site plan key

Post on 13-Feb-2022

6 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

BUSSTOP

BUS STOP

Ticket

TicketTicket

Ticket TicketEntrance

Car Park Access

Site Entrance

Existing Foot Bridge

Future Pedestrian Foot Bridge

Pedestrian Foot Bridge to Central

Park

Fire Exit

Fire Exit

New Bus Stop

Existing Stairs

2000x600 Feeder Pillar

Existing retaining wall partially demolished-path widened to 3 meters with dawrf wall

built alongside with reused stoneRefer to DRW 90030

Fire Appliance

Point

Location of plant within acoustic timber fenced

enclosure

Existing paving to be Retained

Existing landscaping to be retained

(area TBC by further site investigation)

Maintenance Strip

Maintenance Access

Fire Tender and Service Access Only

Fire Appliance

Point

Loading Bay

Drop Off /

Coach Replacement

Planting Bed

Crossing

800mm

Maintenance Strip

800mm

Maintenance Strip

Area for detention basin and below ground cellular

attenuation Tank

Security Bollards

Railing to edge ofescape ramps

Railing to edge of path

1:2549050

48100 1:25 48250

1500mm PPC steelrailings and gate to network

rail expansion land

Highways works by Darlington Borough

Council

Highways works by Darlington Borough

Council

Highways works by Darlington Borough

Council

Extent of works to this area in abeyance,existing parking surface to be retained

5

43

21

Retractable Security Bollards

Area for below ground cellular

attenuation Tank

Open cycle storage24x bikes

Enclosed cycle storage26x bikes

Enclosed Bin Store

Security Bollards

Fire Exit

Security Bollards

Public Art (by others) on plinth integrated into raised planter

Raised planter and vehicle protection

Raised planter and vehicle protection

Rotunda Entrance

Drop Off

Drop Off

Planting Bed

Planting Bed

Planting Bed

Planting Bed

Planting Bed

Primary Entrance

23

22

21

20

19

18

17

16

15

14

13

1 2 3 4 5 6 7 8 9 10 11 12

A1

A2

A3

A4

A5

A6

B1

B2

B3

B4

B5

B6

B7

D3D2D1

A4.1

Post mounted Special Assistance Call Point

Fire escape Muster Point

Planting to perimeter of detention basin

Planting to perimeter of detention basin

Site Plan Key

Pre-cast Concrete Block Paving with feature bandingColour - Mix

Tarmac access road surface to engineers spec

Planting area/ Hedges

Proposed Trees (type TBC)

Species rich grass seed mix

Red line indicates site boundary

Lighting Column, TBC electrical engineers

Litter bin

Note:

*** Levels, Falls and drainage TBC ***

Orange line indicates site works under a seperate contract

Blue line indicates location (TBC) of existing hard landscaping works to be retained

Pavement Paving: Pressed Grey Concrete Flag Paving Slab to match existing pavements

800mm Maintenance Strip to endge of MSCP: Pressed Grey Concrete Flag Paving

Green line indicates location of handrail to footpath

Pink line indicates location of 1500 high pallisade fence to Network Rail specification

Permeable pre-cast concrete block paving to drop off and loading bay laid in herringbone pattern

Pre-Cast concrete raised planter

Built up asphalt footpath to service areas, loading to support MEWP access

External plant enclosure, surrounded by timber acoustic fencing with gated access

Concrete plinth to external plant enclosure, loading to support plant equipment

Pre-cast Concrete Block Paving contrasting stripes

All dimensions to be checked on site.

DO NOT SCALE FROM DRAWING.

Discrepancies ambiguities and/or omissions between this drawing and information given elsewhere must be reported immediately to the architect before proceeding.THIS DRAWING IS COPYRIGHT.

This drawing is to be read in conjunction with drawings:-

Notes:OS Licence No: 100006354

Rev :

Napper Architects Ltd3 Waterloo SquareNewcastle Upon TyneNE1 4DRTel: 0191 2610491

Date :

Drawn :

Scale :

Client :

Project :

Job Number:

NAPPERinfo@napperarchitects.co.uk www.napperarchitects.co.uk

First Floor, 6 Bakers YardLondonEC1R 3DDTel: 0203 9066814

Originator: Zone: Level: Type: Role: Drawing Number:

Drawing Number :

Internal Project No :

P627/05/2020

1 : 250 @ A0_Landscape GeneralArrangement

Darlington Station MSCP

Willmott Dixon

JT

SGMSCP-NAP-Z0-XX-DR-A-90001

B2013

1 : 250

Landscape General Arrangement 0 12.50m 25.0m

C R DATE N AMENDMENTJT AR 03/04/2020 P1 First IssueJT AR 09/04/2020 P2 Updated Access RoadJT AR 17/04/2020 P3 Updated With Reduced LandscapingJT AR 17/03/2021 P4 Stage 3 IssueJT AR 09/04/2021 P5 Updated Stage 3 IssueJT AR 27/05/2020 P6 Final Stage 3 Issue

top related