Executive Briefing
NASA Cost Analysis Symposium –
Program Affordability ManagementProgram Affordability ManagementPRICE Systems TruePlanning and TrueMethods PRICE Systems TruePlanning and TrueMethods
OverviewOverview
April 12, 2005Robert W. Young, Director – Advanced SolutionsDavid P. Seaver, Director – Consulting Solutions
PRICE Systems LLC, 2003-2004, All Rights Reserved
NASA Cost Community and PRICE Mission
Program Affordability ManagementCost Analysis Data Requirement (CADRe)
One NASA Cost Estimating (ONCE) DatabaseCost Readiness LevelsCost Growth StudyFull cost estimating methods Cost risk analysis methods and best practicesCost Risk Feedback ContinuumNASA Inflation IndexCost Estimating HandbookNPR 7120.5C Cost Estimator Career GuideProcess Based Cost EstimatingImproved Operations Cost ModelingUse of COTs tools
One NASA Cost Engineering Initiatives
PRICE Systems LLC, 2003-2004, All Rights Reserved
Objective – Tools to Support Cost Trade-off Decisions
ONCE Affordability Management Common / scalable cost estimating framework
Acquisition Simulations and Modeling
ONCE cost driver library and knowledge base
ONCE Affordability Management Common / scalable cost estimating framework
Acquisition Simulations and Modeling
ONCE cost driver library and knowledge base
Demonstration
PRICE TruePlanning Overview and
the True-S Software Cost
Estimating Model
PRICE Systems LLC, 2003-2004, All Rights Reserved
Agenda
PRICE True Planning Vision
Product Strategy
TRUE S Highlights
PRICE Systems LLC, 2003-2004, All Rights Reserved
PRICE TruePlanning Vision
What if Models & Estimates
Could be easily understood and explained?
Had the same basic structure?
Could be easily stored, found, and reused?
Could be shared across boundaries?
Easily worked together for total cost views?
Interfaced with projects budgets and measures?
Interfaced with general ledgers/ERP applications?
Interfaced with Earned Value Measurement systems?
PRICE Systems LLC, 2003-2004, All Rights Reserved
PRICE TruePlanning Vision
Is a single point of access to project planning tools, methods, and data
Stores project and technical data, cost models and supporting programmatic information
Enables a structured planning process
Provides industry specific benchmarks
Enables the customization and unification of disparate project planning methods to provide organizations with industry specific best of breed solutions
Saves time and money by enabling collaborative project planning and the effective capture and reuse of normalized project data
PRICE Systems LLC, 2003-2004, All Rights Reserved
Cost Objects - Collection of Cost Models
that are driven by inputs and produce cost/schedule/risk outputs
Cost Objects consists
of Activities
Activities are made up of Resources
PRICE Systems LLC, 2003-2004, All Rights Reserved
Cost Research Strategy
Delivery of Cost Research
Calibrated PRICE data points in the PRICE KnowledgeNetwork
Updated CERs, tables and generators in the PRICE True Planning
Publications and Symposia presentations
Leverage cost research during Consulting Engagements
Selection Criteria
Client Requirements Drive Research Decisions
Technologies clients are presently struggling with
Technology likely to become future challenges
Relates to current or future PRICE consulting engagements
Data Sources Available
PRODUCTS STRATEGY
PRICE H/HL/S/M
Customer Requests
KnowledgeManager &
Network
Customer Requests
TruePlanner Maturing
TrueAnalyst
Internal Customer Requests
True Software Model
Maturing
True IT Model Maturing
True Cocomo Maturing
True Hardware Model
Research & Development
PRICE Systems LLC, 2003-2004, All Rights Reserved
Cost Research Deliverables
Completed Cost Research Projects
NAFCOM 2002 Updated
Cost of COTS-Based/COTS Intensive Software Systems
Use Case Conversion Points
Cost of software with Security Requirements
In Process Research Projects
International Software Benchmark Standards Group (ISBSG) calibration study
Helicopter Knowledgebase
Cost of development, oversight, & integration of Systems of Systems
Unmanned Air Vehicles
Hardware COTS
Software Sizing from requirements
Fighter Aircraft Software
PRODUCTS STRATEGY
PRICE H/HL/S/M
Customer Requests
KnowledgeManager &
Network
Customer Requests
TruePlanner Maturing
TrueAnalyst
Internal Customer Requests
True Software Model
Maturing
True IT Model Maturing
True Cocomo Maturing
True Hardware
Model
Research & Development
PRICE Systems LLC, 2003-2004, All Rights Reserved
Product Strategy
Objective 1:Take care of customer needs and concerns
Reduce learning investment to ease acceptance of TruePlanner
Develop Software Suite (True S, IT, COCOMO) to eliminate gaps and position as “best solution” in market
Respond to ERP requirements
Product Strategy 2004 Accomplishments
PRICE H/HL/S/MCustomer Requests
Schedule penalty, Print EBS, Export report, Monitor spares graphically, Updated total ownership costs & MS Excel solution, Custom clipboard output locking, Financials
Knowledge Manager & Network
Customer Requests
Search Usability Improvements, Data points added
TruePlanner Maturing
Major usability and performance improvements, Risk, Document Management, Internationalization, Calibration, MS Project Export, E300 Report
TrueAnalystInternal
Customer Requests
Data model rework, Usability improvements
True Software Model MaturingCOTs, Life Cycles, Use Case Points, Auto Code, Security Costs, other maturing features
True IT Model MaturingPlan and Oversee, other maturing features
True COCOMO MaturingUse Case Points, other maturing features
True Hardware ModelResearch &
DevelopmentResearch & Development
PRICE Systems LLC, 2003-2004, All Rights Reserved
TruePlanning Road Map
2005 Beyond
PRICE H/HL/S/M COM improvements, Customer Requests
Customer Requests
KnowledgeManager & Network
Add Data Points, Data Taxonomy
Migrate to True Platform
TruePlanner Workgroup Collaboration: Project Status, Multiple Database, Role Based
access, Store/Search/Retrieve
XML/APIs
Microsoft Office Interface
EVM Interfaces
Import PRICE H, KM Functionality, Microsoft Office Integration, PAM Dashboard,
Workflow
TrueAnalyst Usability, Search, GUI General Availability
True Software Model Project Management/Technical Assembly
Interoperate with Hardware
Application Specific Cost Objects
True IT Model Project Management/Technical Assembly
Application Specific Cost Objects
True Cocomo Project Management/Technical Assembly
Application Specific Cost Objects
True Hardware Model Development/Introduce New Hardware Solution
Mature Hardware Offering
PRICE Systems LLC, 2003-2004, All Rights Reserved
How can you influence the strategy?
Communicate Technical & Cost Research Issues/Priorities
Requirements Gathering / Validation
Early Adopter – True H June 13th in Denver
Contact me directly
David Seaver (240) 725-0836
david.seaver@pricesystems.com
Or
Pete Pizzutillo (856) 608-7218
Peter.Pizzutillo@PRICESystems.com
PRICE Systems LLC, 2003-2004, All Rights Reserved
TRUE S Features
Commercial Off The Shelf (COTs)
Use Case Points
Auto Code
Security Costs
Risk Analysis
PRICE Systems LLC, 2003-2004, All Rights Reserved
COTs Highlights
Inputs for COTs ComponentsSize Options for COTS
Functional Size Example
Functional Complexity
Generator
Custom Generator
Operations Specification
COTS off the shelf specification
Target specification
Glue Code
Components under Evaluation
Inputs for COTs ComponentsTailoring Complexity
Vendor and Product Complexity
Project Constraints
Integration
Integration Team
Integration Complexity
Amount for Purchased Software
Upgrade Frequency
PRICE Systems LLC, 2003-2004, All Rights Reserved
True S Cost Objects
PRICE Systems LLC, 2003-2004, All Rights Reserved
Inputs for COTS Component
PRICE Systems LLC, 2003-2004, All Rights Reserved
SIZE Options for COTS
We provide 5 options to size COTs components
Functional Size
SLOC
Function Points
Predictive Object Points
Use Case Conversion Points
PRICE Systems LLC, 2003-2004, All Rights Reserved
Generator for Functional Size
PRICE Systems LLC, 2003-2004, All Rights Reserved
Functional Complexity Generator
PRICE Systems LLC, 2003-2004, All Rights Reserved
Functional Complexity Generator - Custom
PRICE Systems LLC, 2003-2004, All Rights Reserved
Operating Specification
True S allows you to describe the Operating Specification for the COTs component
You can specify the target Operation Specification as well as the Off the Shelf Specification
PRICE Systems LLC, 2003-2004, All Rights Reserved
Glue Code
Glue code is source code which needs to be developed to augment the functionality of a COTs applications
TRUE S enables you to estimate Glue code with the same or a different size metric
Full range of programming languages available
PRICE Systems LLC, 2003-2004, All Rights Reserved
Components Under Evaluations
If multiple COTs components are under consideration, True S enables you to specify how many components are being evaluated
PRICE Systems LLC, 2003-2004, All Rights Reserved
Tailoring Complexity
PRICE Systems LLC, 2003-2004, All Rights Reserved
Vendor and Product Complexity
PRICE Systems LLC, 2003-2004, All Rights Reserved
Integration (Team & Complexity)
PRICE Systems LLC, 2003-2004, All Rights Reserved
External Integration Complexity
PRICE Systems LLC, 2003-2004, All Rights Reserved
Purchase Cost & Upgrade
Purchase Cost of COTs
Annual Support Fee
Upgrade Frequency
PRICE Systems LLC, 2003-2004, All Rights Reserved
Use Case Points
A use case describes a typical transaction between the user and the software. Use cases focus on the functions that a user may want to perform rather than on the way that the software will perform those functions
The Use Case Conversion Points sizing metric represents an extension of the Use Case Points first developed by Gustav Karner in 1993. Karner's metric is a function of a weighted count of the actors involved in the use case and a complexity factor based on the number of steps required to successfully complete the typical use case transaction.
Actors are weighted by a complexity factor:
Simple: External system interfaced using an API
Average: External system interfaces using a text based protocol
Complex: End user interfacing through a graphical user interface
PRICE Systems LLC, 2003-2004, All Rights Reserved
Use Case Points Generator
Simple: External system interfaced
using an API
Average: External system interfaces using a text based
protocol
Complex: End user interfacing through
a graphical user interface
PRICE Systems LLC, 2003-2004, All Rights Reserved
Security Costs
EAL refers to effective evaluation level from the Common Criteria
PRICE Systems LLC, 2003-2004, All Rights Reserved
Risk Analysis
PRICE Systems LLC, 2003-2004, All Rights Reserved
Auto Code Generation Auto Code Translation
PRICE Systems LLC, 2003-2004, All Rights Reserved
Affordability Simulation Toolsets/Techniques
Real-time, web-based Engineering Trade-off / Cost Impact Analysis
Integrated Collaborative Engineering Environment
Active cost element structure, descriptors, WBS
Secure multi-user access management
Complex System Support
Hardware Modeling
Software Modeling
System Modeling
Visual Cost Toolset Integration - Significantly Increased Trade-Study Accuracy, Requirements Definition, and Estimating Credibility
$
$
$
$
PRICE Systems LLC, 2003-2004, All Rights Reserved
Visual Cost Architecture
COST MODEL INTEGRATION: Visual Cost
CAD Display Features
CAD image display
360° rotation of the model
Selection of individual model components
Selected component highlighted in WBS
Exploded view of the model
Context-sensitive Bill of Material
Select elements to display cost information
Shows relationship between elements
Scrollable window
Elements correspond to viewable CAD image
Active WBS (A tree structure that maps the major components in the CAD model to the cost model)
Cost Estimate Display Features
Estimates based on active WBS selection
Displays baseline and alternative cost estimates
Displays Delta for Total Cost
Supports cost, weight, and schedule targets
Supports Analysis of Alternatives (AoA) and Cost as an Independent Variable (CAIV)
Control Panel Features
Cost model/worksheet management
Report generator
Advanced image controls
User administration
Functionality specific to core user groups:
--PM
--Engineering
--Cost Analyst
PRICE Systems LLC, 2003-2004, All Rights Reserved
… a long term partnership
19701970 19801980 19901990 20002000Apollo γ Ray SpectrometerApollo Landing Radar
SAD GrummanBooster Avionics ControlAstronomical Observ Sat (AOS)Clemens/Fogleman Shuttle Orbiter Experimental LabELMSNIMBUS & wave Spectrometerγ Ray Balloon Experiment
Comms Interface Equipment (CIE)CV990 Microwave SpectrometerInternational Space Station (ISS)MESSOC (Space Station Model )Assured Crew ERVCost Parameter ForecastingPersonnel Launch System (PLS)EOSTDRSS
Mission Operations and Support AreaNetwork Control CenterShuttle Orbiter -Structural Spares Model,Solar ProbeSpace Transportation Arch StudiesDocking Mechanism,MIRShuttle Orbiter Enhanced MEDS (cockpit)Integrated Communication SystemKU Band System Update/ModificationOn-Orbit Meteoroid/Debris Risk ReductionSingle Stage to Orbit (SSTO)Soyuz ACRVStandard Payload CarrierTwo Stage to Orbit (TSTO)Shuttle Orbiter - Autonomous Ops Mod KitISS Direct BerthingMars Aerobrake (Measur)Mars Global Observer (MGO)Mars Relay SpacecraftSecond TDRSS Ground TerminalShuttle Orbiter/MIR AirlockX-33Liquid Flyback BoosterWhite Sands Ground TerminalTEP-IRDSShuttle Orbiter Digital MockupShuttle Enhanced Instrumentation (MADS)Shuttle FastTrack-N2 TanksOrbiter Upgrades- IVHM/TPS/OMS-RCSISS Propulsion/Control ModuleShuttle Orbiter Avionics UpgradesShuttle Orbiter Upgrades- MPS/APU-HYD Rendezvous Radar (RPSS)
STS SRB Insulation Trade StudyISS ITCS Calibration StudyONCE and CADRe ReqmtsAdvanced Materials ComplexityRBSS and TBSS ComplexitySSME Common Cost FrameworkCrew Rescue Vehicle (CRV)RLV - 2nd GenHW / SW CalibrationQuiet Aircraft Technology (QAT)Shuttle Orbiter CalibrationSLI Cost Credibility TeamSmall Aircraft TransportationSpace Interferometry Mission Space Systems Knowledge Base National Aero-Space Plane (NASP)
PRICE SystemsPRICE Systems & NASA & NASA……Over Four DecadesOver Four Decades……Over 70 SuccessesOver 70 Successes
Others …Others …
PRICE Systems Washington DC Office – 703-740-0087