site proposal
Post on 21-Jul-2016
225 Views
Preview:
DESCRIPTION
TRANSCRIPT
Source: http://www.jeavons.net.au/services.html
0 50 100
Nmetres
source: google maps 2015
marta elefterijadis|studio air
SITE MAP
chosen site:Clifton Hill railwaybridge
marta elefterijadis|studio air
SITE MODEL
chosen site:Clifton Hill railwaybridge
5 KEY REASONS FOR SITE CHOICE:
• Accessible to a wide range of people due
to proximity to main road, housing estates
and train stations.
• Already a widely used skate park on theother side of creek – wide exposure – and
may bring more from different target
audiences.
• Adversely, the specific areas on site to be
used have been underutilised unlike the
skate park.
• Opportunity to hang and anchor design
from many points of both the bridge andthe staircases/supporting structure.
• Opportunity to incorporate the built and
natural environments present on site.
marta elefterijadis|studio air
marta elefterijadis|studio air
Examples of various iterations of Green Void (left) andreverse engineering of Gridshell (right).
top related