• 2007 Ashland Block• 2015‐ Reconnaissance lines• 2016 Sarpy County Area• 2018‐ Reconnaissance lines and Tekamah Block Flight

Reconnaissance Lines

Tekamah Block

PMRNRD-LPPMRNRD Boundary

XRI, 2015

Avoid Large Power Lines

Avoid Structures

Generator

Generator

Usually 2-3 Flights/dayTotaling about 180-250 line-miles/day

Approx. 100’ – 150’ above ground

Along-Line Data Density, Post Processing,

Approximately Every ~ 100 ft

2018 Papio‐Missouri  NRD Acquisition Schedule

• Use CSD test-hole database• Use CSD historical cross sections• Use selected DNR well logs• Use selected oil and gas well logs• Water table elevations

Utilize as much existing and accurate geologic test-hole data as possible!

Outwash sand and gravelTill

Elkhorn River

High Detail AEM