SHOVEL

EXCAVATOR1

Submitted by:

Athulya.c.s

Roll No:14,

S7 , Civil

SHOVEL EXCAVATOR

2

Track system

3

4

•POWER SHOVEL EXCAVATORS

•BACK HOE SHOVEL EXCAVATOR

•FRONT SHOVEL EXCAVATOR

THREE TYPES...

POWER SHOVEL EXCAVATOR

Long-lasting and useful class of earth moving equipment

Capable of excavating all types of earth except hard rock

Size of power shovel varies from 0.375-1.05m3

It may be crawler mounted or wheel mounted shovels

5

6

Crawler mounted shovel:

Low speed

Effective in unstable soil

Wheel mounted shovel:

Higher speed

Effective only in firm ground

Power shovel deponds on:

Class of material

Depth of cutting

Angle of swing

Job conditions

Management conditions

Size of hauling units

Skill of the operator

Physical condition of the shovel 7

Applications:

Suitable for close range work

Capable of digging very hard materials & remove big boulders

Used in digging in gravel banks , clay pits , digging cuts in road

works , road-side berms etc.

8

BACK HOE SHOVEL EXCAVATOR

Also known as hoe , back shovel & pull shovel

Used to excavate below the natural surface on which it rests

Hoes used to excavate trenches , pits for basemants & grading works

Used to establish natural slopes

9

In strom drain and utility work the hoe can perform the

trench excavation and can handle the pipe by eliminating

a second machine

There are special buckets for everything from light sand

to hard rock digging

10

Parts of a back hoe excavator

11

Applications:

Suitable for digging below the machine level

Effectively used to dress or trim the surface avoiding the use of

manual effort for dressing the excavated surface

12

FRONT EXCAVATOR

Used predominately for hard digging above track level

and loading haul units

Loading of shot rock will be a typical application

Shovel is capable of developing a high break out force

The material being excavated should be such that it will

stand with a fairly vertical face

13

FRONT SHOVEL EXCAVATOR

High excavation rate due to unique front shovel and side

tip operation

Prolec laser system enables excavation to a more

accurate level – resulting in quicker excavation rates

while reducing the chance of over-digging

14

Improved track quality due to the excavation action

(pushing into spoil rather than pulling it back)

Fewer machine controllers on site meaning less risk and

safer operations

15

16

17

Factors afecting shovel excavators are:

Class of material

Height of cut

Angle of swing

Size of houling units

Operator skill

Physical conditions of the shovel

18