Overview KANGEAN ENERGY INDONESIA LTD

Prepared By

INVENTORY & LOGISTIC DIVISION

©2016

VENDORS

Overview

KANGEAN ENERGY INDONESIA LTD

VENDOR’S DAY BERSAMA EAST JAVA 2017

Golden Tulip Hotel, Batu - Malang

DIDI BASUKI

VP SCM

2

OVERVIEW

KANGEAN ENERGY INDONESIA LTD

DIDI BASUKI

VP SCM

EAST JAVA VENDOR’S DAY , 27 JULY 2017

Golden Tulip Hotel, Batu - Malang

HISTORY

4

KEI FIELDS

PAGERUNGAN (PAG)

Production type : Gas & Condensate

Lifespan : 1993 – Now

Cum. Production (1993 – Now)

Gas : 1,191 Bscf

Condensate. : 13.9 MMbbl

TERANG SIRASUN BATUR (TSB)

Production type : Gas

Lifespan : 2012 – Now

Cum. Production : 438 Bscf

Estimated Reserves : 855.1 Bscf

5

KEI FIELD

PAG

PUO

SED

TSB

PUO

Terang - Sirasun - Batur Area

SEGENTOH

6

UP COMING PROJECT TSB Phase 2 – Development

• Phase 1

5 subsea completion development wells in Terang gas field had been drilled and completed in the middle of 2011 and started producing gas in May 2012.

• Phase 2

Drilling 4 subsea development wells in Sirasun and Batur gas field is planned to be commenced in March 2018 (Target spud-in) followed by Subsea facility installation.

Target Gas-in : Jan 2019

LOGISTIC MAP

8

Sirasun-Batur

16

2km

(8

0N

M)

Tanjungwangi Supply Base

GAS BUYERS

Existing Metering System

New Metering System

80 BBTUD

65 BBTUD

60BBTUD

20BBTUD

TSB Field

JAKARTA OFFICE

Wisma Mulia Building 25 – 26 Floor Jl. Jend. Gatot Subroto No 42

Jakarta - Indonesia

10

KEI OFFICE

SURABAYA REP OFFICE

Jl Raya Jemursari No 52 Surabaya – East Java

TANJUNGWANGI SHOREBASE

Jl. Raya Situbondo No.44, Desa Ketapang, Kecamatan Kalipuro, Banyuwangi 68451

Thank You...