risk assessment of outsourcing pharmaceutical packaging · risk assess.pack outsourcing slide...

Post on 30-Sep-2020

4 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 11 11/0411/04

Risk Assessment of Outsourcing Pharmaceutical Packaging

Dr Afshin HosseinyNovember 2004

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 22 11/0411/04

Why Outsource?

• Technical requirements• Capacity requirements• Speed of Setting up• Location - market requirements• Costs!

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 33 11/0411/04

What to Outsource?

• Primary packaging operations• Secondary packaging operations• Primary & secondary packaging• May include

– pack design– artwork– sourcing of materials

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 44 11/0411/04

How to Outsource

• Assess internal (own) resources– personnel– facility– equipment– capacity

• Assess external resource availability– personnel– facility– equipment– capacity

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 55 11/0411/04

How to Outsource

• Assess ability to manage contractors– technical support– product/technology transfer– auditing & monitoring

• Consider associated risks– doing it in-house Vs– outsourcing

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 66 11/0411/04

What should be considered?• technical knowledge requirements• product(s) characteristics• facility & equipment• cGMP - ability to comply! • location - logistics considerations• capacity - availability• personnel requirements• regulatory requirements

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 77 11/0411/04

What should be considered?

• assess internal resources• do we have suitable facility/equipment?• do we have sufficient capacity?

– people– facility & equipment– infrastructure, e.g.QC/QA, warehouse, etc.

• do we have technical expertise?• any limitations,e.g. regulatory, market,etc.• costs!

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 88 11/0411/04

What should be considered?

• assess external resources, can you find a company with required:– technical expertise– capacity - facility & equipment– resources - people, infrastructure

• are they located where you want them?• regulatory consideration• local market considerations• costs!

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 99 11/0411/04

Risk Assessment

Risks - in-house!• insufficient knowledge (technology!)• poor /lack of local market requirements• insufficient capacity• may require capital investments

– costs– lead time, design, build, install, validate

• overall unit cost may be too high!

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 1010 11/0411/04

Risk Assessment

Advantages - in-house• under own control• can implement operations in line with own

policies and procedures• limited management issues• staff development

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 1111 11/0411/04

Risk Assessment

Risks - outsourcing• confidentiality issues• technical knowledge• resource availability• capacity - (in line with your timelines!)• other products in the facility• other customers!• communication & management issues

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 1212 11/0411/04

Risk Assessment

Advantages - outsourcing• technical knowledge for specialist products• local market advantages, e.g regulatory• resource availability• logistical advantages (e.g. close to market

or region)• potentially lower costs!

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 1313 11/0411/04

Developing Requirements

• What is it you want to outsource?– Primary packaging– secondary packaging– both– sourcing of materials

• what standards do you expect?– regulatory– local market– own company

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 1414 11/0411/04

Developing Requirements

• Document your expectations on– quality standards– volumes/spread over say 12 months– regions to be covered– stock control– support availability, tech transfer, validation– audits– right to visit– dealing with complaints

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 1515 11/0411/04

Developing Requirements(Setting priorities)

High = must have– meeting cGMP standards– validation– regulatory approval– capacity– cost?!!

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 1616 11/0411/04

Developing Requirements(Setting priorities)

Medium = would like to have but will accept alternatives– sourcing materials from your approved

suppliers– use of dedicated facilities– stock holding

• Low = nice to have

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 1717 11/0411/04

Decision Making

Assess risk, considering – requirements– in-house advantages– in-house disadvantages– outsource advantages– outsourcing disadvantages– priorities

• First level decision

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 1818 11/0411/04

Decision Making

If decision was to outsource, then;• identify potential candidates• conduct due diligence audits• prepare short list• second risk assessment• use knowledge from audits• assess against the requirements and

priorities

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 1919 11/0411/04

Risk Management

• detailed contract with the contractor– business– quality & technical

• prepare technical transfer documentation• provide technical support (product data)• agree roles & responsibilities• prepare mitigation plans for each risk• monitor progress, including the first launch

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 2020 11/0411/04

Summary

• outsourcing packaging can be a good short or long term solution

• ensure you know and have documented your requirements

• have a robust selection process• always challenge against in-house option• must have sufficient resource to transfer

technical knowledge, implement & validate

Risk Assess.Pack outsourcingRisk Assess.Pack outsourcing Slide Number Slide Number 2121 11/0411/04

Summary

• must have sufficient resource to continue support, monitor and audit

• a good detailed technical agreement will minimise problems

• if cost is the main driver, then ensure you include cost of technical transfer and support required!

top related