sap presentation

Post on 16-Apr-2017

230 Views

Category:

Technology

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

SAP PP PRESENTATION

PREPARED BY -: SANJAY KUMAR

CLICK HERE TO LOG ON

User ID

Password

Enter

Production order information report

1

This transaction is used for check the production order information with reference to production order

, material, sales order, sales item, etc.

T-code -- > COOIS

WE WILL BRIEFLY DISCUSS IT IN NEXT SLIDE SO KEEP CONSANTRATION.

TYPE T-CODE HERE

COOIS

ENTER

PLANT

SALES ORDER

SALES ITEM

CLICK ON HERE AND PRESS F8

Copy Production Order

On this screen we can select a production order in which we make a confirmation according to the production.

2

Enter time ticket or production confirmation

T-code -- > CO11N

THIS T-CODE IS USED FOR THE PRODUCTION ORDER CONFERMATION.

CO11N

TYPE T-CODE HERE

ENTER

TYPE PRODUCTION

ORDER

PRODUCTION QTY.

SELECT SHIFT PRODUCTIO

N DATE

PERSON NAME

M/C IDLE TIME

T YPE SETUP TIME,M/C PROCESS

TIME,LABOR TIME,

NO.OF LABORS ETC.

TYPE START TIME/DATE,FINIS

H TIME/DATE

POSTING DATE

ENTER

CLICK ON GOODS MOVEMENTS

AFTER PRESS THE ENTER SCREEN LOOK LIKE THIS ..

Fill STORAGE LOCATIO

N

CLICK ON BATCH

DETERMINATION

SELECT THE CONSUMING

MATERIAL

THIS WINDOW IS OPENCLICK ON

BATCH DETERMINATIO

N

CLICK ON W/O CLASS

SELECTION

MATERIAL QTY AUTOMATICALY

SELECTED IN BATCHES FROM STOCK

THEN CLICK ON COPY

1. SELEC THE TOP MATERIAL AND FILL THE BATCH(DRUM

NO.).

2. CLICK ON COMPONENT

top related