Slide Slide David Britton, University of Glasgow IET, Oct 09 1
Prof. David BrittonGridPP Project leaderUniversity of Glasgow
GridPP33 20th Aug 2014
GridPP33Preparing for Run-2
Slide Slide
Outline
• Feedback from Science Board on GridPP5
• GridPP5 – Next Steps• GridPP4+ extension• GridPP33
David Britton, University of Glasgow GridPP33 2
Slide Slide
Funding Process
David Britton, University of Glasgow GridPP33 3
Strategic Review Panel
Tensioning Sub-Group
Science Board
Programmatic Review
STFC Council
GridPP5 Proposal + Scenarios
LHC Upgrade
s
• Can computing be deliver with 50% of funding?
• Urr, no.
• Exploit what we’ve paid for or pay for more?
• Agreed
Slide Slide
Science Board Feedback
David Britton, University of Glasgow GridPP33 4
Slide Slide
Next Steps
Peer-Review of GridPP5 will take place in conjunction with the next PPGP (Experiment) Consolidated Grant round in 2015.
“STFC are currently considering how best to integrate this with the PPGP review process.”
“GridPP funding will be considered by a dedicated committee with a separate funding line, in parallel with the Consolidated Grant, and there will be some coordination between the PPGP and the GridPP funding committee to coordinate funding for computing resources.
David Britton, University of Glasgow GridPP33 5
PPGP
Consolidate Grant
Proposals
Experiment’s Input
Consolidate Grant
Proposals
Consolidate Grant
Proposals
Consolidate Grant
Proposal
GridPP5 Proposal
Expert Review
?
Will need to update/expand previous submission soon.
Slide Slide
GridPP4+ Extension
• 1st Sep: Submit a status report for GridPP4 and a Work-Plan for GridPP4+
• 12th Sep: Deadline for finalising institutional JeS forms for GridPP4+ for GridPP review.
• 17th Sep: Deadline for submission of JeS forms.
• 30th Sep: Deadline for issue of GridPP4+ grants.
David Britton, University of Glasgow GridPP33 6
Slide Slide
GridPP4 Grants
Tony Medland: “a no-cost extension of GridPP4 so should not be a problem as long as the costs are synchronised between existing (GridPP4) and continuation (GridPP4+) awards, i.e. we only end up paying for things once! However, I must ask that you minimise any overlapping spend (i.e. beyond March 2015) as far as possible to try to avoid creating any cash flow issues for us between years. On that basis, I would be happy to allow the existing GridPP4 grants a no-cost extension of up to 6 months to enable them to complete their spend on the current approved programme.”
David Britton, University of Glasgow GridPP33 7
Slide Slide
GridPP33
David Britton, University of Glasgow GridPP33 8
Slide Slide
GridPP33
David Britton, University of Glasgow GridPP33 9
Slide Slide
GridPP33
David Britton, University of Glasgow GridPP33 10
top related