rab pengawasan pltmh ilu 2015
Post on 06-Nov-2015
69 Views
Preview:
DESCRIPTION
TRANSCRIPT
RAB(CDB)
PEMERINTAH KABUPATEN PUNCAK JAYADINAS PEKERJAAN UMUMBIDANG PERTAMBANGAN DAN ENERGIAlamat : Jalan Drs. Philipus Andreas Coem No. 3 Mulia
U R A I A N B I A Y A
KEGIATAN: PEMBANGUNAN DAN PENGADAAN PLTMH ILUPEKERJAAN: PENGAWASAN TEKNIS PEMBANGUNAN DAN PENGADAAN PLTMH ILULOKASI: DISTRIK ILUTAHUN ANGGARAN: 2015
A. BIAYA LANGSUNG PERSONILNO.PERSONILJUMLAHVOLUMESATUANHARGA SATUANJUMLAH BIAYA(Orang)(Rp.)(Rp.)I.BIAYA TENAGA AHLI66,000,000.001Team Leader/Supervision Engineering1.006.00OB6,000,000.0036,000,000.002Inspector1.006.00OB5,000,000.0030,000,000.00
II.BIAYA STAF PENDUKUNG85,000,000.001Draftman1.006.00OB4,000,000.0024,000,000.002Operator Komputer1.006.00OB4,000,000.0024,000,000.003Administrasi Kantor/Sekretaris1.005.00OB3,800,000.0019,000,000.004Penjaga Kantor1.006.00OB3,000,000.0018,000,000.00 Jumlah A151,000,000.00 B. BIAYA LANGSUNG NON PERSONILNO.URAIANJUMLAHVOLUMESATUANHARGA SATUANJUMLAH BIAYA(Rp.)(Rp.)I.BIAYA OPERASIONAL KANTOR37,200,000.001Sewa Komputer dan Printer1.001.00ls6,000,000.006,000,000.002Sewa Kantor1.006.00Bulan1,500,000.009,000,000.003Operasional Kantor 1.006.00Bulan3,000,000.0018,000,000.004Komunikasi (Telp/Internet)1.006.00Bulan700,000.004,200,000.00
II.BIAYA MOBILISASI/DEMOBILISASI40,000,000.001Transportasi Pesawat (Jayapura - Mulia)2.002.00Flight5,500,000.0022,000,000.002Transportasi Lokal 2.006.00Bulan1,500,000.0018,000,000.00
III.MATERIAL DAN PERALATAN UKUR7,000,000.001Alat dan Perlengkapan Ukur1.001.00set7,000,000.007,000,000.00
IV.BIAYA PELAPORAN15,550,000.001Laporan Mingguan5.0024.00eksp.90,000.0010,800,000.002Laporan Bulanan5.006.00eksp.100,000.003,000,000.003Laporan Akhir5.001.00eksp.350,000.001,750,000.00
Jumlah B99,750,000.00
REKAP(CDB)PEMERINTAH KABUPATEN PUNCAK JAYADINAS PEKERJAAN UMUMBIDANG PERTAMBANGAN DAN ENERGIAlamat : Jalan Drs. Philipus Andreas Coem No. 3 Mulia
R E K A P I T U L A S I
KEGIATAN: PEMBANGUNAN DAN PENGADAAN PLTMH ILUPEKERJAAN: PENGAWASAN TEKNIS PEMBANGUNAN DAN PENGADAAN PLTMH ILULOKASI: DISTRIK ILUTAHUN ANGGARAN: 2015
NO.URAIANBILL RATEJUMLAH BIAYA(Rp.)(Rp.)A. BIAYA LANGSUNG PERSONIL151,000,000.00I.BIAYA TENAGA AHLI66,000,000.00II.BIAYA STAF PENDUKUNG85,000,000.00
B. BIAYA LANSUNG NON PERSONIL99,750,000.00I.BIAYA OPERASIONAL KANTOR37,200,000.00II.BIAYA MOBILISASI/DEMOBILISASI40,000,000.00III.MATERIAL DAN PERALATAN UKUR7,000,000.00IV.BIAYA PELAPORAN15,550,000.00
Real Cost250,750,000.00PPn (10%)25,075,000.00Jumlah275,825,000.00Dibulatkan275,825,000.00Terbilang :Dua ratus tujuh puluh lima juta delapan ratus dua puluh lima ribu rupiah
Mulia, 17 Juni 2015CV. CITRA DAYA BINA
IR. OKTAVIANUS RAMBAKDirektur
RAB(atma)
PEMERINTAH KABUPATEN PUNCAK JAYADINAS PEKERJAAN UMUMBIDANG PERTAMBANGAN DAN ENERGIAlamat : Jalan Drs. Philipus Andreas Coem No. 3 Mulia
U R A I A N B I A Y A
KEGIATAN: PEMBANGUNAN DAN PENGADAAN PLTMH ILUPEKERJAAN: PENGAWASAN TEKNIS PEMBANGUNAN DAN PENGADAAN PLTMH ILULOKASI: DISTRIK ILUTAHUN ANGGARAN: 2015
A. BIAYA LANGSUNG PERSONILNO.PERSONILJUMLAHVOLUMESATUANHARGA SATUANJUMLAH BIAYA(Orang)(Rp.)(Rp.)I.BIAYA TENAGA AHLI66,000,000.001Team Leader/Supervision Engineering1.006.00OB6,000,000.0036,000,000.002Inspector1.006.00OB5,000,000.0030,000,000.00
II.BIAYA STAF PENDUKUNG84,000,000.001Draftman1.006.00OB4,000,000.0024,000,000.002Operator Komputer1.006.00OB4,000,000.0024,000,000.003Administrasi Kantor/Sekretaris1.005.00OB3,600,000.0018,000,000.004Penjaga Kantor1.006.00OB3,000,000.0018,000,000.00 Jumlah A150,000,000.00 B. BIAYA LANGSUNG NON PERSONILNO.URAIANJUMLAHVOLUMESATUANHARGA SATUANJUMLAH BIAYA(Rp.)(Rp.)I.BIAYA OPERASIONAL KANTOR36,000,000.001Sewa Komputer dan Printer1.001.00ls6,000,000.006,000,000.002Sewa Kantor1.006.00Bulan1,500,000.009,000,000.003Operasional Kantor 1.006.00Bulan3,000,000.0018,000,000.004Komunikasi (Telp/Internet)1.006.00Bulan500,000.003,000,000.00
II.BIAYA MOBILISASI/DEMOBILISASI40,000,000.001Transportasi Pesawat (Jayapura - Mulia)2.002.00Flight5,500,000.0022,000,000.002Transportasi Lokal (sewa motor)2.006.00Bulan1,500,000.0018,000,000.00
III.MATERIAL DAN PERALATAN UKUR7,500,000.001Alat dan Perlengkapan Ukur1.001.00set7,500,000.007,500,000.00
IV.BIAYA PELAPORAN14,950,000.001Laporan Mingguan5.0024.00eksp.85,000.0010,200,000.002Laporan Bulanan5.006.00eksp.100,000.003,000,000.003Laporan Akhir5.001.00eksp.350,000.001,750,000.00
Jumlah B98,450,000.00
REKAP(atma)PEMERINTAH KABUPATEN PUNCAK JAYADINAS PEKERJAAN UMUMBIDANG PERTAMBANGAN DAN ENERGIAlamat : Jalan Drs. Philipus Andreas Coem No. 3 Mulia
R E K A P I T U L A S IKEGIATAN: PEMBANGUNAN DAN PENGADAAN PLTMH ILUPEKERJAAN: PENGAWASAN TEKNIS PEMBANGUNAN DAN PENGADAAN PLTMH ILULOKASI: DISTRIK ILUTAHUN ANGGARAN: 2015
NO.URAIANBILL RATEJUMLAH BIAYA(Rp.)(Rp.)A. BIAYA LANGSUNG PERSONIL150,000,000.00I.BIAYA TENAGA AHLI66,000,000.00II.BIAYA STAF PENDUKUNG84,000,000.00
B. BIAYA LANSUNG NON PERSONIL98,450,000.00I.BIAYA OPERASIONAL KANTOR36,000,000.00II.BIAYA MOBILISASI/DEMOBILISASI40,000,000.00III.MATERIAL DAN PERALATAN UKUR7,500,000.00IV.BIAYA PELAPORAN14,950,000.00
Real Cost248,450,000.00PPn (10%)24,845,000.00Jumlah273,295,000.00Dibulatkan273,295,000.00Terbilang :Dua ratus tujuh puluh tiga juta dua ratus sembilan puluh lima ribu rupiah
Mulia, 17 Juni 2015CV. ATMA MITRA CITPA
IR. BAMBANG IRIADIDirektur
RAB(cend)
PEMERINTAH KABUPATEN PUNCAK JAYADINAS PEKERJAAN UMUMBIDANG PERTAMBANGAN DAN ENERGIAlamat : Jalan Drs. Philipus Andreas Coem No. 3 Mulia
U R A I A N B I A Y AKEGIATAN: PEMBANGUNAN DAN PENGADAAN PLTMH ILUPEKERJAAN: PENGAWASAN TEKNIS PEMBANGUNAN DAN PENGADAAN PLTMH ILULOKASI: DISTRIK ILUTAHUN ANGGARAN: 2015A. BIAYA LANGSUNG PERSONILNO.PERSONILJUMLAHVOLUMESATUANHARGA SATUANJUMLAH BIAYA(Orang)(Rp.)(Rp.)I.BIAYA TENAGA AHLI66,000,000.002Team Leader/Supervision Engineering1.006.00OB6,000,000.0036,000,000.003Inspector1.006.00OB5,000,000.0030,000,000.00
II.BIAYA STAF PENDUKUNG84,000,000.001Draftman1.006.00OB4,000,000.0024,000,000.002Operator Komputer1.006.00OB4,000,000.0024,000,000.003Administrasi Kantor/Sekretaris1.005.00OB3,600,000.0018,000,000.004Penjaga Kantor1.006.00OB3,000,000.0018,000,000.00 Jumlah A150,000,000.00 B. BIAYA LANGSUNG NON PERSONILNO.URAIANJUMLAHVOLUMESATUANHARGA SATUANJUMLAH BIAYA(Rp.)(Rp.)I.BIAYA OPERASIONAL KANTOR35,186,500.001Sewa Komputer dan Printer1.001.00ls5,786,500.005,786,500.002Sewa Kantor1.006.00Bulan1,400,000.008,400,000.003Operasional Kantor 1.006.00Bulan3,000,000.0018,000,000.004Komunikasi (Telp/Internet)1.006.00Bulan500,000.003,000,000.00
II.BIAYA MOBILISASI/DEMOBILISASI40,000,000.001Transportasi Pesawat (Jayapura - Mulia)2.002.00Flight5,500,000.0022,000,000.001Transportasi Lokal (sewa motor)2.006.00Bulan1,500,000.0018,000,000.00
III.MATERIAL DAN PERALATAN UKUR7,500,000.001Alat dan Perlengkapan Ukur1.001.00set7,500,000.007,500,000.00
IV.BIAYA PELAPORAN14,950,000.001Laporan Mingguan5.0024.00eksp.85,000.0010,200,000.002Laporan Bulanan5.006.00eksp.100,000.003,000,000.003Laporan Akhir5.001.00eksp.350,000.001,750,000.00
Jumlah B97,636,500.00
REKAP(cend)PEMERINTAH KABUPATEN PUNCAK JAYADINAS PEKERJAAN UMUMBIDANG PERTAMBANGAN DAN ENERGIAlamat : Jalan Drs. Philipus Andreas Coem No. 3 Mulia
R E K A P I T U L A S IKEGIATAN: PEMBANGUNAN DAN PENGADAAN PLTMH ILUPEKERJAAN: PENGAWASAN TEKNIS PEMBANGUNAN DAN PENGADAAN PLTMH ILULOKASI: DISTRIK ILUTAHUN ANGGARAN: 2015
NO.URAIANBILL RATEJUMLAH BIAYA(Rp.)(Rp.)A. BIAYA LANGSUNG PERSONIL150,000,000.00I.BIAYA TENAGA AHLI66,000,000.00II.BIAYA STAF PENDUKUNG84,000,000.00
B. BIAYA LANSUNG NON PERSONIL97,636,500.00I.BIAYA OPERASIONAL KANTOR35,186,500.00II.BIAYA MOBILISASI/DEMOBILISASI40,000,000.00III.MATERIAL DAN PERALATAN UKUR7,500,000.00IV.BIAYA PELAPORAN14,950,000.00
Real Cost247,636,500.00PPn (10%)24,763,650.00Jumlah272,400,150.00Dibulatkan272,400,000.00Terbilang :Dua ratus tujuh puluh dua juta empat ratus ribu rupiah
Mulia, 17 Juni 2015KONSULTAN SUPERVISICV. CENDANA CONSULTANT
NATALIA ALLOBUA, S.Sos.Direktris
Sheet3
top related