sanyu jushi sdn bhd reduce powder waste for incineration purpose towards greener environment sanyu...
Post on 18-Dec-2015
222 Views
Preview:
TRANSCRIPT
SANYUSANYU JUSHI SDN JUSHI SDN BHDBHD
Reduce Powder Waste Reduce Powder Waste For Incineration Purpose For Incineration Purpose
Towards Greener Towards Greener EnvironmentEnvironment
SANYU JUSHI SDN BHD
Team MembersTeam Members
MR. KYOSUKE KAJIYAMA – AdvisorMR. KYOSUKE KAJIYAMA – Advisor MR. SASIDHARAN - Project LeaderMR. SASIDHARAN - Project Leader MR. ANDREW – Project AssistantMR. ANDREW – Project Assistant MR. SHAN - Project AssistantMR. SHAN - Project Assistant
SANYU JUSHI SDN BHD
WASTE POWDER CURING WASTE POWDER CURING Waste Powder PreparationWaste Powder Preparation
SANYU JUSHI SDN BHD
1
WASTE POWDER CURING WASTE POWDER CURING Water Tank For Curing Water Tank For Curing
ProcessProcess
SANYU JUSHI SDN BHD
WASTE POWDER CURING WASTE POWDER CURING Waste Powder Transferred Into Tank Waste Powder Transferred Into Tank
For CuringFor Curing
SANYU JUSHI SDN BHD
1 2 3 4
5 6
WASTE POWDER CURING WASTE POWDER CURING Remove The Cured WasteRemove The Cured Waste
SANYU JUSHI SDN BHD
1 2 3
4 5 6
WASTE POWDER CURING WASTE POWDER CURING Ready For LandfillReady For Landfill
SANYU JUSHI SDN BHD
1 2 3
POWDER WASTE POWDER WASTE GENERATED & CUREDGENERATED & CURED
TOTAL POWDER WASTE TOTAL POWDER WASTE GENERATED :GENERATED :
9.489 tons 9.489 tons (from June ~ August 2007)(from June ~ August 2007)
TOTAL POWDER WASTE CURED :TOTAL POWDER WASTE CURED :
7.230 tons 7.230 tons (cured in August 2007)(cured in August 2007)
SANYU JUSHI SDN BHD
TARGET ACHIEVEDTARGET ACHIEVED
We have achieved our target to reduce We have achieved our target to reduce the powder waste for incineration the powder waste for incineration
purpose at purpose at
76.2 % (target : 50 %)
SANYU JUSHI SDN BHD