production log greenwich park

Post on 21-May-2015

122 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Production Log

Location: Greenwich Park

Date: 26th November (Tuesday)

Why this Date?

1. This date is the most accessible date because I can leave at 12:30 and shoot.2. The Person in the music video is free on this day.

Props Needed:

-Bag-Tripod-Camera-Scarf-Hairbrush

Problems that might occur:

-It could Possibly rain-The battery on the camera could run out-Time needed to film could be limiting-There could be too many people in the park to film-It could go dark-The camera could break

How to prevent the problems:

Bring an umbrella, plastic bag and an extra battery pack.

Time Leaving:

12:30pm-4: 15pm

Scenes that you are shooting for:

-The running scene.-The walking Scene-The ending-The beginning after the animation

Time expected back:

5:00pm- as there may be faults with public Travel.

People Going:

Thomas Madden- To complete the filming, continuity, props and Locations

Costuming:

-A Jumper-A scarf-A pair of Jeans-Military Coat-Fashionable Top

top related