pjotr s. suvorov budapest, september 17th, 2013

Post on 31-Dec-2015

43 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

DESCRIPTION

Market observation, traffic organization features, Corridor VII The DC ‘ s contribution to the EUSDR. Pjotr S. Suvorov Budapest, September 17th, 2013 Danube Commission, Budapest. Scheme of main gauging stations for assessment navigational conditions. - PowerPoint PPT Presentation

TRANSCRIPT

Pjotr S. Suvorov Budapest, September 17th, 2013Danube Commission, Budapest

Market observation, traffic organization features, Corridor VII

The DC‘s contribution to the EUSDR

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Scheme of main gauging stations for assessment navigational conditions

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Scheme of main control points for monitoring fleet traffic and cargo flows

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

PERIODS OF INTERRUPTION OF NAVIGATION ON THE DANUBE SECTIONS CAUSED BY ICE PHENOMENA IN 2012

PERIODS OF INTERRUPTION OF NAVIGATION ON THE DANUBE SECTIONS CAUSED BY ICE PHENOMENA IN 2012

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Scheme of critical "bottlenecks" limiting navigation on the Danube, and announced projects

(as of 2009)- Construction of retaining section- Implemented hydrotechnical projects without retaining schemes- Local hydrotechnical projects

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Budapest, Vigado ter, June 2013

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Forecast of the traffic density for the Danube (2020)

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Cargo volumes transported through the Sulina channel in 2012 in tonnes

Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

Thank you for your Thank you for your attention!attention!

Pjotr S. SuvorovDeputy Director-General for Development of the Danube Navigation

Secretariat of the Danube Commissionpjotr.suvorov@danubecom-intern.org

H-1068 BudapestBenczur utca 25

top related