 3309415.641