pgsr workstation presentation

Post on 16-Apr-2017

1.342 Views

Category:

Business

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Clean

Dry

Warm

Environmentally ....friendly Safe working ....environment

• Clean air in Clean air out• Carbon ...exhaust filters• Compact

• 60kg total ...weight• Cost effective

Looking towards the exhaust filter wall

Workstation prepared for rotor placement

Rotor stands awaiting the steam turbine rotor

Steam turbine ready for grit blasting

Protective sheets installed for grit over spray

Grit blasting being conducted on the steam turbine rotor

A noise survey showed 112dB inside and 99dB outside the workstation

Current methods of “clean, warm and dry” environment for generator rotor

With old methods if crane work is to be carried out, licensed scaffolders are required to modify the structure

Workstation floor section for the generator rotor is 11m long and 3 m wide

Workstation inflation is complete in approximately 5 minutes

No licences are required for personnel to erect, modify or move the Workstation

Clear sides allow adequate ambient lighting for safe work conditions

Halogen lamps are used to increase the Workstation temperature

A de-humidifier is used to control humidity for ideal generator rotor conditions

A temperature of 32o C and humidity of 40% has been maintained for over 2 weeks on the turbine deck

Additional heating can be introduced when required

Workstation fan unit and services penetration point

Hire RatesAre available on request

Custom sizes available

Low transport costs

No erection costs