PROBLEMS WITH NEWER GENERATORS
CLYDE MAUGHAN, PRESIDENT MAUGHAN GENERATOR CONSULTANTS SCHENECTADY, NEW YORK Phone: 518 377 5351 Email: clyde@maughan.com Web: clyde.maughan.com
1
PRELUDE A FEW COMMENTS
2
LAST 15-YEAR FOCUS (OF A 27-YEAR CONSULTING CAREER)
CONSULTING WORK GENERATOR CONDITION ASSESSMENT FAILURE ROOT CAUSE DIAGNOSIS LITTLE-TO-NO TEST AND INSPECTION, OR REPAIR
WORK
TRAINING (KNOWLEDGE TRANSFER) EFFORTS SEMINAR: ~1000 PARTICIPANTS HANDS-OFF WHEN ASSESSING TECHNICAL PUBLICATION (PASSING ON TO THE NEXT
GENERATIONS THE KNOWLEDGE OF MY GENERATION OF GENERATOR ENGINEERS)
3
KNOWLEDGE TRANSFER Book
“Maintenance of Turbine-Driven Generators”, 210 pp, 250 color photographs,. Focused directly on knowledge helpful to utility personnel : Design impact, Operation impact, Failure mechanisms, Monitoring, Inspection, Test, and Repair
Papers “Generator Ground Protection Relay Deficiencies” “A Brief History of Turbine-Generator Electrical Insulation and Support Systems “Uprating and Upgrading of Generators” “Advances in Motor and Generator Rotor Health “Electromagnetic Interference (EMI) Testing of Electrical Equipment “Vibration Detection instrumentation for Turbine-generator Stator Endwindings” “Vibration Sparking and Other Electrical Failure Mechanisms on Large Generators” “Generator Condition Monitor Evolution and Capability” “Monitoring of Generator Condition – and some limitations thereof” “On-Line Partial Discharge Testing on Generator Stator Windings” “Electrical and Mechanical Testing of Medium-Voltage Generators” “Partial Discharge as a Stator Winding Evaluation Tool” “Carbon-Brush Collector Maintenance on Turbine-Generators” “Root-Cause Diagnostics of Generator Service Failures” “Testing of Turbine-Generator Stator Core Lamination Insulation” “Upgrading of Generators to Improve Reliability” “Inspection/Test Impact on Maintenance of Generators” “Partial Discharge as a Concern on Turbine Generators” “Generator Failure Diagnosis” “Testing of Large Electric Generators for Suitability of Service” “Visual Inspection of Large Electric Generators” “Generator Reliability as Influenced by Engineering Design Parameters” “Comparative Measurements – PD/EMI Prototype Test - Ohio Edison – Sammis #6”.
4
THIS “NO-ULTERIOR MOTIVE” TRAINING EFFORT . . .
PERSONAL COST . . . MAYBE 3000 HOURS OF UNPAID TIME MAYBE $60,000 OF EXPENSES PRESENTING
PAPERS AT TECHNICAL CONFERENCES PERSONAL BENEFIT . . . WELL, PHONE STILL RINGING ON INCOME-
PRODUCING CONSULTING JOBS AT AGE 87 ABSURD INCOME
AND A CERTAIN LEVEL OF JOB SATISFACTION SO WHY WOULD I COMPLAIN?
5
AND MY LIBRARY (OF HOPEFULLY USEFUL KNOWLEDGE)
You can find about everything I have written on generators in the last 15 years on the NEC web site: www.generatortechnicalforum.org
At the Home Page, click on “technical forum” to register. Go to the discussion topic, Inner Water-Cooled Stator Windings (of which I am moderator), click on any thread, click on the Documents tab at the top
Find 24 technical papers on about 20 different generator topics and my 210-page text on generator maintenance
No-cost download by double clicking the titles
6
NOW, TO THE TOPIC PROBLEMS WITH NEWER GENERATORS
7
PRESENT FLEET INDUSTRY-WIDE
OLDER GENERATORS GENERALLY SUBSTANTIAL MARGIN IN DESIGN BUT MANY ARE 40+ YEARS OLD, i.e WORN OUT LITTLE SIGN OF FUNDAMENTAL CHANGE SOON
NEWER GENERATORS SOMETIMES NEGATIVE MARGIN IN DESIGN NUMEROUS INFANT MORTALITY AND EARLY-FAILURE
PROBLEMS (COST-REDUCED, i.e., “CHEAP”) GENERALLY NOT HIGH EXPECTATIONS FOR LONG-
TERM RELIABILITY
8
SOME SPECIFIC PROBLEMS ON NEWER GENERATORS
SOME CONFINED TO SPECIFIC OEMs CORE VIBRATION ISOLATION DRY-TIE
SOME GENERIC PARTIAL DISCHARGE GLOBAL VPI
ON THESE SLIDES WILL NAME NAMES WITH CONCERN RECOGNIZING THAT NO OEM STANDS OUT
PARTICULARLY FROM THE REST (AND ROOT PROBLEM IS THAT UTILITIES BUY THE
CHEAPEST PRODUCT) 9
ALSTOM CORE ISOLATION PROBLEM
2-POLE CORES TYPICALLY OVAL ~2 MILS, i.e., UN-RESISTIBLE VIBRATION MAGNETIC PULL OF THE FIELD
ALSTOM SEEMS TO HAVE AT LEAST ONE LINE WITH LITTLE ISOLATION
BUT YOU MUST ISOLATE (I FIRST KNEW THIS IN MY FIRST YEAR AT GE – 1950)
MAJOR COST REDUCTION NO OBVIOUS REALISTIC FIX – REPLACE STATOR OR LIVE
WITH THE CONDITIONS NOISE – 116 dBA POSSIBLE FRAME CRACKING POSSIBLE FOUNDATION CRACKING
10
11
12
13
14
15
HIGH LEVELS OF PARTIAL DISCHARGE
PROBLEM ON ALL GENERATORS CONTRIBUTING FACTORS
WORSE ON AIR COOLED HIGH VOLTS/MIL STRESS DESIGN INADEQUATE GROUNDING PAINTS INADEQUATE SPACING IN END ARM REGIONS JUNCTION OF END ARM AND GROUNDING PAINTS
OZONE PRODUCTION POTENTIAL HEALTH HAZARD ATTACK ON SOME MATERIALS
BUT GENERALLY PD DOES NOT CAUSE FAILURE 16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
VIBRATION SPARKING OLD PROBLEM FROM FIRST HARD INSULATION
SYSTEMS – LATE 1950s RECURRED ON A LINE OF SIEMENS GENERATORS
~4 YEARS AGO DRAMATIC AND FAST ACTING
IN-SERVICE FAILURE IF NOT CORRECTED 2-3 YEARS, OR SOONER
COMPLICATED ACTIONS, BUT PRETTY WELL UNDERSTOOD STATOR BAR VIBRATION IN THE SLOT (SIDE OR VERTICAL) LOW GROUNDING PAINT RESISTANCE
37
38
39
40
41
42
43
REWINDING GLOBALLY VACUUM PRESSURE IMPREGNATED STATOR WINDINGS
MANY GENERATORS IN SERVICE LOW STATOR WINDING MANUFACTURING COSTS MOST OEMs DO THIS UP TO ~400MVA
CONDITIONS ENTIRE STATOR GOES INTO A VERY LARGE
IMPREGNATION TANK BONDS (GLUES) BARS IN SLOTS VERY DIFFICULT TO REMOVE WINDING
COSTLY AND TIME CONSUMING MAY DAMAGE CORE
MAY DECIDE TO JUST BUY A NEW STATOR 44
GE DRY-TIE PROBLEM IMPLEMENTED FOR SAFETY AND COST REASONS BUT GE ENDWINDING DESIGN IS BASED ON
EVERYTHING BONDING TOGETHER HISTORIC SYSTEM
WET ROVING GLASS, DIRECTLY OUT OF A RESIN BATH HIGH BOND STRENGTH BETWEEN GLASS AND BAR/CONNECTION
RING INSULATION
DRY TIE USES A PRE-IMPREGNATED GLASS TAPE RESIN IS B-STAGED, i.e., RESIN IS DRIED BUT UNDER HEAT SOFTENS AND FLOWS IN THEORY OKAY, BUT BOND TURNS OUT TO BE WEAK
CORRECTION REMOVE ALL DRY TIES AND REPLACE WITH WET TIES
45
46
47
48
49
50
51
52
ALSTOM ROTOR WINDING COPPER BRAZE PROBLEM
FAILURE OF RECENTLY REWOUND FIELD CRACKING AND FRACTURE OF WINDING
COPPER ROOT CONCERN INABILITY TO REUSE COPPER WINDING WHEN
REWINDING FIELD ROOT CONDITION THIN COPPER ATTACHMENT BRAZE CONTROL
PROBABLY TOO HIGH TEMPERATURE WITH BETTER QUALITY CONTROL, MAYBE OKAY
53
54
55
GE STATOR WINDING TAPE MIGRATION PROBLEM
A RETURN OF A PROBLEM OF THE 1950-60s CONDITION
ASPHALT INSULATION SYSTEM MICA IMPREGNATED WITH ASPHALT (REALLY!) GREAT SYSTEM FROM THE 1915s BUT IF SELECTED ASPHALT BECAME SOFT (LIQUID) AT
OPERATING TEMPERATURES NO MECHANICAL STABILITY INSULATION MIGRATED INWARD IN SLOT WITH LOAD
CYCLING
I AM THE WORLD EXPERT ON THIS PROBLEM (BECAUSE NO ONE ELSE IN THE WORLD IS OLD
ENOUGH TO REMEMBER THE PROBLEM)
56
57
58
59
60
61
62
A FEW OTHER (POTENTIAL) PROBLEMS
FRAME CRACKING FIELD FORGING CRACKING
MAIN FIELD FORGING ONE CASE IN SPAIN ABOUT 4 YEARS AGO
RETAINING RINGS GET RID OF YOUR 18/5 RINGS
ONLY COST YOU HALF A MILLION DOLLARS EVEN 18/18 RINGS CAN CRACK IF BAD ENOUGH
OPERATING CONDITION STATOR ENDWINDING VIBRATION NEGATIVE SEQUENCE CURRENTS FIELD WINDING GROUNDS
63
64
65
66
67
68
69
70
IN CLOLSING
LOTS OF OTHER FAILURE OPPORTUNITIES (UNFORTUNATELY) I’M STILL RUNNING INTO THINGS I
HAVE NEVER SEEN BEFORE AFTER 60+ YEARS
GOOD LUCK TO YOU BUT I AM GOING TO HAVE TO STOP
(TALKING AND CONSULTING) BEST WISHES!
71
PROBLEMS WITH NEWER GENERATORS