rencana anggaran biaya marka jalan
Post on 08-Mar-2016
2.817 Views
Preview:
DESCRIPTION
TRANSCRIPT
-
DAFTAR ISIAN
NAMA KEGIATAN : PENGADAAN MARKA JALAN (DAK)
PENGADAAN SARANA PENDUKUNG BIDANG PERHUBUNGAN DARAT (SISA DAK)
PEKERJAAN : BELANJA MODAL PENGADAAN MARKA JALAN: PENGADAAN DAN PEMASANGAN CERMIN TIKUNGAN (SISA DAK)
SUMBER DANA : DAK
TAHUN : 2015
LOKASI : KABUPATEN BENER MERIAH
DISIAPKAN OLEH :
DINAS : DINAS PERHUBUNGAN, PARIWISATA, TELEKOMUNIKASI DAN INFORMATIKA
ALAMAT : KOMPLEK PEMDA KABUPATEN BENER MERIAH
(PPTK) : SUARDI, STMAIZARIDHA, S.kom
KEPALA DINAS : ASWAD, S.pd
DI BUAT OLEH :
PEMBUATAN : REDELONG
Propinsi : ACEHKabupaten : BENER MERIAH
-
Sub Pekerjaan : Bangunan Gedung
-
DAFTAR ISIAN
PENGADAAN SARANA PENDUKUNG BIDANG PERHUBUNGAN DARAT (SISA DAK)
BELANJA MODAL PENGADAAN MARKA JALANPENGADAAN DAN PEMASANGAN CERMIN TIKUNGAN (SISA DAK)
DINAS PERHUBUNGAN, PARIWISATA, TELEKOMUNIKASI DAN INFORMATIKA
KOMPLEK PEMDA KABUPATEN BENER MERIAH
NIP : NIP. 19770325 201003 1 001NIP. 19730120 200604 1 003
NIP : Penata Utama Muda NIP. 19621009 198512 1 002
DIREKTUR :
Januari 2015
Sumber Dana : DAK Tahun Anggaran : 2015
-
Kode Kegiatan : -
-
DAFTAR HARGA SATUAN UPAH DAN BAHAN
NAMA KEGIATAN : PENGADAAN MARKA JALAN (DAK)PEKERJAAN : BELANJA MODAL PENGADAAN MARKA JALANSUMBER DANA : DAKTAHUN ANGGARAN : 2015LOKASI : KABUPATEN BENER MERIAH
NO. URAIAN HARGA UPAH SATUAN HARGA
Pekerja Org/Hari @Rp. 75,000.00 Mandor OH -"- 150,000.00 Tukang Cat OH -"- 110,000.00 Kepala Tukang OH -"- 130,000.00 11 Jaga Malam OM -"- 48,000.00
NO. URAIAN HARGA BAHAN-BAHAN SATUAN HARGA
1 2 3 4
A. TIMBUNAN / GALIANPasir Beton M3 -"- 175,500.00
B. BAHAN PEREKATPortland Cement (PC) Kg -"- 1,596.58
C. BATU / BATU CETAKANBatu Kerikil/koral 5 - 7 cm M3 -"- 188,500.00
H. CAT / MINYAKCat Dasar Kg @Rp. 23,500.00 Thermoplastic Kg @Rp. 58,000.00 Glass Beads Kg @Rp. 26,000.00
-
DAFTAR HARGA SATUAN UPAH DAN BAHAN
KETERANGAN
KETERANGAN
5
-
ANALISA BIAYA KONSTRUKSIBELANJA MODAL PENGADAAN MARKA JALAN
PA Taksir 1 Unit Papan Nama Proyek1.000 unit x Rp 500,000 = Rp
PA Taksir P3K1.000 unit x Rp 500,000 = Rp
PA Taksir Pengukuran Dan Pematokan1.000 LS x Rp 1,830,000 = Rp
= Rp
PA Taksir Foto Dokumentasitaksir = Rp
ABK PEKERJAAN BETON
SNI 7394-2002.6.1 1 M Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr6.1.1 Bahan
Semen portland 218.000 Kg x Rp. 1,597 = Rp.Pasir beton 0.520 M x Rp. 175,500 = Rp.Koral beton 5/7 0.670 M x Rp. 188,500 = Rp.
Jumlah (1) = Rp.6.1.2. Tenaga
Pekerja 1.650 Oh x Rp. 75,000 = Rp.Tukang batu 0.250 Oh x Rp. 90,000 = Rp.Kepala tukang 0.025 Oh x Rp. 130,000 = Rp.Mandor 0.080 Oh x Rp. 150,000 = Rp.
Jumlah (2) = Rp.Jumlah (1) + (2) = Rp.
PL Taksir 1 M2 Pengecatan MarkaBahanThermoplastic 5.0000 Kg x Rp. 58,000 = Rp.Glass Beads 0.8333 Kg x Rp. 26,000 = Rp.Cat Permaking 0.0833 Kg x Rp. 23,500 = Rp.
Jumlah (1) = Rp.TenagaPekerja 0.4000 Oh x Rp. 75,000 = Rp.Tukang 0.2250 Oh x Rp. 110,000 = Rp.Kepala Tukang 0.0025 Oh x Rp. 130,000 = Rp.Mandor 0.0075 Oh x Rp. 150,000 = Rp.Alat Bantu Pengecatan 1.0000 Ls x Rp. 25,000 = Rp.
Jumlah (2) = Rp.Jumlah (1) + (2) = Rp.
Harga untuk 1 M' Mengecat Marka Jalan Ukuran (3x0,12) M = 0,12 x Jumlah = Rp.Dibulatkan = Rp.
( Alat Pengaduk, Penghampar, Genset Dan peralatan Penunjang Pengaman Lainnya)
-
ANALISA BIAYA KONSTRUKSIBELANJA MODAL PENGADAAN MARKA JALAN
500,000.00
500,000.00
1,830,000.001,830,000.00
500,000.00
348,053.3591,260.00
126,295.00565,608.35
123,750.0022,500.003,250.00
12,000.00161,500.00727,108.35
290,000.0021,665.801,957.55
313,623.35
30,000.0024,750.00
325.001,125.00
25,000.0081,200.00
394,823.35
47,378.8047,300.00
-
ANALISA BIAYA KONSTRUKSI ( ABK )BELANJA MODAL PENGADAAN MARKA JALAN
NO JENIS PEKERJAAN ANALISA VOLUMEHARGABAHAN( Rp )
A. PEKERJAAN PERSIAPAN
Papan Proyek Taksir 1 Unit 500,000.00P3K Taksir 1 Bln 500,000.00Pengukuran Dan Pematokan Taksir 1 Ls - Foto Dokumentasi Taksir 1 Unit 500,000.00
G. PEKERJAAN BETONMembuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr SNI 7394-2002.6.1 1 M 565,608.35
M. PEKERJAAN PENGECATANPengecatan Marka Taksir 1 M 313,623.35
-
ANALISA BIAYA KONSTRUKSI ( ABK )BELANJA MODAL PENGADAAN MARKA JALAN
HARGA JUMLAHUPAH HARGA( Rp ) ( Rp )
- 0.00 - 0.00
1,830,000.00 0.00 - 500,000.00
161,500.00 727,108.35
81,200.00 394,823.35
-
RENCANA ANGGARAN BIAYANAMA KEGIATAN : PENGADAAN MARKA JALAN (DAK)PEKERJAAN : BELANJA MODAL PENGADAAN MARKA JALANSUMBER DANA : DAKTAHUN ANGGARAN : 2015LOKASI : KABUPATEN BENER MERIAHDISIAPKAN OLEH : CV. KEMBAR KONSULTAN
NO URAIAN PEKERJAAN VOLUME SATUAN ANALISA
1 2 3 4 5
A PEKERJAAN PERSIAPAN
A.1 PEKERJAAN PENDAHULUAN
1 Papan nama proyek 0.00 bh Taksir2 Photo proyek Dan dokumentasi 1.00 Ls Taksir3 P3K 1.00 Ls Taksir4 Pengukuran Dan Pematokan 1.00 Ls Taksir
SUB TOTAL A
B PEKERJAAN MARKA JALAN
1 Pekerjaan Marka Jalan- Pengecatan Marka Jalan 3030.00 M' Taksir- Pengecatan Marka Parkir 800.50 M' Taksir
2.00 Unit Taksir
- Pengecoran Rambu parkir 0.13 m SNI 7394-2002.6.1
SUB TOTAL B
REKAPITULASI PEKERJAAN
A PEKERJAAN PERSIAPAN
B PEKERJAAN MARKA JALAN
TERBILANG: DUA RATUS TIGA JUTA LIMA RATUS RIBU RUPIAH
DI SETUJUI OLEHPEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)
DINAS PERHUBUNGAN, PARIWISATA, TELEKOMUNIKASI DAN INFORMATIKA
- Pemasangan Rambu Parkir Sesuai Gambar Lengkap Terpasang
-
SUARDI, STNIP. 19770325 201003 1 001
MENGETAHUI KEPALA DINAS PERHUBUNGAN, PARIWISATA, TELEKOMUNIKASI DAN INFORMATIKA
KABUPATEN BENER MERIAH
ASWAD, S.pdPenata Utama Muda NIP. 19621009 198512 1 002
-
RENCANA ANGGARAN BIAYA
HARGA JUMLAH SATUAN SATUAN
(Rp.) (Rp.) 6 7 = ( 3 X 6 )
500,000.00 - 500,000.00 500,000.00
### 500,000.00 1,830,000.00 1,830,000.00
SUB TOTAL A 2,830,000.00
47,300.00 143,319,000.00 47,300.00 37,863,650.00
450,000.00 900,000.00
721,158.35 90,865.95
SUB TOTAL B 182,173,515.95
REKAPITULASI PEKERJAAN
2,830,000.00
182,173,515.95
JUMLAH TOTAL 185,003,515.95
P. P. N 10% 18,500,351.60
JUMLAH TOTAL 203,503,867.55
DIBULATKAN 203,500,000.00
REDELONG, Januari 2015DI BUAT OLEH
CV. KEMBAR KONSULTAN
-
Syukri Indrawansyah, STDirektur
MENGETAHUI KEPALA DINAS PERHUBUNGAN, PARIWISATA, TELEKOMUNIKASI DAN INFORMATIKA
KABUPATEN BENER MERIAH
ASWAD, S.pdPenata Utama Muda NIP. 19621009 198512 1 002
-
TOTAL : 203,500,000.00
0
MILYARAN JUTAANRATUSAN 0 2PULUHAN 0 0SATUAN 0 3
JUTA
HASIL : DUA RATUS TIGA JUTA LIMA RATUS RIBU
TOTAL : 11.00
01
1 SEBELAS
HASIL : SEBELAS
TOTAL : 200.00
2 DUA RATUS DUA RATUS0
-
HASIL : DUA RATUS
-
203 500
JUTAAN RIBUANDUA RATUS DUA RATUS 5 LIMA RATUS LIMA RATUS
0TIGA TIGA 0
JUTA RIBU
DUA RATUS TIGA JUTA LIMA RATUS RIBU
-
-
RATUSAN000
ISIANUpah&bahanAnalisaResumABKRAB MARKASheet1