P R O J E C T E X P E R I E N C E : F I V E -Y E A R O V E R V I E WOSI has been involved in more than 200 fiber optic network projects globally. This is a representative list of our company’s more recent projects.

ASIAConfidential / 2015• Feasibility study• Engineering & system design• Business plan

HAWAII– NEW ZEALANDBlue Sky / 2015-2017Turn-key technical lead:• Network design• Procurement strategy • Supplier negotiations• Construction & installation mgmt. • Commercial strategy• O&M Strategy

MONET: US–BRAZILAngola Cables / 2015-OngoingTurn-key technical lead:• Commercial due diligence• Technical due diligence• Network design• Procurement strategy • Supplier negotiations• Construction & installation mgmt. • Testing & commissioning• Interconnection strategy

AUSTRALIA OFFSHORE OIL & GASChevron / 2015-2016Engineering support:• Construction oversight• Installation management• Testing and commissioning

ATISA: GUAM–SAIPANDocomo Pacific / 2015-OngoingTurn-key technical lead:• Cable route design• Technology assessment• RFP formation• Supplier negotiations• Construction oversight• Installation management• Testing and commissioning

NEW CALEDONIAOPT / 2015• Technical feasibility study• Commercial feasibility study

ASIAConfidential / 2015• Feasibility study• Desk top study• Life cycle cost assessment

MEDITERRANEAN:POSEIDON SYSTEMCSnet International / 2012-2018Turn-key system development – design, build, operate:• System design• Cable route design• Power Feed Equipment design and build• Procurement and landing party negotiation• Installation management• Testing and Commissioning• International circuit & co-lo provisioning• Ongoing NOC and system maintenance services

ARCTICQuintillion, Natixis / 2016-2018Independent engineers:• Project technical & contract review• System installation oversight• O&M strategy review• Multi-year Arctic region system

installation

SACS NETWORK: ANGOLA–BRAZILAngola Cables / 2011-OngoingTurn-key program lead:• Commercial feasibility analysis• Strategic partnering arrangements• System design• Supplier negotiation• Construction oversight • Implementation

SAPL NETWORK: CHILE–ECUADOR– PANAMA–FLORIDAOcean Networks / 2017-OngoingTurn-key technical lead:• Technical due diligence• Procurement strategy• Supplier negotiations• Construction & installation mgmt.• Testing & commissioning• Interconnection strategy

ICN2: SOLOMON ISLANDSInterchange Limited / 2017-OngoingTurnkey project management:• Supplier procurement• Supplier management• Oversight of system design & route design• Landing site evaluation• Installation oversight• Testing & commissioning