1 Preparing Inspection and Test Plans
This Guideline is provided to assist service providers in preparing Inspection and Test Plans (ITPs) for
construction contracts.
Although the current AS!"S IS# $%%& Quality management systems Requirements' does not coverITP ith inspection and testing' service providers ill e re*uired to develop and implement ITPs.
1.1 Purpose and scope
The purpose of an Inspection and Test Plan is to put together a single document that records allinspection and testing re*uirements relevant to a specific process. #n a construction contractthe process is li+ely to e a construction activity' element of or+' trade or+ or providing aproduct section. An Inspection and Test Plan identifies the items of materials and or+ to einspected or tested' y hom and at hat stage or fre*uency' as ell as ,old and -itness
Points' references to relevant standards' acceptance criteria and the records to e maintained.Inspection and Test Plans' hen properly implemented' help ensure that' and verify hether'
or+ has een underta+en to the re*uired standard and re*uirements' and that records are +ept.
1.2 Glossary
,old Point A /hold0 point defines a point eyond hich or+ may not proceed ithout theauthorisation of a designated service provider or authority.
This /designated service provider or authority0 might e an agency1s or othercustomer0s representativeauthorised person' or a regulatory authority (such asa council' Sydney -ater' -or+2over and the li+e) representative' or it may e
the service provider inspecting its service provider or employee or agent.-itness Point A /itness0 point provides a party (such as the customer' service provider and a
regulatory authority) ith the opportunity to itness the inspection or test oraspect of the or+' at their discretion.
Surveillance Intermittent monitoring of any stage of the or+ in progress (hether y theservice provider or customer).
Self inspection -here the service provider performing the or+ verifies the *uality progressively often ith the aid of chec+lists.
-or+ area A discrete section of the hole or+' usually defined y location' here any tradeor+ or activity ould e completed efore it moves onto another area.34amples include a all' a room' a uilding' a length of pipeline eteenmanholes and the li+e. Also referred to as lots.
1.3 Roles and Responsibilities
There are no set rules as to ho' in a service provider organisation' should document Inspectionand Test Plans. It is appropriate' hoever' that they receive input from those ith a goodtechnical and practical +noledge of' and e4perience in' the activities involved. The use'understanding and acceptance of ITPs y inspectors and other personnel ill generally egreatly enhanced if they are involved in their preparation.
The service provider is responsile for ensuring that all the re*uired Inspection and Test Plans
are prepared' including those covering or+ or processes to e carried out y its serviceproviders. -hile it is preferale that its service providers prepare the ITPs for their on or+' inthe final analysis some may re*uire the service provider0s involvement.
&
-
8/10/2019 qms_guidelines_appendix_e_0.doc
2/15
Quality Management Systems Guidelines
A senior representative of the service provider ould e made responsile for approvingInspection and Test Plans' and any suse*uent amendments' prior to their sumission orsumission of complianceconformity certification to the customer. The contract conditions oulddefine the sumissions to the customer and any responses re*uired.
1.4 OverviewThe folloing steps are involved in documenting Inspection and Test Plans for a constructioncontract5
Step & 6ead the contract documents (including the technical specifications) and prepare alist of any discrepancies' amiguities' missing information and standards of materialsandor or+manship that are considered inappropriate.
Step 7 2ontact the customer and resolve the issues listed as a result of Step &.
Step 8 34amine the scope of or+ and divide it into separate areas re*uiring an Inspectionand Test Plan (here not already prescried in the contract documents). As ageneral guide it is normally most convenient to document a separate Inspection and
Test Plan for each trade or or+ areasection.Step 9 !ote the ,old and -itness Points re*uired y the customer (including as listed in the
contract documents).
Step : 6evie the contract documents again and note the re*uirements that have the mostimpact on the *uality of the finished or+. ;or each' as+ the *uestion ?e certain to include anyreferences to tests' sumitting information to the customer' otaining approvals and,old and -itness Points (see&.@.$for further information).
Step @ etermine from Step : hich items or aspects of each inspection ill need to erecorded on chec+lists and prepare these.
Step B iscuss the chec+lists ith those directly involved ith the or+ and otain their input.This input should particularly e directed at identifying those issues that have causedprolems (and involved e4tra costs) in the past' and therefore arrant chec+ing at theearliest opportunity to avoid unnecessary and costly rectification.
Step C Prepare each Inspection and Test Plan to reflect the re*uirements of the contractdocuments. 6eference the ITP in the Quality Management Plan and crossreferenceto the other related ITPs.
Step $ Issue each Inspection and Test Plan andor associated certification to the customerfor consideration ithin a reasonale period prior to commencing the or+ descriedin the Plan and adDust them to suit any comment received (or act as otherisere*uired in the contract documents).
Step &% ecide ho est to divide the hole of the or+ into or+ areas for control purposesand indicate these locations either on a schedule (ith reference to grids and levels)or y mar+ing up draings.
Step && Prepare and issue chec+lists for each or+ area and identify them according tolocation.
Step &7 Train those directly involved ith each of the ITP in their use. ;ormalise a procedurefor the notification of -itness and ,old Points to the appropriate person(s).
Step &8 2arry out inspections and tests in accordance ith the Inspection and Test Plans'provide notices to the customer andor regulatory authorities for ,old or -itness
Points' as designated or applicale' and record the results on chec+lists.
7
-
8/10/2019 qms_guidelines_appendix_e_0.doc
3/15
Quality Management Systems Guidelines
1.5 ontract particulars
6ecord the folloing contract particulars on each of the Inspection and Test Plans5
- 2ontract !ame
- 2ontract !umer
-escription of processactivities for that particular Inspection and Test Plan
1.! Inspection and Test Plans
1.!.1 General
&.@.7to &.@.$inclusive descrie hat needs to e considered for each component of anInspection and Test Plan. They e4plain the components and ho to select the relevantinformation re*uired for each.
1.!.2 "escription o# operation or stage o# wor$ re%uiring inspection or test
?ecause &%%E inspection and testing in most cases is neither practical nor desirale' it isnecessary to adopt a testing fre*uency and sampling process hich provides a representativeindication of the or+ to suit the ris+s involved' as is addressed in &.@.9.
Inspections and tests are often est done after a numer of separate activities' ut prior to amaDor one that ill cover up previous or+. Service providers ould carry out preliminary tests toassist in otaining an early indication of conformity.
etermining the type and e4tent of inspections and tests (along ith the characteristics see&.@.8) is proaly the most challenging aspect of documenting an Inspection and Test Plan. Theapprovals re*uired are sometimes easier to determine as they are usually specified and identifyparticular or+stages re*uiring inspections and tests. The type' timing and fre*uency ofinspections and tests vary to suit the ris+s and or+ involved.
The ' and is governed y5
- -hat the or+ is and ho comple4 it is
- Accessiility for inspections and sampling
- 2onse*uences of failure' including as follos5
- 2ost of remedial or+
- 3ffect on construction program
- Accessiility for rectification
- isruption to use of uilding or structure
-
2onse*uential damage to other elements- Threat to safety of or+ers and pulic
- Availaility of resources
The type' timing and fre*uency (the hat' hen and ho often) of inspections and tests are estdetermined in conDunction ith the consideration of the characteristics to e verified.
1.!.3 &aracteristics o# inspection'test'approval
The characteristics of a or+ item can e defined as
-
8/10/2019 qms_guidelines_appendix_e_0.doc
4/15
Quality Management Systems Guidelines
Some characteristics can only e considered after one particular operation and efore another'such as the inspection of steel reinforcement after installation ut prior to the pouring ofconcrete.
1.!.4 (tage'#re%uency
The inspectiontest stagefre*uency ill often e determined y the re*uirements of the contractdocuments or y the type of inspection andor test and the characteristics under consideration'as outlined aove. In the latter case hoever' there is the potential for a considerale range in
hat constitutes the most appropriate fre*uency and sampling process. It is suggested that arepresentative sampling of the or+ to suit the ris+s involved e used as a guide initially.Thereafter' fre*uencies ould e increased and processes revieed for /prolem0 or+ activitiesand decreased here consistent conformity as evidenced.
1.!.5 Records
6ecords are essential to *uality management ecause they provide the documented evidencenecessary to verify that a productservice is in accordance ith the contract re*uirements.
The records ould e in various forms' and ould include the chec+lists' test certificates'certificates of complianceconformity' survey data' ritten approvals and the li+e. Inspection andTest Plans ould help define the records re*uired.
1.!.! (peci#ication'standard
The standards against hich conformity is measured can ta+e various forms. The most commonsource is usually the contract technical specification. #ther standards ould often e referencedin this document' and may include any of the folloing5
- 2ontract documentsspecification generally
- 2ontract draings
-Approved or+shop draings andor calculations
- Approved technical detailsprocedures
- Approved samples andor prototypes
- 6egulatory re*uirements
- Australian Standards
- International Standards
- Standard specifications
- Manufacturers0 recommendations
1.!.) *cceptance criteriaAcceptance criteria ould normally e defined in the contract documents (either directly or yreference to other standards such as Australian Standards). -here this is not the case it oulde necessary to identify them and possily to agree to them ith the customer. It is preferale toestalish acceptance criteria ith the customer (here they are not specified or clear) to agreethe yardstic+s (such as test panelssections or previous or+) against hich a productservice isto e declared conforming or nonconforming.
1.!.+ Inspection'test procedures
;or many inspectionstests' the methods employed ill e specified or self evident anddetermined y the characteristics eing e4amined. In other cases' hoever' the precise mannerin hich the inspectiontest is carried out ould need to e identified and descried. A clearlydescried test procedure ill usually e necessary to help achieve consistent and relialeresults.
9
-
8/10/2019 qms_guidelines_appendix_e_0.doc
5/15
-
8/10/2019 qms_guidelines_appendix_e_0.doc
6/15
Quality Management Systems Guidelines
2.1 Planning o# inspection and testing
4.2 INSPECTION AND TEST PAN
,ave ITPs een developed for all the relevant contract activities= (2lause 9.7)
Are there ITPs for each activity affecting *uality= (2lause 9.7)
Are all the Plan documents identified and their revision status shon= (2lause9.7.8)
Are all the Plan records legile' readily identifiale and retrievale= (2lause
9.7.9)
! "ANAGE"ENT #ESPONSI$IIT%
oes the service provider identify and include all customer re*uirements in ITPs
(2lause :.7)=
Is the contract *uality representative nominated in the ITPs= (2lause :.:.8)
o the ITPs nominate the person responsile on site for all +ey and related
construction activities= (2lause :.:.8)
& #ESO'#CE "ANAGE"ENT
o the ITPs identify the resources proposed to carry out inspections and tests=
(clause @.&)
o the ITPs include the minimum re*uired *ualifications and e4perience of the
people that are to carry out inspections and tests= (2lause @.7)
o the ITPs identify the re*uired e*uipment' facilities and supporting services=(2lause @.8)
o the ITPs identify each critical or+ing environment= (2lause @.9)
( P#OD'CT #EAISATION
Are the ITPs updated to reflect changes to customer re*uirements= (2lause B.7)
o the ITPs identify inspections and tests to verifyvalidate design= (2lause B.8)
o the ITPs identify the inspections and tests re*uired to ensure that the
productsservices meet the re*uirements= (2lause B.9)
o the ITPs reflect the control of conditions re*uired for inspection and testing=
(2lause B.:)
o the ITPs identify hether the monitoring and measuring e*uipment are
calirated and to specification= (2lause B.@)
) "EAS'#E"ENT* ANA%SIS AND I"P#O+E"ENT
oes the service provider plan and implement in the ITPs the monitoring'
measurement' and analysis needed to demonstrate conformity to product re*uirements of all
or+= oes the service provider state in the ITPs ho is responsile for receiving' in
process and final inspection and testing for all or+ activities and for closing out or+ areas=
@
-
8/10/2019 qms_guidelines_appendix_e_0.doc
7/15
Quality Management Systems Guidelines
o the ITPs include the methods for indicating hen nonconformity control is
initiated and for closing out or+ areas=
,ave inspection and test forms een developed and implemented for recording
inspection and testing for each activity= (each stage in a process may e on separate ut lin+edforms)
#ecei,in inspection
o the ITPs define responsiility for verifying conformity of the supplied product
to re*uirements efore using it in the constructed or+s=
o the ITPs ade*uately address the inspection and testing re*uirements for the
supplied product efore it is used in the constructed or+s=
In-process inspection
o the ITPs define responsiility and provide for inprocess inspection and
testing=
o the ITPs ade*uately address the inspection and testing re*uirements for allthe productsservices during construction of the or+s=
inal Inspection and Testin
o the ITPs define responsiility and provide for final (or acceptance) inspection
and testing=
oes the service provider have a method and define responsiility in the ITPs
for final revie of all inspectiontest results to confirm that all inspections and tests have eencarried out to verify completely conformity to product re*uirements for each or+ area=
2.2 Inspection and test #or0s
o the ITP forms indicate5
all the inspection and testing re*uired y the customer=
inspections and tests to verify and validate design (here applicale)=
inspection and tests re*uired for the supplied product efore it is used in the
or+s=
inspection and tests re*uired for the productsservices during construction of the
or+s=
ho performs the inspection or test and at hat stage of the contract or+=
ho each inspection or test is to e carried out and recorded= (such as a
documented testing procedure or y reference to a standard test method)
the acceptance criteria and fre*uency of testing' including customer1s
re*uirements=(reference to a contract specification clause alone may not e acceptale)
the record reference verifying conformity of materialsproduct or preceding or+
to the re*uirements=
ho revies inspectiontest results' evaluates hether or+ conforms to the
product re*uirements' determines hat to do ne4t if or+ does not pass a re*uired inspection or
test' and closes out completed and conforming or+ areas=
hen statistical analysis of test results is re*uired=
B
-
8/10/2019 qms_guidelines_appendix_e_0.doc
8/15
Quality Management Systems Guidelines
provision for confirmation that all inspections and tests have een carried out to
verify completely conformity to product re*uirements in each or+ area=
C
-
8/10/2019 qms_guidelines_appendix_e_0.doc
9/15
Quality Management Systems Guidelines
SA"PE O#"S
Inspection and Test Plan
Custo/er0
Contract Nu/1er0
ContractPro3ect Na/e0
INSPECTION AND TEST PAN for0 (Insert work activity)
or5 area0 (Insert work area)
Insert ContractorIdentification and/orLogo
#ef Operation or stae of 6or5 Stae
fre7uenc8
#ecords #e7uire/ent
standardspecification
Acceptance
criteria
Inspection
testprocedure
Inspection 96:at6:o
Description C:aracteristics E/plo8ee Ser,icepro,ider
Custo/er
9 ; itness Point< = ; =old Point< =>A? ; InspectionTest 18 Aut:orit8< '>C? ; InspectionTest 18 Consultant< S ; Sur,eillance or /onitorin< @; Self inspection 18 perfor/er of 6or5.
C:ec5listINSPECTION AND TEST PAN C=ECIST for0(To e com!leted y t"e !erson(s) directly res!onsile for t"e work)
Contract Nu/1er0
ContractPro3ect Na/e0
Contractor0
Su1contractor
or5 area0 C:ec5list Nu/1er0
or5 Ite/sacti,ities to 1e ,erified #eference InitialledO Co//ents
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0
Date0
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e 6or5 for t:is 6or5 area:as 1een co/pleted and confor/s to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
$
-
8/10/2019 qms_guidelines_appendix_e_0.doc
10/15
Quality Management Systems Guidelines
E@A"PES
Inspection and Test Plan
Custo/er0
Contract Nu/1er0
ContractPro3ect Na/e0
INSPECTION AND TEST PAN for0 PAINTING
or5 area0 (Insert work area)
Insert ContractorIdentification and/orLogo
#ef Operation or stae of 6or5 Stae
fre7uenc8
#ecords #e7uire/ent
standardspecification
Acceptance
criteria
Inspection
testprocedure
Inspection 96:at6:o
Description C:aracteristics E/plo8ee Ser,icepro,ider
Custo/er
& Incoming materialsinspection
2onform to order 3achdelivery
eliverydoc+ets2hec+list
#rders asplaced
GP2approved Kcolour sched.
2hec+againstorders
, -
7 Storage andprotection
As specified 3achee+
2hec+list Specification' asattached
Safe' secureade*uateprotection
Lisual S S
8 Preliminaryactivities
Tas+ completion 3achor+ area
2hec+list Specification' asattached' -,Spractice K6egulation
All tas+scompleted
Lisual , - S
9 Surfacepreparation
6eady to paint'clean and smooth
3achor+ area
2hec+list Specification' asattached
Smooth andclean
Lisual , , -
: Painting ;ull K uniformcover' smooth'colour
3achor+ area 2hec+list Specification' asattached 2hec+list andtest panel Lisual S' ,(2) S
@ Prehandoveractivities
All mattersfinalised' cleanand tidy
3achor+ area
2hec+list Specification' asattached
2ompleted tospec cleanand tidy
;inalinspection
, , ,
9 ; itness Point< = ; =old Point< =>A? ; InspectionTest 18 Aut:orit8< '>C? ; InspectionTest 18 Consultant< S ; Sur,eillance or /onitorin< @; Self inspection 18 perfor/er of 6or5.
Custo/er0
Contract Nu/1er0
ContractPro3ect Na/e0
INSPECTION AND TEST PAN for0 ELECTRICAL
or5 area0 (Insert work area)
Insert ContractorIdentification and/orLogo
#ef Operation or stae of 6or5 Stae
fre7uenc8
#ecords #e7uire/ent
standardspecification
Acceptance
criteria
Inspection
testprocedure
Inspection 96:at6:o
Description C:aracteristics E/plo8ee Ser,icepro,ider
Custo/er
& Incoming materialsinspection
2onform to order 3achdelivery
eliverydoc+ets2hec+list
#rders asplaced
SpecificationK codes
2hec+againstorders
, S
7 Storage andprotection
As specified 3achee+
2hec+list Specification'as attached
Safe' secureade*uateprotection
Lisual S S
8 Preliminaryactivities
Tas+ complet ion 3achor+ area
2hec+list Specification'as attached'-,S practiceK 6egulation
All tas+scompleted
Lisual , - S
9 Prestart 6eady tocommence or+
3achor+ area
2hec+list Specification'as attached
To authorityre*uirements
2hec+ed , - S
: 2arry out or+ To trade codes
and authorityre*uirements
3ach
or+ area
2hec+list Specification'
as attached
2hec+list and
test panel
2hec+ed ,(A) - S
@ Prehandoveractivities
All mattersfinalised' cleanand tidy
3achor+ area
-iringdiagrams2hec+list
Specification'as attached
All itemscompleted tospecification
;inalinspection
, , ,
9 ; itness Point< = ; =old Point< =>A? ; InspectionTest 18 Aut:orit8< '>C? ; InspectionTest 18 Consultant< S ; Sur,eillance or /onitorin< @; Self inspection 18 perfor/er of 6or5.
&%
-
8/10/2019 qms_guidelines_appendix_e_0.doc
11/15
Quality Management Systems Guidelines
Custo/er0
Contract Nu/1er0
ContractPro3ect Na/e0
INSPECTION AND TEST PAN for0 REINFORCED CONCRETE
or5 area0 (Insert work area)
Insert ContractorIdentification and/orLogo
#ef Operation or stae of 6or5 Staefre7uenc8
#ecords #e7uire/entstandardspecification
Acceptancecriteria
Inspectiontestprocedure
Inspection 96:at6:o
Description C:aracteristics E/plo8ee Ser,icepro,ider
Custo/er
& Preliminaryactivities (re*uiringPrincipal0snotification)
!otificationprovided
Prestartconcrete
or+
2hec+list Specification' asattached
All tas+scompleted
Sumitdetails
, , ,
7 Preliminaryactivities (re*uiring2ontractor0sacceptance)
Approvalsre*uired otained
Prestartconcrete
or+
2hec+list Specification' asattached
All tas+scompleted
6evie , , S
8 #rder concrete To specification 3achpour
2opy oforder
Specification' asattached' -,Spractice K6egulation
6eflectsspec. safe'secure
6evie , , S
9 Pre pour inspection Tas+ complet ion 3achpour
2hec+list Specificationdraings' asattached
6ight levels Kdimensionsclean safe
Lisualmeasure
, - -
: Slump test -or+aility of mi4 3achdelivery
Attachedrecord
Specification' asattached
:% to &%% mm Measure , - S
@ 2oncrete testcylinder
2oncretestrength
7 perpour
Test lacertif.
Specification' asattached
8% Mpaminimum
!ATA la. , - S
B 2oncrete pour To specification 3achpour
2hec+list Specification' asattached
2orrectplacement
Lisual - S
C Stripping K curing To specification 3achpour
2hec+list Specification' asattached
;inishcuringmaintained
Lisual - S
$ Prehandoveractivities
All mattersfinalised' cleanand tidy
3achpour
2hec+list Specification' asattached
2ompleted tospec. cleanand tidy
;inal visualinspection
, , ,
9 ; itness Point< = ; =old Point< =>A? ; InspectionTest 18 Aut:orit8< '>C? ; InspectionTest 18 Consultant< S ; Sur,eillance or /onitorin< @; Self inspection 18 perfor/er of 6or5.
&&
-
8/10/2019 qms_guidelines_appendix_e_0.doc
12/15
Quality Management Systems Guidelines
C:ec5list
INSPECTION AND TEST PAN C=ECIST for0 PAINTING
(To e com!leted y t"e !erson(s) directly res!onsile for t"e work)
Contract Nu/1er0
ContractPro3ect Na/e0
Contractor0
Su1contractor0
or5 area0 C:ec5list Nu/1er0
or5 Ite/sacti,ities to 1e ,erified #eference InitialledO Co//ents
Preliminaryactivities
Access permission otained
Access otained
3*uipment approvedon site
Scaffoldladders
Signagearricades
?rushesrollersdrop sheets
Materials approvedon site
;illerthinners
Paintscolours
6epairs completed
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/
to t:e contract specificationdocu/ents
Na/e0
Sinature0Date0
Surfacepreparation
!otification of poer disruption
Protective measures
Isolate appropriate circuits
;illed correctly
;ree of oilgrease
;ree of dirt and loose particles
Sanded smooth
-ashed don
Spot primed
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
Painting ,umiditytemperature appropriate
Protective measures
Paint applied to manufacturer0s instructions
3ach coat free of imperfections such as runs'patchiness' pinholes' misses etc.
rying time eteen coats appropriate
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
Prehandoveractivities
6eplace fi4tures
Touch up
6emove protective measures
;inal inspection confirms conforming
6emove scaffoldladders' clean up etc.I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e 6or5 for t:is 6or5 area:as 1een co/pleted and confor/s to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
&7
-
8/10/2019 qms_guidelines_appendix_e_0.doc
13/15
Quality Management Systems Guidelines
INSPECTION AND TEST PAN C=ECIST for0 ELECTRICAL
(To e com!leted y t"e !erson(s) directly res!onsile for t"e work)
Contract Nu/1er0
ContractPro3ect Na/e0
Contractor0
Su1contractor0
or5 area0 C:ec5list Nu/1er0
or5 Ite/sacti,ities to 1e ,erified #eference InitialledO Co//ents
Preliminaryactivities
Access permission otained
Access otained
3*uipment approvedon site
Scaffoldladders
Signagearricades
#ther
Materials approvedon site
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
Prestart ;i4tures removed
Protective measures
Install temporary poer (here necessary)
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
2arry out or+ Apply safety procedures at all stages
Protective measures
2arry out or+ as per specification' AS 8%%%and other relevant codes
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
Prehandoveractivities
2arry out all testing and safety chec+s
6estore poer supply to all isolated circuits
6emove temporary poer supply
6emove protective measures
;inal inspection confirms conforming
6emove scaffoldladders' clean up etc.
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
I :a,e carried out all
necessar8 inspections and ,erif8 t:at t:e a1o,e 6or5 for t:is 6or5 area
:as 1een co/pleted and confor/s to t:e contract specificationdocu/entsNa/e0Sinature0Date0
&8
-
8/10/2019 qms_guidelines_appendix_e_0.doc
14/15
Quality Management Systems Guidelines
INSPECTION AND TEST PAN C=ECIST for0 REINFORCED CONCRETE
(To e com!leted y t"e !erson(s) directly res!onsile for t"e work)
Contract Nu/1er0
ContractPro3ect Na/e0
Contractor0
Su1contractor
or5 area0 C:ec5list Nu/1er0
or5 Ite/sacti,ities to 1e ,erified #eference InitialledO Co//ents
Preliminaryactivities (re*uiringPrincipal0snotification)
Structural design chec+
2oncrete supplier formor+er
Admi4tures
;ormor+ design
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
Preliminaryactivities (re*uiring2ontractor0sacceptance)
Access otained
Signagearricadesfalseor+
6einforcing scheduled and ordered
Testing and sampling e*uipment
Instruction to Sucontractors on ITP
re*uirements
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
#rder concrete Strength
Slump
-atercement ratio
Type of cement
Admi4ture
elivery notice and arrangements
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
Pre pour inspection ;ormor+ chec+ed (dimensions' levels andcapacity)
;ormor+ design certified
;oundation (clean' scaled' starter ars etc)
2over to reo. Naps as specified
Termite treatment
Memranes
?loc+outs
34pansion stripsater stop
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
2oncrete pour Slump test ta+en results recorded
2oncrete test cylinders ta+en and mar+ed
Time for delivery
Time for pour
Pouring techni*ues conform (height' viration'tremmying' pumping)
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
Stripping K curing -hen stripped
6epairs
2uring method
2uring maintained OOOO.. days
&9
-
8/10/2019 qms_guidelines_appendix_e_0.doc
15/15
Quality Management Systems Guidelines
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
Prehandoveractivities
;inish
Nevels dimensions
3*uipment cleaned and site clean
Test results for concrete cylinders
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e ite/sacti,ities confor/to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
I :a,e carried out allnecessar8 inspections and ,erif8 t:at t:e a1o,e 6or5 for t:is 6or5 area:as 1een co/pleted and confor/s to t:e contract specificationdocu/ents
Na/e0Sinature0Date0
INSPECTION AND TEST PAN C=ECIST for0 STORAGE AND PROTECTION
(To e com!leted y t"e !erson(s) directly res!onsile for t"e work)
Contract Nu/1er0ContractPro3ect Na/e0
Contractor0
Su1contractor0
or5 area0 C:ec5list Nu/1er0
"aterials co/ponentse7uip/ent
ocation of storae Date Initials Co//ents
Pass ail
INSPECTION AND TEST PAN C=ECIST for0 INCOMING INSPECTION
(To e com!leted y t"e !erson(s) directly res!onsile for t"e work)
Contract Nu/1er0
ContractPro3ect Na/e0
Contractor0
Su1contractor0
or5 area0 C:ec5list Nu/1er0
"aterials co/ponentse7uip/ent
Purc:aseOrder No.
Deli,er8Doc5et No.
Buantit8sie ,erified Inspected for Date Initial
Aainst PO Aainst DD Da/ae Tec:nicaldetails
"ar5etin
top related