1
New York City Benchmarking
REBNY – Multifamily ProgramsJanuary 28, 2011
Cameron Bard NYSERDA
2
New York State Energy R&D Authority
• Established in 1975
– administering energy efficiency & clean energy programs since the 1990s
• Commercial, Industrial, and Residential Programs
• Statewide Funding
– primarily funded by ratepayers
– SBC, EEPS, etc.
3
NYSERDA Benchmarking Services
• Services and On-Site Energy Analysis
• Pre-Qualified Consultants– Flex Tech and Multifamily Partners
• Services Initially Funded by NYSERDA– cost-sharing for expenses above $7,000
• Emphasis on Transition into MPP– projects encouraged to continue with additional
NYSERDA services
4
Multifamily Performance Program (MPP)
• Launched in May 2007 – MPP Version 4 was launched September ‘10
• Program for all 5+ Unit New and Existing Buildings– benchmarking– energy audit & energy reduction planning
• Participant and Partner Relationship– pre-qualified energy consultants work to develop a work scope
detailing how the building will achieve a 15% source energy reduction target
• Advanced Modeling Techniques– thermodynamic modeling allows for accurate baseline and post-
retrofit energy saving analysis
5
Benefits of MPP Participation
• Reduced Energy Costs
– minimum of 15% source energy reduction projections
– current annual, average for existing buildings post-retrofit: 25%
• Reduced Operations & Maintenance Costs
– “building as a whole” approach
• Continued Affordability for Residents
– protection against rising fuel costs
• Resident Comfort
– health and safety just as important as energy savings
• Compliance with Benchmarking Legislation
6
Multifamily Program Options
< 76 Units – NYSERDA or Con Edison
75 + Units - NYSERDA
7
MPP Process
INSTALL50% completion inspectionsubstantial completion inspection
PLANscoping session with owner/managementbenchmarkingaudit & energy reduction plan (ERP)
MEASUREpost construction benchmarking
8
MPP Incentive Levels: Existing Buildings
AFFORDABLE HOUSING MARKET-RATE HOUSING
PAYMENT #1
Base Incentive(projects up to 30 units)
$5,000 / project $2,500 / project
Base Incentive(projects from 31-500 units
$10,000 / project $5,000 / project
Incremental Incentive $20 / unit (over 100 units) $10 / unit (over 100 units
Incentive payable upon of the Energy Reduction Plan and associated documents, which must include documentation that the building has been benchmarked using the NYSERDA Benchmarking Tool. The list of required documents and additional information is located in
Program Guidelines Section 3.
PAYMENT #2 $300 / unit
Incentive payable at 50% construction complete, based upon a successful Program inspection. The list of required documents and additional information is located in Program Guidelines Section 4.
PAYMENT #3 $300 / unit
Incentive payable at substantial completion of construction, based upon a successful Program inspection, performance testing (asapplicable), and verification of active utility accounts. The list of required documents and additional information is located in Program
Guidelines Section 4.
INSTALL
PLAN
MEASURE
9
MPP Incentive Levels: New Construction
AFFORDABLE HOUSING MARKET-RATE HOUSING
PAYMENT #1
Performance Path $20,000 / project $15,000 / project
Prescriptive Path N/A N/A
Payable upon approval of the Proposed Energy Reduction Plan and associated documents. The list of required documents and additional information is located in Program Guidelines Section 3.
Payment #1 is available for performance path projects only.
PAYMENT #2 $1.00/ghsf*
Payment upon approval of the Open-Wall Site Inspection. The list of required documents and additional information is located in Program Guidelines Section 3.
PAYMENT #3 $0.50/ghsf* minus 10% retainage
Payable upon approval of the As-Built Energy Reduction Plan (Performance path projects only) and the As-Built Site Inspection. The list of required documents and additional information is located in Program Guidelines Section 3.
PAYMENT #4 10% retainage held from Payment #3
Payable upon receipt of the Fuel Release Forms as detailed in the Participation Agreement. The list of required documents and additional information is located in Program Guidelines Section 3.
INSTALL
PLAN
MEASURE
10
Most Recommended Measures: Existing
0% 10% 20% 30% 40% 50% 60%
Programmable thermostats, install
Washing machines, install Energy Star
Lighting, exterior, upgrade or install
Thermostatic radiator valves, install
Exterior doors, weatherstrip or airseal
DHW heater, high efficiency, install
Boiler, new high efficiency, install
DHW, controls
Piping, DHW, insulate
Lighting, fluorescent, upgrade existing - apts
Windows, replace, apts
Lighting, CFL's, install
Low-flow showerheads, install
Boiler, replace
Envelope penetrations, seal (with energy savings)
Low-flow aerators, install
Lighting, incandescent to fluorescent - apts
Insulation, roof deck or attic
Lighting, fluorescent, upgrade existing - CA
Refrigerators, install Energy Star
11
Most Recommended Measures: New Construction
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Elevator, High Efficiency, install
Motors, Install NEMA premium efficiency
Pumps, VFD Install
Lighting, exterior, upgrade or install
Insulation, Below Grade Walls
DHW indirect-fired heater, install
Exhaust fans, install Energy Star
Low-flow aerators, install
Low-flow showerheads, install
Dishwasher, Install Energy Star
Air Conditioners, install
Lighting, occupancy sensors, install
Lighting, High Efficiency Flourescent, CA, install
Boiler, new high efficiency, install
Lighting, High Efficiency Flourescent, Apt install
Washing machines, install Energy Star
Windows, new high efficiency, install, apts
Insulation, walls
Refrigerators, install Energy Star
Insulation, roof deck or attic
12
MPP Timeline
20122011
Projects Must Be In Construction by November 2011
Notice to Proceed
60 Days ERP Submittal
ERP Approval One YearConstruction Completion
13
Participation Type: Existing Buildings
Condo2%
Co-op20%
For-Profit Rental
58%
Non-Profit Rental
20%
14
Participation Type: New Construction
Affordable85%
Market Rate15%
15
Interested in Participating?
Visit:
www.getenergysmart.org
Email:
MultifamilyPrograms@nyserda.org