phoenix controls healthcare projects

Post on 16-May-2015

1.102 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

DESCRIPTION

Venturi Valve Healthcare Project Applications and References

TRANSCRIPT

HealthcareProject Histories

"We judge ourselves by what we feel capable of doing,

while others judge us by what we have already done."

- Henry Wadsworth Longfellow

SUSTAINABILITY- LEED - GREEN PROJECTS

Innovative Technologies - Venturi Airflow Valves Green Alignment

LEED – GGHC Guide

Healthcare

■ Burnham Institute, Orlando, FL • Blood Bank

■ Central Washington Hospital, Wenatchee, WA• New Tower

■ Colorado Children's Hospital, Aurora, CO• New East Tower

■ CS Mott Children's & Women’s, Ann Arbor, MI• New Hospital

■ Enumclaw Medical Center, Enumclaw, WA • New Hospital

■ Good Samaritan Hospital, Puyallup, WA • New Hospital

■ HUP, Philadelphia, PA • Advanced Medicine Tower

■ Johns Hopkins Hospital, Baltimore, MD • Asthma Building

LEED Projects

Healthcare

■ John Muir Medical Center Walnut Creek, CA • New Hospital

■ Kaiser Permanente, Oakland, CA • Replacement Hospital

■ Mass General, Boston, MA • Building for Third Century

■ Mills Peninsula Hospital, Burlingame, CA • New Hospital

■ Nationwide Children's Hospital, Columbus, OH • New Tower

■ Northwest Community, Arlington Heights, IL • Addition

■ Rady Children’s Hospital, San Diego, CA • New Hospital

■ Santa Clara Valley Medical Ctr, San Joe, CA • New Hospital

LEED Projects

Healthcare

■ St. Luke RMC, Twin Falls, ID • New Hospital

■ Texas B&P San Antonio, TX • New Texas Center for Infectious

Disease Hospital■ U of Chicago Medical Center, Chicago,

IL • Expansion

■ U of Kentucky, Lexington, KY • Addition

■ VA Med Center, Richmond, VA • McGuire Clinic

LEED Projects

DEPARTMENT OF VETERANS PROJECTS

Healthcare

■ Anchorage Vet Center, AK • Isolation

■ VA Long Beach, CA • Isolation

■ Boise VA Medical Center, ID • Isolation

■ Ventura Vet Center, CA • Emergency

■ Lexington VA Medical Center, KY • Pharmacy

■ Minneapolis VA Medical Center, MN • Surgery

■ Sioux Falls VA Medical Center, SD • Ambulatory

Department of Veterans Affairs

Healthcare

■ James A Haley Eye Clinic, FL • Surgery

■ Nashville Vet Center, TN • Labs, TB, Bone Marrow and Isolation

■ Reno Vet Center, NV • Isolation

■ VA Roseburg Healthcare System, OR • Isolation

■ Amarillo Vet Center, TX • Isolation

■ William S. Middleton Memorial, WI • Labs and Pharmacy

■ Sepulveda Vet Center, CA • Isolation and Labs

Department of Veterans Affairs

Healthcare

■ Jacksonville Vet Center, FL • Pressurized Spaces

■ Biloxi Vet Center, MS • Pressurized Spaces

■ Raleigh Vet Center, NC • Pressurized Spaces

■ Albuquerque Vet Center, NM • Pressurized Spaces

■ VA Baton Rouge Outpatient Clinic, LA • Pressurized Spaces

■ Canandaigua VA Medical Center, NY • Pressurized Spaces

■ Jack Montgomery VAMC , OK • Labs, Isolation and Pressurized

Spaces

Department of Veterans Affairs

Healthcare

■ VA Butler Healthcare, PA • Pressurized Spaces

■ William Jennings Bryan Dorn VA MC, SC • Pressurized Spaces

■ VA Palo Alto Health Care System, CA • Research

■ Raleigh Vet Center, NC • Pressurized Spaces

■ VA West Haven Campus, CT • Isolation and Pressurized Spaces

■ Lebanon VA Medical Center, PA • Labs

■ San Antonio Vet Center, TX • Labs

Department of Veterans Affairs

Healthcare

■ Michael E. DeBakey VA Medical Center, TX • Labs

■ Hampton VA Medical Center, VA • Isolation

■ Seattle Vet Center, WA • Isolation and Labs

■ Asheville VA Medical Center, NC • Labs

■ James A. Haley Veterans' Hospital, FL • Labs

■ Atlanta Vet Center, GA • Labs

■ Southern Arizona VA, AZ • Labs

Department of Veterans Affairs

Healthcare

■ Jesse Brown VA Medical Center, IL • Labs

■ Hunter Holmes McGuire VA Medical Center, VA • Labs

■ James J. Peters VA Medical Center, Bronx, NY• Labs

■ VA Med Ctr-Richmond, VA • McGuire Clinic

Department of Veterans Affairs

PROJECTS APPLICATIONEXAMPLES

Benefis Health System Great Falls, MT

■ New Patient Tower• 204K ft2• CV, TP, APM, BACnet• Isolation Rooms, Patient

Recovery, Surgery• Lower Cost vs. VAV Boxes

w/DDC, Valve Accuracy, Feedback and Alarm Capabilities, Lab History, Short Commissioning Time, Energy Conservation, Pressurization

• Sletten, CTA-OPW, LPW, Central Plumbing, FICO Controls, Vemco

Women's and Children's Hospital

Black River Falls, WI

■ Hospital Addition and Remodel• 55K ft2, 31K ft2• Surgical Services, Emergency,

Patient Rooms, Dialysis • No Maintenance, Repeatable

Flow Performance, Static Pressure Response, High Turndown, VAV Accuracy, Pandemic Design

• 1 Year Payback• HSR Associates, Inc., Market &

Johnson Inc., Eau Claire, WI, Masters Building Solutions

Memorial Hospital

Catholic Initiatives - Franciscan Health

■ Replacement Hospital• 90K ft2• LEED Project• TP, LON • OR, Patient, Iso• Pandemic Control, Energy

Conservation, Infection Control• Open 2011• Mahlum Architects, Sellen Co.,

OveArup, ATS Seattle

Enumclaw Regional Hospital

“The new Enumclaw Regional Hospital will be the first LEED certified hospital in Washington State.”

Cayuga Medical Center, Ithaca, NY

■ Surgery Reconfiguration• Theris• OR’s, Isolation • Health and Safety, No

Maintenance• Install 2012• Charles A. Gaetano Construction

Corporation, R.L. Kistler

Surgical Suite

“There will be an overall reconfiguration of the surgical suite space to enhance technological capabilities, meet the community’s needs,

and improve and enhance operational efficiencies.”

City and County of San Francisco, San Francisco, CA

■ Replacement Hospital• 448K ft2• LEED Gold Project, Level 1

Trauma• 1465 VVs, TP, BACNet• Patient, ICU, Iso, Surgery• Accuracy, Reliability,

Affordability, Past Lab History• Install 2010, Open 2015• Fong & Chan Arch, Webcor

Builders, Gayner Engineers, Critchfield Mechanical, Newmatic Eng. Inc.

San Francisco General Hospital

City of Hope National, Duarte, CA

■ New Patient Tower• 900 Venturi Air Valves• Patient Rooms, Surgical Suites,

Labs, Cancer, Patient Safety, Isolation, Zone Control Design

• No Maintenance, No Recalibration, Pressurization Accuracy

• OSHPD Approved• Open 2004• NBBJ, Syska, George Yardley

Medical Center

“The venturi design of the Venturi Valve was uniquely suited for this configuration because of its ability to precisely control airflow, thereby providing the positive

pressure required for protecting immunocompromised patients.” - Syska Hennessy, Los Angeles, CA

Colorado Children's Hospital, Aurora, CO

■ New Patient Tower• $230 million expansion, 355K ft2 • LEED Project, Integrated Project

Delivery• Theris• OR’s, Isolation, Patient• Accuracy, No Maintenance,

Energy Savings, Risk Reduction• Install 2012• H+L Architecture , ZGF

Architects LLP McCarthy Building Companies, Inc., Gerald H. Phipps, BR+A, Cator, Ruma & Associates, Air Purification Company

East Expansion

“Energy modeling to ensure the most advanced building enclosure and

efficient mechanical, electrical and plumbing systems.”

Central Washington Health Services, Wenatchee, WA

■ New Patient Tower• 190K ft2 • TP, BACnet• OR, Patient, Isolation• Open 2011• HDR, Cdi, Mortenson, ATS

Seattle

Central Washington Hospital

Cleveland Clinic, Cleveland, OH

■ Surgery Center and Expansion• LEED Gold Project• C2 • Isolation, Specialty, Labs,

Pharmacies, Pressurized Spaces• Open 2011• Westlake Reed Leskosky, Tuner

Jacobs Family Health

Reference Clinic at Twinsburg

El Camino Hospital, Mountain View, CA

■ Replacement Hospital• 450K ft2• 1600 VVs, Room Pressure

Monitors• Venturi Valves in 90% of the

facility• Sustainability, Energy Savings,

Efficiency• 500 zones• 2.9 year payback• Install 2008, Open 2009• KMD, Rudolph and Sletten,

Siemens, M+NLB, Newmatic

New Construction

“Room pressurization is increasingly becoming more critical throughout all hospital spaces, not just isolation rooms and operating rooms.

In hospitals, we design in Venturi Valve products because we know they have the highest VAV turndown ratio for energy conservation and

reliable pressurization is never an issue with lower airflows.” – Jon Inman, Principal, M+NLB

El Camino Hospital, Mountain View, CA

■ VAV Savings■ VAV Savings with Setbacks■ $3 per CFM

• Savings = $369K and $542K

■ Payback @ 2.9 years

No 100% Shut-DownOperating Rooms

Prep Rooms

Recovery Rooms

Patient Beds

Emergency Department

Radiology

Nuclear Medicine

Cardiology

Pharmacy

Kitchen/Dining

Administration

CV Supply Airflow (Original) 555,000 CFM

VAV Airflow Occupied (Full Op) 432,000 CFMVAV Airflow Reduction 123,000 CFMVAV Savings 22.20%

VAV Airflow Unoccupied (w/Setbacks) 374,400 CFMVAV Airflow Reduction 180, 600 CFM

VAV Savings 32.50%

F.F. Thompson Hospital, Canandaigua, NY

■ Project Excel Expansion and Renovation• A $43M • 61K ft2 addition, 42K ft2

renovation• Theris• OR’s, Isolation, Pressurized Spaces• Install-Open: 2012• Turner Engineering, R.L. Kistler• “State-of-the-art suites that can

better accommodate the latest technology, Project Excel will make major strides in enhancing the quality and healing environment”

F.F. Thompson Hospital

F.F. Thompson Hospital, Canandaigua, NY

■ 113-bed acute care community hospital

■ Original building opened in 1970 • 126,000 sq.ft.

■ With current 60,000 sq. ft, addition • 285,000 sq.ft.

Located in Finger Lakes Region of Upstate New York

University of Rochester Affiliate

3 hospital systemU of R MC: 739 Beds

Highland: 253 Beds

F.F. Thompson Hospital, Canandaigua, NY

■ Expansion/Renovation Project62K sf New Construction:

Surgical Suite – 6 Ors

4 Endoscopy Rooms

PACU – 9 Beds

Pre-Post – 24 beds

PT/OT Department

45K sf Renovation:Central Sterile Supply

Laboratory

ICU

OR Support

F.F. Thompson Hospital, Canandaigua, NY

■ Patient Safety• Needed better control of room

pressurization

■ Reliability• Issues with old system

- Energy reduction was accomplished by reducing the air flow at the AHU – occupancy switch

• Individual room pressurization control was not possible

■ Energy Savings• Allows for the ability to

turndown rooms individually

Why Venturi Valves?

7 Years Experience:

Implemented in isolation rooms in ED expansion

F.F. Thompson Hospital, Canandaigua, NY: OR Facts

F.F. Thompson Hospital, Canandaigua, NY OR Annual Energy Use Assessment

F.F. Thompson Hospital, Canandaigua, NYOR Life Cycle Cost Analysis

F.F. Thompson Hospital, Canandaigua, NYDemand Impact Comparison

John Muir Health, Walnut Creek, CA

■ Tom and Billie Long Patient Care Tower • 346K ft2• LEED Project, OSHPD Approved• CV, TP• Patient Rooms, ICU, ICNU, Surgical

Suites, Trauma Treatment• Lower Cost, No Maintenance,

Accurate Pressurization, Mechanical Pressure Independence

• 560 zones• 2 year payback• Install 2009, Open 2011• Ratcliff, Arup, Clark, M+NLB,

Newmatic

John Muir MC

Kaiser Permanente, Oakland, CA

■ Replacement Hospital• 12 floors, 349 beds, 12 Inpatient

Operating Rooms, 8 Labor & Delivery Rooms, Emergency

• LEED Gold Project• Theris, TP, CV• Patient, Iso, Surgery,

Pressurized Spaces• Accuracy, Reliability,

Affordability• Install 2011, Opening 2014• NBBJ, McCarthy, Ted Jacobs,

Newmatic Eng. Inc

Oakland Medical Center

Kaiser Permanente, Oakland, CA

■ New Hospital• 2880K ft2• Built with total health in mind,

including “green” features using the Green Guide for Healthcare

• OR’s, Isolation, Patient• Accuracy, Reliability,

Affordability• Install 2012, Open: 2014• AECOM/Ellerbe Becket, Rudolph

and Sletten Inc., Newmatic Eng. Inc

Redwood City Medical Center

Redwood City, CA

Kaiser Permanente, Oakland, CA

■ New Hospital• $600M, 425K ft2• “Green” facility• OR’s, Isolation• Accuracy, Reliability,

Affordability• Install: 2012, Open: 2014• AECOM/Ellerbe Becket, M+NLB,

Newmatic Eng. Inc

San Leandro Medical Center

San Leandro, CA

Kaiser Permanente, Oakland, CA

■ Renovations, Upgrades, Expansions• Patient, ICU, Iso, OR’s,

Pharmacy, Pressurized Spaces• Accuracy, Reliability,

Affordability• Open 2011, 2012, 2013

San Diego Surgical

Sunnyside Portland

Westside Hillsboro

MOB San Marcos

San Leandro MC

Castle Rock MOB

La Maestra Community Health Centers , San Diego, CA

■ New Construction• 32K ft2• LEED Gold Project• C2, BACNet • 42 zones, Pharmacy, Lab, Clinic

Spaces• Energy Conservation and

Sustainability• Saved >12,000 CFM of air• 2 year payback• Yen & Associates, Walsh

Engineering, Newmatic, ECS-JCI

Medical Office Building

“The new La Maestra Community Health Center in the City of San Diego is expected to be the first community clinic to be a LEED® Certified Gold level green building in the nation.”

Lathrop PARC, Redwood City, CA

■ New Facility• 69K ft2• Theris• Patient Spaces• Fong & Chan Architects, James

Embleton Consulting, Newmatic Eng. Inc.

Post-Acute Care

Louisiana State University Health , New Orleans, LA

■ Replacement Hospital• $1.2B• 560K ft2 Inpatient Tower• 747K ft2 Diagnostic Pavilion• OR’s, Iso, Labs, Pharmacy,

Pressurized Spaces• Install: 2012, Open: 2015• NBBJ, URS, Skanska, Schully-

Strawn

Medical Center of Louisiana at New Orleans

Mid-Michigan Health , Midland, MI

■ Expansion and Renovation• 280k ft2• TP• Operating Rooms• Long-Term Cost Savings, Energy

Savings, Reduced Maintenance• Install 2009, Open 2010• HDR Chicago

Mid-Michigan Medical Center

“We knew we had to make dozens of separate decisions right the first time”

“It would be cost-prohibitive, difficult or impossible to retrofit these kinds of building systems after the fact,

and we felt they would be even more important in the future than they are today.” - Mike Erickson, VP of Facilities and Construction

Multicare, Tacoma, WA

■ New Patient Tower• 357K ft2• Silver LEED• 600+VVs, TP, TX, CV, LON• Patient, General Areas, Surgery,

Isolation• VAV Energy Conservation, Lab

Experience• BIM ROI Under 2 Years• Install 2009, Open 2010• Clark/Kjos Architects and GBJ

Architects, Skanska, CDi Engineers, University Mechanical, GSH Design Collaborative, ATS Seattle

Good Samaritan Hospital, Puyallup, WA

“Hospitals are energy intensive operations, requiring rigorous environmental controls”

Nationwide Children’s , Columbus, OH

■ New Construction• 720K ft2• Tracking Pairs BACNet• Isolation and Pressurized Spaces• Install 2010, Open 2012• No Maintenance, Accuracy,

Control Flexibility, Emergency Response

• FKP, Turner, HAWA, Ingenuity IEQ

Hospital

“We have looked around the nation to identify the ‘best of the best’ in pediatric facilities and our plan is

to bring those features here for our community’s children.”

Northwest Community Healthcare , Arlington Heights, IL

■ Patient Care Addition• 225K ft2• ORs, SPD, Isolation, Pandemic

Patient Floors• Install 2008, Open 2010• No Sensors Maintenance,

Accuracy, Pressurization, Emergency Control Flexibility

• OWPP, Power Contracting, JCI, Verus (HTS Chicago)

Northwest Community Hospital

Arlington Heights, IL

Northwest Community Healthcare , Arlington Heights, IL

• (BMS) command sequence initiated by the facility engineer

• HVAC control system changes the balance of supply and exhaust air volumes to ensure that the direction of airflow goes from neutral to clean to unclean

• Emergency CFM quantities provide more air volume to exhaust than supply, and full exhaust vents outdoors

• Normal patient rooms convert to negative pressure beds or airborne infection isolation rooms

Northwest Community Hospital

Arlington Heights, IL

Mechanical systems on the fifth and ninth floors

Pandemic-ready patient rooms become isolation rooms on demand

VAV Venturi Valve devices and controls

Partners Healthcare, Boston, MA

■ Building for the Third Century (B3C), Phase II New Hospital• 530K ft2• Green• 300 VVs, EO• Ors, ICUs, Patient, PACUs• No Flow Sensors, No

Maintenance, Feedback• Install 2009, Open 2011• NBBJ, Turner, APA

Massachusetts General Hospital

“Will offer a number of sustainable architectural design elements intended to

promote healing, conserve energy and enhance the interior areas.”

Partners Healthcare, Boston, MA

Massachusetts General Hospital

Boston, MA

Building for the Third Century (B3C), Phase II

Boston, MA

Partners Healthcare, Boston, MA

■ Procedure Room• Reduce air changes during

unoccupied periods• 20 Procedure Rooms• Difference in Air Flow: 2,352

cfm• Temp of Conditioned Air (AHU):

55°F• Annual Savings $147,700

Massachusetts General Hospital

Boston, MA

Building for the Third Century (B3C), Phase II

Boston, MA

Occupied25 ACH

2,800 cfm

65 hr/wk

Unoccupied4 ACH

448 cfm

103 hr/wk

Partners Healthcare, Boston, MA

■ Isolation Room• Reduce air changes when not

needed as an Isolation Room and utilize as a Patient Room

• 25 Isolation Rooms • Difference in Air Flow: 508 cfm• Temp of Conditioned Air (AHU):

55°F• Annual Savings $46,604 per

Massachusetts General Hospital

Boston, MA

Building for the Third Century (B3C), Phase II

Boston, MA

AII Occupied12 ACH

1,015 cfm

42 hr/wk (25%)

Patient Room6 ACH

508 cfm

126 hr/wk (75%)

Conditioned Air Cooling 2,035 kWh $305Conditioned Air Heating 5.4 Mbtu $81Reheat Energy 53.9 Mbtu $808Fan Energy 4,465 kWh $670

6,499 kWh59.3 Mbtu

$1,864Total:

Providence Health & Services , Renton, WA

■ Patient Tower• 12 Stories, 680K ft2, 368 Beds• TP, BACnet• Patient Rooms, Isolation• Energy Conservation, Airborne

Infection Control , Room Pressurization, Emergency Surge Capacity

• ZGF Architects , CDi, Mortenson Construction, Hermanson Mechanical, ATS Seattle

Providence Everett

Everett, WA

Providence Health and Services, Renton, WA

Providence Everett

Everett, WA

Engineering study Changing from CV (11.6 ACH) to VAV would provide significant savings

Fan energy and re-heat demand

VAV design Energy savings

Venturi Valve Technology

Airborne infection control

Enables hospital to respond to pandemic incidents by creating isolation rooms on-demand

Providence Health and Services, Renton, WA

■ New Wing• 74K ft2 • CV and TP • Patient Rooms, Hallways• Monetary Savings, No

Maintenance or Recalibration, Control Flexibility, Integration Ease and Accurate Pressurization

• GBJ Architects, Glumac, Oregon Air Reps

Providence Hospital

Hood River, OR

Spectrum Health, Grand Rapids, MI

■ New Construction• 900 Venturi Air Valves, Theris,

SO, CV• OR’s, Isolation, Pharmacy,

Pressurized Spaces• Accuracy, Flow with HEPA Load,

Turndown, No Flow Sensors, No Maintenance

• Open 2011 and 2012• Jonathan Bailey & Associates,

Rockwell Design, URS, Turner, Wolverine Building Group, Quality Air Service

Helen DeVos Children's New Hospital

Michigan Hill New Tower 35

St. Luke Magic Valley RMC, Twin Falls, ID

■ New Tower• 700K ft2• 1,289 VVs, SO, EO, TP, TX, LON • Mechanical Pressure

Independence, Accurate Flow, Volumetric Offset, Emergency Modes, Inlet Insensitivity, Airborne Infection Control, No Maintenance

• Install 2009, Open 2011• Hummel, Nexus Architects,

Engineering Inc., Hobson Fabricating, Yamas Invensys, Norbryhn Equipment

In-Patient Tower

Sutter Health, Sacramento, CA

■ Replacement Hospital• 460K ft2 • TP in 90% of Spaces• Energy Efficiency• Install 2009, Open 2010• Anshen + Allen, Ted Jacob

Engineering, Turner, Newmatic Engineering

Mills Peninsula Health

Burlingame, CA

“The hospital is served by 100% outside air HVAC system with heat recovery

to maintain proper pressurization, cooling and indoor air quality.”

Texas State Department of Health Services, Austin, TX

■ New Hospital• 66,000 SF2

• Isolation• VAV C2• Airflow Accuracies, Airborn

Infection Risk Reduction• O’Connell Robertson, JE Dunn,

TAC, Vicon

TCID Texas Center for Infectious Disease Hospital

University of California, San Francisco, CA

■ New Women’s and Children’s Facility• LEED Gold Project • OR’s, Isolation, Patient,

Pressurized Spaces• Install: 2012, Open: 2013• Anshen + Allen, DPR

Construction Inc., Newmatic Engineering, Inc.

UCSF Medical Center at Mission Bay

University of Chicago Medical Center, Chicago, IL

■ Expansion• LEED Project• Theris TP, BACnet• Patient Rooms• Rafael Viñoly Architects,

Cannon, AEI, JCI Evanston, HTS Chicago

Pavillion

University of Kentucky Health , Lexington, KY

■ New Tower• 500+ Venturi Valves, TP, CV• Accuracy, No Maintenance • BACnet• GBBN, AEI, Turner, Tridium,

Master’s Building Solutions, Air Equipment Co., Honeywell

Chandler Patient Tower

University of Michigan Health System, Ann Arbor, MI

■ New Clinic and Inpatient Tower• 1.1 M ft2 • LEED Silver Hospital• Tracking pairs• Pandemic Rapid Infection

Control Units, Hazmat Capability and Control Flexibility

• Install 2009, Open 2011• HKS Architects, Barton Malow,

CCRD Partners

C.S. Mott Children’s Hospital

University of Michigan Health System. Used with permission."

Virginia Department of Health, Richmond, VA

■ New Construction• CV, SO, TP, APMs, Thermostats• Theris LON w/BACNet interface• Toilets, Corridors, Waiting

Rooms, Treatment Rooms • Pressure Control Capabilities• Dunlap Engineers, Comfort

Systems, Metropolitan Equipment

Medical Office Building

top related