RISK BASED ENVIRONMENTAL ASSESSMENT
RISK-BASED ENVIRONMENTAL ASSESSMENT
Simon CatchpolePorto, May 2012
www.bgcengineering.ca
RISK BASED ENVIRONMENTAL ASSESSMENT
AN OVERALL RISK ASSESSMENT ADDRESSES THE UNDERLYING PHYSICAL RISKS, UPON WHICH THE NON-PHYSICAL RISKS DEPEND:
Environmental and Geotechnical Risks
Legal and Permitting
Social and Political
Financial
Safety and Human Health
Operational Risks
RISK BASED ENVIRONMENTAL ASSESSMENT
IMPACT COMPENSATION
RESIDUAL IMPACTS
IMPACT MITIGATION
POTENTIAL IMPACTS
SCREENING FOR PROJECT -
ENVIRONMENT INTERACTIONS
A.I. BASELINEPROJECT
DESCRIPTION
REGIONAL BASELINEALTERNATIVES
ANALYSIS
ENVIRONMENTAL IMPACT ASSESSMENT
RISK MANAGEMENT
RESIDUAL RISKS
RISK MITIGATION
EVENTUAL RISKS
SCREENING FOR PROJECT -
ENVIRONMENT INTERACTIONS
A.I. BASELINEPROJECT
DESCRIPTION
REGIONAL BASELINEALTERNATIVES
ANALYSIS
ENVIRONMENTAL RISK ASSESSMENT
RISK BASED ENVIRONMENTAL ASSESSMENT
SEA FISHING ENERGY USE WATER USEAGRICULTURE &
MININGLAND USE
CLIMATE CULTURAL
ARCHAEOLOGY
SEASONAL WEATHER
FAUNA
MARINE BIOLOGY AQUATIC BIOLOGY
VEGETATION
SOILS
OCEANOGRAPHYSNOW
ACCUMULATIONHYDROLOGY LANDSCAPE
GEOMORPHOLOGY
ICE ACCUMULATION WATER CHEMISTRY
COASTAL PROCESSES
SURFACE PROCESSES
FROZEN GROUND HYDROGEOLOGY
GEOLOGY SEISMOLOGY
GEO-HAZARDS
HYDRO-HAZARDSAVALANCHES
STORMS
SEISMICHAZARDS
TSUNAMI HAZARDS
RISK BASED ENVIRONMENTAL ASSESSMENT
RISKS AND IMPACTS INVENTORY
COMPONENT ENVIRONMENTAL ASPECT OR HAZARD
PREPARATION WORKS PERMANENT DAM WATER INTAKE COMMISSIONING
SURFACE
WATER
DIVERSION
SITE CLEAR
ING
COFFER
DAM CONSTRUCT
ION
EXCAVATION
TO BASE LEVEL
MATERIALS MANAGEME
NT
DAM WALL CONSTRUCT
ION
COMPLEMENTARY WORK
S
EXCAVATION
OF PORTA
L
TUNNEL
ADVANCE
WASTE
ROCK REMO
VAL
WATER
MANAGEME
NT
FILLING OF
RESERVOIR
DAMMING
OF RIVER FLOW
DISCHARGE
OF FLOO
D FLOW
S
GEOMORPHOLOGY
MODIFICATION OF SLOPES I I I I I
MODIFICATION OF WATER COURSES I I I I
SOILREMOVAL / DISTURBANCE OF SOIL I I I I I
INCREASED EROSION RATE I R R R R
HYDROLOGY
MODIFICATION OF FLOW REGIME I I I I I I
MODIFICATION OF SLOPE RUNOFF I I I I
INCREASED SEDIMENT LOAD R R I
MODIFICATION OF RECHARGE TO GROUNDWATER I I I I I
I EXPECTED IMPACTR ENVIRONMENTAL RISK
RISK BASED ENVIRONMENTAL ASSESSMENT
RISKS AND IMPACTS INVENTORY
COMPONENT ENVIRONMENTAL ASPECT OR HAZARD
PREPARATION WORKS PERMANENT DAM WATER INTAKE COMMISSIONING
SURFACE
WATER
DIVERSION
SITE CLEAR
ING
COFFER
DAM CONSTRUCT
ION
EXCAVATION
TO BASE LEVEL
MATERIALS MANAGEME
NT
DAM WALL CONSTRUCT
ION
COMPLEMENTARY WORK
S
EXCAVATION
OF PORTA
L
TUNNEL
ADVANCE
WASTE
ROCK REMO
VAL
WATER
MANAGEME
NT
FILLING OF
RESERVOIR
DAMMING
OF RIVER FLOW
DISCHARGE
OF FLOO
D FLOW
S
GEOMORPHOLOGY
MODIFICATION OF SLOPES I I I I I
LANDSLIDE IN CATCHMENT R R R R
MODIFICATION OF WATER COURSES I I I I
SOILREMOVAL / DISTURBANCE OF SOIL I I I I I
INCREASED EROSION RATE I R R R R
HYDROLOGY
MODIFICATION OF FLOW REGIME I I I I I I
MODIFICATION OF SLOPE RUNOFF I I I I
INCREASED SEDIMENT LOAD R R I
MODIFICATION OF RECHARGE TO GROUNDWATER I I I I I
FLOOD EVENTS IN CATCHMENT R
I EXPECTED IMPACTR ENVIRONMENTAL RISKR EFFECT ON GEOHAZARD RISK
RISK BASED ENVIRONMENTAL ASSESSMENT
RISKS AND IMPACTS INVENTORY
COMPONENT ENVIRONMENTAL ASPECT OR HAZARD
PREPARATION WORKS PERMANENT DAM WATER INTAKE COMMISSIONING
SURFACE
WATER
DIVERSION
SITE CLEAR
ING
COFFER
DAM CONSTRUCT
ION
EXCAVATION
TO BASE LEVEL
MATERIALS MANAGEME
NT
DAM WALL CONSTRUCT
ION
COMPLEMENTARY WORK
S
EXCAVATION
OF PORTA
L
TUNNEL
ADVANCE
WASTE
ROCK REMO
VAL
WATER
MANAGEME
NT
FILLING OF
RESERVOIR
DAMMING
OF RIVER FLOW
DISCHARGE
OF FLOO
D FLOW
S
GEOMORPHOLOGY
MODIFICATION OF SLOPES R R I I I R I R
LANDSLIDE IN CATCHMENT R R R R
MODIFICATION OF WATER COURSES I I I I
SOILREMOVAL / DISTURBANCE OF SOIL R R I R I R
INCREASED EROSION RATE R R R R R R
HYDROLOGY
MODIFICATION OF FLOW REGIME I I I I I I
MODIFICATION OF SLOPE RUNOFF R R R I R
INCREASED SEDIMENT LOAD R R R R R I
MODIFICATION OF RECHARGE TO GROUNDWATER I I I I I
FLOOD EVENTS IN CATCHMENT R R
I EXPECTED IMPACTR ENVIRONMENTAL RISKR EFFECT ON GEOHAZARD RISKR ENHANCED ENVIRONMENTAL RISK