1

OVERVIEW OF

CHENNAI METRO RAIL LIMITED

PHASE 1

2

CHENNAI CITY MAP

3

PRESENT TRAFFIC SCENARIO IN

CHENNAI CITY

4

Main Arterial Roads In Chennai City

Anna Salai / Mount Road

E V R Salai / Poonamalle High Road

Inner Ring Road / Jawaharlal Nehru Road/100 feet Road

5

Distribution Of Road Net Work In Chennai City

Right Of Way (ROW)

ROW(m) Length(km) Percentage

<10* 6.43 1.74

10-15* 146.15 39.44

15-20* 159.06 42.93

20-30 57.83** 15.61

30-40 1.05 0.28

Total 370.52 100.00

* ROW of 84 % of the city roads <20 m** Out of this 57.83km, Phase I Metro will run through 40km

6

Growth of Population in Chennai City / CMA

1971 1981 1991 2001 2008

Chennai City 2.64 3.29 3.84 4.32 4.75

Other than City 0.86 1.32 1.98 2.72 3.52

CMA 3.50 4.61 5.82 7.04 8.27

In Million

7

CHENNAI CITY LIMTS

8

Steady increase in the growth of Bus transport

Year Routes Fleet Bus Fleet per One Lakh Population

1980-81 298 1794 25

1990-91 439 2296 34

2000-01 580 2816 40

2008-09 640 3300 40

9

Share Of Public Transport

The share of public transport has reduced

1992- 60%

2003- 53%

2008- 41%

Ideally this should be 70%

10

Growth of Vehicle Population

1984 1992 2000 2008

Cars 24%(34,000)

21%(1,20,000)

20%(2,28,000)

19%(5,04,000)

Twowheelers

61%(87,000)

71%(4,05,000)

73%(8,32,000)

76%(20,15,000)

11

Road vehicles, especially two wheelers have substantially increased.

Whereas the infrastructure facilities of the city not proportionately increased.

Due to increase in vehicle population, the average journey time has increased

Growth of Vehicle Population

3%

▄Chennai is the fourth- largest city in India with a population of about 8 million

▄11 million trips in a day, of which about 6 million vehicular trip

▄Many areas in city and suburbs are not served by rail based system

▄Suburban and MRTS traffic have increased, but NOT in tune with the traffic

demand

▄Rail network expansion failed to keep pace with demand resulting in severe

congestion on road network & Environmental pollution

Present Scenario of Transport Infrastructure

12

26% 71%

13

The options are…………

1. ROAD BASED SYSTEM

2. RAIL BASED MASS TRANSIT SYSTEM

14

ROAD BASED SYSTEM

Widening of Roads Involves large scale land and building acquisition in the heart of the City- not feasible

Elevated Bus bay systemDedicated bus bays/expressways not feasible because: -numerous existing flyovers ;

-city landscape intervened with commercial/residential buildings and walkways

15

RAIL BASED MASS TRANSIT SYSTEM

Mono Rail: Suitable as a feeder serviceLimited capacity <10000 phpdt

Light Rail Transit (LRT): Suitable for low to medium capacity trafficbetween 10000 and 25000 phpdt

The arterial roads of Chennai is already having traffic in the order of 30000phpdt and growing steadily

16

RAIL BASED MASS TRANSIT SYSTEM

Medium Capacity Metro System

Suitable for traffic demand of 30000-40000 phpdt

Most economically suited system for the saturated corridors of the Chennai City

17

Advantages of Metro System Requires 1/5th energy per passenger km compared to road

based system

More reliable, Comfortable and Safer

Fully air conditioned

Carries same amount of traffic as 7 lanes of bus traffic or 22 lanes of private cars

Reduces journey time by 50 to75%

Washermanpet to Airport

-by road will take 90 to 100 minutes

-Metro Rail will take 45 minutes

18

Advantages of Metro System

Tangible & non Tangible SavingsSocio Economic Benefits

Vehicle operating costs (VOC) savedPassenger time savedLess air and noise pollutionReduction in number of road accidentsReduction in Road infrastructure and consequent

maintenanceChennai city will be placed in global Metro map

19

CHENNAI METRO SELECTION OF CORRIDOR

Detailed Feasibility Study was carried out, and 7 (Seven) corridors prioritised

Detailed traffic survey was done for the

3 (Three) main corridors

Cor

r 1Corr 7

Corr 2

Corr 3

Co

rr 3

Corr 4

Co

rr 5

Corr 6

Corr 1

CHENNAI METRO SELECTION OF CORRIDOR

CHENNAI METRO SELECTION OF CORRIDOR

CORRIDOR - 1

Airport - GST Road- Anna Salai- Central - Broad Way- Washermanpet- Tiruvottiur

CORRIDOR - 2

Alandur - JN Road - Koyambedu - EVR Salai - Egmore - Chennai Central - Fort – Beach Station

CORRIDOR - 3

Ambattur - Ring Road - Arcot Road - Panagal Park - Eldams

Road- Luz Church Road - RK Mutt Road - Adyar Bridge - Lattice

Bridge Road -Thiruvanmiyur

21

22

Govt. decided to take up Corridor 1 & Corridor 2, under Phase-I based on maximum ridership

Subsequently both these corridors slightly modified-extent reduced.

Corridor 3 will be taken up under Phase-II Extension of Corridor 1 (to Tiruvottiyur) will be taken

up shortly

CHENNAI METRO SELECTION OF CORRIDOR

U/G Station

Elevated Station

23

CHENNAI METRO RAIL ALIGNMENT

24

Chennai Metro Rail Project Phase I

Largest infrastructure project ever in Tamil Nadu

Cost - Rs. 14,600 Crores (US $ 3.2 Billion)

59% funding from Japan International Cooperation

Agency, 20% by Central Govt. and 21% by State

Govt.

25

Implementation Module

A special purpose vehicle formed – Chennai Metro Rail Limited (CMRL)

Stake Holders- Govt of India and Govt of Tamil Nadu

26

Chennai Metro Rail Phase - 1 Salient Features

Description Under Ground (Km) Elevated (Km) Total (Km)

Corridor I 13.8 8.7 22.5

Corridor II 9.6 11.8 21.4

Total 23.4 20.5 43.9

Description Under Ground (Nos) Elevated (Nos) Total (Nos)

Corridor I 11 6 17

Corridor II 8 7 15

Total 19 13 32

1. No of Corridors – 2 Nos

2. Route length

3. No. of Stations

27

Under Ground StationsCorridor - 1 Corridor - 2

1 Washermanpet 1 Chennai Central

2 Mannadi 2 Egmore

3 High Court 3 Nehru Park

4 Chennai Central 4 K M C

5 Government Estate 5 Pachaiappa’s College

6 L I C Building 6 Shenoy Nagar

7 Thousand Lights 7 Anna Nagar East

8 Gemini 8 Anna Nagar Tower

9 Teynampet 9 Thirumangalam

10 Chamiers Road

11 Saidapet

Elevated StationsCorridor - 1 Corridor - 2

1 Little Mount 1 Koyambedu

2 Guindy 2 CMBT

3 Alandur 3 Arumbakkam

4 Officers Training Academy

4 Vadapalani

5 Meenambakkam 5 Ashok Nagar - K. K. Nagar

6 Chennai Airport 6 SIDCO

7 Alandur

8 St. Thomas Mount

CHENNAI METRO List of Stations

Integration with other modes of Transport

28

29

CONNECTIVITY TO BUS STATIONS

WASHERMANPET BUS STATION

ESPLANADE BUS STATION

KOYAMBEDU INTERSTATE BUS TERMINUS

SAIDAPET BUS

STATION

PROPOSED ST.THOMAS MOUNT BUS

STATION

Integration with other modes of Transport

30

Chennai Mofussil Bus Terminus (CMBT) Koyambedu

• Largest Interstate Bus Terminus in Asia

• Handle over 2000 Buses / Day (270 buses parked at a time) • Handle over 2 lakh Passengers / Day

31

CONNECTIVITY TO CHENNAI AIRPORT

PROPOSED AIRPORT

STATION

32

Chennai International Airport

• Rs. 2000 Crore Expansion and Modernization of Domestic and International Airports is on going

• Target handling capacity in 2011 - 23 million passengers per annum or 66,000 passengers per day

• Expected traffic flow to Airport in 2011- 1 lakh / day

• Cannot be handled by Road

• CHENNAI METRO the only alternative

Integration with other modes of Transport

33

WASHERMANPET

WASHERMANPET METRO STATION

INTEGRATION WITH EXISTING SUB-URBAN AND MRTS STATIONS

CORRIDOR 2

CORRIDOR 1

34

HIGH COURT

FORT STATION

INTEGRATION WITH EXISTING SUB-URBAN AND MRTS STATIONS

CORRIDOR 2

CORRIDOR 1

35

HIGH COURT

ELEVATED SKY WALK FROM HIGHCOURT

STATION TO FORT STATION FOOT BRIDGE

36

CHENNAI CENTRAL

INTEGRATION WITH EXISTING SUB-URBAN AND MRTS STATIONS

CORRIDOR 1

CORRIDOR 2

CENTRAL METRO STATION

CHENNAI CENTRALSUB URBAN (MMC)

37

Chennai Central Station

(long distance)

1.75 lakh passengers / day

MMTC Suburban Station

4.75 lakh passengers / day

Park Suburban Station 4.4

lakh passengers / dayPark MRTS Station 25,000

passengers / day

38

EGMORE

EGMORE METRO

STATION

INTEGRATION WITH EXISTING SUB-URBAN AND MRTS STATIONS

CORRIDOR 2

CORRIDOR 1

Egmore Station (long distance) 1.0 lakh

passengers / day

39

GOVERNMENT ESTATE

CHINTHADRIPET

INTEGRATION WITH EXISTING SUB-URBAN AND MRTS STATIONS

CORRIDOR 2

CORRIDOR 1

GOVERNMENT ESTATE

NEW SUBWAY CONNECTING THE EXISTING SUBWAY AT ANNA SALAI WITH

CHINTHADRIPET MRTS STATION

40

41

GUINDY METRO STATION

INTEGRATION WITH EXISTING SUB-URBAN AND MRTS STATIONS

CORRIDOR 2

CORRIDOR 1

42

ST. THOMAS MOUNT

INTEGRATED STATION FOR MRTS AND METRO

INTEGRATION WITH EXISTING SUB-URBAN AND MRTS STATIONS

CORRIDOR 1

CORRIDOR 2

▄Length of the route : 20.5 km (Elevated)

: 23.5 km (Under Ground)

▄Gauge (standard) : 1.435m

▄Tunnel Dia : 5.8m (Internal Diameter)

▄Traction Power : 25 Kv A.C

▄Rail Profile : 60kg (UIC 60)

▄Track Structure : Slab Track / Plinth

▄Track Centre (Under Ground) : 14.05m / 14.50m

▄Track Centre (Elevated) : 4.10m

▄Car Depot location : Koyambedu

43

Chennai Metro Technical Details

44

Typical Underground Station Section

Chennai Central Station - Corridor 2 over Corridor 1

45

46

Underground Station Platform

47

STATION INSIDE VIEW

48

STATION INSIDE VIEW

49

Typical Bored Tunnel Section.

50

INSIDE VIEW OF TUNNELInside View of Tunnel

Cross Section of a typical Cross Passage

51

Cross Passages are provided every 244m

52

Typical Elevated Viaduct Section

53

Viaduct Section-in progress

Typical Elevated Station

Construction by Station Contractor

Construction by Viaduct Contractor

54

Alandur Station - Corridor 2 over Corridor 1

55

56

Elevated Station

57

Elevated Station Platform

58

METRO RAIL INSIDE VIEW

58

59

METRO RAIL INSIDE VIEW

59

METRO Rail Depot

60

METRO Rail Depot

61

62

Progress - Civil Contracts

Elevated :- 3 Viaduct contracts – work in progress- 2 Elevated station contracts (10 stations)- awarded- 2 Elevated station contracts ( 3 stations)- tender will be

called for shortly- Depot – Tender return early August 2010

Under Ground :- 5 Contract packages (19 stations and 18km tunnels)-

Tender return early August 2010

63

Progress - Systems Contracts

- Rolling Stock – Bid evaluation- Power Supply and Overhead Equipment, Track Works -

Call for Tender - Signaling, Platform Screen Doors and Telecommunication, Lifts and Escalators – Tender will be called for shortly- Tunnel Ventilation and Under Ground Station Air

Conditioning System, AFC Equipment – P Q Evaluation

Physical Work Completion for Elevated Portion: 2012 -13 Underground Portion: 2014-15

Chennai Metro – Future WorksCorridor 1 Extension to Tiruvottiyur

64

Preliminary study completed, Financial Sanction in progress

Cor

r 1Corr 7

Corr 2

Corr 3

Co

rr 3

Corr 4

Co

rr 5

Corr 6

Corr 1

Chennai Metro – Future WorksCorridors 3 & 4 - Feasibility study completed, now under active

consideration

65

66

Chennai Metro Rail Project

Thank you