photo album for pierce job 34941 central emergency services, ak · 2020. 11. 13. · photo album...

Post on 19-Feb-2021

7 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

  • Photo Album for Pierce Job 34941Central Emergency Services, AK

    Custom Enforcer PUC PumperWk 3 Production ending November 13, 2020• The cab has begun paint operations at the 41 plant.• The raw frame rails are in staging for assembly at the 41 plant.• The body continues the weld process at the IPP plant.

  • Photo Album for Pierce Job 34941�Central Emergency Services, AK�Custom Enforcer PUC PumperSlide Number 2Slide Number 3Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18

top related