paper and other web coating mact implementation · paper and other web coating mact implementation...

Post on 12-Apr-2018

223 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Paper and Other Web Coating Paper and Other Web Coating MACT ImplementationMACT Implementation

Ingrid WardEnvironmental Protection Agency (EPA)

Office of Air Quality Planning and Standards (OAQPS)

919-541-0300ward.ingrid@epa.gov

1

• Implementation efforts – PIRG role

• OAQPS Organizational Chart

• FPA – EPA implementation partnerships

• Implementation tools – what, where, when

• Next steps

2

Presentation OverviewPresentation Overview

PIRG PIRG -- Who Are We?Who Are We?

8

� Develop implementation tools for MACT standards –‘Plain Language’ folks

� Generally begin after rule promulgation

� FY02 efforts include -

Ø Paper and Other Web Coating (POWC)Ø Other 10-yr surface coating categoriesØ General ProvisionsØ Secondary AluminumØ + others

Implementation MaterialsImplementation Materials

Paper & Other Web Coating*Miscellaneous Metal PartsPlastic Parts and Products

10 yr Surface Coating Categories

Auto/Light Duty TruckFabric Printing/Coating/Dyeing

Large AppliancesMetal Can

Metal Coil*Metal Furniture

Wood Building Products*

6

* Implementation tool development has begun

Office of Air Quality Planning & Standards (OAQPS)

[RTP NC]

John Seitz [Director]

Coatings & Consumer Products Group

(CCPG)Dianne Byrne [Group Leader]

Paul Almodovar [POWC Rule Lead]

Program Implementation &Review Group

(PIRG)Racqueline Shelton (Group Leader)

Ingrid Ward[POWC Implementation Lead]

1. Air Quality Strategies &Standards Division (AQSSD)

[4 groups]

2. Emission Monitoring &Analysis Division (EMAD)

[6 groups]

3. Emission Standards Division (ESD)

[8 groups]

Sally Shaver [Director]

4. Information Transfer &Program Integration Division

(ITPID)[6 groups]

Bill Harnett [Director]

OAQPS Organizational ChartOAQPS Organizational Chart

Paper and Other Web ToolsPaper and Other Web Tools

� EPA/FPA began partnership July 2001 [Glynn Rountree, Ram Singhal]

� ‘Paper beta tested’ proposed POWC rule – ‘very draft’ tools developed

Ø Rule brochureØ Rule overviewØ Compliance timelineØ Compliance options flow diagrams

� Forwarded implementation issues to ESD [unclear language, cross reference errors, etc.]

8

Phase I – Beta Testing

EXAMPLE ONLY

Brochure tells you:

• Who is covered?• Who is not covered?• Emission limits• Operating limits• Compliance date• NRR Requirements• Compliance Options• Compliance

Calculations• Where to go for help

EXAMPLE ONLYMore detailed10-20 pages

EXAMPLE ONLY

EXAMPLE ONLY

Graphically represents

Options available

Information Exchange ForumInformation Exchange Forum

• Sept 27, 2001 Information Exchange very successful

• Purpose – meaningful exchange

Ø What types of tools are neededØ When are they neededØ In what format should they be developedØ Who would be willing to help develop tools

• Meeting summary available

8

Phase II – Tool Development Begins

Information Exchange ForumInformation Exchange Forum

• 44 participants, including FPA members

• Breakout and group discussions to determine –

Step 1: Who within organizational structure needed trainingStep 2: What level of detail did they needStep 3: What tools best served their needsStep 4: What format should be used (e.g., html)

8

Plenary and Breakout Sessions

Information Exchange ForumInformation Exchange Forum

• Top priority tools identified -Ø Applicability flowcharts Ø Frequently asked questions (FAQ) listsØ Inspection checklistsØ Example HAP data sheet

• Since 9/01 – total of 25 tools have been identified, all but 2 have leads

8

• Applicability flowcharts• Q&A [searchable]• Inspection checklists• Example HAP technical

data sheet

Paper & Other WebPaper & Other Web

Identified Need (FY02 effort)

• Rule overviews [brief]• Compliance timelines• Compliance option flow

diagrams• Poster-type compliance

information [work practice]• Title V example language• MRR Overviews• Sample forms and plans +

9

FPAFPA--EPA PartnershipsEPA Partnerships

8

FPA and its members step up to the plate

• FPA members volunteer to be leads of several tools Ø Example Title V permit placeholder language [MTrutna] Ø Compliance Options Flow DiagramsØ Example HAP Product Data SheetØ Example Annual Compliance CertificationØ Example Semiannual Summary ReportØ MRR Overview Tables

• THANK YOU

Other PartnershipsOther Partnerships

• Graphic Arts Technical Foundation (GATF)/ Screenprinting & Graphic Imaging Association International (SGIAI) Ø Regulatory overview Ø Reviewer – list of sources, brochure

• Pressure Sensitive Tape Council (PSTC)Ø Example SSMP & Monitoring PlansØ Step-By-Step Approach to Compliance – An Overview

8

Other PartnershipsOther Partnerships

• EPA Region I [Adopt-A-MACT]Ø Applicability flowchartØ Inspection checklist

• EPA HQ [PIRG in partnership w/ ESD and OECA]Ø Air Toxics Website – POWC page

www.epa.gov/ttn/atw/powc/powcpg.html

8

Other PartnershipsOther Partnerships

EPA – HQ Ø Brochure Ø Compliance TimelineØ Process OverviewØ Q&As [searchable database – prototype FY02]

Ø Example report forms [under General Provisions]

8

POWC Tool Development PlanPOWC Tool Development Plan

www.epa.gov/ttn/atw/powc/powcplan.html

Ø What tools are being developedØ Who is helping us develop themØ When will they be availableØ Where can you get them once finalized

8

Air Toxics WebsiteAir Toxics Website

One-Stop-Shopping Information Center

10

www.epa.gov/ttn/atw

www.epa.gov/ttn/atw/powc/powcpg.html

EPA Clearinghouse

www.epa.gov/clearinghouse

Next StepsNext Steps

� Modify tools to meet final rule� Workgroup review� EPA final approval prior to upload

Continue to work together to complete tools …

15

Continue to work together in other areas if possible …

Thank Youfor your

continued support

top related