Why incentives? Mass legislature extended requirement of IOU electric efficiency programs until 2007The charge of less than 3 mills/kwh for each commercial customer creates a pool of cash for incentives$millions are allocated to be spent in NE each yearCash incentives paid to reduce paybacks for projects that result in energy savingsMassachusetts Electric program’s started in the mid 80s and have been consistent leaders in paying out the incentive budget each year since
Incentive GeographyMassachusetts
Massachusetts Electric http://www.nationalgridus.com/masselectric/Western Massachusetts Electric http://www.nu.com/NSTAR http://www.nstaronline.com/
Connecticut Connecticut Light and Power
http://www.cl-p.com/clmbus/target/indextarget.asp#municipal
Rhode Island Narragansett Electric
http://www.nationalgridus.com/narragansett/business/energyeff/energyeff.asp
Maine New Hampshire
Public Service of New Hampshire http://www.psnh.com/Business/Efficiency/IndustrialRetrofit.aspGranite State Electric
http://www.nationalgridus.com/granitestate/business/energyeff/energyeff.asp
Vermonthttp://www.efficiencyvermont.com/
Conservation Incentive Programs
Prescriptive measures – lighting, motors, HVAC set incentivesCustom measures – cost benefit analysisRetrofit Program
MECO program - Energy Initiative40-45% of total cost or 2 year payback
New buildings, expansions, new loadMECO program - Design 2000+60-75% of incremental cost or 1.5 yr payback
Large CustomerMECO program – Accelerated Application ProcessEI – 1 year paybackD2+ - full incremental
Municipal programEI – 60%, customer net cost financed on electric billD2+ - full incremental
Industrial System Optimization ServiceLong payback measures may be able to split costs based on
percent savingsTechnical Assistance - contract with a third party engineering firm and share 50% of cost of TA study
Action plan for efficiency upgradesCompare your facility to othersInventory all equipmentDevelop a measure listPrepare estimates of cost and savingsThird party reviewSecure funding/allocate budgetImplement with oversightCommission by third partyTA funds from local util may cover portion
Pumping Efficiency MeasuresReduce loadManage loadWater to wire efficiencyPump selectionMotor and drive selectionAutomated control
Waste Water Aeration Measures
Fine bubbleImproved surface aeratorsPremium motorsHigh efficiency motor driveBlower vfds andAutomatic DO control
Lighting efficiency measures
T5 low and high bay fixtures
Pulse start Metal halide
Indirect fluorescent Super efficient T8s Comprehensive
controls for large buildings