A MEMBER OF WINN & COALES INTERNATIONAL

77 - 95 National Boulevard, Campbellfield, Victoria 3061DENSO (AUSTRALIA) PTY LTD

TEL: +61 3 9356 7600 FAX: +61 3 9387 6973 EMAIL: denso@densoaustralia.com.au WEB: www.densoaustralia.com.au

SUBSEA & SPLASH ZONE COATINGS

Waterway Constructions were engaged to build a new extension to the existing Eden wharf with 295 linear metres of heavy duty Denso SeaShield Series 2000FD specified to protect 78 new 714mm and 610mm diameter steel piles.

The new wharf extension will enable large cruise ships with a length of 300m or more to enter Eden port and come alongside the wharf rather than using tenders to get passengers to the shore from anchored vessels outside the port.

The wharf extension was officially opened in August 2019 with the first cruise ship docked at the beginning of the cruise ship season the following month.

Location Twofold Bay, Eden NSW

Contractor Waterway Constructions

Client NSW Government

Products Denso SeaShield Series 2000FD

Date Apr 2019

Ref No S043

PROJECT DETAILS

PROJECT DATA

PROTECTION OF NEW STEEL PILES ON EDEN BREAKWATER WHARF EXTENSION

DATE PUBLISHED: FEBRUARY 2020

Denso SeaShield Series 2000FD used on Eden breakwater wharf extension.